MS-100_AM3.pdf
PDF 152 KB Posted
- Solicitation number
- W912DS25RA002
About this file
This document is a mechanical site plan (HVAC Site Plan) for a repair project at Building 606 at the United States Military Academy, West Point, NY. The project is part of the FY2024 New York District construction efforts, with the contract number W912DS19C0034. The drawing (MS-100) provides a detailed site plan showing utility routing and piping connections, including chilled water supply/return (CHWS/R), high pressure steam (HPS), low pressure steam (LPS), and potential control (PC) piping. Key technical details include connecting 8-inch diameter pipes to existing valved and capped taps, heat tracing exposed piping, and demolishing and replacing piping in Steam Vault F4. The document emphasizes the importance of positive identification of fluid carrier piping and notes that utility routing is illustrative, with actual locations to be confirmed through civil drawings and on-site investigation.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHWS/R
TO CEAC
C H
W R
C H
W S
8" ø
8" ø
(E)10"Ø
CHWS/R
(E)8"Ø
CHWS/R
CONNECT 8"Ø CHWS/R TO
EXISTING VALVED AND
CAPPED TAPS. HEAT TRACE
EXPOSED PIPING.
REFER TO MP-100 FOR
CONTINUATION
REFER TO M-401 FOR
CONTINUATION
CHWS/R IS DIRECT
BURIED. REFER TO
DETAIL C7/M-504.
8" ø
4" ø
L P
S
H P
S
2-1/2" PC
DEMOLISH AND
REPLACE IN KIND.
CONNECT HPS (50), LPS,
& PC AT UNIONS IN
VAULT F4
PIPING DROPS
BELOW GRADE
STEAM
VAULT F4
D6
M-303
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
P R
O J E
C T
N O
Autodesk Docs://West Point Bldg 606/219208-WP606-M20.rvt
9/11/2025 9:57:45 AM
MS-100
M E
C H
A N
IC
A
L S
IT
E
P L A
N
U N
IT
E
D S
T A
T E
S M
IL
IT
A R
Y A
C A
D E
M Y
W
E S
T P
O
IN
T N
Y P
N
F
Y
N E
W Y
O R
K D
IS
T
R
IC
T A
K
A K
J F
M
A Y
W D
S C
E C
REV RTA SUBMISSION
R E
P A
IR
B
L D
G
G
E N
E R
A L I N
S T
R U
C T
IO
N
B L D
G
SCALE: 1/16" = 1'-0"A1
HVAC SITE PLAN
GENERAL NOTES:
1. UTILITY ROUTING ILLUSTRATED FOR INTENT PURPOSES ONLY. REFER TO SITE CIVIL DRAWINGS FOR
ACTUAL UTILITY LOCATIONS, ROUTING, AND ELEVATIONS.
2. POSITIVE DETERMINATION AND IDENTIFICATION OF FLUID PIPING SUCH AS STEAM, CHILLED WATER SUPPLY, CHILLED WATER RETURN, ETC. CARRIER PIPING OFTEN REQUIRES ACCESS TO CONFINED SPACES AND UNDERGROUND AREAS NOT VISIBLE UNTIL EXCAVATED OR NOT READILY ACCESSIBLE TO DESIGN PERSONNEL WHO ARE NOT TRAINED OR EQUIPPED TO SAFELY SURVEY THESE AREAS.
BEFORE CONNECTING PIPING IN THE FILED TO EXISTING SYSTEMS, CONTRACTORS USING PROPER
PPE AND WITH PROPER PERMITS AND EQUIPMENT TO ENTER OR UNCOVER THESE SPACES SHALL
IDENTIFY OR ASSIST ENGINEERS IN IDENTIFYING FLUID BEING CARRIED BY THE PIPES PRIOR TO
BEING CONNECTED TO NEW SYSTEMS.
A
D D
E N
D U
M
/1
/2
| Sheets |
| MS-100 - MECHANICAL SITE PLAN |
File details come from the government source that posted it. Updated .