About this file

This document is a mechanical site plan (HVAC Site Plan) for a repair project at Building 606 at the United States Military Academy, West Point, NY. The project is part of the FY2024 New York District construction efforts, with the contract number W912DS19C0034. The drawing (MS-100) provides a detailed site plan showing utility routing and piping connections, including chilled water supply/return (CHWS/R), high pressure steam (HPS), low pressure steam (LPS), and potential control (PC) piping. Key technical details include connecting 8-inch diameter pipes to existing valved and capped taps, heat tracing exposed piping, and demolishing and replacing piping in Steam Vault F4. The document emphasizes the importance of positive identification of fluid carrier piping and notes that utility routing is illustrative, with actual locations to be confirmed through civil drawings and on-site investigation.

View the file

Other files

File Type Posted
C-004_AM 9.pdf PDF
C-002_AM 2 and 9.pdf PDF
A-111_AM 7.pdf PDF
M-707_AM 7.pdf PDF
E-601_AM 7.pdf PDF
Solicitation Amendment W912DS25RA0020007 SF 30.pdf PDF
I-110_AM 6.pdf PDF
I-100.5_AM 6.pdf PDF
AD-103_AM 6.pdf PDF
A-105_AM 6.pdf PDF
A-319_AM 6.pdf PDF
H-107_AM 6.pdf PDF
H-109_AM 6.pdf PDF
H-101_AM 6.pdf PDF
H-105_AM 6.pdf PDF
H-100_AM 6.pdf PDF
H-106_AM 6.pdf PDF
M-607_AM 6.pdf PDF
S-323_AM 6.pdf PDF
S-303_AM 6.pdf PDF
S-103_AM 6.pdf PDF
05 40 00_AM 6.pdf PDF
33 63 13_AM 6.pdf PDF
MSEC- Building 606 - Amendment 6 - RFIs - 13 Oct 25.pdf PDF
Solicitation Amendment W912DS25RA0020006 SF 30.pdf PDF
A-551_AM 5.pdf PDF
MSEC- Building 606 - Amendment 4 - RFIs - 23 Sep 25.pdf PDF
A-601_AM 4.pdf PDF
Solicitation Amendment W912DS25RA0020004 SF 30.pdf PDF
HP802 - HVAC_PLUMBING_AND ELECTRICAL COORDINATION SCHEDULE_AM3.pdf PDF
E-618 - Panelboard Schedules_AM3.pdf PDF
01 91 19_AM3.pdf PDF
01 30 00_AM3.pdf PDF
C-101.pdf PDF
RFIs_MSEC_Amendment 2 _ 2 Sep 25.pdf PDF
Criteria and Factors for Evaluation_Basis of Award_Evaluation Criteria_Rating System_AM 2 revised.pdf PDF
E-513.pdf PDF
A-121.pdf PDF
07 60 00.pdf PDF
MSEC- Building 606 - Amendment 1 - RFIs - 20 Aug 25.pdf PDF
JA-002-25 Lutron Lighting Controls MSEC - 31 Jan 25 signedJF sDL rev. 1 -_Redacted.pdf PDF
JA-009-25 Semco Pinnacle DOAS MSEC - 31 Jan 25 signedJF sDL rev. 1_Redacted.pdf PDF
JA-005-25 DAS MSEC - 31 Jan 25 signedJF sDL -_Redacted.pdf PDF
JA-003-25 Shark Meter MSEC - 31 Jan 25 signedJF sDL -_Redacted.pdf PDF
Criteria and Factors for Evaluation_Basis of Award_Evaluation Criteria_Rating System.pdf PDF
W912DS19C0034 PN 94078 Repair Building 606 Revised RTA Drawings - Volume 2.pdf PDF
W912DS19C0034 PN 94078 Repair Building 606 Revised RTA Drawings - Volume 1.pdf PDF
W912DS19C0034 PN 94078 Repair Building 606 Revised RTA Drawings - Volume 4.pdf PDF
W912DS19C0034 PN 94078 Repair building 606 REV.RTA Specification Manual Volume 3.pdf PDF
W912DS19C0034 PN 94078 Repair building 606 REV.RTA Specification Manual Volume 1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHWS/R

TO CEAC

C H

W R

C H

W S

8" ø

8" ø

(E)10"Ø

CHWS/R

(E)8"Ø

CHWS/R

CONNECT 8"Ø CHWS/R TO

EXISTING VALVED AND

CAPPED TAPS. HEAT TRACE

EXPOSED PIPING.

REFER TO MP-100 FOR

CONTINUATION

REFER TO M-401 FOR

CONTINUATION

CHWS/R IS DIRECT

BURIED. REFER TO

DETAIL C7/M-504.

8" ø

4" ø

L P

S

H P

S

2-1/2" PC

DEMOLISH AND

REPLACE IN KIND.

CONNECT HPS (50), LPS,

& PC AT UNIONS IN

VAULT F4

PIPING DROPS

BELOW GRADE

STEAM

VAULT F4

D6

M-303

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

P R

O J E

C T

N O

Autodesk Docs://West Point Bldg 606/219208-WP606-M20.rvt

9/11/2025 9:57:45 AM

MS-100

M E

C H

A N

IC

A

L S

IT

E

P L A

N

U N

IT

E

D S

T A

T E

S M

IL

IT

A R

Y A

C A

D E

M Y

W

E S

T P

O

IN

T N

Y P

N

F

Y

N E

W Y

O R

K D

IS

T

R

IC

T A

K

A K

J F

M

A Y

W D

S C

E C

REV RTA SUBMISSION

R E

P A

IR

B

L D

G

G

E N

E R

A L I N

S T

R U

C T

IO

N

B L D

G

SCALE: 1/16" = 1'-0"A1

HVAC SITE PLAN

GENERAL NOTES:

1. UTILITY ROUTING ILLUSTRATED FOR INTENT PURPOSES ONLY. REFER TO SITE CIVIL DRAWINGS FOR

ACTUAL UTILITY LOCATIONS, ROUTING, AND ELEVATIONS.

2. POSITIVE DETERMINATION AND IDENTIFICATION OF FLUID PIPING SUCH AS STEAM, CHILLED WATER SUPPLY, CHILLED WATER RETURN, ETC. CARRIER PIPING OFTEN REQUIRES ACCESS TO CONFINED SPACES AND UNDERGROUND AREAS NOT VISIBLE UNTIL EXCAVATED OR NOT READILY ACCESSIBLE TO DESIGN PERSONNEL WHO ARE NOT TRAINED OR EQUIPPED TO SAFELY SURVEY THESE AREAS.

BEFORE CONNECTING PIPING IN THE FILED TO EXISTING SYSTEMS, CONTRACTORS USING PROPER

PPE AND WITH PROPER PERMITS AND EQUIPMENT TO ENTER OR UNCOVER THESE SPACES SHALL

IDENTIFY OR ASSIST ENGINEERS IN IDENTIFYING FLUID BEING CARRIED BY THE PIPES PRIOR TO

BEING CONNECTED TO NEW SYSTEMS.

A

D D

E N

D U

M

/1

/2

Sheets
MS-100 - MECHANICAL SITE PLAN

File details come from the government source that posted it. Updated .