AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Revise and reissue the draw ings and specif ications in their entirety (summary of changes below ).
2. Post the Site Visit sign-in sheet from the 30 July 2019.
3. Bid opening remains 13 August 2019 at 2:00PM EST.
NOTE: Bidders must acknow ledge receipt of this amendment by date specified in the bid (or as amended) by one of the follow ing methods: In the space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATION OF BID, OR LATE
WITHDRAWAL OF BID (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Aug-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS19B0014
X 9B. DATED (SEE ITEM 11)
11-Jul-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Aug-2019
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS19B0014
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been added by full text:
AMENDMENT 0002
TO BIDDERS:
The following changes shall be made to the drawings and specifications.
DRAWINGS:
G-002 Revised Sheet H-101 sheet title.
H-101 Revised sheet and detail titles, Note 3, and title of points table.
CD001 Revised Tree Protection Guidelines.
CS001 Re-numbered options to be consistent with the bid schedule. Bid schedule remains unchanged.
CS002 Re-numbered options to be consistent with the bid schedule. Bid schedule remains unchanged.
CS110 Revised root barrier location.
CS501 Revised Lawn Crypt gravel details.
CS502 Revised Lawn Crypt gravel details.
CG102 Added note 4 concerning quantity of piping in the base bid.
CG103 Added note 4 concerning quantity of piping in the base bid.
L-508 Revised General Notes.
CG201 Revised Note 5 wording.
CG201 Revised Note 5 wording.
CG201 Revised Note 5 wording.
LP101 Clarified native seed mix on slope area only.
S-001 Revised General Structural Notes and General Concrete Notes.
S-101 Detail C1, Adjusted thickened slab locations under interior walls and stairs to match adjustments for telecomm room #103.
S-102 Detail D1, Extended mezzanine 9" to east as part of telecomm room #103 adjustment.
A-101 Detail C1, Modified layout of office, storage room, employee bathroom and comm room to meet telecomm room #103 minimum size requirements.
A-102 Detail C1, Extended mezzanine 9" and shifted stairs to east as part of modification for telecomm room #103
A-103 Detail D1, Modified ceiling grid / fixture layout based on adjustments for telecomm room #103.
A-103 Detail D5, Revised outline of mezzanine and stair.
A-111 Detail C1, Added ice dam protection membrane along top edge at ridge vent opening.
A-111 Details A1, A3, A6, and A8, Added ice dam protection membrane, adhered directly to plywood sheathing, to details.
A-201 Keynotes 10 and 14, Modified size of and clarified intake/exhaust vents per mechanical revision.
A-202 Details D1 and D5, Modified size of and clarified intake/exhaust vents per mechanical revision.
A-202 Keynotes 10 and 14, Modified size of and clarified intake/exhaust vents per mechanical revision.
A-301 Details D1 and D5, Modified size of and clarified intake/exhaust vents per mechanical revision.
A-301 Keynote 4, Modified size of and clarified intake/exhaust vents per mechanical revision.
A-401 Detail D1, Adjusted plan (moved east wall and mop sink) as part of revisions for telecomm room
#103.
A-402 Detail A1, Updated Elevations A and C to match plan update for telecomm room #103
A-601 Detail C1, Revised hardware list for doors
P-001 Revised valve symbols in Legend & Abbreviations.
P-002 Detail A1, Revised water riser diagram to accommodate new pressure reducing valve.
P-002 Detail F1, Included typical pressure reducing valve installation detail.
P-101 Detail B2, Included pressure reducing valve for water system on floor plan with reference note.
M-001 Added additional symbols/abbreviations to legend.
M-101 Added occupancy sensors to rest rooms and vehicle bays. Added motorized damper to outdoor air intake. Removed extra thermostat from office. Changed diffuser type in electrical room.
Removed extra smoke detector from vehicle bay. Revised Keynotes 3, 7, 11, 13, 14, 15, and 17.
Added Keynotes 20 and 21.
M-601 Added Register Type “B”. Removed note from fan schedule.
M-701 Revised exhaust fans sequence of operation. Added occupancy sensor to exhaust fans diagram.
Added motorized damper to AHU-1 diagram.
E-001 Added list of standards to General Electrical Notes.
E-002 Moved Electrical Legend – (Medium Voltage One-Line Diagrams) to this sheet from E-001.
E-101 Connected light fixture in telecom room to circuit P1-4. Removed from panel SHW.
E-502 Added UG-4 handhole detail.
E-504 Added light fixture plate XL-17.
E-601 Detail C5, Revised Electrical One-Line diagram – New Work – Maintenance Facility.
E-601 Detail F5, Revised Partial Power Riser Diagram – Demolition – Building 697.
E-603 Revised Panelboard SHW Schedule.
E-604 Added Single Line Diagram and Rack Elevation for Cemetery Land Reclamation
Telecommunications.
SPECIFICATIONS:
SECTION 01 14 00, WORK RESTRICTIONS
Subsection 1.3.1.2, Visitor Access/Contractor Badging Revised entire section.
Subsection 1.3.2, Working Hours Revised length of working hours period.
Subsection 1.3.3, Work Outside Regular Hours Removed reference to utility cutovers.
Subsection 1.3.4, Exclusionary Period Removed reference to days prohibited due to cemetery operations.
SECTION 01 45 00.00 10, QUALITY CONTROL
Subsection 3.2, CONTRACTOR QUALITY CONTROL (CQC) PLAN Removed four bullets at the end of the section.
Subsection 3.7.2.2, Capability Recheck Changed amount of capability recharge check.
Subsection 3.9.2, Verification Statement Change time allowed for records to be furnished.
SECTION 01 50 00, TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
Subsection 2.3, FENCING Added plastic strip inserts to be included.
Subsection 3.2.6, Water Added requirement concerning bottled water.
Subsection 3.4.9, New Building Changed section to prohibit construction of new buildings
SECTION 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS
Subsection 3.14, MILITARY MUNITIONS Removed all but the first paragraph.
SECTION 03 48 21, PRECAST CONCRETE BURIAL CRYPTS
Subsection 1.4.7, Design Criteria Revised entire section.
SECTION 04 43 00, NATURAL STONE VENEER AND CUT STONE
Subsection 1.4, SUBMITTALS SD-02 Shop Drawings – Added niche covers.
SECTION 05 50 13, MISCELLANEOUS METAL FABRICATIONS
Subsection 1.2, SUBMITTALS Added SD-04 Samples Columbarium Niche Cabinets.
Added Subsection 1.5.3, Mock-Ups.
SECTION 32 05 33, LANDSCAPE ESTABLISHMENT
Subsection 3.3.1, Frequency of Maintenance Revised explanation of Establishment Period.
SECTION 32 92 23, SODDING
Subsection 3.1.2, Soil Preparation Revised depth of topsoil.
(End of Summary of Changes)