This document is an Amendment (Amendment 0006) to a federal solicitation for the Troy Lock (AFO) Mooring Pier project issued by the U.S. Army Corps of Engineers, New York District. The amendment extends the bid opening date to March 25, 2025, and provides responses to Request for Information (RFI) questions, including clarifications on painting requirements, geotechnical engineering responsibilities, ladder repairs, composite timber specifications, and joint venture eligibility. The project is a 100% Small Business Set-Aside with a NAICS code of 237990 and a project magnitude range between $1,000,000 and $5,000,000.

The solicitation involves repairing a mooring structure downstream of Troy Lock & Dam on the Hudson River, with work including replacing timber rubbing fenders with composite material, repairing ladders and metal grating, replacing concrete decks, repairing cell wall leaks, and clearing vegetation. All work will be performed via water access only, with careful consideration of the adjacent public boat launch. The contractor must obtain necessary federal, state, and local permits, with a performance period of approximately 365 calendar days. Bids are to be submitted to the U.S. Army Corps of Engineers Contracting Division, with all vendors required to be registered in SAM.gov prior to award.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this modification is to extend bid opening to 25 March 2025 and provide response to RFIs.

NOTE: Bidders must acknow ledge receipt of this amendment by the date specif ied in the solicitation (or as amended) by one of the follow ing methods: In the space provided on the SF1442, by separate letter, or by signing the block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE

MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Mar-2025

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS25B0001

X 9B. DATED (SEE ITEM 11)

02-Dec-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Mar-2025

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS25B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0006

Amendment No.006

To Bidders The following changes shall be made to the drawings and specifications.

DRAWINGS

1. The following DRAWINGS have been REVISED and REISSUED:

- S-001

- S-102

- S-202

2. The following DRAWINGS have been ADDED:

- None

3. The following DRAWINGS have been REVISED but NOT REISSUED:

- None

SPECIFICATIONS:

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

- None

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

- None

3. The following SPECIFICATION SECTIONS have been REVISED and REISSUED in their entirety:

- None

4. The following SPECIFICATION SECTIONS have been REVISED but NOT REISSUED:

REVISED SPECIFICATIONS:

Questions and Answers:

The following questions and answers are provided for information only. Nothing contained below amends or revises any provision of the solicitation.

This is for bidder’s reference only and is not to be considered as a part of the Contract Documents.

Contract award will be based on what is contained in the printed Plans and Specifications in a hard copy format or Electronic Bid Set if provided and as posted in the FBO.

RFI SET #2:

1. Please confirm that a painting contractor who is SSPC QP 1 certified is required to coat the 9 snubbing posts. This will add significant cost to this project.

a. The painter must be SSPC QP 1 certified.

2. Please confirm that the W12x58 fender support beams are to be galvanized and not painted.

a. Yes, Beams will be galvanized

6. Amendment 4 dated 2/13/25, the answer to question 1 references an attachment “1968 –

Downstream Mooring Wall Reconstruction As Built Drawing”. This drawing was not in the amendment 4 and is not on Sam.Gov. Can this drawing be provided?

a. Drawing uploaded to SAM.gov.

8. Are contractors required to provide a professional geotechnical engineer in accordance with specification section 31 00 00, 1.4? The only scope of work pertaining to this specification section is the backfilling of cell fill voids with crushed stone. Please advise.

a. Government Response: The Contractor is expected to perform the work in accordance with the Contract documents, so yes, a professional geotechnical engineer is required. The professional geotechnical engineer is expected to review the gradation results from the quarry where stone is being received from for conformance to the contract documents. They must also provide sampling of the stone delivered to field and an assessment of whether the stone meets the requirements outlined in the specifications. If dewatering is required, the professional geotechnical engineer would design the proper plan for dewatering as well.

9. Specification section 31 00 00 1.4.2 indicates contractors to provide a qualified technician to inspect, monitor, sample and perform field testing. Please specify the field testing required for earthwork on this project. The table under 3.8 in this section only indicates gradation testing at the stone source for the crushed rock fill. Are other field testing procedures required such as compaction testing?

a. Government Response: Gradation testing is required at the source and onsite during construction to ensure the gradation meets the contract requirements. A qualified technician will be onsite to observe the condition of the subgrade prior to filling the voids with crushed rock. The subgrade will be inspected by the qualified technician who will state whether or not the subgrade is ready to receive crushed stone. Once the crushed stone is placed, the qualified technician will ensure that the compaction procedures are being met (8 inch lifts compacted via plate tamper).

12. If existing sheet piles are coated, please clarify if contractors are to recoat the sheet pile after installing the fender support beams? If recoating is to occur please clarify if an SSPC QP 1 certified painter is required and what painting system is to be utilized on the sheet piles.

a. Government Response: The existing sheet pile coating will be locally removed and the area will be cleaned where the steel channels and support brackets are to be welded on as per AWS D-19.0. After welding is complete, the sheet pile will be coated with zinc-primer and paint as per ASTM A780.

Because of the complex conditions of the work site and the need to maintain the water quality of the Hudson River, the painter must be SSPC QP 1 certified. The contract plans now include a note reflecting this direction.

13. Drawing C-102 indicate turbidity barrier around the majority the mooring structure. Is this required?

This scope of work should not create turbidity as all of the work is above MLW.

a. Yes, it is required.

15. Specification section 05 51 33, 1.3 states to provide fabricator certification for ladder assembly that the ladder and associated components have bene fabricated according the requirements of 29 CFR

1910.23. This seems to indicate that new ladders are being provided, the plans seem to indicate that existing bent ladders are to be repaired and reused. Please advise if ladders are to be repaired or replaced.

a. Government Response: Ladders are to be repaired as shown in the contract plans. Specification Section 05 51 33 paragraph 1.3 will be kept in the documentation just in case the contractor finds in the field that a ladder is beyond repair. The contract plans now include a note reflecting this direction.

16. The composite timber manufacturer reviewed the contract documents including Amendment 0004. Based on what’s been provided, they are unable to determine what composite timber (size and reinforcement) is required for this application. Can the USACE provide some guidance on the recommended size (8”x12”, 10”x10” or 12”x12”) and reinforcement (dia of fiberglass rebar reinforcement) that is needed for this application. Product data can be provided if needed.

a. Government Response: The contract plans will be adjusted, particularly S-102, to provide guidance regarding the composite timber size. There will also be more specific guidance that will be directed only to bidders, but this guidance should not restrict the contractor when choosing a fendering system.

17. Would your office allow for a Joint Venture with a larger company to help perform this scope of work? I have found one that is able to conduct this work and has a history of such in the area.

a. Yes, a small business can form a joint venture with a large business and still be eligible for a small business set‐aside contract—but the joint venture must be structured so that it qualifies as a small business concern under FAR 19.001 and FAR 19.301 1. This means that either all partners must individually meet the applicable size standards or, in a mentor–protégé arrangement, the small business (protégé) must qualify as small even if its mentor is large. USACE will evaluate the combined capabilities by reviewing the past performance and experience of each joint venture member, and the joint venture entity must be properly registered (e.g., in SAM), as emphasized in recent GAO decisions and supported by AFARS guidance.

SECTION 00 10 00 - SOLICITATION

The required performance has changed from Project Title: Troy Lock (AFO) Mooring Pier1. This acquisition will be 100% Small Business Set-Aside.2. NAICS Code 237990, Size Standard $45,000,0003. Project Magnitude Range: Between $1,000,000.00 and $5,000,000.00.4. Submit Bids no later than 2:00 P.M. EST on 11 March 2025 (or as amended) to:U.S. Army Corps of EngineersNew York District Contracting Division26 Federal Plaza, Room 16-300Attn: Denisse SotoDue to heightened security at U.S. Government installations, all Bidders are instrcucted to allow ample time to get through security checkpoint in order to have their bids delivered.Contract Specialist - Denisse.M.Soto@usace.army.mil to Project Title: Troy Lock (AFO) Mooring Pier1. This acquisition will be 100% Small Business Set-Aside.2. NAICS Code 237990, Size Standard $45,000,0003. Project Magnitude Range: Between $1,000,000.00 and $5,000,000.00.4. Submit Bids no later than 2:00 P.M. EST on 25 March 2025 (or as amended) to:U.S. Army Corps of EngineersNew York District Contracting Division26 Federal Plaza, Room 16-300Attn: Denisse SotoDue to heightened security at U.S. Government installations, all Bidders are instrcucted to allow ample time to get through security checkpoint in order to have their bids delivered.Contract Specialist - Denisse.M.Soto@usace.army.mil.

SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS

The following have been modified:

BID SUBMISSION INSTRUCTIONS

Contractors are required to deliver bids to 26 Federal Plaza, Room 16-300. The designated recipient of bids is Mohenda Surage (917) 790-8088 or Denisse Soto (917) 790-8177. Bids are due no later than 25 March 2025 at 2:00 P.M. Bid opening will happen on 25 March 2025.

NOTE: If dropping bids off in person, please advise via email to mohenda.r.surage@usace.army.mil and denisse.m.soto@usace.army.mil. The government will not be responsible for submissions delivered to any location or to anyone other than those designated to receive proposals. Offerors are responsible for ensuring that Bids are submitted so as to reach the designated recipient and designated location. Offerors are responsible for allowing sufficient time for the bids to be received in accordance with the instructions provided.

Contractors will be allowed to phyiscally be in the conference room during the bid opening.

Bidders are encouraged to call into the following teleconference line:

Call number:

+1-844-800-2712 US Toll Free +1-669-234-1177 US Toll Access code: 199 476 8533

Bidder must keep their phone on mute as to not disrupt the reader. Please limit the amount of company employees calling into the line so that the line does not disconnect. The abstract of bids will be posted to the Sam.gov website.

ADDITIONAL INSTRUCTIONS

Potential Bidders are reminded that only the minimum documents are required for bid submission:

1. Signed 1442.

2. Acknowledged amendments.

3. Filled out bid schedule and totals.

4. Bid Guarantee.

5. Bidders must check off box (d) in 52.204-8 Annual Representations and Certifications (DEC 2019) for being on SAM.gov

(End of Summary of Changes)