Solicitation Amendment W912DS26BA0140004 SF 30.pdf

PDF 4 MB Posted

Attached to
Maintenance Dredging of NY & NJ Channels, Seguine/Ward/Outerbridge Reaches, Federal Navigation Project
Solicitation number
W912DS26BA014
Issued by

About this file

This is Amendment 0004 to solicitation W912DS26BA014, issued by the U.S. Army Corps of Engineers (USACE), New York District, on May 6, 2026. The amendment provides clarifications and responses to contractor inquiries regarding a dredged material placement project at the Historic Area Remediation Site (HARS).

The amendment addresses seven questions and answers concerning project specifications and requirements. Key clarifications include: the minimum depth restriction for placed dredged material is 50 feet; no specialized insurance is required beyond standard company general liability certificates; pre- and post-placement surveys at HARS are not required, though surveys will be conducted in dredging areas to determine total volume of material dredged; the 120-day acceptance period will remain unchanged to allow adequate time for administrative processing, evaluation, and funding allocation; and the project must be completed within 54 days of the Notice to Proceed, with the "Summer/Fall to Winter 2026" environmental window not extending this contract duration. The contractor was directed to updated specifications section 00 90 02 in amendment W912DS26BA014002 for the New York State Department of Environmental Conservation Water Quality Certification. The amendment was signed by Contracting Officer Matthew Lubiak on May 12, 2026, and does not extend the offer receipt deadline.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section 00 00 00 - Procurement and Contracting Requirements

The following changes have been made:

Miscellaneous text in this section has been modified to:

RFI Disclaimer

Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors "for information only" and do not revise the solicitation, plans or specifications.

Q7. Section 35 20 23,.10, Page 25, Part C, C2, in the Dredged Material Inspector Checklist states that "All water depths observed anywhere within the placement grid were at a depth of at least fifty

(50) feet.". Please confirm if there is a minimum depth restriction in the HARS in which placed material cannot exceed.

A7. The minimum depth restriction for placement of dredged material at the HARS should not exceed 50'.

Q8. Can USACE provide the insurance requirements for this project?

A8. This project does not require specialized insurance and therefore not included in the specifications document. As a result, the contractor should provide their company's general insurance certificates.

Q9. Please include a copy of the NYSDEC WQC or verify any anticipated measures that may differ from the NJDEP FCD so that the contractor can review conditions set forth in the certificate and ensure all compliance and cost impacts are considered before time of bid.

W912DS26BA0140004

A9. Please refer to updated specifications section 00 90 02 to see the NYSDEC WQC in amendment W912DS26BA014002.

Q10. Will a pre and post placement survey conducted by the contractor of the HARS site be required?

A10. Pre and post placement surveys at HARS are not required. Surveys will be conducted within dredging areas to determine total volume of material dredged.

Q11. A 120-day acceptance period for this project is very long considering planned NTP and project duration is all within this acceptance period. Could it be reduced to 60 days?

A11. No, the 120-day acceptance period will remain as stated in the solicitation. This duration is required to ensure adequate time for administrative processing, evaluation and funding allocation prior to award.

Q12. Stated under 1.2.1 Project Description, "The current Notice to Proceed (NTP) is scheduled for July. The work is anticipated to be performed with the approximate time period of summer/fall to winter 2026". However, duration of project is set to 54-days from NTP in the solicitation. Will the Contractor be required to complete the work by the end of August, as the solicitation states (based on the stated anticipated NTP), or will project completion in the fall be acceptable as stated in the specifications?

A12. The project must be completed within 54 days of the NTP. The "Summer/Fall to Winter 2026" language simply identifies the available environmental window for dredging operations and does not extend the 54-day contract duration.

W912DS26BA0140004

IDCode: J
Page: 1
Pages: 3
AmendNo: 0004
EffDate: 06 MAY 2026
ReqNo:
ProjNo: N/A
IssCode: W912DS
AdmCode:
IssuedBy: W2SD ENDIST NEW YORK

KO CONTRACTING DIVISION, 26 FEDERAL PLAZA ROOM 16 300

NEW YORK, NY 10278-0004

UNITED STATES

ADRIAN STAFFORD-BROWNE, EMAIL: ADRIAN.J.STAFFORD-BROWNE@USACE.ARMY.MIL TELEPHONE: 917-790-8087 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912DS26BA014
SolDate: 15 APR 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: The purpose of this amendment is to provided final responses to contractor inquiries.
ContNameTitle:
CoNameTitle: MATTHEW LUBIAK
ContDate:
CODate: 12 MAY 2026