Amendment 0005

View the file

Other files

File Type Posted
Bid_Abstract-W912DS19B0014.pdf PDF
W912DS19B0014-0007.pdf PDF
W912DS19B0014-0006.pdf PDF
WPC_Add5_Specs_190809.pdf PDF
WPC_Add5_Drawings_190809.pdf PDF
W912DS19B0014-0004.pdf PDF
WPC_Final_Drawings_190726.pdf PDF
W912DS19B0014-0003.pdf PDF
WPC_Final_Specs_190726.pdf PDF
W912DS19B0014-0002.pdf PDF
Site_Visit_Sign-in_Sheet.pdf PDF
WPC_Final_Specs_190726.pdf PDF
WPC_Final_Drawings_190726.pdf PDF
W912DS19B0014-0001.pdf PDF
WPC_100pct_Specs_190711.pdf PDF
WPC_100pct_Drawings_190711.pdf PDF
W912DS19B0014.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Revise and reissue some draw ings and specifications (summary of changes below ).

2. Answ er questions from prospective bidders for informational purposes only.

Bid due date remains 20 August 2019, 2:00PM EST.

NOTE: Bidders must acknow ledge receipt of this amendment by date specified in the bid (or as amended) by one of the follow ing methods: In the space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATION OF BID, OR LATE

WITHDRAWAL OF BID (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS19B0014

X 9B. DATED (SEE ITEM 11)

11-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Aug-2019

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS19B0014

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been added by full text:

AMENDMENT 0005

TO BIDDERS:

The following changes shall be made to the drawings and specifications.

DRAWINGS:

GC100 Revised Note 2 concerning the Laydown areas.

B-101 Revised Note 7 concerning the suggested sequence of construction.

CS103 Added equipment pad for heat pump.

CG111 Added Laydown areas and notes.

Added General Note describing Phase I.

CG112 Added Laydown areas and notes.

Added location of E&SC stockpile area.

CG511 Added Project Notes and voided two details.

CG512 Added Project Notes and voided five details.

CG513 Added Phase I and Phase II titles.

CU501 Removed references to Pay Items and added note concerning bidding.

P-001 Added WP, Waste Pipe, to Legend and Abbreviations.

P-002 Revised vent in Detail A7, Sanitary Waste Riser Diagram.

P-101 Revised location of sanitary riser.

M-001 Added AFG, Above Finished Grade, to Legend and Abbreviations.

M-101 Moved heat pump to exterior equipment pad.

M-501 Added Concrete Pad Detail – Exterior

E-103 Moved heat pump to exterior equipment pad.

E-104 Moved heat pump to exterior equipment pad.

E-502 Revised title of Detail UG-4.

SPECIFICATIONS

SECTION 01 11 00, SUMMARY OF WORK

Subsection 1.1.b, FAR 52.211-10, COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK Updated description of work to match subsection 1.3.1.

Subsection 1.3.1, Project Description Corrected spelling and gas station reference.

Subsection 1.9, OFF-SITE DISPOSAL Added subsection to provide direction for approval of off-site disposal sites.

SECTION 01 14 00, WORK RESTRICTIONS

Subsection 1.3.2, Working Hours Added sentence about anticipated number of burials annually.

SECTION 01 33 00, SUMMARY OF WORK

Subsection 1.8.4, Review Schedule Extension Corrected grammar issues in text.

Subsection 1.8.4, Review Schedule Extension Moved requirement for additional review days for food service equipment/HVAC control systems to subsection

1.9.

Subsection 1.8.4, Review Schedule Extension Moved requirement for additional review days for fire protection engineer to subsection 1.9.

SECTION 01 50 00, TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

Removed requirements for connecting to water and sanitary sewer supply lines.

SECTION 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS

Included USMA CRM SOP 15 at the end of the section.

Included USMA CRM SOP 16-1 at the end of the section.

SECTION 01 78 00, CLOSEOUT SUBMITTALS

Subsection 1.7.1.h, Warranty Management Plan Included a requirement for all preventive maintenance parts on all equipment for first year.

Subsection 3.2.1.d, Rename the CAD Drawing files Updated requirement for number of deliverables.

Subsection 3.3, RECORD DRAWINGS Updated requirement for number of deliverables.

Subsection 3.6, AS-BUILT RECORD OF EQUIPMENT AND MATERIALS Updated requirement for number of deliverables.

SECTION 02 61 13, EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL

Subsection 3.6, CONTAMINATED MATERIAL STORAGE Added paragraph allowing the Contracting Officer to stop work if appropriate storage containers are not available.

Subsection 3.8, SPILLS Added emergency spill phone number for New York State.

SECTION 02 82 13.00 10, ASBESTOS ABATEMENT

Subsection 1.4, SYSTEM DESCRIPTION Updated link to USACE detail sheets.

Included an Asbestos Survey at the end of the section.

SECTION 02 83 13.00 20, LEAD IN CONSTRUCTION

Included a Lead-Based Paint Report at the end of the section.

SECTION 02 84 16, HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs AND

MERCURY

Added entire section.

SECTION 31 00 00, EARTHWORK

Subsection 1.4, SUBMITTALS Added a Dewatering Work Plan submittal.

Added number of copies of test results.

Subsection 2.1, REQUIREMENTS FOR OFFSITE SOILS Corrected grammar issues in text.

Subsection 3.1.1, Ditches, Gutters, and Channel Changes Corrected grammar issues in text.

Subsection 3.1.4, Dewatering Modified statement for requirement of dewatering work plan submittal by contractor.

Subsection 3.1.5.1, Bottom Preparation Changed dimension of stone sizes.

Subsection 3.9.1.4.1, Sidewalks, Turfed or Seeded Areas and Miscellaneous Areas Changed dimension of backfill thickness layers.

Subsection 3.12, FINISHING Changed dimension of degree of finish of the grades and elevations.

SECTION 31 23 00.00 20, EXCAVATION AND FILL

Subsection 1.3, SUBMITTALS Added a government approval requirement to the Dewatering Work Plan.

Subsection 1.7.2, Dewatering Work Plan

Modified statement for requirement of dewatering work plan submittal by contractor.

Added Geotechnical Report at the end of the section.

SECTION 31 63 00, MICROPILES

Subsection 1.6.1.b, MICROPILE DESIGN SUBMITTALS Revised wording of paragraph to clarify the Contractor’s responsibility.

BIDDER’S QUESTIONS AND GOVERNMENT REPLY

(Questions that may be of general interest to all Bidders and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Bidders “for information only” and do not revise the solicitation, plans or specifications.)

Bidder's Questions Government Response

I am reaching out on behalf of advanced testing to determine if the Army Corps will be responsible for hiring the special inspections on this project or if it will be the contractor.

Per 01 45 35 it is the contractors responsibility to procure the special inspections

I am bidding out the foundation for this project. I am looking for point loads along the wall from sheet S-101 for details typical of stem wall @ pilaster of which there are several around the perimeter walls. Would you be able to help with that detail so I can provide an accurate bid.

The pilasters are not a structural requirement, but an architectural feature for aesthetic purposes. Please see details on sheet A-311.

There are two card readers shown on drawing E-103. Attached is page 3 of the specs. (Division 28, Electronic Safety and Security) The spec section covers the fire alarm system but has no specs for access. Please provide spec.

Access control devices and details shown on the drawings indicate device locations and pathways only. Specification Section 26 20 00 Interior Distribution System covers conduit and boxes required for installation of access control system.

Due to complexity of the project, the bidder formally requests a two week extension due to bid date.

One week extension was provided in Amendment 4.

Will the government please consider a two week extension of the bid date? With the due date 10 business days from yesterday’s pre-bid meeting and given the complexity of the project we request this extension to properly prepare a bid and provide subcontractors and vendors ample time to quote.

One week extension was provided in Amendment 4.

The Granite Finish Schedule on contract drawing L-508 lists the color G603. We have been informed by industry vendors/subs that the quarry for G603 has been closed and that this color is no longer available. Will northern gray be an acceptable alternate?

Alternate Granite colors will be acceptable upon final approval from given samples for final that best match existing columbarium on site.

In Drawing E101, there are different lights shown in the building. But there is no label written on the lights that which light is which kind. On drawing E503, there are different kinds of lights given like NL-3, NL-5 etc. But where do we have to install it? Same with the Electrical site drawing ES102. Please advise.

Please refer to the Electrical Legend, Lighting on Sheet E-002 where a triangle with a letter inside it is identified as a "Lighting Fixture Type Symbol". Utilize those symbols to identify the fixture types shown on the lighting sheets referenced in your question.

Please refer to the Lighting Fixture Schedule on Sheet E-603 for Fixture Type identification. Refer to the referenced fixture plates for additional fixture information.

Specification 01 14 00 1.3.2 Working Hours requires the contractor to stop all work that may disrupt any memorial burial service that occurs in the cemetery. This unquantifiable downtime places the contractor at great risk as there is no way for the contractor to predict the quantity, duration and frequency of these events or the number and type of equipment, subcontractors, and trades at the site at the times these may happen. We request the USACE consider this downtime be paid as reimbursable costs or a pay item be added to the contract which pays for contractor downtime per hour to alleviate the contractor risk on this item.

It is the contractor’s responsibility to anticipate disruptions due to funeral services.

Please refer to an amendment in Specification 01 14 00 1.3.2 for the estimated quantity of funerals per year and duration.

Specification section 01 14 00 1.3.4 lists 6 exclusionary periods were no work is to be performed. Below this it states there are 30 calendar days were work is prohibited for cemetery operations. Please clarify if these are 30 additional full restricted work days separate from the downtime due to burial services described in the 1.3.2 working hours specification.

Per 01 14 00 1.3.4 the 6 exclusionary days are independent of the disruptions due to funeral services.

Please advise if a dump site is available on base for disposal of unsatisfactory excavation materials being removed from site.

The Contractor shall coordinate NYSDEC approved disposal sites through West Point, DEC and the Contracting Officer.

Sheet E101 appears to indicate exterior wall mounted light type E. Please provide fixture information for this unit.

Please refer to the Lighting Fixture Schedule on Sheet E-603 for Fixture Type identification. Refer to the referenced fixture plate Sheet E-504 for additional fixture information.

Detail XL-27 on sheet E-503 indicates site lighting poles are to be Steel or aluminum and tapered or straight. Please advise which options are preferred.

Please reference the notes in the lighting fixture schedule for the Type F fixture for pole information.

Sheet E103 indicates two card readers. However, electronic safety and security and access control specifications were not provided. Please provide these specifications.

Access control devices and details shown on the drawings indicate device locations and pathways only. Specification Section 26 20 00 Interior Distribution System covers conduit and boxes required for installation of access control system.

Amendment 002 was uploaded to FBO.gov today and indicates additional plans and specs are included. Attempting to upload these documents resulted in an error message indicating the source material may have an issue. Please advise. Based on the issuance of these revised documents and the proximity of the close of RFIs to the bid date please additionally advise if the bid date can be extended.

Error message is resolved.

During the site visit, we reviewed the site from the bottom of the slope behind the new retaining wall and discussed the possibility of site access from that side. Please advise if this site access point will be allowed.

Contractor will be allowed site access from the bottom of the slope. The exact location of access from the bottom of the slope is yet to be determined but will most likely near the Waste Water Treatment facility (either on one side or the other of the facility).

Specification Section 02 61 13 1.2 states that characterization data on the the nature and extent of the contaminated material is shown as an appendix to the specification. We have not been able to locate the appendix, can this be made available?

Please refer to amendment in Specification Sections 02 83 13.00 10 for Asbestos Survey, Specification Sections 02 83 13.00 20 for Lead-Base Paint Report and Specification Section 31 23 00.00 20 for Geotechnical Report.

Can the contractor utilize space in the existing parking lot adjacent to the site for contractor parking, staging and office

Please refer to amendment in drawing GC100, CG111 and CG112 for laydown areas.

Specification 31 63 00 1.4.1 and plan sheet BB-101 state that geotechnical reports are available. We have not found these in the documents, can these be made available for use in bidding the project?

Please refer to amendment in Specification Section 31 23 00.00 20 for Geotechnical Report.

(End of Summary of Changes)