Amendment 0003.pdf
PDF 257 KB Posted
- Attached to
- West Point Delafield Dam Decommission. Federal contract opportunity
- Solicitation number
- W912DS23B0016
About this file
This document provides information regarding a federal solicitation for the West Point Delafield Dam Decommission project. The U.S. Army Corps of Engineers, New York District intends to award a firm fixed price contract for construction services including clearing, excavation, removal of existing structures, installation of underdrain and piping, excavation of outfall channels, stone and geotextile placement, access ramp construction, backfilling, stormwater collection features, seeding and turf establishment. The period of performance is approximately 365 calendar days with an estimated cost between $5-10 million. The solicitation will be issued via Contract Opportunities and all questions must be submitted in writing to the specified Contract Specialist by the deadline.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Abstract 23B0016.pdf | ||
| Amendment 0009.pdf | ||
| Amendment 8_Drawings_Addendum 3 .pdf | ||
| Amendment 8_Spec Section 01 30 00.pdf | ||
| Amendment 0008_Photos - 10 JUL 2023 - Day after historic flooding.pdf | ||
| Amendment 0008.pdf | ||
| Amendment 8_Spec Section 33 46 16.pdf | ||
| Amendment 0007.pdf | ||
| Amendment 0006.pdf | ||
| Amendment 0005.pdf | ||
| Amendment 0004.pdf | ||
| Amendment 0003_As-Built Drawing.pdf | ||
| Amendment 0003_Addendum 2.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0002_Site Visit Sign-In Sheet 20230629.pdf | ||
| Amendment 0001.pdf | ||
| Plans.pdf | ||
| W912DS23B0016.pdf | ||
| Specifications.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of Amenmdent 0003:
1) Bid opening remains 25-July-2023 at 2:00 P.M.
2) Respond to Bidder Request for information. For information Only.
3) Draw ings have been Revised and Reissued. Please see Continuation page and attachments.
NOTE: Bidders must acknow ledge receipt of this amendment by date specif ied in the bid (or as amended) by one of the follow ing methods:
In the space provided on the SF 1442, by separate letter, or by signing block 15 below .FAILURE TO ACKNOWLEDGE AMENDMENT BY DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THELATE BID, LATE MODIFICATION OF BID, OR LATE
WITHDRAWAL OF BID (FAR 14.304)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 16
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Jul-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS23B0016
X 9B. DATED (SEE ITEM 11)
16-Jun-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Jul-2023
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS23B0016
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0003
West Point Delafield Dam Decommission
Amendment 0003
To Bidders
The following changes shall be made to the drawings and specifications.
DRAWINGS
1. The following DRAWINGS have been REVISED and REISSUED:
• G-003, Location and Vicinity Map
• G-004, General Notes, Abbreviations, and Symbols
• C-001, Existing Conditions Plan
• C-002, Demolition Plan
• C-003, Pond Grading Plan
• C-004, Stormwater Plan (Sheet 1 of 2)
• C-005, Stormwater Plan (Sheet 2 of 2)
• C-006, Pond Profile
• C-007, Pond Section
• C-008, Stormwater Details
• C-009, Miscellaneous Details
• C-018, Ramp Section
• C-019, Drainage Pipe Outfall Section
• C-020, Stormwater Pollution Prevention Plan
• C-021, Tree Protection Detail
2. The following DRAWINGS have been ADDED: None.
3. The following DRAWINGS have been DELETED: None
4. The following DRAWINGS have been REVISED but NOT REISSUED: None.
SPECIFICATIONS:
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein: None
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:
None
3. The following SPECIFICATION SECTIONS have been REVISED (red strike/green add) and REISSUED: None
4. The following SPECIFICATION SECTIONS have been REVISED but NOT REISSUED: None
BIDDER’S QUESTIONS AND GOVERNMENT REPLY
(Questions that may be of general interest to all Bidders and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the bidders “For Information Only” and do not revise the solicitation, plans or specifications.)
Question 1:
Not used.
Government Response:
Not used.
Question 2:
I don’t see any deadline for questions, is there one? Also confirming all questions should be emailed to you?
Amendment #1 was posted and indicated the bidder inquiry due date - 05 JUL.
Question 3:
Please change the unit of measurement for the disposal from CY to Tons since this is typically what is used in the industry. In addition, we do not know how wet the material will be, therefore, we will not know the conversion needed.
Unit of measurement will not be changed from CY to tons. Design team has determined that measurement of volume to weight is more appropriate for this project.
Question 4:
How are we to get paid for the 2’ over excavation and the fill required to put back in place of the over excavation. Also, please provide clear limits of the operation.
"1.4.1.1 Payment Payment will be made for costs associated with work included in this line item consists of but is not limited to excavation, temporary storage, and offsite transportation of approximately 4,200 cubic yards of contaminated material within the existing pond side slopes and bottom.
Approximate locations of contaminated material are shown on the drawings and referred to as "Over-excavated Material" or "muck" in the bottom and sides of the existing pond/reservoir. This unit cost line item shall include any other items incidental to excavation, handling and offsite transportation of contaminated material not defined as having a specific unit cost. This unit cost line item shall include backfilling the excavated volume."
"1.4.1.2 Unit of Measure Unit of measure: Cubic Yard"
Question 5:
Please note that the Scale on the plans have two different “scale sizes” Please correct plans to have the proper scale.
Scaling on drawings will be corrected and an addendum submitted for revised drawings.
Question 6:
Many of the Drawings have been reproduced with extremely line weight for showing the existing conditions, the description of existing conditions and the Arrows and Arrowheads pointing to Proposed features.
This makes it difficult for us to know what work is intended to be performed. Please review the line weights on the drawings and re-issue them with corrected line weights. The most important are
• Dwgs C-002 thru C-005
• C-008, C-009
• C-016 thru C-020
Grey line weights are for existing conditions/reference only.
Question 7:
The Graphical Scale on C-002 is incorrect, please correct it so we can determine quantities of work.
Scaling on C-002 will be corrected. See Addendum 1 for revised drawing.
Question 8:
The Scale and the Graphical Scale on C-003 are both incorrect and the drawing seems not to be drawn to scale, please correct them so we can determine quantities of work
Scaling on C-003 will be corrected. See Addendum 1 for revised drawing.
Question 9:
The Scale on C-004 is incorrect and the drawing seems not to be drawn to scale, please correct them so we can determine quantities of work.
Scaling on C-004 will be corrected. See Addendum 1 for revised drawing.
Question 10:
The Scale on C-005 is incorrect and the drawing seems not to be drawn to scale, please
Scaling on C-005 will be corrected. See Addendum 1 for revised drawing.
Question 11:
The Vertical Scale on C-006 is incorrect and the drawing seems not to be drawn to scale, please correct them so we can determine quantities of work.
Scaling on C-006 will be corrected. See Addendum 1 for revised drawing.
Question 12:
The Vertical Scale on C-007 is incorrect and there is no way to verify the Horizontal Scale, please correct them so we can determine quantities of work.
Drawing will be revised and noted as N.T.S. See Addendum 1 for revised drawing.
Question 13:
The Scale on C-008 is incorrect and the drawing seems not to be drawn to scale, please
Drawing is noted as N.T.S.
Question 14:
The Vertical Scale on C-010 thru C-015 is incorrect, please it so we can determine quantities of work.
Question 15:
The Vertical and Horizontal Scales on C-016 are incorrect and the drawing seems not to be drawn to scale, please correct them so we can determine quantities of work.
Question 16:
The Scales on C-017 are close but the drawing is not to scale, please correct them so we can determine quantities of work.
Scaling on C-017 will be corrected and revised drawings provided in an Addendum.
Question 17:
The Scales on C-018 are way off, please correct them so we can determine quantities of work.
Scaling on C-018 will be corrected. See Addendum 1 for revised drawing.
Question 18:
The Scales on C-019 are incorrect and the drawing seems not to be drawn to scale, please
Scaling on C-019 will be corrected. See Addendum 1 for revised drawing.
Question 19:
The Scale on C-020 seem to be close to correct, however the given length of 132’ Silt Fence is either incorrect or the drawing is not to scale. Please verify them so we can be confident in using them.
Scaling on C-020 will be corrected. See Addendum 1 for revised drawing.
Question 20:
It appears there is an error with the scaling on this project which make the plans not usable.
Question 21:
Please take a look at the “MATCH LINE: on Dwg C-004. Next, please take a look at the “MATCH LINE” on Dwg C-005. These lines do not match. Using an Engineer’s Scale of 1” = 20’ (which is not correct, the Drawings are not drawn to scale) there is a gap of approx.
13’ between the 2 “MATCH LINES.” Please correct the Scale and please correct the Drawing such that it is a true “scale drawing” from which we may take measurements to compute quantities.
Scaling/matchline on C-004 and C-005 will be corrected. See Addendum 1 for revised drawings.
Question 22:
Plans call out the pond infill to be compacted fill and drawings C-006 and C-007.
Excavation and Fill specification 312300 does not describe “compacted fill” materials. Is considered structural backfill material? If not, please provide a specification on the compacted fill materials.
Refer to Geotechnical Note 5 on G-004 for clarity regarding Compacted fill & structural backfill.
Question 23:
Referring to sheet C-002 of the plans, the existing retaining wall and retaining wall foundations are to be removed. Please provide any available as-built drawings of the existing structure and its foundation.
Available files will be provided after award.
Question 24:
Referring to sheet C-002 of the plans, the existing retaining wall and retaining wall foundations are to be removed. If no as built drawings are available, please verify the design of the existing retaining wall and foundation with approximate dimensions.
See as-built drawing titled, "Development for Delafield Pond Area Plan, Elevations, Section & Details of Wading Pool, Wall, Railing & Seat" for approximate dimensions.
Question 25:
Section 01 30 00 1.7 Page 6-8 of the Specifications describes the contractor's required key management personnel. The specifications call for a Project Manager, Superintendent, 2 EA Assistant Superintendents, a Quality Control System Manager, an Assistant Quality Control System Manager, a Site Safety and Health Officer, and an Assistant Site Safety and Health Officer. For a project of this size and scope, please verify the contractor's required key management personnel.
Please refer to Specification Section 01 30 00 and EM 385-1-1 for Administrative Requirements.
Question 26:
Section 01 14 00 1.5a on Page 9 of the Specifications states that, "The Contract must maintain continual base security with personnel security guard and temporary fences.
Wherever there are fence disruptions due to the construction of this project, the Contractor shall continually monitor and maintain the fence." Please verify the necessary hours and days of the week that on site security will be required for this project. Are security services required outside of normal work hours?
Security guard not required for this project.
Question 27:
Not used.
Government Response:
Not used.
Question 28:
Referring to sheet C-020 of the plans, Note 1 states to "install 3 rows of stacked hay-bales centered on existing ditch bottom", "placed as shown." Sheet C-020 does not specify where the stacked hay-bales are to be placed. Please clarify the location of the proposed hay-bales.
Note on C-020 for hay-bales will be removed. See Addendum 1 for revised drawing.
Question 29:
Referring to sheet C-020 of the plans, Note 1 states to "install 3 rows of stacked hay-bales."
This conflicts with Section 01 57 19 of the Specifications where in section 3.2.2.1 on page 21, it is stated that "Use of hay bales is prohibited." Please advise whether to use hay bales or not.
Note on C-020 for hay-bales will be removed. See Addendum 1 for revised drawing.
Question 30:
Addendum to sheet G-005 Haul Route Plan to specifically note the vehicle weight limit and tractor trailer truck prohibition.
Notes for vehicle weight limit and tractor trailer truck prohibition will be added to the drawing.
Question 31:
Is the containment soil removal satisfied at 2’ or do we need to excavate until the containment is fully excavated?
From the existing conditions SECTION 02 61 13 Excavation & Handling of Contaminated Material Spec, “Excavate areas of contamination to the depth and extent shown on the drawings and not more than 0.2 ft beyond the depth and extent shown on the drawings unless directed by the Contracting Officer.”
From the earthwork SECTION 31 23 00 Excavation and Fill Spec, “Excavations below indicated depths will not be permitted except to remove unsatisfactory material.
Unsatisfactory material encountered below the grades shown shall be removed as directed”.
Question 32:
Please confirm the scale on the drawings are correct.
Question 33:
Will a full-time safety manager need to be onsite during the whole construction duration?
Please refer to Specification Section 01 30 00, Specification Section 01 35 26, and EM 385- 1-1 for SSHO responsibilities and requirements.
Question 34:
Will .cad files of the job be available for GPS layout use?
.dgn files will be provided after award.
Question 35:
Will .dxf files of the job be available for GPPS layout use?
.dxf files can be provided if needed after award.
Question 36:
The haul road has signage stating nothing over 10 tons. What will be the impacts of hauling with triaxles and heavy equipment?
Drawing G-005 Haul Route will be revised with note to indicate vehicle weight limit and tractor trailer truck prohibition. See Addendum for revised drawing.
Question 37:
Not Sure if there was a bad data transfer or not but scale is off on multiple plans and the match line between C-004 and C-005 seems to be missing 13’ off or missing data.
Scaling and matchline on C-004 and C-005 will be corrected. See Addendum 1 for revised drawings.
Question 38:
Main fill material calls out to be compacted fill yet don’t see that referred to in the specs can you issue a spec for that material?
See Section 31 23 00 for specifications pertaining to fill materials.
Question 39:
I also have alignment issues when I overlay the 2ft under cut from demo plan( C-002) and the drainage layer from sheet C-005,the drainage layer is outside of the under cut area And that doesn’t exist on any profile.
The drainage layer is set at a higher elevation than the bottom of the pond in some cases and will exceed the pond bottom outline in area. C-005 shows an approximate limit of pond bottom excavation. The elevation for this will vary, while the drainage layer will differ in some cases per C-006 and C-007 and C-011 through C-017.
Question 40:
It appears there may be a scaling issue with the plans that were provided. Can you please review drawings and advise.
Question 41:
Please confirm all compacted fill shall meet the requirements of "select Fill" as specified in specification section 31 23 00.00 20 and mentioned in note geotechnical note 5 on drawing G-004
Compacted fill refers to structural backfill as described. Drawings that reference compacted backfill shall meet specification Section 31 23 00 pertaining to fill materials.
Question 42:
Please advise if there are any schedule restrictions as to performing work within the base?
Government Response:
Work restrictions are outlined in Specifications 01 14 00. Please refer to Specification Section 01 14 00 - 1.4.5, 1.4.6, 1.4.7, 1.4.8, 1.4.9 and 1.4.10 for details.
Question 43:
Please advise on how the contractor is supposed to access the end of the existing and proposed outfalls as this appears to be outside the limits of work and would appear to be from the existing parking lot
The maintenance road will be called out on C-001. See Addendum 1 for revised drawing.
Question 44:
The stone layer shown on the profile drawing, drawing sheet C-006 shows the layer to terminate prior to station 12+00 while the plan drawings show the layer to extend beyond station 12+00, please advise as to what the correct limits of the stone drainage layer are?
Drawing C-006 will be revised to show limits of stone drainage layer. See Addendum 1 for revised drawing.
Question 45:
Please advise if it's the contractor’s responsibility to perform compaction testing?
See Specification 31 23 00, "3.14.2 Testing"
Question 46:
Demo plan shows concrete removal in between the two retaining walls where the beach area is I walked that area it was all sand is the concrete below the sand?
The concrete removal is for the foundation of the retaining wall below the sand.
Question 47:
Will RCA material be accepted with proper paperwork?
Provided material adheres to specifications and testing requirements. See Section 31 23 00 for specifications pertaining to fill materials.
Question 48:
There is a fence detail and fence spec, can you please see clarify where the fence is located?
The demo shows fence removal, but I do not see a fence install.
See notes #1 and #12 on G-004 under "General Sequence of Construction", pertaining to replacing fencing in areas where it was removed.
Question 49:
Can you please review the plans and verify the drawings to ensure they are plotted at the proper scale (please check scale)
Question 50:
Will a field office be required for the resident engineer
Please refer to Specification Section 01 50 00 – 3.8 Government Field Office for requirements.
Question 51:
Can an allowance be provided for the contaminated material?
Per 01 20 00 paragraph 1.4.1.1 Payment "Payment will be made for costs associated with work included in this line item consists of but is not limited to excavation, temporary storage, and offsite transportation of approximately 4,200 cubic yards of contaminated material within the existing pond side slopes and bottom. Approximate locations of contaminated material are shown on the drawings and referred to as "Over-excavated Material" or "muck" in the bottom and sides of the existing pond/reservoir. This unit cost line item shall include any other items incidental to excavation, handling and offsite transportation of contaminated material not defined as having a specific unit cost. This unit cost line item shall include backfilling the excavated volume."
Question 52:
Will granular material such as DGA or RCA be permitted as "compacted fill".
Provided material adheres to specifications and testing requirements. See Section 31 23 00 for specifications pertaining to fill materials.
Question 53:
Specs make reference to muck as non-hazardous however the bid form makes reference to it being contaminated. Can you please provide more information regarding these terminologies.
Contaminates may or may not be classified as hazardous, in this case they are non hazardous.
See specifications SECTION 01 57 19, "1.2.20.4 Non-Hazardous Waste Non-hazardous waste is waste that is excluded from, or does not meet, hazardous waste criteria in accordance with 40 CFR 261."
Question 54:
Can an allowance be provided for rock removal. There is no way to properly quantify the amount of rock at the mounds at ledges
See rock removal call out on sheet C-004 for approximate depth. Per 01 20 00 paragraph 1.4.1.1 Payment
"Payment will be made for costs associated with work included in this line item consists of but is not limited to excavation, temporary storage, and offsite transportation of approximately 4,200 cubic yards of contaminated material within the existing pond side slopes and bottom. Approximate locations of contaminated material are shown on the drawings and referred to as "Over-excavated Material" or "muck" in the bottom and sides of the existing pond/reservoir. This unit cost line item shall include any other items incidental to excavation, handling and offsite transportation of contaminated material not defined as having a specific unit cost. This unit cost line item shall include backfilling the excavated volume."
Question 55:
The specifications require the following positions: (1) Project Manager, (1) Superintendent,
(2) Assistant Superintendents, (1) Quality Control Manager and (1) Assistant Quality Control Manager, (1) SSHO and (1) Assistant SSHO. Can any individual fill more than one responsibility as outlined in the specifications as long as they meet the required experience.
Please refer to Specification Section 01 30 00 and EM 385-1-1 for Administrative Requirements.
(End of Summary of Changes)
| 1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein: None |
| 2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety: None |
| 3. The following SPECIFICATION SECTIONS have been REVISED (red strike/green add) and REISSUED: None |
| 4. The following SPECIFICATION SECTIONS have been REVISED but NOT REISSUED: None |
| BIDDER’S QUESTIONS AND GOVERNMENT REPLY |