Amendment-2_to_Request_for_Prqualification_Information_-_Bridge_Work_W912DS18R0001.pdf
PDF 45 KB Posted
- Attached to
- Bridge Work, Physical Security/Safety Improvements Federal contract opportunity
- Solicitation number
- W912DS18R0001
About this file
Amendment 2 to Request for Prequalification Information
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Prequalified_Offeror_List.pdf | ||
| Amendment-4_to_Request_for_Prqualification_Information_-_Bridge_Work_W912DS18R0001.pdf | ||
| QA_4_for_Prequalification_Phase_W912DS18R0001.pdf | ||
| Q&A_3_for_Prequalification_Phase_W912DS18R0001.pdf | ||
| Amendment-3_to_Request_for_Prqualification_Information_-_Bridge_Work_W912DS18R0001.pdf | ||
| Q&A_2_for_Prequalification_Phase_W912DS18R0001.pdf | ||
| Q&A_for_Prequalification_Phase_W912DS18R0001_6-7-2018.pdf | ||
| Amendment-1_to_Request_for_Prqualification_Information_-_Bridge_Work_W912DS18R0001.pdf | ||
| Request_for_Prqualification_Information_-_Bridge_Work-W912DS18R0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 2 to:
Request for Prequalification Information
Bridge Work, Physical Security/Safety Improvements
(FedBizOpps Notice W912DS18R0001) (11 June 2018)
The subject Request for Prequalification Information is amended as indicated below. All other requirements and information in the original request are unchanged.
• FACTORS FOR EVALUATION, BASIS OF AWARD, EVALUATION CRITERIA,
RATING SYSTEM AND DEFINITIONS (SECTION 00 22 11) is amended as follows:
1. Paragraph 3.1.1.1.c. is replaced in its entirety with the following (key changes have been highlighted):
Intumescent Mastic Fireproofing: The Offeror (Prime Contractor) and/or its key subcontractor shall demonstrate via examples of projects completed within the last fifteen (15) years and of similar scope, magnitude and complexity, demonstrating their ability to perform such work. Scope is defined as work applying intumescent mastic coatings (fireproofing). Magnitude is defined as a total cost of over $1M in a single project/contract. Complexity is defined as application of intumescent mastic coatings involving the management and coordination of two (2) or more trades and/or subcontractors in a major metropolitan area. Complexity is further defined as the Offeror's and/or key subcontractor's personnel demonstrating the ability to perform surface preparation or coating application in accordance w/ the certifications defined by AISC 201-06 SPE; ISO 9001; SSPC QP 1, SSPC QP2 Category A or B; SSPC QP 3.
(Personnel of the Offerors and/or key subcontractors will be required to remain certified while accomplishing any surface preparation or coating application on this project.)
Submit at least three (3) relevant projects, showing a minimum of 3 years documented experience working on similar projects, w/ at least one (1) of the projects meeting the magnitude requirement of over $1M in a single project/contract (the other two (2) examples submitted may be of any dollar value and do not have to meet the defined magnitude).
2. The following is added to paragraph 3.1.2.1:
The Government is not requesting at this time, and does not intend to evaluate alternate personnel at this time. References to the alternate personnel in Factor 2 are listed in the event that any of the required personnel need to be replaced, in which case contractors will be required to provide personnel w/ qualifications that are equal to or greater than the requirements in the RFP/specification, or the original personnel that were submitted, whichever is greater. All substituted personnel will be subject to approval by the Government. To ensure sufficient coverage during construction, the successful offeror will be asked by the Government to submit alternate personnel specifically for the Contractor Quality Control System Manager and the Site Safety and Health Officer, after Notice to Proceed (NTP) is provided.
• NOTE: Attached with this amendment are Questions and Answers (Q&A#2 for Prequalification Phase W912DS18R0001.pdf), which are provided for informational purposes only.