W912DS20R0022 Amendment 3.pdf
PDF 679 KB Posted
- Attached to
- Solicitation: Gun Tube Heat Treat Furnace Replacement at the Watervliet Arsenal, Watervliet, NY
- Solicitation number
- W912DS20R0022
About this file
This document is an amendment to a solicitation for replacement of gun tube heat treat furnaces at the Watervliet Arsenal. The Army Corps of Engineers is seeking proposals to design and install new furnaces in phases, with construction of Phase 1 to begin by July 2022. Offerors must submit responses by 1 March 2021 and should include details on their technical approach, schedule, 3D BIM model, and past experience with similar projects. The amendment increases the page limit for the technical approach section to twenty pages, schedules two days of organized site visits in early February, and clarifies that bonds are only required for the construction phases.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Revise page limit under section 3.1.3
2. Revise and add site visit
3. Provide responses to RFIs
Offeror must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow in methods:
in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS20R0022
X 9B. DATED (SEE ITEM 11)
13-Jan-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Feb-2021
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS20R0022
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been added by full text:
AMENDMENT 3
3.1.3 Page Limit and Size of Electronic Materials shall be submitted in the following volumes:
OFFERORS' QUESTIONS AND GOVERNMENT REPLY: Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below.
These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors “for information only ”and do not revise the solicitation, plans or specifications. By this Amendment Offerors are advised of this provision, applicable to all RFI responses.
RESPONSES TO RFIs:
Question 1:
Page extension for Factor 3: Technical Approach.
Under section 3.1.3 there is a page limit for Factor 3: Technical Approach at 10 pages. Since Factor 3 is the most important factor under the performance capabilities, we would like to request this be increased to 20 pages. As you are aware the equipment is the major portion of this project and having only 10 pages for the technical description would limit many key points and details of the equipment and its functionality. Therefore, the requested additional 10 pages would include additional engineering details, performance figures, and further explanations of the uniqueness and operation of each piece of equipment along with a few 3-D model pictures for illustrations purposes.
We believe these additional pages would be beneficial to all parties that will be adjudicating Factor 3 for the
Volume Tab Title Maximum Pages
1 A Factor 1: Past Performance No Page Limit
1 B Factor 2: Proposed Contract Duration, Phasing and Summary Schedule
1 C Factor 3: Technical Approach 20
1 D Factor 4: Organizational Approach 10
2 A Factor 5: Small Business Participation Plan No page limit
2 B Factor 5: Past Utilization of Small Business No page limit
3 A Factor 6: Price (Standard Form 1442 & Contract Line Item Schedule)
No page limit
3 B Factor 6: Bid Guarantee No page limit
3 C Factor 6: Self-Performed Work No page limit evaluation process. Without these additional details there could be misunderstandings of the equipment and its complex nature. Therefore, we request that Factor 3 page limit be increased from 10 pages to 20 pages.
Government Response 1:
Factor 3: Technical Approach maximum pages is increased to twenty (20).
Question 2:
Under 5.3.1of the solicitation it states that the use of a 3-dimensional (3D) Building Information Model (BIM) technology in the design process is required. Does the Arsenal already have a 3-dimensional (3D) Building Information Model that can be utilize for the project or does the Contractor need to perform this task for the design process? Is a NEW 3-dimensional (3D) Building Information Model (BIM) needed for each scope of supply during the life of the project or just for the initial design process? Can we use the original 3D scan and merely updated the BIN after Phase 1 and Phase 2 is completed?
Government Response 2:
3-dimensional (3D) Building Information Model (BIM) technology in the design process is required. More specifically, the use of Autodesk Revit is required. The Government does not have any existing 3D BIM model for the existing facility, which is why the Government cannot provide a 3D BIM model for the existing facility. The contractor will need to develop the 3D BIM model during the design process. The Government does not require a 3D BIM model for each temporal phase of construction; the 3D BIM model is only required at a minimum for the final complete condition. If the Offeror submits a brief BIM Project Execution Plan in their Factor 3 submission, the Government will evaluate that submission.
Question 3:
In several places the solicitation states Bonding is only required for CLINS 0002, 0003 and 0004 but the solicitation still references FAR 52.228-1 & 52.228-15 which states bonds are required for the "bid price" and "original contract price."
1. Please confirm that the "bid price" in FAR 52.228-1(c) (Bid Bond) is the bid price for CLINS 2, 3, and 4 only?
2. Please confirm that the Performance Bond and Payment Bonds in FAR 52.228-15 is the bid price for CLINS 2, 3, and 4 only?
3. Please confirm that the Performance Bond and Payment Bonds in FAR 52.228-15 is limited to the performance for CLINS 2, 3, and 4 only?
Government Response 3:
1. Confirmed
2. Confirmed
3. Confirmed
Question 4:
Requesting that an additional site visit at the arsenal be allowed for the week of Feb 8-12. We are requesting at least 3 days Tuesday, Wed and Thursday.
Government Response 4:
An organized site visit has been scheduled for two days:
09 February 2021 from 10:00 AM to 3:00 PM.
10 February 2021 from 9:00 AM to 3:00 PM
SECTION I - CONTRACT CLAUSES
The following have been modified:
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for:
09 February 2021 from 1000 – 1500 10 February 2021 from 0900 – 1500
(c) Participants will meet at:
Building 135 - North Exterior Entrance Watervliet Arsenal Watervliet, New York 12189
Email all requests to both Kyle Davis and Scott Kosnick site visit POC's listed on the form.
POC: Kyle Davis, Project Manager Email: Kyle.T.Davis@usace.army.mil Office Phone: (518) 266-6365 Mobile Phone: (347) 843-3398
POC: Scott Kosnick, Area Engineer Email: Scott.M.Kosnick@usace.army.mil Office Phone: (518) 266-6362 Mobile Phone: (518) 948-0341
All requests must be in NLT 1000 EST Monday 08 February 2021 in order to be approved in time for the visit.
Please anticipate up to two (2) hours on day of site visit to clear the WVA security background check at the South Gate Visitor’s center. Also, all visitors will need to bring proper ID and PPE (hard hat, eye glasses, safety shoes) to access the project area.
For Covid-19, social distancing will be enforced. After background information is processed at the South Gate Visitor’s center, WVA security will take the person’s temperature. If a person’s temp is 100 degrees or over they will not be allowed on the installation.
Watervliet Arsenal Map
(End of Provision)
(End of Summary of Changes)