This document is an amendment to Solicitation No. W912DS-24-B-0005 for the Maintenance Dredging of Mattituck Harbor, New York Federal Navigation Project. The amendment extends the bid opening to June 11, 2024, at 2 PM. It provides clarification on the total window for dredging, which is October 1 to January 1, with a 35-day period of performance from the issuance of the Notice to Proceed. The government declined the contractor's request to consider a box cut to hard bottom excavation approach instead of the 1:3 profile excavation, stating that payment will be based on the volume dredged between the before and after-dredge surveys. The government also declined the contractor's request to allow the filtering of free-standing water removed from hopper barges, stating that the contractor must comply with all coordination requirements with federal, state, and local agencies.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Bid Opening has been extended to 11 June 2024 at 2PM.
See Continuation Page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Jun-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS24B0005
X 9B. DATED (SEE ITEM 11)
06-May-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Jun-2024
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS24B0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0004
AMENDMENT 0004
Maintenance Dredging of Mattituck Harbor, New York
Federal Navigation Project Solicitation No. W912DS-24-B-0005
The purpose of this amendment is to answer the following question(s) regarding / incorporate the following revision(s) to the subject solicitation:
Bidder’s Question, Government Reply, Incorporated Revision (if applicable):
Q1. Please confirm that the total window of opportunity for onsite performance is Oct 1, 2024, through Jan 15, 2024, for the 20 day onsite performance period. There is a slight discrepancy between the Fisheries and DEC scheduled dates in section 00 90 02 and the schedule listed in Section 01 11 00.
A1: The total window for dredging, 1 October to 1 January. The total window for dredging, 1 October to 1 January. The period of performance for this contract is 35 days from the issuance of NTP.
Q2. Please consider that with the higher dredge material relocation costs associated with this project it would be advantageous to the Government to consider a Box Cut to Hard Bottom excavation approach as opposed to the 1:3 profile excavation as stipulated in Specification 35 20 23, pg 4. The relatively high ratio of side slope to grade and slope over depth material to channel to grade material volumes as shown on table of pg 13 of Section 01 30 00 would introduce an extra-ordinarily high volume of free-standing water to the relocation stream. This is less than practical and would increase the bid cost. If a mutually agreeable box cut footprint could be estimated and bid, the unit price would be more competitive.
A2: 2. Payment and final acceptance will be based on the number of cubic yards dredged made by computing the volume between the bottom surface shown by the before dredge survey and the bottom surface shown by the after-dredge survey, in the dredging limits as shown on the plans. The limits of the side slopes are described in the specifications SECTION 35 20 23, Paragraph 1.7 Side Slopes and will remain as stated.
Q3. It would also be advantageous to the Government consider accepting and supporting an application by the contractor to apply for a permit to filter free standing water removed from hopper barges through a system of frac tanks and coal filters and then return that filtered water to the body from which it was removed after filtration to an acceptable level above back round or equal to back round water.
A3: 3. The contractor must comply with all requirements in all the coordination with federal, state, and local agencies provided in the specifications. Any deviation from this must be included in the low – bidders work plan for acceptance and may require additional coordination from the contractor with these agencies, without impact to the project schedule.
Bid Opening has been extended to June 11, 2024 at 2PM.
W912DS24B0005
** No other Request for Information will be accepted.**
(End of Summary of Changes)