Amendment_2-_Specs.pdf
PDF 12 MB Posted
- Solicitation number
- W912DS-17-B-0007
About this file
SPECIFICATIONS FOR AMENDMENT 0002
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MTOC - 1
MAIN TABLE OF CONTENTS
CT4
SECTION TITLE
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 10 00 SF 1442 AND BIDDING SCHEDULE
00 21 16 INSTRUCTIONS, CONDITIONS, AND NOTICE TO BIDDERS
(to be provided by Contracting Division)
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
(to be provided by Contracting Division)
00 72 00 CONTRACT CLAUSES
(to be provided by Contracting Division)
00 73 00 SPECIAL CONTRACT REQUIREMENTS
LIST OF DOCUMENTS, EXHIBITS & OTHER ATTACHMENTS
00 90 01 WAGE RATES
(To be provided by Contracting Division)
00 90 02 PERMITS
00 90 03 GEOTECHNICAL DATA BORING DATA
00 90 04 SEDIMENT SAMPLING RESULTS
00 90 05 JCP&L REQUIREMENTS
00 90 06 NJ AMERICAN WATER-STANDARD PIPELINE SPECS
TECHNICAL PROVISIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 22 00.00 10 MEASUREMENT AND PAYMENT
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)
01 54 00 MOBILIZATION AND DEMOBILIZATION
01 55 26 TRAFFIC CONTROL
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 23.00 18 TEMPORARY STORM WATER POLLUTION CONTROL
01 74 19 CONSTRUCTION AND DEMOLITION WASTE
MANAGEMENT
e3enpsrm Cross-Out
MTOC - 2
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 01 51 VIBRATION MONITORING OF STRUCTURES
02 27 50.00 18 FLOATING TURBIDITY BARRIER
DIVISION 03 - CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 31 01.00 10 CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL
WORKS
03 39 00.00 10 CONCRETE CURING
DIVISION 05 - METALS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 50 16 BLOCK AND TACKLE SYSTEM
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
05 59 13 FABRICATION OF HYDRAULIC STEEL STRUCTURES
DIVISION 09 - FINISHES
09 97 02 PAINTING: HYDRAULIC STRUCTURES
DIVISION 26 - ELECTRICAL
26 28 00.00 10 PANELBOARDS AND MANUAL TRANSFER SWITCHES AND
CONDUITS
26 43 13.00 18 SURGE PROTECTIVE DEVICES FOR LOW-VOLTAGE
ELECTRICAL POWER CIRCUITS
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 19 GEOTEXTILE
31 11 00 CLEARING AND GRUBBING
31 23 00.00 20 EXCAVATION AND FILL
31 32 11 SOIL SURFACE EROSION CONTROL
31 41 16 METAL SHEET PILING
31 62 16.16 STEEL H PILES
MTOC - 3
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE
BASE COURSE
32 12 10 BITUMINOUS TACK AND PRIME COATS
32 12 17 HOT MIX BITUMINOUS PAVEMENT
32 92 19 SEEDING
32 93 00 EXTERIOR PLANTING
DIVISION 33 - UTILITIES
33 30 00 SANITARY SEWERS
33 40 00 STORM DRAINAGE UTILITIES
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 01 70.13 WIRE ROPE FOR GATE OPERATING DEVICES
35 20 16.59 CLOSURE GATES
35 22 26 SLUICE GATES
35 31 19 STONE RIPRAP CONSTRUCTION
SECTION 00 90 01
Wage Rates
00 90 01-1
General Decision Number: NJ170058 09/01/2017 NJ58
Superseded General Decision Number: NJ20160058
State: New Jersey aed 10/05/2017
Construction Type: Heavy
County: Monmouth County in New Jersey.
HEAVY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.
The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2017 1 02/10/2017 2 03/03/2017 3 04/21/2017 4 05/19/2017 5 06/02/2017 6 06/09/2017 7 08/04/2017 8 09/01/2017
ASBE0032-005 09/19/2015
MONMOUTH COUNTY (Township of Aberdeen; Borough of Allenhurst; City of Asbury Park;
Boroughs of Atlantic Highlands, Avon-by-the-sea, Belmar and Bradley Beach; Township of Colts Neck; Boroughs of Deal, Eatontown and Fair Haven; Township of Hazlet; Borough of Highlands;
Township of Holmdel; Boroughs of Keansburg, Keyport and Little Silver; Township of Marlboro;
Borough of Matawan; Township of Middletown; Borough of Monmouth Beach; Township of
00 90 01-2
Neptune; Boroughs of Neptune City, Oceanport, Red Bank, Sea Bright and Shrewsbury;
Township of Shrewsbury; Boroughs of South Belmar, Union Beach and West Long Branch):
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR (Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement).............................................$ 47.24 31.95
ASBE0089-005 07/01/2016
MONMOUTH COUNTY (Borough of Freehold; Townships of Freehold, Howell, Millstone, Upper Freehold and Wall)
ASBESTOS WORKER/HEAT & FROST
INSULATOR ((includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement))...........................................$ 42.02 31.83
PAID HOLIDAYS:
The last day prior to the Christmas and New Year's Day observed holiday: 4 hrs. pay.
BRNJ0004-001 11/01/2016
Rates Fringes
CEMENT MASON...................................................................$ 40.00 29.29
CARP0006-013 05/01/2017
00 90 01-3
CARPENTER (Including Form Work)......................................$ 47.28 57%
The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.
CARP0454-009 05/01/2016
Rates Fringes
PILEDRIVERMAN....................................................................$ 43.95 31.32
PAID HOLIDAYS:
New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day; provided that the worker works any of the three days in the five-day work week preceding the holiday and the first work day after the holiday.
CARP0715-007 11/01/2016
Rates Fringes
Millwright.............................................................................$ 46.55 56%
Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.
ELEC0400-007 05/29/2017
Rates Fringes
Electrician & Cable Splicer.......................................................$ 47.50 34.68
ENGI0825-021 01/01/2016
00 90 01-4
Power equipment operators:
GROUP 1.............................................................................$ 47.70 29.80 GROUP 2.............................................................................$ 46.05 29.80 GROUP 3.............................................................................$ 43.91 29.80 GROUP 4.............................................................................$ 42.41 29.80 GROUP 5.............................................................................$ 40.69 29.80
Hazardous waste removal work:
Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: 20% per hour additional.
PAID HOLIDAYS:
New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided
1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday.
DEFINITION OF GROUPS:
GROUP 1:
Backhoe, Including Backhoe Track; Boom; Concrete Paving Machine; Crane (all types, including overhead and straddle traveling type); Drill (down-the-hole drill, rotary drill, self-propelled hydraulic drill, self-powered drill);
Elevating Grader; Excavator; Front End Loader (5 cu. yd.
and over); Piledriver (length of boom, including length of leads, shall determine premium rate applicable)
GROUP 2:
Backhoe Loader Combo; Concrete Pumper; Grader/Blade (Finish);
Hoist; Hydraulic Crane, 10 Tons and under; Front End Loader (2 cu. yd. but less than 5 cu. yd.); Scraper; Side Boom
00 90 01-5
GROUP 3:
Asphalt Spreader; Bulldozer; Compressor(2 or 3) (in Battery) (within 100 ft.); Crusher; Forklift; Front End Loader (1
cu. yd. and over but less than 2 cu. yd.); Lull; Mechanic;
Paver, Asphalt; Roller, Blacktop; Tractor;
GROUP 4:
Broom; Compressor (Single); Farm Tractor; Front End Loader (under 1 cu. yd.); Roller, Grade; Pump
GROUP 5:
Oiler
IRON0011-013 07/01/2016
Rates Fringes
IRONWORKER
Reinforcing.........................................................................$ 39.24 42.92 Structural, Ornamental, Rigger..........................................$ 41.54 42.92
LABO0172-009 03/01/2017
Rates Fringes
Laborers:
Common or General Laborer; Landscape Laborer, Power Tool Operator................................................$ 38.75 28.60 Pipelayer..........................................................................$ 39.45 28.60
Hazardous waste removal work:
Work on a state or federally designated hazardous waste site, where the worker is required to wear Level A, B or C personal protection: $3.00 per hour additional.
Work on a state or federally designated hazardous waste site, where the worker is not required to wear Level A, B, or C personal protection: $1.00 per hour additional.
New Year's Day, President's Day, Memorial Day, 00 90 01-6
Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided that the worker works three days for the same employer within a period of ten working days consisting of five working days before and five working days after the day upon which the holiday falls or is observed.
LABO0222-013 07/01/2012
Rates Fringes
LABORER
MASON TENDER:
Cement/Concrete................................................................$ 29.35 23.07
PAIN0711-023 05/01/2017
Rates Fringes
Painters:
Work on bridges (Major Bridges Designed for Commercial Navigation)...................................................$ 54.13 27.12
PAIN0711-024 05/01/2017
Rates Fringes
Painters:
New Construction Brush and roller.................................$ 40.19 22.72 Repaint work, on projects on which no major alterations occur.
Brush and roller................................................................$ 29.05 18.91
PLUM0009-024 03/01/2017
Rates Fringes
PIPEFITTER...........................................................................$ 47.47 35.51 Service and Repair...........................................................$ 37.48 21.08
* TEAM0469-008 05/01/2017
00 90 01-7
Truck drivers:
Dump Truck; Flatbed Truck;Pick up truck............................................................$ 39.50 30.985 Off the Road Truck.............................................................$ 39.65 30.985
Hazardous waste removal work:
Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional.
Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional.
Work on a state or federally designated hazardous waste site where the worker is not working in a zone requiring Level A, B or C personal protection: $1.00 per hour additional.
New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day.
VACATION PAY CREDIT:
Workers working or receiving pay for 80 days within a year receive one week paid vacation (48 hours); 125 days receive two weeks paid vacation (96 hours); 145 days receive 15 days paid vacation (120 hours); 15 years seniority and 145 days receive 4 weeks paid vacation (160 hours).
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
00 90 01-8
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.
07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
00 90 01-9
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the
00 90 01-10 response from this initial contact is not satisfactory, then the process described in 2.) and 3.)
should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
SECTION 00 90 03
GEOTECHNICAL DATA
SUBSURFACE INFORMATION
The physical conditions indicated on the drawings and in the specifications are the result of site investigations by surveys, borings, and/or other in-situ testing methods including flat plate dilatometer tests. Measured and interpreted parameters obtained from these in-situ tests are included. Foundation exploration logs inserted in this Section. The exploration logs presented represent the best subsurface information available; however, variations may exist in the subsurface between samples and between boring locations and will vary with time and season. Portions of the geotechnical data other than the boring logs, in-situ testing results (measured parameters only), and laboratory testing data are interpretive, are provided as background information only, and shall not be used as a basis for bid or construction.
2.5
0.50.5
-1.5-1.5
-3.5-3.5
-7.5-7.5
-17.5-17.5
0.0
2.02.0
4.04.0
6.06.0
10.010.0
20.020.0
LE
G
E N
D
CLASSIFICATION OF MATERIALS
(Description)
REC.
SAMPLE/
BOX
ELEV.
(ft)
DEPTH
(ft) RQD
Length
RQD
(in)
Length
REC.
(ft)
SPT/
AB/
CR
PP/
tsf
Blows/
0.5 ft
NSPT
3. DRILLING AGENCY
DISTURBED
North Atlantic
7. THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAL DEPTH OF HOLE
15. ELEVATION GROUND WATER
Baltimore District
Hole No. NW-1
INSTALLATION SHEET
NAVD88
UNDISTURBED
2. BORING LOCATION (Coordinates or Station)
12. MANUFACTURER'S DESIGNATION OF DRILL
11a. VERTICAL DATUM 11b. HORIZONTAL DATUM
17. ELEVATION TOP OF HOLE
OF
6. DIRECTION OF HOLE
DIVISION
DRILLING LOG
SHEETS
18. TOTAL ROCK CORE RECOVERY FOR BORING
4. NAME OF DRILLER
19. SIGNATURE OF INSPECTOR
14. TOTAL # OF CORE BOXES
13. TOTAL NO. OF OVERBURDEN
SAMPLES TAKEN
NAD83
1. PROJECT
16. DATE/
TIME
Port Monmouth, NJ - Phase II
N/A
COMPLETED
10. SIZE AND TYPE OF BIT
STARTED
VERTICAL INCLINED DEG. FROM VERT.
5. NAME OF INSPECTOR
New York District Corps of Engineers
2.5 ft
N 580,207.22 E 604,781.32
24.0 ft
2.8ft
C E
N A
N
LE
T
T E
R
V
IS
U A
L A
N D
L A
B O
V E
R P
O R
T M
O N
M O
U T
H
M A
Y
W
O R
K
IN
G .G
P J
A C
E M
V D
W
IT
H R
A P
ID
C
P T
9_
3_
.G D
T
/2 9/
Port Monmouth, NJ - Phase II NW-1DURING
DRILLING
AFTER
DRILLING
PROJECT HOLE NO.1836 AT
COMPLETIONJUN 15
NAN FORM
S-1
S-2
S-3
S-4
S-5
S-6
S-7
S-8
S-9
S-10
SPT
SPT
SPT
SPT
SPT
SPT
SPT
SPT
SPT
SPT
SILTY SAND (SM), fine; brown.
(SP-SM) Poorly Graded SAND with SILT
SILTY SAND (SM), very fine to fine.
POORLY GRADED SAND W/ SILT
(SP-SM), very fine to fine; gray green.
POORLY GRADED SAND (SP), medium;
tan to yellow brown, trace silt.
-19.5-19.5
-21.5
22.022.0
24.0
2 SHEETS
PROJECT 2INSTALLATION
ELEVATION TOP OF HOLE
Hole No. NW-1
SHEET
OF
DRILLING LOG (Cont. Sheet) 2.5 ft
Port Monmouth, NJ - Phase II New York District Corps of Engineers
LE
G
E N
D
CLASSIFICATION OF MATERIALS
(Description)
REC.
SAMPLE/
BOX
ELEV.
(ft)
DEPTH
(ft) RQD
Length
RQD
(in)
Length
REC.
(ft)
SPT/
AB/
CR
PP/
tsf
Blows/
0.5 ft
NSPT
C E
N A
N
LE
T
T E
R
V
IS
U A
L A
N D
L A
B O
V E
R P
O R
T M
O N
M O
U T
H
M A
Y
W
O R
K
IN
G .G
P J
A C
E M
V D
W
IT
H R
A P
ID
C
P T
9_
3_
.G D
T
/2 9/
Port Monmouth, NJ - Phase II NW-1DURING
DRILLING
AFTER
DRILLING
PROJECT HOLE NO.1836-A AT
COMPLETIONJUN 15
NAN FORM
S-11
S-12
SPT
SPT
(SP) Poorly Graded SAND
POORLY GRADED SAND (SP), fine to medium.
3.2
1.2
-0.8
-2.8
-4.8
-10.8-10.8
-12.8-12.8
-14.8-14.8
0.0
2.0
4.0
6.0
8.0
14.014.0
16.016.0
18.018.0
LE
G
E N
D
CLASSIFICATION OF MATERIALS
(Description)
REC.
SAMPLE/
BOX
ELEV.
(ft)
DEPTH
(ft) RQD
Length
RQD
(in)
Length
REC.
(ft)
SPT/
AB/
CR
PP/
tsf
Blows/
0.5 ft
NSPT
3. DRILLING AGENCY
DISTURBED
North Atlantic
7. THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAL DEPTH OF HOLE
15. ELEVATION GROUND WATER
Baltimore District
Hole No. PM-1
INSTALLATION SHEET
NAVD88
UNDISTURBED
2. BORING LOCATION (Coordinates or Station)
12. MANUFACTURER'S DESIGNATION OF DRILL
11a. VERTICAL DATUM 11b. HORIZONTAL DATUM
17. ELEVATION TOP OF HOLE
OF
6. DIRECTION OF HOLE
DIVISION
DRILLING LOG
SHEETS
18. TOTAL ROCK CORE RECOVERY FOR BORING
4. NAME OF DRILLER
19. SIGNATURE OF INSPECTOR
14. TOTAL # OF CORE BOXES
13. TOTAL NO. OF OVERBURDEN
SAMPLES TAKEN
NAD83
1. PROJECT
16. DATE/
TIME
Port Monmouth, NJ - Phase II
N/A
COMPLETED
10. SIZE AND TYPE OF BIT
STARTED
VERTICAL INCLINED DEG. FROM VERT.
5. NAME OF INSPECTOR
New York District Corps of Engineers
3.2 ft
N 581,034.08 E 604,325.45
24.0 ft
1.8ft
C E
N A
N
LE
T
T E
R
V
IS
U A
L A
N D
L A
B O
V E
R P
O R
T M
O N
M O
U T
H
M A
Y
W
O R
K
IN
G .G
P J
A C
E M
V D
W
IT
H R
A P
ID
C
P T
9_
3_
.G D
T
/2 9/
Port Monmouth, NJ - Phase II PM-1DURING
DRILLING
AFTER
DRILLING
PROJECT HOLE NO.1836 AT
COMPLETIONJUN 15
NAN FORM
S1
S2
S3
S4
S5
S6
S7
S8
S9
S10
SPT
SPT
SPT
SPT
SPT
SPT
SPT
SPT
SPT
SPT
SILTY SAND (SM), very fine; dark brown, moist.
Dark brown, wet.
SILTY SAND (SM), fine; brown.
Brown, trace gravel.
Dark gray.
(CL) Silty Lean CLAY
SILTY LEAN CLAY (CL), gray, Slightly micaceous.
FINE SAND (SP), and medium sand, trace silt.
-17.8-17.8
-20.8
21.021.0
24.0
2 SHEETS
PROJECT 2INSTALLATION
ELEVATION TOP OF HOLE
Hole No. PM-1
SHEET
OF
DRILLING LOG (Cont. Sheet) 3.2 ft
Port Monmouth, NJ - Phase II New York District Corps of Engineers
LE
G
E N
D
CLASSIFICATION OF MATERIALS
(Description)
REC.
SAMPLE/
BOX
ELEV.
(ft)
DEPTH
(ft) RQD
Length
RQD
(in)
Length
REC.
(ft)
SPT/
AB/
CR
PP/
tsf
Blows/
0.5 ft
NSPT
C E
N A
N
LE
T
T E
R
V
IS
U A
L A
N D
L A
B O
V E
R P
O R
T M
O N
M O
U T
H
M A
Y
W
O R
K
IN
G .G
P J
A C
E M
V D
W
IT
H R
A P
ID
C
P T
9_
3_
.G D
T
/2 9/
Port Monmouth, NJ - Phase II PM-1DURING
DRILLING
AFTER
DRILLING
PROJECT HOLE NO.1836-A AT
COMPLETIONJUN 15
NAN FORM
S11
S12
SPT
SPT
SILTY CLAY (CL), dark brown, little organics.
5.7
3.7
1.7
-0.3
-4.3-4.3
-6.3-6.3
-8.3-8.3
-10.3
-12.3
-14.3-14.3
0.0
2.0
4.0
6.0
10.010.0
12.012.0
14.014.0
16.0
18.0
20.020.0
LE
G
E N
D
CLASSIFICATION OF MATERIALS
(Description)
REC.
SAMPLE/
BOX
ELEV.
(ft)
DEPTH
(ft) RQD
Length
RQD
(in)
Length
REC.
(ft)
SPT/
AB/
CR
PP/
tsf
Blows/
0.5 ft
NSPT
3. DRILLING AGENCY
DISTURBED
North Atlantic
7. THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAL DEPTH OF HOLE
15. ELEVATION GROUND WATER
Baltimore District
Hole No. PM-2
INSTALLATION SHEET
NAVD88
UNDISTURBED
2. BORING LOCATION (Coordinates or Station)
12. MANUFACTURER'S DESIGNATION OF DRILL
11a. VERTICAL DATUM 11b. HORIZONTAL DATUM
17. ELEVATION TOP OF HOLE
OF
6. DIRECTION OF HOLE
DIVISION
DRILLING LOG
SHEETS
18. TOTAL ROCK CORE RECOVERY FOR BORING
4. NAME OF DRILLER
19. SIGNATURE OF INSPECTOR
14. TOTAL # OF CORE BOXES
13. TOTAL NO. OF OVERBURDEN
SAMPLES TAKEN
NAD83
1. PROJECT
16. DATE/
TIME
Port Monmouth, NJ - Phase II
N/A
COMPLETED
10. SIZE AND TYPE OF BIT
STARTED
VERTICAL INCLINED DEG. FROM VERT.
5. NAME OF INSPECTOR
New York District Corps of Engineers
5.7 ft
N 581,537.1 E 604,863.56
24.0 ft
6.0ft
C E
N A
N
LE
T
T E
R
V
IS
U A
L A
N D
L A
B O
V E
R P
O R
T M
O N
M O
U T
H
M A
Y
W
O R
K
IN
G .G
P J
A C
E M
V D
W
IT
H R
A P
ID
C
P T
9_
3_
.G D
T
/2 9/
Port Monmouth, NJ - Phase II PM-2DURING
DRILLING
AFTER
DRILLING
PROJECT HOLE NO.1836 AT
COMPLETIONJUN 15
NAN FORM
SPT
SPT
SPT
SPT
SPT
SPT
SPT
SPT
SPT
SPT
POORLY GRADED SAND (SP), fine; brown, dry, trace silt, trace rootlets, trace gravel, predom qtz.
Very moist, no organics, moist to wet.
Light brown, wet.
Trace silt.
(SP-SM) Poorly Graded SAND with SILT
POORLY GRADED SAND (SP), fine to medium; light brown, wet, trace silt, trace gravel, predom qtz.
POORLY GRADED SAND W/ SILT
(SP-SM), fine to medium; light brown mottled with red, trace rock fragments, Begin mud at 14.0.
Yellow with brown.
Light brown mottled with red, trace gravel, trace rock fragments.
-16.8
-17.8-17.8
-18.3
22.5
23.523.5
24.0
2 SHEETS
PROJECT 2INSTALLATION
ELEVATION TOP OF HOLE
Hole No. PM-2
SHEET
OF
DRILLING LOG (Cont. Sheet) 5.7 ft
Port Monmouth, NJ - Phase II New York District Corps of Engineers
LE
G
E N
D
CLASSIFICATION OF MATERIALS
(Description)
REC.
SAMPLE/
BOX
ELEV.
(ft)
DEPTH
(ft) RQD
Length
RQD
(in)
Length
REC.
(ft)
SPT/
AB/
CR
PP/
tsf
Blows/
0.5 ft
NSPT
C E
N A
N
LE
T
T E
R
V
IS
U A
L A
N D
L A
B O
V E
R P
O R
T M
O N
M O
U T
H
M A
Y
W
O R
K
IN
G .G
P J
A C
E M
V D
W
IT
H R
A P
ID
C
P T
9_
3_
.G D
T
/2 9/
Port Monmouth, NJ - Phase II PM-2DURING
DRILLING
AFTER
DRILLING
PROJECT HOLE NO.1836-A AT
COMPLETIONJUN 15
NAN FORM
SPT
SPT
POORLY GRADED SAND (SP), fine; yellow with tan, wet, trace silt.
Yellow with tan, Slightly laminated.
POORLY GRADED SAND W/ SILT
(SP-SM), fine; orange, Slightly laminated.
4.5
2.52.5
0.50.5
-1.5-1.5
-3.5-3.5
-9.5-9.5
-11.5-11.5
-15.5-15.5
0.0
2.02.0
4.04.0
6.06.0
8.08.0
14.014.0
16.016.0
20.020.0
LE
G
E N
D
CLASSIFICATION OF MATERIALS
(Description)
REC.
SAMPLE/
BOX
ELEV.
(ft)
DEPTH
(ft) RQD
Length
RQD
(in)
Length
REC.
(ft)
SPT/
AB/
CR
PP/
tsf
Blows/
0.5 ft
NSPT
3. DRILLING AGENCY
DISTURBED
North Atlantic
7. THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAL DEPTH OF HOLE
15. ELEVATION GROUND WATER
Baltimore District
Hole No. PM-3
INSTALLATION SHEET
NAVD88
UNDISTURBED
2. BORING LOCATION (Coordinates or Station)
12. MANUFACTURER'S DESIGNATION OF DRILL
11a. VERTICAL DATUM 11b. HORIZONTAL DATUM
17. ELEVATION TOP OF HOLE
OF
6. DIRECTION OF HOLE
DIVISION
DRILLING LOG
SHEETS
18. TOTAL ROCK CORE RECOVERY FOR BORING
4. NAME OF DRILLER
19. SIGNATURE OF INSPECTOR
14. TOTAL # OF CORE BOXES
13. TOTAL NO. OF OVERBURDEN
SAMPLES TAKEN
NAD83
1. PROJECT
16. DATE/
TIME
Port Monmouth, NJ - Phase II
N/A
COMPLETED
10. SIZE AND TYPE OF BIT
STARTED
VERTICAL INCLINED DEG. FROM VERT.
5. NAME OF INSPECTOR
New York District Corps of Engineers
4.5 ft
N 582,263.19 E 604,843.53
24.0 ft
3.0ft
C E
N A
N
LE
T
T E
R
V
IS
U A
L A
N D
L A
B O
V E
R P
O R
T M
O N
M O
U T
H
M A
Y
W
O R
K
IN
G .G
P J
A C
E M
V D
W
IT
H R
A P
ID
C
P T
9_
3_
.G D
T
/2 9/
Port Monmouth, NJ - Phase II PM-3DURING
DRILLING
AFTER
DRILLING
PROJECT HOLE NO.1836 AT
COMPLETIONJUN 15
NAN FORM
S1
S2
S3
S4
S5
S6
S7
S8
S9
S10
SPT
SPT
SPT
SPT
SPT
SPT
SPT
SPT
SPT
SPT
SILTY SAND (SM), brown, trace rootlets.
(SM) SILTY SAND
SILTY SAND (SM), gray with green, wet, some silt, trace gravel.
(SM) SILTY SAND
SILTY SAND (SM), with organics.
(SM) SILTY SAND
(SP-SM), fine; gray with green.
-19.5 24.0
2 SHEETS
PROJECT 2INSTALLATION
ELEVATION TOP OF HOLE
Hole No. PM-3
SHEET
OF
DRILLING LOG (Cont. Sheet) 4.5 ft
Port Monmouth, NJ - Phase II New York District Corps of Engineers
LE
G
E N
D
CLASSIFICATION OF MATERIALS
(Description)
REC.
SAMPLE/
BOX
ELEV.
(ft)
DEPTH
(ft) RQD
Length
RQD
(in)
Length
REC.
(ft)
SPT/
AB/
CR
PP/
tsf
Blows/
0.5 ft
NSPT
C E
N A
N
LE
T
T E
R
V
IS
U A
L A
N D
L A
B O
V E
R P
O R
T M
O N
M O
U T
H
M A
Y
W
O R
K
IN
G .G
P J
A C
E M
V D
W
IT
H R
A P
ID
C
P T
9_
3_
.G D
T
/2 9/
Port Monmouth, NJ - Phase II PM-3DURING
DRILLING
AFTER
DRILLING
PROJECT HOLE NO.1836-A AT
COMPLETIONJUN 15
NAN FORM
S11
S12
SPT
SPT
POORLY GRADED SAND (SP), gray with green, trace silt, trace gravel.
1.3
2.0
1.5
1.7
1.1
1.6
1.3
65%
100%
75%
85%
55%
80%
65%
3.02.72.7
2.0
1.0 0.8 0.6 0.3
-1.0-1.0
-3.0-3.0 -3.4
-5.0-5.0
-5.5
-6.0
-7.0-7.0
-7.8-7.8
-9.0-9.0
-12.0-12.0
-13.1-13.1
-14.0-14.0
-17.0-17.0
0.00.40.4
1.0
2.0 2.2 2.4 2.7
4.04.0
6.06.0 6.4
8.08.0
8.5
9.0
10.010.0
10.810.8
12.012.0
15.015.0
16.116.1
17.017.0
20.020.0
LE
G
E N
D
CLASSIFICATION OF MATERIALS
(Description)
REC.
SAMPLE/
BOX
ELEV.
(ft)
DEPTH
(ft) RQD
Length
RQD
(in)
Length
REC.
(ft)
SPT/
AB/
CR
PP/
tsf
Blows/
0.5 ft
NSPT
3. DRILLING AGENCY
DISTURBED
North Atlantic
7. THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAL DEPTH OF HOLE
15. ELEVATION GROUND WATER
Baltimore District
Hole No. PM14-28
INSTALLATION SHEET
NAVD88
UNDISTURBED
2. BORING LOCATION (Coordinates or Station)
12. MANUFACTURER'S DESIGNATION OF DRILL
11a. VERTICAL DATUM 11b. HORIZONTAL DATUM
17. ELEVATION TOP OF HOLE
OF
6. DIRECTION OF HOLE
DIVISION
DRILLING LOG
SHEETS
18. TOTAL ROCK CORE RECOVERY FOR BORING
Jase Ousley
4. NAME OF DRILLER
19. SIGNATURE OF INSPECTOR
14. TOTAL # OF CORE BOXES
13. TOTAL NO. OF OVERBURDEN
SAMPLES TAKEN
NAD83
Albert McNamara
1. PROJECT
16. DATE/
TIME
Port Monmouth, NJ - Phase II
N/A
COMPLETED
6/19/14 0000
10. SIZE AND TYPE OF BIT
6/19/14 0000
STARTED
CME-55
VERTICAL INCLINED
2-1/4 Hollow Stem Augers
DEG. FROM VERT.
5. NAME OF INSPECTOR
New York District Corps of Engineers
3.0 ft
N 582,201.33 E 604,839.96
82.0 ft
3.9ft
29.1ft
C E
N A
N
LE
T
T E
R
V
IS
U A
L A
N D
L A
B O
V E
R P
O R
T M
O N
M O
U T
H
M A
Y
W
O R
K
IN
G .G
P J
A C
E M
V D
W
IT
H R
A P
ID
C
P T
9_
3_
.G D
T
/2 9/
Port Monmouth, NJ - Phase II PM14-28DURING
DRILLING
AFTER
DRILLING
PROJECT HOLE NO.1836 AT
COMPLETIONJUN 15
NAN FORM
J-1
J-2
J-3
J-4
J-5
J-6 & J-7
J-8 & J-9
SPT
SPT
SPT
SPT
SPT
SPT
SPT
Asphalt.
SILTY SAND (SM), fine to medium; yellow red, moist, trace clay, trace fine gravel.
Yellow red, moist, discontinue fine gravel.
SILTY SAND (SM), fine to medium; red brown and dark red brown, moist.
Black.
Olive, moist.
POORLY GRADED SAND W/ SILT
(SP-SM), fine to medium; red brown, moist.
(SP) Poorly Graded SAND Orange, medium sand.
SILTY SAND (SM), fine to medium; yellow red, very moist, trace gravel.
Trace subangular coarse sand and fine gravel.
0.05' lithified iron-stained layer.
POORLY GRADED SAND W/ SILT
(SP-SM), fine to medium; dark yellow brown, moist.
SANDY LEAN CLAY TO FAT (CL), fine to medium; red brown, moist.
Auger only
POORLY GRADED SAND W/ SILT
(SP-SM), fine to medium; very moist, and gravel, little lithified iron-stained nodules.
CLAYEY SILTY SAND (SM), fine to medium; very moist, liesegang banding.
Auger only
1.0
2.0
2.0
2.0
2.0
50%
100%
100%
100%
100%
-19.0-19.0
-22.0-22.0
-23.0-23.0
-23.7-23.7 -24.0-24.0
-27.0-27.0
-27.8-27.8
-28.3-28.3
-29.0-29.0
-32.0-32.0
-32.8 -33.1
-34.0-34.0
-37.0-37.0
-37.5 -37.8-37.8
-39.0-39.0
-42.0-42.0
22.022.0
25.025.0
26.026.0
26.726.7 27.027.0
30.030.0
30.830.8
31.331.3
32.032.0
35.035.0
35.8 36.1
37.037.0
40.040.0
40.5 40.840.8
42.042.0
45.045.0
4 SHEETS
PROJECT 2INSTALLATION
ELEVATION TOP OF HOLE
Hole No. PM14-28
SHEET
OF
DRILLING LOG (Cont. Sheet) 3.0 ft
Port Monmouth, NJ - Phase II New York District Corps of Engineers
LE
G
E N
D
CLASSIFICATION OF MATERIALS
(Description)
REC.
SAMPLE/
BOX
ELEV.
(ft)
DEPTH
(ft) RQD
Length
RQD
(in)
Length
REC.
(ft)
SPT/
AB/
CR
PP/
tsf
Blows/
0.5 ft
NSPT
C E
N A
N
LE
T
T E
R
V
IS
U A
L A
N D
L A
B O
V E
R P
O R
T M
O N
M O
U T
H
M A
Y
W
O R
K
IN
G .G
P J
A C
E M
V D
W
IT
H R
A P
ID
C
P T
9_
3_
.G D
T
/2 9/
Port Monmouth, NJ - Phase II PM14-28DURING
DRILLING
AFTER
DRILLING
PROJECT HOLE NO.1836-A AT
COMPLETIONJUN 15
NAN FORM
J-10
J-11, 12 & 13
J-14, 15 & 16
J-17
J-18 & J-19
SPT
SPT
SPT
SPT
SPT
(SM) SILTY SAND
Auger only
POORLY GRADED SAND W/ SILT
(SP-SM), fine to medium; red brown, moist.
SILTY SAND (SM), fine to medium; orange to vary pale brown, very moist, with gravel, iron oxide staining, trace pyrite.
SANDY LEAN CLAY (CL), fine to medium;
dark gray, moist, soft, laminated, high plasticity.
Auger only
POORLY GRADED SAND (SP), fine to medium; light brown gray, moist.
PP: 1.25; TOR: 5.3
SANDY LEAN TO FAT CLAY (CL), fine to medium; dark gray, moist, stiff, high plasticity.
POORLY GRADED SAND W/ SILT
(SP-SM), fine to medium; dark red brown and yellow brown, very moist.
Auger only
POORLY GRADED SAND (SP), fine to medium; dark yellow brown and gray, moist.
0.05' clay seam.
Light gray, trace silt.
Auger only
POORLY GRADED SAND (SP), fine to medium; dark gray and gray, moist.
Trace clay.
(ML) SILT
PP: 2.0, 2.0, 2.5; TOR: 6.7, 7.0, 7.9 (with fissure) Auger only
FAT CLAY (CH), fine; dark gray, moist, stiff, high plasticity, trace sand.
2.0
2.0
1.5
1.8
2.0
2.0
100%
100%
75%
90%
100%
100%
-44.0-44.0
-47.0-47.0
-48.1
-49.0-49.0
-52.0-52.0
-54.0-54.0
-57.0-57.0 -57.2-57.2 -57.6-57.6
-59.0-59.0
-62.0-62.0
-63.0 -63.4
-64.0-64.0
-67.0-67.0 -67.4-67.4
47.047.0
50.050.0
51.1
52.052.0
55.055.0
57.057.0
60.060.0 60.260.2 60.660.6
62.062.0
65.065.0
66.0 66.4
67.067.0
70.070.0 70.470.4
4 SHEETS
PROJECT 3INSTALLATION
ELEVATION TOP OF HOLE
Hole No. PM14-28
SHEET
OF
DRILLING LOG (Cont. Sheet) 3.0 ft
Port Monmouth, NJ - Phase II New York District Corps of Engineers
LE
G
E N
D
CLASSIFICATION OF MATERIALS
(Description)
REC.
SAMPLE/
BOX
ELEV.
(ft)
DEPTH
(ft) RQD
Length
RQD
(in)
Length
REC.
(ft)
SPT/
AB/
CR
PP/
tsf
Blows/
0.5 ft
NSPT
C E
N A
N
LE
T
T E
R
V
IS
U A
L A
N D
L A
B O
V E
R P
O R
T M
O N
M O
U T
H
M A
Y
W
O R
K
IN
G .G
P J
A C
E M
V D
W
IT
H R
A P
ID
C
P T
9_
3_
.G D
T
/2 9/
Port Monmouth, NJ - Phase II PM14-28DURING
DRILLING
AFTER
DRILLING
PROJECT HOLE NO.1836-A AT
COMPLETIONJUN 15
NAN FORM
J-20
J-21
J-22
J-23 & J-24
J-25
J-26 & J-27
SPT
SPT
SPT
SPT
SPT
SPT
PP: 4.25, 4.25, 3.5; TOR: 5.9 (with fissure),
7.2 (with fissure), 6.1 (with fissure)
Auger only
FAT CLAY (CH), fine; dark brown, moist, stiff, high plasticity, trace sand.
PP: 1.8, 3.25; TOR: 6.5, 6.4
0.1' pyrite nodule.
Auger only
SILTY SAND (SM), fine to medium; dark gray and gray, very moist, laminated.
Auger only
POORLY GRADED SAND W/ SILT
(SP-SM), fine to medium; gray, very moist.
PP: 1.5; TOR: 3.5
FAT CLAY W/ SAND (CH), fine to medium;
dark red gray, moist, to 60.6 clay seam.
POORLY GRADED SAND W/ SILT
(SP-SM), fine to medium; gray, very moist.
Auger only
(SP-SM) Poorly Graded SAND with SILT
Trace clay.
Very fine to fine sand.
Auger only
POORLY GRADED SAND W/ SILT
(SP-SM), fine to medium; gray and dark gray, moist, trace organics.
SANDY LEAN CLAY TO FAT CLAY (CL),
1.8
2.0
90%
100%
-69.0-69.0
-72.0-72.0
-73.4
-74.0-74.0
-77.0-77.0
-77.7
-79.0
72.072.0
75.075.0
76.4
77.077.0
80.080.0
80.7
82.0
4 SHEETS
PROJECT 4INSTALLATION
ELEVATION TOP OF HOLE
Hole No. PM14-28
SHEET
OF
DRILLING LOG (Cont. Sheet) 3.0 ft
Port Monmouth, NJ - Phase II New York District Corps of Engineers
LE
G
E N
D
CLASSIFICATION OF MATERIALS
(Description)
REC.
SAMPLE/
BOX
ELEV.
(ft)
DEPTH
(ft) RQD
Length
RQD
(in)
Length
REC.
(ft)
SPT/
AB/
CR
PP/
tsf
Blows/
0.5 ft
NSPT
C E
N A
N
LE
T
T E
R
V
IS
U A
L A
N D
L A
B O
V E
R P
O R
T M
O N
M O
U T
H
M A
Y
W
O R
K
IN
G .G
P J
A C
E M
V D
W
IT
H R
A P
ID
C
P T
9_
3_
.G D
T
/2 9/
Port Monmouth, NJ - Phase II PM14-28DURING
DRILLING
AFTER
DRILLING
PROJECT HOLE NO.1836-A AT
COMPLETIONJUN 15
NAN FORM
J-28
J-29
SPT
SPT
fine; dark red gray, moist, stiff, high plasticity.
Auger only FAT CLAY (CH), fine; dark gray, moist, medium stiff, high plasticity, trace sand.
PP: 0.4, 0.9, 2.75; TOR: 1.4, 3.0, 5.0 (with fissure) To 76.5, very pale brown.
Auger only
FAT CLAY (CH), dark gray, moist, medium stiff, high plasticity.
PP: 1.9, 1.7, 3.0; TOR: 4.5, 4.5, 6.5
To 80.8m very pale brown.
BOTTOM OF HOLE
Notes:
Sampled using a standard 1 3/8 split spoon driven automatically by a 140 lb. hammer dropped 30.
Soils are field visually classified in accordance with the Unified Soils Classification System and the Burmister Method to quantify the major and minor components.
1.3
1.1
1.3
1.3
1.2
1.4
1.4
65%
55%
65%
65%
60%
70%
70%
4.23.93.9
2.2
0.2
-1.3
-1.8
-3.8
-5.8
-7.8-7.8
-10.8-10.8
-12.8-12.8
-15.8-15.8
0.00.30.3
2.0
4.0
5.5
6.0
8.0
10.0
12.012.0
15.015.0
17.017.0
20.020.0
LE
G
E N
D
CLASSIFICATION OF MATERIALS
(Description)
REC.
SAMPLE/
BOX
ELEV.
(ft)
DEPTH
(ft) RQD
Length
RQD
(in)
Length
REC.
(ft)
SPT/
AB/
CR
PP/
tsf
Blows/
0.5 ft
NSPT
3. DRILLING AGENCY
DISTURBED
North Atlantic
7. THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAL DEPTH OF HOLE
15. ELEVATION GROUND WATER
Baltimore District
Hole No. PM14-29
INSTALLATION SHEET
NAVD88
UNDISTURBED
2. BORING LOCATION (Coordinates or Station)
12. MANUFACTURER'S DESIGNATION OF DRILL
11a. VERTICAL DATUM 11b. HORIZONTAL DATUM
17. ELEVATION TOP OF HOLE
OF
6. DIRECTION OF HOLE
DIVISION
DRILLING LOG
SHEETS
18. TOTAL ROCK CORE RECOVERY FOR BORING
Adam Gattuso
4. NAME OF DRILLER
19. SIGNATURE OF INSPECTOR
14. TOTAL # OF CORE BOXES
13. TOTAL NO. OF OVERBURDEN
SAMPLES TAKEN
NAD83
Albert McNamara
1. PROJECT
16. DATE/
TIME
Port Monmouth, NJ - Phase II
N/A
COMPLETED
2/4/15 0000 0.3ft
10. SIZE AND TYPE OF BIT
2/4/15 0000
STARTED
CME-45
VERTICAL INCLINED
2-1/4 Hollow Stem Augers
DEG. FROM VERT.
5. NAME OF INSPECTOR
New York District Corps of Engineers
4.2 ft
N 581,685.37 E 604,865.53
52.0 ft
0.9ft
2.4ft3.9 ft
C E
N A
N
LE
T
T E
R
V
IS
U A
L A
N D
L A
B O
V E
R P
O R
T M
O N
M O
U T
H
M A
Y
W
O R
K
IN
G .G
P J
A C
E M
V D
W
IT
H R
A P
ID
C
P T
9_
3_
.G D
T
/2 9/
Port Monmouth, NJ - Phase II PM14-29DURING
DRILLING
AFTER
DRILLING
PROJECT HOLE NO.1836 AT
COMPLETIONJUN 15
NAN FORM
J-1 & J-2
J-3
J-4 & J-5
J-6
J-7
J-8
J-9
SPT
SPT
SPT
SPT
SPT
SPT
SPT
SILTY CLAYEY SAND (SC), fine to medium;
very dark brown, wet, some reeds, with wood, Organic odor.
SILTY SAND (SM), fine to medium; dark red brown, very moist, trace roots, trace rootlets, Organic odor.
Yellowish yellow red, wet.
Greenish gray, very moist.
Yellow red, very moist, no rootlets, thinly layered.
Gray slightly mottled with orange.
Light brown, wet, trace subangular fine gravel.
Auger only
SILTY SAND (SM), fine to medium; yellow brown with orange, mottled with black, very moist, iron oxide staining, lensed and layered.
1.5
1.8
0.6
1.4
1.9
75%
90%
30%
70%
95%
-17.8-17.8
-20.8-20.8
-21.6-21.6
-22.2-22.2
-22.8-22.8
-25.8-25.8
-27.8-27.8
-30.8-30.8
-32.8-32.8
-35.8-35.8
-37.0
-37.8-37.8
-40.8-40.8
22.022.0
25.025.0
25.825.8
26.426.4
27.027.0
30.030.0
32.032.0
35.035.0
37.037.0
40.040.0
41.2
42.042.0
45.045.0
3 SHEETS
PROJECT 2INSTALLATION
ELEVATION TOP OF HOLE
Hole No. PM14-29
SHEET
OF
DRILLING LOG (Cont. Sheet) 4.2 ft
Port Monmouth, NJ - Phase II New York District Corps of Engineers
LE
G
E N
D
CLASSIFICATION OF MATERIALS
(Description)
REC.
SAMPLE/
BOX
ELEV.
(ft)
DEPTH
(ft) RQD
Length
RQD
(in)
Length
REC.
(ft)
SPT/
AB/
CR
PP/
tsf
Blows/
0.5 ft
NSPT
C E
N A
N
LE
T
T E
R
V
IS
U A
L A
N D
L A
B O
V E
R P
O R
T M
O N
M O
U T
H
M A
Y
W
O R
K
IN
G .G
P J
A C
E M
V D
W
IT
H R
A P
ID
C
P T
9_
3_
.G D
T
/2 9/
Port Monmouth, NJ - Phase II PM14-29DURING
DRILLING
AFTER
DRILLING
PROJECT HOLE NO.1836-A AT
COMPLETIONJUN 15
NAN FORM
J-10
J-11,12,&13
J-14
J-15
J-16 & J-17
SPT
SPT
SPT
SPT
SPT
(SP-SM) Poorly Graded SAND with SILT
Auger only
POORLY GRADED SAND (SP), fine to medium; yellow, moist.
SILTY SAND (SM), fine to medium; yellow red, very moist.
SANDY LEAN CLAY (CL), fine to medium;
light red brown and gray and black, moist, contains clay lenses and thin layers.
PP: 0.8 (layer) Auger only
POORLY GRADED SAND (SP), fine to medium; light gray with dark gray, moist.
Auger only
POORLY GRADED SAND (SP), fine to medium; light gray and brown yellow, moist, lensed and thinly layered.
Auger only
(SP) Poorly Graded SAND
POORLY GRADED SAND (SP), fine to medium; pale gray with dark gray, moist, trace silt, with thin layers of sand with silt.
Auger only
POORLY GRADED SAND (SP), fine to medium; gray, moist, homogeneous.
1.2
1.7
86%
85%
-42.2-42.2
-45.8-45.8
-47.4-47.4 -47.8
46.446.4
50.050.0
51.651.6 52.0
3 SHEETS
PROJECT 3INSTALLATION
ELEVATION TOP OF HOLE
Hole No. PM14-29
SHEET
OF
DRILLING LOG (Cont. Sheet) 4.2 ft
Port Monmouth, NJ - Phase II New York District Corps of Engineers
LE
G
E N
D
CLASSIFICATION OF MATERIALS
(Description)
REC.
SAMPLE/
BOX
ELEV.
(ft)
DEPTH
(ft) RQD
Length
RQD
(in)
Length
REC.
(ft)
SPT/
AB/
CR
PP/
tsf
Blows/
0.5 ft
NSPT
C E
N A
N
LE
T
T E
R
V
IS
U A
L A
N D
L A
B O
V E
R P
O R
T M
O N
M O
U T
H
M A
Y
W
O R
K
IN
G .G
P J
A C
E M
V D
W
IT
H R
A P
ID
C
P T
9_
3_
.G D
T
/2 9/
Port Monmouth, NJ - Phase II PM14-29DURING
DRILLING
AFTER
DRILLING
PROJECT HOLE NO.1836-A AT
COMPLETIONJUN 15
NAN FORM
/5"
J-18
J-19 & J-20
SPT
SPT
Auger only
POORLY GRADED SAND (SP), fine to medium; gray, moist.
LEAN TO FAT CLAY (CL), fine to medium;
very dark gray, moist, little sand lenses.
PP: 3.2, 2.6; TOR: not available
BOTTOM OF HOLE
Notes:
Sampled using a standard 1 3/8 split spoon driven automatically by a 140 lb. hammer dropped 30.
Soils are field visually classified in accordance with the Unified Soils Classification System and the Burmister
0.3
0.4
1.4
1.2
1.0
0.8
1.2
15%
20%
70%
60%
50%
40%
60%
5.0
3.0
1.01.0
-1.0-1.0
-3.0-3.0
-5.0-5.0
-7.0-7.0
-10.0-10.0
-12.0-12.0
-15.0-15.0
0.0
2.0
4.04.0
6.06.0
8.08.0
10.010.0
12.012.0
15.015.0
17.017.0
20.020.0
LE
G
E N
D
CLASSIFICATION OF MATERIALS
(Description)
REC.
SAMPLE/
BOX
ELEV.
(ft)
DEPTH
(ft) RQD
Length
RQD
(in)
Length
REC.
(ft)
SPT/
AB/
CR
PP/
tsf
Blows/
0.5 ft
NSPT
3. DRILLING AGENCY
DISTURBED
North Atlantic
7. THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAL DEPTH OF HOLE
15. ELEVATION GROUND WATER
Baltimore District
Hole No. PM14-30
INSTALLATION SHEET
NAVD88
UNDISTURBED
2. BORING LOCATION (Coordinates or Station)
12. MANUFACTURER'S DESIGNATION OF DRILL
11a. VERTICAL DATUM 11b. HORIZONTAL DATUM
17. ELEVATION TOP OF HOLE
OF
6. DIRECTION OF HOLE
DIVISION
DRILLING LOG
SHEETS
18. TOTAL ROCK CORE RECOVERY FOR BORING
Adam Gattuso
4. NAME OF DRILLER
19. SIGNATURE OF INSPECTOR
14. TOTAL # OF CORE BOXES
13. TOTAL NO. OF OVERBURDEN
SAMPLES TAKEN
NAD83
Steve Simmons
1. PROJECT
16. DATE/
TIME
Port Monmouth, NJ - Phase II
N/A
COMPLETED
8/22/14 0000 0.5ft
10. SIZE AND TYPE OF BIT
8/22/14 0000
STARTED
CME-850
VERTICAL INCLINED
2-1/4 Hollow Stem Augers
DEG. FROM VERT.
5. NAME OF INSPECTOR
New York District Corps of Engineers
5.0 ft
N 581,309.84 E 604,619.8
52.0 ft
3.9ft
9.3ft4.5 ft
C E
N A
N
LE
T
T E
R
V
IS
U A
L A
N D
L A
B O
V E
R P
O R
T M
O N
M O
U T
H
M A
Y
W
O R
K
IN
G .G
P J
A C
E M
V D
W
IT
H R
A P
ID
C
P T
9_
3_
.G D
T
/2 9/
Port Monmouth, NJ - Phase II PM14-30DURING
DRILLING
AFTER
DRILLING
PROJECT HOLE NO.1836 AT
COMPLETIONJUN 15
NAN FORM
J-1
J-2
J-3
J-4
J-5
J-6
J-7
SPT
SPT
SPT
SPT
SPT
SPT
SPT
SILTY SAND (SM), fine to medium; dark brown, moist, trace roots, and rootlets.
PP: 0.25; TOR: not testable
(SP-SM) Poorly Graded SAND with SILT
POORLY GRADED SAND W/ SILT
(SP-SM), fine to medium; brown, wet, trace roots, organic odor.
SILTY SAND (SM), fine to medium; yellow brown and red brown, moist.
POORLY GRADED SAND W/ SILT
(SP-SM), fine to medium; red brown, moist.
Auger only
POORLY GRADED SAND W/ SILT
(SP-SM), fine to medium; red yellow, moist, trace thin layers of clean sand and clay.
1.3
1.4
1.5
1.6
1.8
65%
70%
75%
80%
90%
-16.7-16.7 -17.0-17.0
-20.0-20.0
-22.0-22.0
-25.0-25.0
-27.0-27.0
-30.0-30.0
-32.0-32.0
-35.0-35.0
-37.0-37.0
-40.0-40.0
21.721.7 22.022.0
25.025.0
27.027.0
30.030.0
32.032.0
35.035.0
37.037.0
40.040.0
42.042.0
45.045.0
3 SHEETS
PROJECT 2INSTALLATION
ELEVATION TOP OF HOLE
Hole No. PM14-30
SHEET
OF
DRILLING LOG (Cont. Sheet) 5.0 ft
Port Monmouth, NJ - Phase II New York District Corps of Engineers
LE
G
E N
D
CLASSIFICATION OF MATERIALS
(Description)
REC.
SAMPLE/
BOX
ELEV.
(ft)
DEPTH
(ft) RQD
Length
RQD
(in)
Length
REC.
(ft)
SPT/
AB/
CR
PP/
tsf
Blows/
0.5 ft
NSPT
C E
N A
N
LE
T
T E
R
V
IS
U A
L A
N D
L A
B O
V E
R P
O R
T M
O N
M O
U T
H
M A
Y
W
O R
K
IN
G .G
P J
A C
E M
V D
W
IT
H R
A P
ID
C
P T
9_
3_
.G D
T
/2 9/
Port Monmouth, NJ - Phase II PM14-30DURING
DRILLING
AFTER
DRILLING
PROJECT HOLE NO.1836-A AT
COMPLETIONJUN 15
NAN FORM
J-8 & J-9
J-10
J-11
J-12
J-13
SPT
SPT
SPT
SPT
SPT
SILTY SAND (SM), fine to medium; dark gray, very moist, trace clay lenses.
LEAN TO FAT CLAY W/ SAND (CL), fine to medium; dark gray, very moist.
PP: 0.4; TOR: not testable Auger only
SILTY SAND (SM), fine to medium; dark red brown and red gray, moist.
Auger only
(SP) Poorly Graded SAND
Auger only
SANDY LEAN CLAY (CL), fine to medium;
dark red gray and yellow red, moist, sample lensed and thinly layered between clay, sandy clay and SP-sand.
Auger only
SILTY SAND (SM), fine to medium; dark red gray, moist, little clay, trace clayey lenses, trace cemented sand nodules to 3/8.
Auger only
SILTY SAND (SM), fine to medium; gray slightly mottled with orange.
1.7
1.9
85%
95%
-42.0-42.0
-45.0-45.0
-46.3
-47.0
47.047.0
50.050.0
51.3
52.0
3 SHEETS
PROJECT 3INSTALLATION
ELEVATION TOP OF HOLE
Hole No. PM14-30
SHEET
OF
DRILLING LOG (Cont. Sheet) 5.0 ft
Port Monmouth, NJ - Phase II New York District Corps of Engineers
LE
G
E N
D
CLASSIFICATION OF MATERIALS
(Description)
REC.
SAMPLE/
BOX
ELEV.
(ft)
DEPTH
(ft) RQD
Length
RQD
(in)
Length
REC.
(ft)
SPT/
AB/
CR
PP/
tsf
Blows/
0.5 ft
NSPT
C E
N A
N
LE
T
T E
R
V
IS
U A
L A
N D
L A
B O
V E
R P
O R
T M
O N
M O
U T
H
M A
Y
W
O R
K
IN
G .G
P J
A C
E M
V D
W
IT
H R
A P
ID
C
P T
9_
3_
.G D
T
/2 9/
Port Monmouth, NJ - Phase II PM14-30DURING
DRILLING
AFTER
DRILLING
PROJECT HOLE NO.1836-A AT
COMPLETIONJUN 15
NAN FORM
J-14
J-15 & J-16
SPT
SPT
Auger only
POORLY GRADED SAND (SP), fine to medium; dark gray, moist, no silt, no lenses.
Gray, moist, trace clay, trace thin layers of sand with clay.
BOTTOM OF HOLE
Notes:
Sampled using a standard 1 3/8 split spoon driven automatically by a 140 lb. hammer dropped 30.
Soils are field visually classified in accordance with the Unified Soils Classification System and the Burmister
0.1
1.5
1.4
1.8
1.8
1.1
1.6
5%
75%
70%
90%
90%
55%
80%
2.5
0.50.5
-0.6-0.6
-1.5
-3.5-3.5
-5.5-5.5
-7.5
-9.5-9.5
-12.5-12.5
-14.5-14.5
-17.5-17.5
0.0
2.02.0
3.13.1
4.0
6.06.0
8.08.0
10.0
12.012.0
15.015.0
17.017.0
20.020.0
LE
G
E N
D
CLASSIFICATION OF MATERIALS
(Description)
REC.
SAMPLE/
BOX
ELEV.
(ft)
DEPTH
(ft) RQD
Length
RQD
(in)
Length
REC.
(ft)
SPT/
AB/
CR
PP/
tsf
Blows/
0.5 ft
NSPT
3. DRILLING AGENCY
DISTURBED
North Atlantic
7. THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAL DEPTH OF HOLE
15. ELEVATION GROUND WATER
Baltimore District
Hole No. PM14-31
INSTALLATION SHEET
NAVD88
UNDISTURBED
2. BORING LOCATION (Coordinates or Station)
12. MANUFACTURER'S DESIGNATION OF DRILL
11a. VERTICAL DATUM 11b. HORIZONTAL DATUM
17. ELEVATION TOP OF HOLE
OF
6. DIRECTION OF HOLE
DIVISION
DRILLING LOG
SHEETS
18. TOTAL ROCK CORE RECOVERY FOR BORING
4. NAME OF DRILLER
19. SIGNATURE OF INSPECTOR
14. TOTAL # OF CORE BOXES
13. TOTAL NO. OF OVERBURDEN
SAMPLES TAKEN
NAD83
1. PROJECT
16. DATE/
TIME
Port Monmouth, NJ - Phase II
N/A
COMPLETED
11/14/14 0000 3.4ft
10. SIZE AND TYPE OF BIT
11/14/14 0000
STARTED
VERTICAL INCLINED DEG. FROM VERT.
5. NAME OF INSPECTOR
New York District Corps of Engineers
2.5 ft
N 580,985.54 E 604,513.02
52.0 ft
0.8ft -0.9 ft
C E
N A
N
LE
T
T E
R
V
IS
U A
L A
N D
L A
B O
V E
R P
O R
T M
O N
M O
U T
H
M A
Y
W
O R
K
IN
G .G
P J
A C
E M
V D
W
IT
H R
A P
ID
C
P T
9_
3_
.G D
T
/2 9/
Port Monmouth, NJ - Phase II PM14-31DURING
DRILLING
AFTER
DRILLING
PROJECT HOLE NO.1836 AT
COMPLETIONJUN 15
NAN FORM
J-1
J-2 & J-3
J-4
J-5
J-6
J-7
J-8
SPT
SPT
SPT
SPT
SPT
SPT
SPT
PEAT (Pt), dark brown, wet, very soft.
(SM) Organic SILTY SAND
SILTY SAND (SM), subangular to subrounded; fine to medium; dark red brown, very moist, with roots, with plant matter and strong organic odor.
Red brown, moist.
POORLY GRADED SAND (SP), fine to medium; yellow brown, moist.
SILTY SAND (SM), fine to medium; dark gray brown, moist, trace clay nodules, trace roots.
Brown, moist, trace gravel.
Auger only
(SM) SILTY SAND
1.4
1.7
1.3
1.6
1.6
70%
85%
65%
80%
80%
-18.5-18.5
-19.5-19.5
-22.5-22.5
-24.5-24.5
-27.5-27.5
-29.5-29.5
-32.5-32.5
-34.5-34.5
-37.5-37.5
-39.5-39.5
-42.5-42.5
-43.0-43.0
21.021.0
22.022.0
25.025.0
27.027.0
30.030.0
32.032.0
35.035.0
37.037.0
40.040.0
42.042.0
45.045.0
45.545.5
3 SHEETS
PROJECT 2INSTALLATION
ELEVATION TOP OF HOLE
Hole No. PM14-31
SHEET
OF
DRILLING LOG (Cont. Sheet) 2.5 ft
Port Monmouth, NJ - Phase II New York District Corps of Engineers
LE
G
E N
D
CLASSIFICATION OF MATERIALS
(Description)
REC.
SAMPLE/
BOX
ELEV.
(ft)
DEPTH
(ft) RQD
Length
RQD
(in)
Length
REC.
(ft)
SPT/
AB/
CR
PP/
tsf
Blows/
0.5 ft
NSPT
C E
N A
N
LE
T
T E
R
V
IS
U A
L A
N D
L A
B O
V E
R P
O R
T M
O N
M O
U T
H
M A
Y
W
O R
K
IN
G .G
P J
A C
E M
V D
W
IT
H R
A P
ID
C
P T
9_
3_
.G D
T
/2 9/
Port Monmouth, NJ - Phase II PM14-31DURING
DRILLING
AFTER
DRILLING
PROJECT HOLE NO.1836-A AT
COMPLETIONJUN 15
NAN FORM
J-9
J-10
J-11
J-12
J-13
SPT
SPT
SPT
SPT
SPT
(SC) Clayey SAND
POORLY GRADED SAND W/ SILT
(SP-SM), fine to medium; brown, moist.
Auger only
POORLY GRADED SAND W/ SILT
(SP-SM), fine to medium; brown and dark gray, moist.
Auger only
POORLY GRADED SAND (SP), fine to medium; gray, moist.
Auger only
POORLY GRADED SAND (SP), fine to medium; gray, moist.
Auger only
POORLY GRADED SAND (SP), fine to medium; dark gray, moist.
Auger only
SANDY LEAN CLAY (CL), dark red gray, moist, trace wood.
1.7
1.5
85%
75%
-44.5-44.5
-47.5-47.5
-49.5
47.047.0
50.050.0
52.0
3 SHEETS
PROJECT 3INSTALLATION
ELEVATION TOP OF HOLE
Hole No. PM14-31
SHEET
OF
DRILLING LOG (Cont. Sheet) 2.5 ft
Port Monmouth, NJ - Phase II New York District Corps of Engineers
LE
G
E N
D
CLASSIFICATION OF MATERIALS
(Description)
REC.
SAMPLE/
BOX
ELEV.
(ft)
DEPTH
(ft) RQD
Length
RQD
(in)
Length
REC.
(ft)
SPT/
AB/
CR
PP/
tsf
Blows/
0.5 ft
NSPT
C E
N A
N
LE
T
T E
R
V
IS
U A
L A
N D
L A
B O
V E
R P
O R
T M
O N
M O
U T
H
M A
Y
W
O R
K
IN
G .G
P J
A C
E M
V D
W
IT
H R
A P
ID
C
P T
9_
3_
.G D
T
/2 9/
Port Monmouth, NJ - Phase II PM14-31DURING
DRILLING
AFTER
DRILLING
PROJECT HOLE NO.1836-A AT
COMPLETIONJUN 15
NAN FORM
J-14
J-15
SPT
SPT
SILTY SAND (SM), fine to medium; dark gray and light gray, moist.
Auger only
SILTY SAND (SM), fine to medium; gray and very dark gray, moist.
0.0
0.0
0.0
0.3
0.0
1.5
0.6
0.8
0.9
0%
0%
0%
15%
0%
75%
30%
40%
45%
3.2
2.22.2
-2.8-2.8
-4.8-4.8
-6.8-6.8
-8.8-8.8
-10.8-10.8
-12.8-12.8
-14.8-14.8
-16.8-16.8
0.0
1.01.0
6.06.0
8.08.0
10.010.0
12.012.0
14.014.0
16.016.0
18.018.0
20.020.0
LE
G
E N
D
CLASSIFICATION OF MATERIALS
(Description)
REC.
SAMPLE/
BOX
ELEV.
(ft)
DEPTH
(ft) RQD
Length
RQD
(in)
Length
REC.
(ft)
SPT/
AB/
CR
PP/
tsf
Blows/
0.5 ft
NSPT
3. DRILLING AGENCY
DISTURBED
North Atlantic
7. THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAL DEPTH OF HOLE
15. ELEVATION GROUND WATER
Baltimore District
Hole No. PM14-32
INSTALLATION SHEET
NAVD88
UNDISTURBED
2. BORING LOCATION (Coordinates or Station)
12. MANUFACTURER'S DESIGNATION OF DRILL
11a. VERTICAL DATUM 11b. HORIZONTAL DATUM
17. ELEVATION TOP OF HOLE
OF
6. DIRECTION OF HOLE
DIVISION
DRILLING LOG
SHEETS
18. TOTAL ROCK CORE RECOVERY FOR BORING
Adam Gattuso
4. NAME OF DRILLER
19. SIGNATURE OF INSPECTOR
14. TOTAL # OF CORE BOXES
13. TOTAL NO. OF OVERBURDEN
SAMPLES TAKEN
NAD83
Steve Simmons
1. PROJECT
16. DATE/
TIME
Port Monmouth, NJ - Phase II
N/A
COMPLETED
8/22/14 0000 0.3ft
10. SIZE AND TYPE OF BIT
8/22/14 0000
STARTED
CME-850
VERTICAL INCLINED
2-1/4 Hollow Stem Augers
DEG. FROM VERT.
5. NAME OF INSPECTOR
New York District Corps of Engineers
3.2 ft
N 580,611.78 E 604,653.92
52.0 ft
1.2ft
2.4ft2.9 ft
C E
N A
N
LE
T
T E
R
V
IS
U A
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .