Department of the Army
New York District
Corps of Engineers
26 Federal Plaza, RM 16-300
New York, NY 10278-0090
FY25 PN 106580 Building 110 Repairs – D-B RFP Phase 1 Watervliet, New York
U.S. Army Corps of Engineers, New York District
Contract No.: W912DS19D0012
Order No.: W912DS24F0100
Final Design-Build Request for Proposal
April 2025
Colby Company Engineer ing
TABLE OF CONTENTS - Page 1
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00 STATEMENT OF WORK
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 16.00 10 DESIGN DATA (DESIGN AFTER AWARD)
01 33 29 SUSTAINABILITY REQUIREMENTS AND
REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 10 FACILITY DATA REQUIREMENTS
01 91 00.15 BUILDING COMMISSIONING
01 91 19 BUILDING ENCLOSURE COMMISSIONING
APPENDICES
Appendix A – RFP Drawings
Appendix B – Hazardous Materials Reports
Appendix C – Reference Drawings
Appendix D – WVA Information for Contractors
Appendix E – Compressed Air Reference Material
Appendix F – Field Investigation Report / Existing Photos
-- End of Project Table of Contents –
TABLE OF CONTENTS - Page 2
SECTION 01 10 00
STATEMENT OF WORK
1.0 PROJECT DESCRIPTION
1.1. OBJECTIVES
1.2. SECTION ORGANIZATION
2.0 SCOPE
2.1. PHASE 1 REPAIR SUMMARY
2.2. PROJECT DESIGN
2.3. AMERICANS WITH DISABILITIES ACT (ADA) / ARCHITECTURAL BARRIERS ACT (ABA)
2.4. ANTITERRORISM AND FORCE PROTECTION REQUIREMENTS (AT/FP)
2.5. INSTALLATION DESIGN GUIDE/INSTALLATION PLANNING STANDARD
2.6. SUSTAINABLE DESIGN AND CONSTRUCTION
2.7. CYBERSECURITY
2.8. WORKFLOW PROCESS/PHASING
2.9. SPECIAL DESIGN CHALLENGES
2.10. BUILDING COMMISSIONING
2.11. SHPO DOCUMENTATION
3.0 EXISTING SITE DESCRIPTION
3.1. CONSTRUCTION PHASING, STAGING, AND CONTRACTOR ACCESS
3.2. DEMOLITION
3.3. LANDSCAPE DESIGN
3.4. MISCELLANEOUS REQUIREMENTS
4.0 APPLICABLE CRITERIA
4.1. INDUSTRY CRITERIA
4.2. MILITARY CRITERIA
5.0 FUNCTIONAL AND AREA REQUIREMENTS
TABLE OF CONTENTS - Page 3
5.1. PROJECT & DESIGN REQUIREMENTS
6.0 PROJECT SPECIFIC REQUIREMENTS
A10 FOUNDATIONS
B20 EXTERIOR ENCLOSURE
B30 ROOFING
C30 INTERIOR FINISHES
D20 PLUMBING
D30 HVAC
D40 FIRE PROTECTION
D50 ELECTRICAL
CHAPTER 1 - PROJECT DESCRIPTION - Page 1
1.0 PROJECT DESCRIPTION
This project is the first of three phases intended to extend the useful life of an approximately 150 year old building currently used for manufacturing and administration. The tasks for this phase primarily focus on improving the building’s envelope, with attention to the compressed air, steam distribution, domestic water, and fire protection systems, as well as perform abatement in way of the improvements.
1.1. OBJECTIVES
The Army's objective is that buildings have a 25-year useful design life before a possible reuse/re-purpose or renovation requirement, to include normal sustainment, restoration, modernization activities and a 40-year building replacement life. Therefore, design and construction should provide an appropriate level of quality to ensure continued use of the facility over that time-period with the application of reasonable preventive maintenance and repairs.
Site infrastructure will have at least a 40-year life expectancy with industry-accepted maintenance and repair cycles.
Requirements stated in this Contract are minimums. Innovative, creative, and life cycle cost effective solutions, which meet or exceed these requirements are encouraged. Further, the OFFEROR is encouraged to seek solutions that will expedite construction (panelization, pre-engineered, etc.) and shorten the schedule.
The Government’s intent is to emphasize the placement of funds into functional/operational requirements.
Materials and methods should reflect this by choosing the most economical Type of Construction allowed by code for this occupancy/project allowing the funding to be reflected in the quality of interior/exterior finishes
1.2. SECTION ORGANIZATION
This Section is organized under six major chapters.
Chapter 1 - Defines project objectives.
Chapter 2 - Describes the scope of the project.
Chapter 3 – Describes the site analysis.
Chapter 4 - Lists applicable industry and government design criteria, generally applicable to all facility types, unless otherwise indicated in the Section and is not an all-inclusive list. Other industry and government standards may also be used, where necessary to produce professional designs, unless they conflict with those listed.
Chapter 5 - Provides additional functional requirements.
Chapter 6 - Contains Army Standard Design Criteria, generally applicable to all facility types, installation and project specific criteria unless otherwise indicated in Section. Criteria in Chapter 6 follows industry standard ASTM Uniformat II.
CHAPTER 2 – PROJECT SCOPE - Page 1
2.0 SCOPE
The original construction of Building 110 Big Gun Shop (originally Sea Coast Gun Shop) occurred in 1888‐ 1892, with subsequent additions from 1917 to 1941. Building 110 is a 213,799 square foot industrial and manufacturing building. It hosts numerous manufacturing processes in a partial 2‐story, red brick, modified rectangular plan, 1245 feet in length, and 125 feet wide (except where widened by 1‐story, brick annexes).
Recent exterior improvements include roofing, fenestration and doors on the East and West elevations, which completed construction in 2015. Subsequently, fenestration and doors along the North and South elevations were replaced, completing construction around 2020. Additional recent improvements include a new fire sprinkler system including fire pumps, replacement of all lighting fixtures throughout and associated wiring leading to and from the lighting panels, as well as exhaust fans and wiring, and lighting load center(s). The scope for Phase I is summarized below:
Base Bid
• Substructure o Patch and Level Existing Select Portions of Concrete Slab
• Shell o Exterior Brick Repair o Replacement of Exterior Doors and Door Hardware o Insulated Metal Panel Replacement at North and South Elevations of Center Bay o Roof System Replacement (20% of Roof Area)
• Interiors (Main Bay Area – Excluding Offices/Labs) o Interior Window Refurbishment o Interior Brick Repair and Cleaning o Replacement of Signage
• Services o Compressed Air System Repairs and Upgrades o Domestic Water Repairs o Steam Distribution System Repairs o Fire Suppression System Repairs o Electrical Repairs in Support of System Upgrades/Repairs
• Special Construction and Demolition (See various sections for details) o Demolition to Support Repair Work o Abatement of Hazardous Materials to Support Repair Work
WVA to remove materials and equipment from all surfaces requiring abatement in order to provide work area for the contractor.
o Sustainability Requirements in Support of Phase 1 Repairs
Phase I also includes the following bid option items which are to be fully included or in part as dictated by funding:
• Replacement of Mezzanine Wood Plank Decking
• Ladder and Crane Rail Repairs
• Additional Brick Repairs
• Fin Tube Repairs and Abatement
• Converting Plywood Wall Partitions to Metal Partitions
• Truss Replacement
• Purlins in way of Trusses
• Interior Painting Identified surfaces below the ceiling Ceiling
• Interior Painting on 2nd and 3rd Shift
CHAPTER 2 – PROJECT SCOPE - Page 2
2.1. PHASE I REPAIR SUMMARY
2.1.1. Substructure
The scope for this project includes localized floor slab repairs. Several areas of the first floor slab are infilled with upturned wood blocking and brick. The wood in these locations, estimated to comprise approximately 5% of the first floor slab area and at an estimated fifteen (15) locations throughout the facility, must be removed and replaced with concrete slab infill doweled into the surrounding slab to prevent differential settlement.
Localized geotechnical exploration is required to verify that a concrete substrate is present beneath the wood infill and to determine the sub grade condition. It is assumed based on record drawings concrete exists below this wood infill. A high strength, high impact, abrasion resistant topping or epoxy coating is required at replaced slab areas to match adjacent conditions and finish. This topping must be compatible with the concrete substrate. For reference, at the previously executed Paint Booth project, 4 concrete core samples were extracted from the existing slab on grade. Unit strength values ranged from 2,660 psi to 8,872 psi and slab thickness varied between 6” and 10” at the sampled locations. Core locations and results are included in Appendix F for reference.
2.1.2. Shell
The scope for this project includes masonry repointing, repair, and cleaning. Repoint improperly pointed mortar joints throughout the building exterior using a compatible (color, composition, and low-strength) mortar.
A mortar analysis of existing mortar by the contractor is required to establish its constitutive properties and to ensure that the replacement mortar is truly compatible. Repoint deteriorated mortar joints, replace damaged units, clean bricks to remain, and apply compatible coating over the first 4 feet up from grade at the exterior and at interior overhead doors in splash zones exposed to de-icing chemicals. Fill abandoned anchor holes in exterior and brick walls with mortar. Clean exterior masonry staining and efflorescence. Clean interior masonry surfaces of efflorescence, peeling and incompatible paint, and dirt buildup. Finish with compatible coating.
Replace exterior doors, transoms, and rolling overhead service doors that are approaching end of service life, targeting a minimum 30% improvement above ASHRAE 90.1-2019 thermal performance requirements.
Personnel doors and transom glazing is recommended to be replaced with new insulated doors, double pane glazing with a low-e coating, and thermally broken aluminum frames. Damaged sections of overhead doors should be replaced. Install new sill gaskets and patch slabs at door sills to create a weather-tight assembly.
Glazing exterior building elements must provide no less than 1/4-inch. nominal polycarbonate or laminated glass in accordance with UFC ATFP requirements.
Scope also includes reinstatement of truss anchors and braces as required to comprise a complete lateral load path; localized roof deck repairs; and localized truss reinforcement in support of new roof insulation, if required. At the East and West Annex roof trusses, reinstate missing lateral cross bracing under roof truss top chords to provide a consistent, coherent path for lateral loads. Repair details required must be developed during the design phase.
Repair the gray TPO membrane roof in select areas with observed water staining and water damage, approximately 20% of the roof area will require repair as shown on the RFP drawings. The insulation thicknesses must match existing adjacent for a uniform roofing system. Seal and solder existing brake metal coping and repaint to match existing finish and color. All gasketed sealants between coping and brickwork will be replaced in areas impacted by roof repairs. Roof areas replaced must transition to the existing adjacent insulation system to allow for a smooth transition between the existing and new roof systems.
New roof areas must be installed to transition to existing roof areas. New roofing material must be physically and chemically compatible with the existing substrate.
Areas of unsound wood deck must be replaced in kind, comprising approximately 5% of the roof area.
CHAPTER 2 – PROJECT SCOPE - Page 3
As part of the base bid scope, the Contractor’s A/E Designer of Record (Structural PE) must perform additional inspection of wood roof trusses, particularly the top chords, to provide formal recommendations for repair or replacement of deteriorated members. Refer to the D-B RFP appendix F for general truss locations and descriptions. A report must be submitted to the Contracting Officer identifying the investigations conducted, results of investigations, and recommendations.
Refer to the bid option summary below for the items and quantities to be included which will be evaluated as part of the recommendation report.
Bid Options
Roof Truss Repair – Truss Replacement: A unit rate assuming five wood top cord members for replacement is included in the bid schedule.
Roof Truss Repair – Purlins in Way of Truss Repair: A unit rate assuming 235 wood purlins for replacement is also included in the bid schedule.
Mezzanine Repairs - Localized popped knots and trip hazards along the length of the mezzanine must be replaced in kind to provide a safe, level walking surface. A line item is included in the bid schedule for full replacement of 2x tongue and groove decking is included in the bid schedule.
Ladder and Crane Rail Repairs - Replace all wooden catwalks, stair treads, and gantry crane platforms with steel grating. Install a new top rail, welded onto the crane cab railings, to correct the railings that are currently too low to meet OSHA requirements. Replace damaged ladders with new steel ladders and remove all obstructions. Replace or reconfigure existing ladders such that the OSHA required clearances and construction method/ladder type are met.
2.1.3. Interiors
Replace deteriorated and missing brick units at the interior to restore the original solid structural cross-sections throughout as identified in the RFP drawings.
Installation of daylighting measures to reduce solar heat gain and reduce HVAC loads are required, including the following:
A solar control film on existing windows and glazing
Replace signage throughout the building. The perimeter of pits must be re-striped after necessary slab repairs. Appropriate signage at all exit doors and fire extinguisher locations must be provided. Existing, misleading, or abandoned in place life safety and hazard signage must be replaced with permanent fixed signage, including any faded or paper signs. Where programming has changed, floor markings must be updated to delineate walking paths from work areas.
Generally, all interior surfaces of the building (floors, ceilings, walls, columns, and windows) require a thorough cleaning in accordance with historic preservation standards and this work is separated between base bid and options. The base bid includes a coating to be provided on the inside face of the brickwork in order to allow the envelope to dry out. It is critical to note that improper selection of coating materials may lead to moisture getting trapped in the wall assembly, resulting in possible degradation of the brickwork.
Damaged brick walls and deteriorated sections of concrete floor slab must be patched. Floor slabs must be sealed and painted, including re-striping of pedestrian circulation pathways. The existing interior windows that are identified for repair contain lead based paint and will require abatement. Limited localized painting will be required at the column base repair locations. If the bid option for painting below the ceiling surfaces is not exercised, this is the only instance where painting and encapsulation will be acceptable at these areas of repair. Painting must encompass the repair area and 2’ above and below (or to the existing slab) the repair area to match the existing adjacent surface.
CHAPTER 2 – PROJECT SCOPE - Page 4
All inclusive, the base bid and bid options listed below represent a comprehensive cleaning of all surfaces, abatement of all lead based paint, and painting for 100% of the building area.
Bid Options
Painting Below Ceiling – All below ceiling areas not included in the base bid must be cleaned, abated of lead based paint, and coated. Existing paint that is flaking and peeling on the interior brickwork must be abated excluding areas already included in the base scope. Surfaces must be re-coated in accordance with historic preservation standards.
Painting Ceiling – All ceiling areas including roof deck and exposed steel not included in the base bid must be cleaned, abated of lead based paint, and coated. Surfaces must be re-coated in accordance with historic preservation standards.
Perform Interior work on 2nd & 3rd Shift – Work includes the painting of below ceiling areas and painting of ceiling encompassing the two bid options above on the 2nd and 3rd shift in lieu of performing the work on the 1st shift. All interior painting work as part of the base bid and other bid options are not included in this option and will be performed during normal working hours.
2.1.4. Services
This project proposes removal of all B110 steam and condensate piping systems and providing new piping, pressure reducing stations, valves, fittings, and condensate receivers and pumps that meet the Watervliet Standards Reference for Design and applicable codes. Objectives for the HVAC design include renewing infrastructure.
All steam and condensate mains and distribution piping must be replaced as shown on the RFP drawings.
The project must provide all new compressed air driven condensate return pumps. The project must provide all new steam pressure regulating stations to match existing pressures. Some of the abandoned equipment must be removed including the cooling tower, gas-fired air compressor and associated tanks and piping.
A new air compressor must be provided and the existing air compressor must be removed and replaced. The compressed air distribution piping must be replaced as well. New drops must be installed per the information provided in Appendix E. Refer to the drawings for number and locations of drops. This system must be tied into the campus compressed air system as it is presently.
The building’s non-potable water system must be removed and replaced. A backflow preventer must be installed where the non-potable water connects to the building's domestic cold water system. New distribution piping must be installed throughout the facility. Refer to the drawings for number and locations of drops.
The fire protection scope of work for Phase 1 will address sprinkler pipework located above electrical panels.
The preaction sprinkler systems will be provided with nitrogen gas supervision. The fire protection scope of work will also remove the existing manual dry standpipe system and provide a new Class I manual wet standpipe system with hose stations throughout the manufacturing area.
Fire protection work must be coordinated in accordance with the impairment requirements of NFPA 1 and NFPA 241. A fire watch or other mitigation measures for system impairments must be provided as required by NFPA 25 section 15.5 and NFPA 72 section 10.21 and as approved by USACE.
Remove existing electrical circuits to mechanical equipment that is being removed. This includes an abandoned cooling tower, an abandoned gas-fired air compressor and the existing operational air compressor. The circuits will be removed completely back to their energizing source. Circuit breakers will be left in place and labeled as spares.
A new dedicated circuit will be installed for an air compressor to be installed. Additional circuits will be added as required for new motorized overhead doors throughout the building and the new nitrogen generators for
CHAPTER 2 – PROJECT SCOPE - Page 5 the updated preaction fire sprinkler systems. The exact panelboards that will be utilized for the circuits will be determined by the design build contractor. A power study must be performed to verify capacity for the new loads.
Bid Option
Fin Tube Repairs - Various fin tube radiator sections have been previously removed or are in deteriorating condition. A unit cost assuming the installation of eight replacement fin tube radiator sections with pipe insulation is included as a bid option. Each section is approximately 12 feet in length and the piping contains four elbows. The elbows require the removal of asbestos containing insulation and abatement of this insulation must be included as part of the bid option.
2.2. PROJECT DESIGN
Provide overall project design per Section 01 33 16.00 10, Design Data (Design After Award). The Contractor’s Designer of Record (DOR) is responsible for continuing the development of the schematic design documents located in Appendix A RFP Drawings based on the criteria in the DBRFP. CAD drawings will be provided to the Contractor at project award which can be used at the Contractor’s risk.
2.2.1. Site Design
Project site is located within the existing Building 110 in the Watervliet Arsenal, Watervliet, NY. Project design and construction must consider proximity to active roadways and the buildings in the vicinity of the project. All buildings will maintain operations throughout the construction duration.
2.2.2. Building Designs
Contractor and Contractor’s Designer of Record must be responsible to provide oversight, inspection and overall project coordination throughout. Design and construction approvals are required through review, comment, resolution, and concurrence by the Government.
Design Submittals must be in accordance with Design Submittal Procedures in the Specifications, and other sections of this RFP. Delegated designs and proprietary materials specified in design documents must comply with DOD regulations.
2.3. AMERICANS WITH DISABILITIES ACT (ADA) / ARCHITECTURAL BARRIERS ACT (ABA)
Provide barrier-free design in accordance with UFC 1-200-01 , DoD Building Code (General Building Requirements).
2.4. ANTITERRORISM AND FORCE PROTECTION REQUIREMENTS (AT/FP)
Facility has an occupancy designated as low occupancy and UFC 4-010-01 does not apply. The provisions of UFC 4-010-01 are not required to be followed as per section 1-6.2.1: project renovation costs do not exceed 50% of the replacement value. The building is not required to meet the progressive collapse avoidance standards of UFC 4-010-01 because occupant access to the third floor is prevented.
Facility is within a controlled perimeter.
Facility minimum standoff distance zero feet from parking and roadways.
2.5. INSTALLATION DESIGN GUIDE / INSTALLATION PLANNING STANDARD
The installation design guides will be provided to the Contractor following the award of the contract.
CHAPTER 2 – PROJECT SCOPE - Page 6
2.6. SUSTAINABLE DESIGN AND CONSTRUCTION
Design and construct project to comply with sustainability requirements identified in Section 01 33 29, Sustainability Requirements and Reporting. Additional specific sustainability requirements are found in RFP Chapter 6 sections.
Design and construct project in accordance with UFC 1-200-02, High Performance and Sustainable Building Requirements.
2.6.1. Energy Efficiency
Incorporate energy efficiency in accordance with UFC 1-200-02, High Performance and Sustainable Building Requirements.
2.7. CYBERSECURITY
Provide all Facility-Related Control Systems (FRCS) in accordance with UFC 4-010-06 Cybersecurity of Facility-Related Control Systems (latest edition as of contract award), individual Facilities Engineering Command (FEC), and Installation implementation policy.
These types of systems include but are not limited to: Utility Monitoring and Control System (UMCS\EMCS\HVAC) and Fire Alarm Mass Notification (FA\MNS). Determine the FRCSs involved. Provide a complete list to the Government as required in the design phases for approval.
Provide all designer submissions and deliverables as outlined in UFC 4-010-06. Provide a fully tailored Unified Facility Guide Spec 25 05 11 (UFGS 25 05 11) for each FRCS identified. Ensure the latest DoD, Component, and installation’s policies and guidance are met for the requirements. Submit documentation required in accordance with the UFC for all FRCS. All design submittals and deliverables must be reviewed and approved by the Government at all stages of the design. All required construction submittals must be submitted and approved per the approved Unified Facility Guide Specs for each FRCS.
Interface with the Base System Owner (SO) for each system via COR\RFI to define existing system requirements, Confidentiality Integrity Availability (CIA) Impact Ratings, transport cybersecurity requirements (existing enclave, standalone, etc.), existing authority to operate (ATO), local installation cyber-requirements and other items that may impact the security posture of the system or scope and level of work required.
The Contractor is not responsible for achieving an ATO for any of the FRCS systems, but must provide artifacts noted in the UFC and UFGS in support of the ATO effort.
2.8. WORKFLOW PROCESS/PHASING
Work performed to the exterior of the building is to be coordinated with the occupants to minimize disruption at entry points, but does not have a prescribed sequence. Work shall be sequenced in the manner that is most efficient and cost effective.
Work performed within the building, including the installation of windows and doors, shall be divided into three phases and performed on first shift with emphasis on minimizing the impact to the occupants and operations.
See Appendix A.
All work associated with the steam system is to start after April 30th and be completed by September 30th.
2.8.1. Operation
Building 110 will be in operation during the execution of the project and access will be maintained to the building for personnel including parking areas and walkways. All efforts shall be made to minimize impact to the occupants and operations of the facility. This includes coordinating the replacement of the steam system to be between May and September.
CHAPTER 2 – PROJECT SCOPE - Page 7
2.9. SPECIAL DESIGN CHALLENGES
The Contractor must understand that operational performance of the existing building must remain uninterrupted throughout project duration. This includes coordinating the replacement of the steam system to start no sooner than May and return to operation by October.
2.10. BUILDING COMMISSIONING
Provide commissioning to meet requirements identified in Section 01 91 00.15 Building Commissioning, and UFC 1-200-02 High Performance and Sustainable Building Requirements.
2.11. SHPO DOCUMENTATION
Provide supporting documentation to the WVA Cultural Resources and Environmental team to support the SHPO consultation required for the project. The SHPO consultation effort will include engagement from the Contractor A/E team for review and input from SHPO. The SHPO consultation requirements must be reviewed at the project kickoff meeting and documentation included in each design submittal.
CHAPTER 3 – SITE ANALYSIS- Page 1
3.0 EXISTING SITE DESCRIPTION
The original construction of Building 110 Big Gun Shop (originally Sea Coast Gun Shop) occurred in 1888‐1892, with subsequent additions from 1917 to 1941. Building 110 is a 213,799 square foot industrial and manufacturing building. It has a partial 2‐story, red brick, modified rectangular plan, 1,245 feet in length, and 125 feet wide (except where widened by 1‐story, brick annexes). The building is qualified as contributing to the historic Watervliet Arsenal district listed on the National Register of Historic Places.
Building 110 hosts numerous manufacturing processes. Ceilings in production areas are open to the underside of roof structure with top of roofs ranging from 35 to 117 feet high. The main interior production room includes a bridge crane on an independent structural steel frame extending the length of the building. The center of the building contains a high central bay, a former shrink pit and rail access into the building. The lower ceiling annexes have overhead cranes running in portions of the spaces. A small two-story area occurs toward the center on the west side of B110 and houses IT/Communications equipment in a secured server room on the first floor, break room on the first floor, and offices on the second floor.
Materials and finishes are typical of office space including painted gypsum drywall partitions, carpeting, vinyl tile and suspended acoustical ceilings. The second-floor offices are accessed by a single stair and are not currently occupied. A small three-story area occurs in the center and on the east side of B110.
Recent exterior improvements include roofing, fenestration and doors on the East and West elevations, which completed construction in 2015. Subsequently, fenestration and doors along the North and South elevations were replaced, completing construction around 2020. Additional recent improvements include a new fire suppression system including fire pumps, replacement of all lighting fixtures throughout and associated wiring leading to and from the lighting panels, as well as exhaust fans and wiring, and lighting load center(s).
3.1. CONSTRUCTION PHASING, STAGING, AND CONTRACTOR ACCESS
The following requirements are in addition to the requirements identified in Specification 01 14 00 – Work Restrictions and Specification 01 50 00 – Temporary Construction Facilities and Controls. The existing operations within Building 110, parking, and loading areas must be operational during construction. The Contractor must consider any phasing aspects during the refurbishment in order to maintain all on-going operations to the maximum extent practicable, including but not limited to pavement construction, utilities, fencing, and other equipment operations.
The Contractor staging and trailer areas must be contained within the project limits and must minimize the impact to the existing buildings and existing operations to the maximum extent practicable. Areas to be utilized must be included in design documents and approved by the Government. Security of the site is the Contractor’s responsibility and fencing (permanent and/or temporary) must be installed at the Contractors discretion within the project limits or portions thereof. Any areas disturbed by the Contractor’s staging areas not part of the refurbishment project must be stabilized against erosion and restored with top soil and seeded per landscape paragraphs herein and in accordance with New York State Department of Environmental Conservation (NYSDEC) requirements. Any pavement areas damaged during construction must be repaired at the Contractor's expense to the satisfaction of the Contracting Officer. Staging of equipment, soil stockpile, and other material must not be placed within 5 feet from any existing tree drip line.
Contractor access must be coordinated with and approved by the Contracting Officer and all Contractor and Sub-Contractor related vehicles must strictly adhere to the approved construction access route.
CHAPTER 3 – SITE ANALYSIS- Page 2
3.2. DEMOLITION
Some minor demolition is required for this project.
All existing utilities to remain on the site must be protected during the demolition and construction process. Any damage must be immediately repaired to the satisfaction of the Contracting Officer in accordance with the utility owner’s requirements at the Contractor’s expense. Utility lines not in use or abandoned as the result of construction must be completely removed to the project limits as shown on the RFP drawings or capped at the main distribution. See the electrical and mechanical portion of the RFP for their respective demolition requirements. A detailed demolition plan must be developed and submitted per Section 01 33 16.
Disposal must be in accordance with the federal, state, and local regulations. Notify the Contracting Officer if any material to be disposed of is found to contain hazardous, toxic, biological, or radiological substances. Rubbish and debris must be removed from Government property promptly to avoid accumulation at the project site.
3.2.1. Erosion and Sediment Control and Stormwater Management
Refer to Specification 01 57 19 – Temporary Environmental Controls for requirements.
3.3 LANDSCAPE DESIGN
3.3.1 Overall Landscape Design
No landscape design is anticipated with this project other than the re-establishment of some grass areas.
3.4 MISCELLANEOUS REQUIREMENTS
Requirements stated in this RFP are minimums. Innovative, creative, and life cycle cost effective solutions, which meet or exceed these requirements are encouraged. Any work that is shown elsewhere in this RFP (Drawings, Specifications) that are not covered in the written part of the RFP is nonetheless the responsibility of the Contractor. In addition, it must be distinctly understood that the failure to mention specifically any work which would normally be required to complete the Project does not relieve the Contractor of their responsibility to perform such work.
CHAPTER 4 – APPLICABLE CRITERIA – Page 1
4.0 APPLICABLE CRITERIA
Although a specific document version or date may be indicated, use criteria from the most current references, including any applicable addenda, unless otherwise stated in the contract or task order, as of the date of the Contractor’s latest accepted proposal or date of issue of the contract or task order solicitation, whichever is later. In the event of conflict between References and/or Applicable Military Criteria, apply the most stringent requirement, unless otherwise specifically noted in the contract or task order.
4.1. INDUSTRY CRITERIA
Applicable design and construction criteria references are listed in Table 1 below. This list is not intended to include all criteria that may apply or to restrict design and construction to only those references listed.
References cited herein are not necessarily incorporated in their entirety. Refer to specific design requirements established in Paragraph 6 for applicability extents or limits. Refer also to Paragraph 2 for additional facility-specific applicable criteria.
Table 1: Industry Criteria
Air Conditioning, Heating, and Refrigeration Institute (AHRI)
ANSI/AHRI/CSA 310/380 Standard for Packaged Terminal Air-Conditioners and Heat Pumps (CSA-C744-04)
ANSI/AHRI 430 Central Station Air Handling Units
ANSI/AHRI 440 Performance Rating of Room Fan-Coils
ANSI/AHRI 880 Performance Rating of Air Terminals
Air Movement and Control Association (AMCA)
ANSI/AMCA 210
ANSI/ASHRAE 51-07
Laboratory Methods of Testing Fans for Certified Aerodynamic Performance Rating
American Architectural Manufacturers Association (AAMA)
AAMA 605.1-75 Specification for High Performance Organic Coatings on Architectural Extrusions and Panels
AAMA 607.1-77 Voluntary Guide Specifications and Inspection Methods for Clear Anodic Finishes for Architectural Aluminum
CHAPTER 4 – APPLICABLE CRITERIA – Page 2
AAMA 1503-09 Voluntary Test Method for Thermal Transmittance and Condensation Resistance of Windows, Doors, and Glazed Wall Sections
American Bearing Manufacturers Association (ABMA)
AFBMA 9:1990 (R2008) Load Ratings and Fatigue Life for Ball Bearings
AFBMA 11:1990 (R2008) Load Ratings and Fatigue Life for Roller Bearings
American Boiler Manufacturers Association (ABMA)
Comparison of Fatigue Assessment Techniques for Heat Recovery Steam Generators
Determining and Testing Boiler Efficiency for Commercial/Institutional Packages Boilers
Specification Design Life Requirements and Implications Relative to Boilers
Steam Source Book
American Concrete Institute
ACI 302.2R-06 Guide for Concrete Slabs that Receive Moisture-Sensitive Flooring Materials
ACI 315 Details and Detailing of Concrete Reinforcement
ACI 318-19 Building Code Requirements for Structural Concrete and Commentary
ACI 355.2 Qualification of Post-Installed Mechanical Anchors in Concrete
CHAPTER 4 – APPLICABLE CRITERIA – Page 3
ACI 355.4 Acceptance Criteria for Qualification of Post-Installed Anchors in Concrete
ACI SP-66 (04) ACI Detailing Manual
American Institute of Steel Construction (AISC)
AISC 201 AISC Certification Program for Structural Steel Fabricators
AISC 303 Code of Standard Practice for Steel Buildings and Bridges
AISC 325 Steel Construction Manual
AISC 341 Seismic Design Manual
AISC 360 Specification for Structural Steel Buildings
AISC DESIGN GUIDE 10 Erection Bracing of Low-Rise Structural Steel Buildings
American Iron and Steel Institute (AISI)
AISI D100 Cold-Formed Steel Design Manual
AISI S100 North American Specification for the Design of Cold-Formed Steel Structural Members
American National Standards Institute (ANSI)
ANSI/IEEE C2 National Electrical Safety Code
American Society of Civil Engineers (ASCE)
ASCE/SEI 7-16 Minimum Design Loads for Buildings and Other Structures
CHAPTER 4 – APPLICABLE CRITERIA – Page 4
American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE)
ASHRAE Guideline 0 The Commissioning Process
ASHRAE Guideline 1.1 HVAC&R Technical Requirements for The Commissioning Process
ASHRAE Standard 15 Safety Standard for Refrigeration Systems
ASHRAE Standard 55 Thermal Environmental Conditions for Human Occupancy
ASHRAE Standard 62.1 Ventilation for Acceptable Indoor Air Quality
ASHRAE Standard 90.1 ANSI/ASHRAE/IES 90.1, Energy Standard for Buildings Except Low-Rise Residential Buildings
ASHRAE Standard 135 BACnet – A Data Communication Protocol for Building Automation and Control Networks
ASHRAE Standard 189.1 Standard for the Design of High-Performance Green Buildings (ANSI Approved; USGBC and IES Co- sponsored)
American Society of Mechanical Engineers International (ASME)
ASME B31 (Series) Piping Code Series, Various Dates (Current Versions)
ASME BPVC, Section VII Boiler and Pressure Vessel Code: Section VII, “Care of Power Boilers”
American Water Works Association (AWWA)
AWWA Standards: Full Set of Standards
American Welding Society (AWS)
CHAPTER 4 – APPLICABLE CRITERIA – Page 5
WHB Welding Handbook
AWS D1.1 Structural Welding Codes – Steel
AWS D1.8 Structural Welding Code – Seismic Supplement
American Wood Council (AWC)
ANSI/AWC NDS National Design Specification (NDS) for Wood Construction with Commentary
Architectural Woodwork Institute (AWI)
Architectural Woodwork Standards
Association for Materials Protection and Performance (AMPP)
NACE-SP0169 Control of External Corrosion on Underground or Submerged Metallic Piping Systems
NACE-SP0185 Extruded Polyolefin Resin Coating Systems with Soft Adhesives for Underground or Submerged Pipe
NACE-SP0286 Electrical Isolation of Cathodically Protected Pipelines
SSPC-QP 1 Society for Protective Coatings certification for an industrial painter’s ability to apply coatings to complex industrial and marine coatings.
SSPC-QP 2, Category “A” Society for Protective Coatings certification for industrial paint contractors that demonstrates their ability to safely remove hazardous paint using negative air containment.
SSPC-QP 3 Society for Protective Coatings certification standard that evaluates one’s ability to apply protective coatings and prepare surfaces in a shop facility.
CHAPTER 4 – APPLICABLE CRITERIA – Page 6
SSPC QP-5 Society for Protective Coatings accreditation program that evaluates the quality of inspection companies that work in the industrial coating and lining industry.
ASTM International
ASTM A123 Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM C1060-11a Standard Practice for Thermographic Inspection of Insulation Installations in Envelope Cavities of Frame Buildings
ASTM E779-10 Standard Test Method for Determining Air Leakage Rate by Fan Pressurization
ASTM E1300-12 Standard Practice for Determining Load Resistance of Glass in Buildings
ASTM E1827-11 Standard Test Methods for Determining Airtightness of Buildings Using an Orifice Blower Door
ASTM F2248-12 Standard Practice for Specifying an Equivalent 3-Second Duration Design Loading for Blast Resistant Glazing Fabricated with Laminated Glass
ASTM F2912-11 Standard Specification for Glazing and Glazing Systems Subject to Airblast Loadings
Builders Hardware Manufacturers Association (BHMA)
ANSI/BHMA A156 Series ANSI/BHMA A156 Series Standards, Various Dates (Current Versions)
Building Industry Consulting Service International
Telecommunications Distribution Methods Manual
CHAPTER 4 – APPLICABLE CRITERIA – Page 7
Outside Plant Design Reference Manual
Code of Federal Regulations (CFR)
49 CFR 192 Transportation of Natural and Other Gas by Pipeline:
Minimum Federal Safety Standards
10 CFR 430 Energy Conservation Program for Consumer Products
Consumer Electronics Association (CEA)
CEA 709.1-C (ANSI) Control Network Protocol Specification
CEA 709.3 R (ANSI) Free-Topology Twisted-Pair Channel Specification
CEA 852-B (ANSI) Tunneling Device Area Network Protocols Over Internet Protocol Channels
Institute of Electrical and Electronics Engineers (IEEE)
IEEE/ASTM SI_10 American National Standard for Metric Practice
IEEE Standard 1100 IEEE Emerald Book: IEEE Recommended Practice for Powering and Grounding Electronic Equipment
International Building Code (IBC)
IBC: 2021 International Building Code
International Organization for Standardization (ISO)
ISO 6781 Qualitative Detection of Thermal Irregularities in Building Envelopes – Infrared Method
CHAPTER 4 – APPLICABLE CRITERIA – Page 8
LonMark International (LonMark)
LonMark Interoperability Guidelines
LonMark Resource Files (LMRFs)
Metal Building Manufacturers Association (MBMA)
MBMA MBSM Metal Building Systems Manual
Midwest Insulation Contractors Association (MICA)
National Commercial and Industrial Insulation Standards Manual, 7th Edition
National Environmental Balancing Bureau (NEBB)
PST-TAB-2005 Procedural Standards for Testing, Adjusting, and Balancing of Environmental Systems
National Fire Protection Association (NFPA)
NFPA 01 Fire Code
NFPA 03 Standards for Commissioning of Fire Protection and Life Safety Systems
NFPA 04 Standard for Integrated Fire Protection and Life Safety System Testing
NFPA 10 Standard for Portable Fire Extinguishers
NFPA 13 Standard for the Installation of Sprinkler Systems
CHAPTER 4 – APPLICABLE CRITERIA – Page 9
NFPA 14 Standard for the Installation of Standpipe and Hose Systems
NFPA 17 Standard for Dry Chemical Extinguishing Systems
NFPA 20 Standard for the Installation of Stationary Pumps for Fire Protection
NFPA 24 Standard for the Installation of Private Fire Service Mains and Their Appurtenances
NFPA 25 Standard for the Inspection, Testing And Maintenance of Water- Based Fire Protection Systems
NFPA 30 Flammable and Combustible Liquids Code
NFPA 31 Standard for the Installation of Oil-Burning Equipment
NFPA 33 Standard for Spray Application Using Flammable or Combustible Materials
NFPA 51B Standard for Fire Prevention During Welding, Cutting, and Other Hot Work
NFPA 54 National Fuel Gas Code
NFPA 58 Liquefied Petroleum Gas Code
NFPA 70 National Electrical Code
NFPA 70E Standard for Electrical Safety in the Workplace
NFPA 72 National Fire Alarm and Signaling Code
NFPA 75 Standard for the Fire Protection of Information Technology Equipment
CHAPTER 4 – APPLICABLE CRITERIA – Page 10
NFPA 76 Standard for the Fire Protection of Telecommunications Facilities
NFPA 80 Standard for Fire Doors and Other Opening Protectives
NFPA 90A Standard for the Installation of Air-Conditioning and Ventilating Systems
NFPA 91 Standard for Exhaust Systems for Air Conveying of Vapors, Gases, Mists, and Particulate Solids
NFPA 96 Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations
NFPA 101 Life Safety Code
NFPA 170 Standard for Fire Safety and Emergency Symbols
NFPA 241 Standard for Safeguarding Construction, Alteration, and Demolition Operations
NFPA 291 Recommended Practice for Fire Flow Testing and Marking of Hydrants
NFPA 780 Standard for the Installation of Lightning Protection Systems
NFPA 850 Recommended Practice for Fire Protection for Electric Generating Plants and High Voltage Direct Current Converter Stations
NFPA 855 Standard for the Installation of Stationary Energy Storage Systems
National Roofing Contractors Association (NRCA)
The NRCA Roofing Manual
Occupational Safety and Health Administration (OSHA)
CHAPTER 4 – APPLICABLE CRITERIA – Page 11
29 CFR 1926 Safety and Health Regulations for Construction
Plumbing and Drainage Institute (PDI)
PDI G101 Testing and Rating Procedure for Grease Interceptors
PDI WH201 Water Hammer Arrestors Standard
Precast Concrete Institute
PCI Design Handbook
Sheet Metal and Air Conditioning Contractors’ National Association (SMACNA)
HVAC Duct Construction Standards - Metal and Flexible
Architectural Sheet Metal Manual
HVAC Systems - Testing, Adjusting and Balancing
State & Local Regulations
State Specific Environmental Control Requirements
State Specific Sedimentation and Erosion Control Design Requirements
State Specific Storm Water Management Requirements
Steel Door Institute (SDI)
ANSI/SDI A250.8 (R2008) SDI-100 Recommended Specifications for Standard Steel Doors and Frames
CHAPTER 4 – APPLICABLE CRITERIA – Page 12
Steel Deck Institute (SDI)
SDI DDM04 Steel Deck Institute Diaphragm Design Manual, Fourth Edition
SDI RD Standard for Steel Roof Deck
SDI MOC3 Manual of Construction with Steel Deck, Third Edition
Steel Joist Institute (SJI)
SJI LOAD TABLES Catalogue of Standard Specifications Load Tables and Weight Tables for Steel Joists and Joist Girders
SJI MANUAL Open Web Steel Joist Construction
Telecommunications Industry Association (TIA)
TIA-568 Set Commercial Building Telecommunications Cabling Standard Set
TIA-569 Telecommunications Pathways and Spaces
TIA-606 Administration Standard for the Telecommunications Infrastructure
TIA-607 Generic Telecommunications Bonding and Grounding (Earthing) for Customer Premises, Edition B with Addendum
The Masonry Society
TMS 402/602 Building Code Requirements and Specification for Masonry Structures and Related Commentaries
TMS 1700-17 Guide for Condition Assessment of Masonry Facades
CHAPTER 4 – APPLICABLE CRITERIA – Page 13
Underwriters Laboratories (UL)
UL 96A Standard for Installation Requirements for Lightning Protection Systems
UL 300 Standard for Fire Testing of Fire Extinguishing Systems for Protection of Commercial Cooking Equipment
U.S. ACCESS BOARD
ADA/ABAAG Americans with Disabilities Act and Architectural Barriers Act Accessibility Guidelines, Excluded are:
(a) Facilities, or portions of facilities, on a military installation that are designed and constructed for use exclusively by able-bodied military personnel. (See Paragraph 3 for any reference to this exclusion).
(b) Reserve and National Guard facilities, or portions of such facilities, owned by or under the control of the Department of Defense, that are designed and constructed for use exclusively able-bodied military personnel. (See paragraph 3 for any reference to this exclusion).by
U.S. GREEN BUILDING COUNCIL (USGBC)
LEED v4 LEED Reference Guide for Green Building Design and Construction v4
4.2. MILITARY CRITERIA
The project shall conform to the following criteria. Certain design impacts and features due to these criteria are noted for the benefit of the offeror; however, all requirements of the referenced criteria will be applicable, whether noted or not, unless otherwise specified herein.
Table 2: Military Criteria
LAWS, POLICIES, REGULATIONS, AND OTHER CRITERIA
CHAPTER 4 – APPLICABLE CRITERIA – Page 14
ARMY REGULATIONS
AR 405-70
Utilization of Real Property
Administrative Space Criteria and Assignment Guidelines
EISA07 Energy Independence and Security Act of 2007
EO 12770
Metric Usage In Federal Government
(a) Metric design and construction is required except when it increases construction cost. Offeror to determine the most cost- efficient system of measurement to be used for the project.
ECB 2018-17 New Requirements for Visual Notification for Mass Notification Systems
EPACT05 Energy Policy Act of 2005 / Public Law 109-58
I3A
Technical Criteria for Installation Information Infrastructure Architecture (I3A)
(a) A copy of the I3A Criteria can be obtained by sending an email request to: detrickISECI3Aguide@conus.army.mil
PROTECTIVE DESIGN CENTER (PDC)
PDC TR 06-08 Single Degree of Freedom Structural Response Limits
PDC TR 10-02 Blast Resistant Design Methodology for Window Systems Designed Statically and Dynamically
UNIFIED FACILITIES CRITERIA (UFC)
UFC 1-200-01 General Building Requirements mailto:detrickISECI3Aguide@conus.army.mil
CHAPTER 4 – APPLICABLE CRITERIA – Page 15
(a) References to applicable International construction codes, such as: International Building Code (IBC), International Mechanical Code (IMC), International Residential Code (IRC), International Plumbing Code (IPC), and International Energy Conservation Code (IECC) are located within this UFC.
(b) Always utilize the latest edition of this document, regardless of references in this RFP or in other publications.
UFC 1-200-02 High Performance and Sustainable Building Requirements
UFC 1-300-07A Design Build Technical Requirements
UFC 3-101-01 Architecture
UFC 3-110-03 Roofing
UFC 3-120-01 Sign Standards
UFC 3-120-10 Interior Design
UFC 3-201-01 Civil Engineering
UFC 3-210-10 Low Impact Development
UFC 3-220-01 Geotechnical Engineering, UFC 3-250-01 Pavement Design for Roads and Parking Areas
UFC 3-250-03 Manual for Flexible Pavements
UFC 3-301-01 Structural Engineering
CHAPTER 4 – APPLICABLE CRITERIA – Page 16
UFC 3-320-06A Concrete Floor Slab on Grade Subjected to Heavy Loads
UFC 3-401-01 Mechanical Engineering
UFC 3-410-01 Heating, Ventilating, and Air Conditioning Systems
UFC 3-410-02 Direct Digital Control for HVAC and Other Building Control Systems
UFC 3-420-01 Plumbing Systems
UFC 3-430-01FA Heating and Cooling Distribution Systems
UFC 3-470-01 Utility Monitoring and Control System (UMCS) Front End and Integration
UFC 3-501-01 Electrical Engineering
UFC 3-520-01 Interior Electrical Systems
UFC 3-530-01 Interior and Exterior Lighting Systems and Controls
UFC 3-575-01 Lightning and Static Electricity Protection Systems
UFC 3-580-01 Telecommunications Interior Infrastructure Planning and Design
UFC 3-600-01 Fire Protection Engineering for Facilities
UFC 3-601-02 Fire Protection System Inspection, Testing and Maintenance
UFC 4-010-01 DoD MINIMUM ANTITERRORISM STANDARDS FOR
BUILDINGS
UFC 4-010-06 Cybersecurity of Facility-Related Control Systems (10 October 2023)
CHAPTER 4 – APPLICABLE CRITERIA – Page 17
UFC 4-021-01 Design and O&M: Mass Notification Systems
UFC 4-022-03 Security Fences and Gates
UFC 4-023-03 Design of…