E-100
E-100
TYPE P1 LUMINAIRE DETAIL
N.T.S.
N.T.S.
PULL BOX DETAIL FOR ROADS AND LEVEES
CONDUIT
4" DIA. PVC
FOR INSTALLATION
CONSTRUCTION TEAM
FLOODWALL
TO COORDINATE WITH
CONTRACTOR NEEDS
ONE LINE DIAGRAM
POWERED FROM CAMPBELL AVE. - AREA Q
SLUICE GATE & ROAD CLOSURE WINCH
208V, 3P
AREA S - 1 HP
SLUICE GATE
C1-1
208V, 3P
AREA R - 1 HP
SLUICE GATE
C1-MAIN
208V, 3P
AREA Q - 1 HP
SLUICE GATE
C2-4
208V, 3P
AREA P - 1 HP
SLUICE GATE
C2-3
208V, 3P
AREA N - 1 HP
SLUICE GATE
C2-MAIN
E-100
DISTANCES SHOWN ARE APPROXIMATE
PLANS FOR NUMBER OF PULL BOXES)
NOT ALL PULL BOXES ARE SHOWN (SEE SITE
BRANCH CIRCUIT CONDUCTOR SIZE
3-#4 AWG PLUS #10 AWG GROUND
3-#6 AWG PLUS #6 AWG GROUND
AREA Q
AT CAMPBELL AVE
120/208V, 3P
POWER PANEL 100 AMP
JCP&L METER
CONNECTION
GENERATOR
AREA F
208V, 3P
WINCH 10 HP
ROAD CLOSURE
P
164 FT
3 3
PP
NTS
UNLESS OTHERWISE NOTED
ALL WORK SHOWN UNDER CONTRACT #4
18"
GRADE
TYP
4"24"W x 24"L4"
HOLDOWNS
S.S. 3/4" DIA. BOLTS
18" x 3/4" ROUND.
STEEL PLATE COVER
CONDUIT
4" DIA. PVC
BELL ENDS
ALL DUCTS TO HAVE
PULL-IN IRONS
M
IN
45.4033°
POLE JC-1004MDT
TO JCP&L
5 2-#10 AWG PLUS #12 AWG GROUND
(TYP. OF 3)
LED FIXTURES
POLE MOUNTED
AREA F
208V, 3P
WINCH 10HP
CLOSURE
ROAD
DISTANCE FROM PANEL
AREA DISTANCE (FT.)
Q
P
N
R
S
164 FT.
374 FT.
1,044 FT.
430 FT.
730 FT.
430 FT
730 FT374 FT
1,044 FT
P
3-#6 AWG PLUS #10 AWG GROUND (NOT USED)
S E
C T
IO
N S D
IA
G R
A M
S
M
IS
C E
L L
A N
E O
U S D
E T
A
IL
S
VOLTAGE DROP % VD
0.67
1.52
1.68
1.75
1.17
0%
1%
1%
1%
1%
3-#2 AWG PLUS #8 AWG GROUND IN 2" RSC
AND DRAIN
END WALL KNOCKOUTS
CONC. HANDHOLE WITH
DIMENSION) PRE-CAST
2' X 2' X 4' (INTERNAL
E-100 N.T.S.
1A
(IF IN ROADWAY OR ON LEVEE)
PULL BOXES 2FT x 2FT x 4FT- H-20 RATED
GROUND AND UNDER ROADWAYS AND WALLWAYS)
PVC COATED RIGID STEEL CONDUIT (ABOVE
LEVEE AND FLOODWALL)
CONDUIT SCHEDULE 80 PVC (UNDERGROUND IN
TYP.
ON SITE PLANS
AS SHOWN
PULL BOX
2FT x 2FT x 4FT
K 1.62 1%75 FT.
POINT
ACCESS
POINT
ACCESS
POINT
ACCESS
G R
A D
E
B E
L O
W
- ACCESS POINTS WITH COVERS
DETAIL FOR FLOODWALL
(SEE STRUCTURAL DWGS.)
IS
S
U E D
A T
E h tt p /w w w .n a n .u s a c e .a rm y .m il
N E
W Y
O R
K
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T A
P R
S O
L
IC
IT
A T
IO
N N
O
W
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
A P
P R
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
C O
N T
R A
C T N
O
1 2 3 4 5
D
C
A
B
F I L
E
N A
M E
U S
E R
N A
M E
S u b m i t t e d b y
D D
M M
M
Y Y
Y Y
H
:M
M P l o t
D a t e
-0
N E
W Y
O R
K
N Y
R O
O M
F
E D
E R
A L P
L A
Z A
Sheet of 148
®of Engineers
US Army Corps
New York District
Number
Reference
Sheet
P O
R T M
O N
M O
U T
H
N E
W J
E R
S E
Y
P H
A S
E I I
C O
N T
R A
C T
R A
R
IT
A N B
A Y S
A N
D Y H
O O
K B
A Y
H U
R R
IC
A N
E S
T O
R M D
A M
A G
E R
E D
U C
T
IO
N X .X .X
X .X .X
BRACKET
TWO (2) FIXTURE
MANUFACTRURER
RATING PER LUMINAIRE
HANDHOLE BOX. FUSE
FUSE HOLDER INSIDE
FOR EACH LUMINAIRE IN
PROVIDE IN-LINE FUSE
POLE BASE
HEIGHT
IS TWO (2) MOUNTING
TYPICAL AIMING POINT
45 DEG. TO VERTICAL
DETAIL
FOUNDATION
FOR POLE
SEE SHEET E-502
4K, 8 COB (TYPICAL)
GUARD, DARK BRONZE,
SIZE 3, VANDAL
148 WATTS, D SERIES,
LITHONIAL LIGHTING,
FLOOD LIGHT
LED POLE MOUNTED
100 MPH WIND RATING.
THICKNESS .188"
TOP O.D. 4",
FINISH BOTTOM O.D. 6",
BRONZE ANODIZED
ALUMINUM POLE DARK
25'-0" ROUND TAPERED
(TYP.)
CONDUIT
BUSHING
ONE LINE DIAGRAM
POWERED FROM BROADWAY - AREA K
SLUICE GATE & ROAD CLOSURE WINCH
208V, 3P
AREA M- 1HP
SLUICE GATE
C2-2
208V, 3P
AREA K- 1HP
SLUICE GATE
C2-1
OTHERWISE NOTED
ALL WORK SHOWN UNDER CONTRACT #4 UNLESS
DISTANCES SHOWN ARE APPROXIMATE
PLANS FOR NUMBER OF PULL BOXES)
NOT ALL PULL BOXES ARE SHOWN (SEE SITE
AREA K
208V, 3P
WINCH 10 HP
ROAD CLOSURE
AREA K
208V, 3P
WINCH 10 HP
ROAD CLOSURE
P
P
P
800 FT
NTS
SHEET ES-109)
BT41953MDT (SEE
TO JCP&L POLE
AT BROADWAY AREA K
120/208V, 3P
POWER PANEL 100 AMP
(TYP. OF 4)
LED FIXTURES
POLE MOUNTED
JCP&L METER
CONNECTION
GENERATOR
TYP.
ON SITE PLANS
AS SHOWN
PULL BOX
P
LEVEE).
4 " C SCH 80 PVC (TYP. FOR CONDUIT ON
FLOODWALL).
4 " C SCH 40 PVC (TYP. FOR CONDUIT ON
LEVEE).
4 " C SCH 80 PVC (TYP. FOR CONDUIT ON
FLOODWALL).
4 " C SCH 40 PVC (TYP. FOR CONDUIT ON
BOTTOM TILE DRAIN PIPE
GRAVEL DRAIN BASIN WITH
TO UNDERGROUND
12"
12"
12"
18"
(1) 4" CONDUIT
(1) 4" CONDUIT
CAST BOX
WATERPROOF
12"x18"x12"
END BELL
D
E T
A
IL
R
E V
IS
E D T
O A
G R
E E W
IT
S T
R U
C T
U R
A L D
R A
W
IN
G S
SCHEDULE 40
2 2 S
E P
T
Standard Hooks
Bar Size Top Bar Other Bar Top Bar Other Bar Dev. Length
(Ldh)
(in.) (in.) (in.) (in.) (in.)
#3 17 13 22 17 7
#4 22 17 29 22 9
#5 28 22 36 28 11
#6 33 26 43 33 13
#7 49 37 63 49 15
#8 5 43 72 55 17
#9 63 48 81 63 19
#10 70 54 91 70 22
#11 78 60 101 78 24
#14 94 72 ‐‐‐ ‐‐‐ 29
#18 125 96 ‐‐‐ ‐‐‐ 39
Development Class "B" Spl ice
Tens ion Development and Spl ice Lengths for f 'c=5,000 ps i and fy=60 ks i
HORIZ- #6 @ 12" O.C.
VERT- #9 @ 10" O.C.
STUDS 5" LONG
1" DIAM. SHEAR
(SEE NOTE 3 & 4)
PILE LENGTH, 75FT
J A
P
J A
P
A N
S I
D
S-301
T Y
P
IC
A L F
L O
O D
W A
L L S
E C
T
IO
N
HP12X84
HORIZ- #6 @ 12" O.C.
VERT- #9 @ 10" O.C.
TOP & BOT
#9 @ 10" O.C.
TOP & BOT
#8 @ 12" O.C.
B/PILE CAP EL -4.0
T/PILE CAP EL -0.5
HORIZ- #8 @ 12" O.C.
VERT- #10 @ 6" O.C.
TOP & BOT
#8 @12" O.C.
HP12X84
TOP & BOT
#10 @ 6" O.C.
TAPER EL +6.0
T/WALL EL +13.0
B/PILE CAP EL +1.5
T/PILE CAP EL +4.0
GROUND LEVEL EL +7.0
APPROX MINIMUM
T/WALL EL +13.0
B/PILE CAP EL -0.5
T/PILE CAP EL +2.0
GROUND LEVEL EL +5.0
APPROX MINIMUM
FLOOD SIDE PROTECTED SIDE
FLOOD SIDE PROTECTED SIDE
T/WALL EL +13.0
FLOOD SIDE PROTECTED SIDE
GROUND LEVEL EL +2.5
APPROX MINIMUM
4'-0" 4'-0"
2'-0"
2'-0"
5'-0" 5'-0"
2'-0"
M
IN
E
M B
E D
M E
N T
2'-0"
6'-3"2'-6"6'-3"
2'-0"
2'-2"
8"
8"
")4 ("8
")4 ("8
2'-2"
A706 GRADE 60
#8 REBAR, ASTM
(FIXED)
PILE CONNECTION TOP VIEW
(SEE NOTE 3 & 4)
PILE LENGTH, 60FT
BOT EL -20
CUTOFF WALL
PZ22
(SEE NOTE 3 & 4)
PILE LENGTH, 60FT
BOT EL -20
CUTOFF WALL
PZ22
BOT EL -20
CUTOFF WALL
PZ22
1'-4" MIN
1'-4" MIN
PILE CONNECTION ARE PINNED.
NOTES:
PILE CONNECTION ARE PINNED.
NOTES:
PILE CONNECTIONS ARE FIXED.
NOTES:
M
IN
E
M B
E D
M E
N T
1'-4" MIN.
STUDS 5" LONG
1" DIAM. SHEAR
CLEAR COVER
4" MIN.
M
IN
E
M B
E D
M E
N T
TOP & BOT
#8 @ 12" O.C.
TOP & BOT
#9 @ 10" O.C.
COVER
4" MIN. CLEAR
COVER
4" MIN. CLEAR
2'-0"
S-301
TYPICAL T - FLOOD WALL SECTION STA. 0+00 TO STA. 7+98
SCALE 2/5" = 1'
S-301
TYPICAL T - FLOOD WALL SECTION STA. 8+28 TO STA. 12+78
SCALE 2/5" = 1'
S-301
TYPICAL T - FLOOD WALL SECTION STA. 13+08 TO STA. 22+78.25
" = 1'2/5SCALE
M
IN
S-301
FIXED PILE CONNECTIONS
SCALE: NTS
STUDS 5" LONG
1" DIAM. SHEAR
BATTERED PILE CONNECTIONVERTICAL PILE CONNECTION
8"
8"
")4 ("8
")4 ("8
'-0
1'-4"
'-4
A706 GRADE 60
#8 REBAR, ASTM
A706 GRADE 60
#8 REBAR, ASTM
-0
-3
FLUTED FIN FINISH, TYP.
P
IL
E A
N D S
T U
D L
E N
G T
H U
P D
A T
A
U G
S
E P
PASSING THRU THE PILES.
MAXIMUM 1" OFFSET ON BOTH SIDES OF H-PILES ALLOWED FOR REBARS 10.
PINNED PILE CONNECTIONS LOCATED IN 5/S-302.9.
FLOODWALLS SHALL BE STAINED AND HAVE AN ANTI-GRAFFITI COATING.8.
METHODS.
TO FACILITATE CONSTRUCTION AS PART OF CONTRACTOR'S MEANS AND
MINIMUM OF 6" CRUSH STONE BASE, SHOWN SCHEMATICALLY, OR MUD SLAB 7.
T-FLOODWALL SECTION STA. 12+78 TO STA. 13+08 LOCATED IN 2/S-520.6.
T-FLOODWALL SECTION STA. 7+98 TO STA. 8+28 LOCATED IN 1/S-520.5.
BOTTOM TIP ELEVATION.
BATTER PILES BOTTOM TIP ELEVATION SHALL MATCH THE VERTICAL PILES 4.
ACTUAL PILE LENGTHS SHALL BE BASED ON THE PILE LOAD TEST.
THE PILE LENGTHS ARE STATED FOR ESTIMATING PURPOSES ONLY. THE 3.
SHEET S-303 AND S-304.
THE TYPICAL FLOODWALL SECTIONS FOR THE CLOSURE GATES ARE SHOWN ON 2.
S-307 TO S-310.
THE TYPICAL FLOODWALL SECTIONS FOR THE PIPES ARE SHOWN ON SHEET 1.
NOTES:
S T
IR
R U
P S R
E M
O V
E D
N O
T E C
H A
N G
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
IS
S
U E D
A T
E
New York District of Engineers
US Army Corps
SHEET OF
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W Y
O R
K
N Y
N E
W Y
O R
K D
IS
T R
IC
T
H U
R R
IC
A N
E S
T O
R M D
A M
A G
E R
E D
U C
T
IO
N
R A
R
IT
A N B
A Y S
A N
D Y H
O O
K B
A Y
P O
R T M
O N
M O
U T
H
N J
P H
A S
E I I, C
O N
T R
A C
A
P
J A
P
A N
S I
D
S-302
T Y
P
IC
A L F
L O
O D
W A
L L S
E C
T
IO
N
HORIZ- #8 @ 12" O.C.
VERT- #10 @ 6" O.C.
TOP & BOT
#10 @ 6" O.C.
TOP & BOT
#8 @ 12" O.C.
TOP & BOT
#10 @ 6" O.C.
HORIZ- #8 @ 12" O.C.
VERT- #10 @ 6" O.C.
TOP & BOT
#8 @ 12" O.C.
FLOOD SIDE FLOOD SIDE PROTECTED SIDE
T/WALL EL +13.0
T/PILE CAP EL -2.5
TAPER EL +6.0
APPROX MIN GROUND
LEVEL EL +0.5
T/WALL EL +13.0
B/PILE CAP EL -2.5
T/PILE CAP EL +1.0
APPROX MIN GROUND
LEVEL EL +4.0
HP12X84
S-302
TYPICAL T - FLOOD WALL SECTION STA. 24+28.25 TO STA. 36+39
SCALE 2/5" = 1'
THREE BULB WATERSTOP
(T Y
P
W A
T E
R S
T
P
C T
H R
E E B
U
B
THREE BULB WATERSTOP
TEE (┴) WATERSTOP JOINT
FACTORY FABRICATED
3"
S-302
WITH SHEET PILE CUT-OFF WALL
TYPICAL T - FLOOD WALL MONOLITH JOINT
SCALE 2/5" = 1'
S-508
(TYP.)
WATERSTOP MATERIAL
WITH HYDROPHILIC
TO A MIN. DEPTH OF 3"
WIDTH OF WATERSTOP
PACK VOID OVER
(SEE NOTE 3)
PILE LENGTH, 60FT
PROTECTED SIDE
B/PILE CAP EL -6.0
COVER
4" MIN. CLEAR
COVER
4" MIN. CLEAR
PLAN VIEW
SIDE VIEW
L
/2
PILE FLANGE
SPLICER
(AS REQUIRED)
BACK-UP PLATE
PILE SPLICER
HP 12X84
2'-9"
M
IN
E
M B
E D
M E
N T
2'-9"
M
IN
E
M B
E D
M E
N T
(SEE NOTE 3 &4)
PILE LENGTH, 75FT
BOT EL -20
CUTOFF WALL
PZ22
BOT EL -20
CUTOFF WALL
PZ22
PILE CONNECTIONS ARE FIXED
NOTES:
PILE CONNECTIONS ARE FIXED
NOTES:
CUT-OFF WALL
PZ22
TYP.
S-302
AND STA. 47+42.61 TO 48+49
TYPICAL T - FLOOD WALL SECTION STA. 46+36 TO STA. 47+12.61
SCALE 2/5" = 1'
PROTECTED SIDEFLOOD SIDE
2'-0"
3'-0"
2'-0"
6'-0"6'-0"
1'-4" MIN.
6'-6" 6'-6"
1'-4" MIN.
S-302
PILE SPLICE DETAIL
SCALE: NTS
1'-6"
1'-4" MIN.
'-4
STUDS, 5" LONG
1" DIAM, SHEAR
STUDS, 5" LONG
1" DIAM, SHEAR
VERTICAL PILE CONNECTION BATTERED PILE CONNECTION
S-302
PINNED PILE CONNECTIONS
SCALE: NTS
2'-0"
2'-0"
-0
-3
TYP.
FLUTED FIN FINISH,
TYP.
FLUTED FIN FINISH,
S
E P
9.
CONTRACTOR'S MEANS AND METHODS.
OR MUD SLAB TO FACILITATE CONSTRUCTION AS PART OF
MINIMUM OF 6" CRUSH STONE BASE, SHOWN SCHEMATICALLY, 8.
BROADWAY CLOSURE GATE IS AT STA. 47+94 TO STA. 47+90.7.
LOCATED IN 4/S-519.
T-FLOODWALL SECTION STA. 47+12.61 TO STA. 47+42.61 6.
LOCATED IN 3/S-520.
T-FLOODWALL SECTION STA. 23+98.25 TO STA. 24+28.25 5.
VERTICAL PILE BOTTOM TIP ELEVATION.
BATTER PILE BOTTOM TIP ELEVATION SHALL MATCH THE 4.
ON THE PILE LOAD TEST.
PURPOSES ONLY. THE ACTUAL PILE LENGTHS SHALL BE BASED
THE PILE LENGTHS ARE STATED FOR ESTIMATING 3.
GATES ARE SHOWN ON SHEET S-303 AND S-304.
THE TYPICAL FLOODWALL SECTIONS FOR THE CLOSURE 2.
ARE SHOWN ON SHEET S-307 TO S-310.
THE TYPICAL FLOODWALL SECTIONS FOR THE PIPES 1.
NOTES:
PASSING THRU THE PILES.
MAXIMUM 1" OFFSET ON BOTH SIDES OF H-PILES ALLOWED FOR REBAR 11.
FIXED PILE CONNECTIONS LOCATED IN 4/S-301.10.
FLOODWALLS SHALL BE STAINED AND HAVE AN ANTI-GRAFFITI COATING.
S T
IR
R U
P S R
E M
O V
E D
N O
T E C
H A
N G
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
IS
S
U E D
A T
E
New York District of Engineers
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W Y
O R
K
N Y
N E
W Y
O R
K D
IS
T R
IC
T
H U
R R
IC
A N
E S
T O
R M D
A M
A G
E R
E D
U C
T
IO
N
R A
R
IT
A N B
A Y S
A N
D Y H
O O
K B
A Y
P O
R T M
O N
M O
U T
H
N J
P H
A S
E I I, C
O N
T R
A C
A
P
J A
P
A N
S I
D
S-303
6'-0"
3'-6"
2'-0"
B/PILE CAP EL -2.5
T/PILE CAP EL +1.0
FLOOD SIDE PROTECTED SIDET/PILASTER EL +15.0
"1"
T/GATE EL +13.0
T/CONC SEAL EL +4.1
#8 @ 8" O.C.
5'-1"
E M
B E
D M
E N
T
M
IN
T/CONC SEAL EL +4.1
T/GATE AND FLOODWALL EL +13.0
FLOOD SIDE PROTECTED SIDE
EL SEAL PL +4.14
TYP
HP 12X84 PILES,
4'-0"
#5 TIES @12" O.C.
(AS SHOWN)
22 #11 VERTICAL BARS
" =1'2
SCALE:
0 1' 2' 4' 8'
F L
O O
D W
A L L S
E C
T
IO
N S
C A
M P
B E
L L G
A T
E T
Y P
IC
A L
C FLOODWALL ALIGNMENTL
(SEE NOTE 5 & 6)
PILE LENGTH, 60FT
B/PILE CAP EL -2.5
T/PILE CAP EL +1.0
(SEE NOTE 5 & 6)
PILE LENGTH, 60FT
BOT EL -20
WALL
PZ22 CUT-OFF
4" CLR
1'-4" MIN
PILES CONNECTION ARE FIXED
NOTES:
2'-9"
BOT EL -20
WALL
PZ22 CUT-OFF
TOP & BOT
#10 @ 6" O.C.
TOP & BOT
#9 @ 12" O.C.
C FLOODWALL ALIGNMENTL
S-303
S-303
GATE SECTION THROUGH PILASTER NO 1 & 2
" = 1'
1SCALE
S-303
SECTION THROUGH PILASTER
" = 1'
1SCALE
0 5'
SCALE 2" = 5'
10'
11"
T/CONC SEAL EL +4.1
B/PILE CAP EL -2.5
T/PILE CAP EL +1.0
T/GATE AND FLOODWALL EL +13.0
2'-6" 3'-0"
TYP
2'-9"
(SEE NOTE 5 & 6)
PILE LENGTH, 60FT
BOT EL -20
WALL
PZ22 CUT-OFF
1'-4" MIN
HORIZ- #9 @ 12" O.C, E.F.
VERT- #10 @ 6" O.C., E.F.
4" MIN CLEAR COVER
PROTECTED SIDE
C FLOODWALL ALIGNMENT
HORIZ- #9 @ 12" O.C, E.F.
VERT- #10 @ 6" O.C., E.F.
FLOOD SIDE
TOP & BOT
#10 @ 6" O.C.
L
TOP & BOT
#9 @ 12" O.C.
2'-9"
11" 6'-3" 11" 6'-0"
4" MIN CLEAR COVER
1'-4" MIN
PILES CONNECTION ARE FIXED
NOTES:
S-303
GATE STORAGE SECTION STA 22+78.25 TO STA 22+90.75
" = 1'
1SCALE
PILES CONNECTION ARE FIXED
NOTES:
S-303
GATE STORAGE SECTION STA 23+55.75 TO STA 23+98.25
" = 1'
1SCALE
-0
-3
FINISH, TYP.
FLUTED FIN
FINISH, TYP.
FLUTED FIN
S
E P
FLOODWALL TRANSITION OCCURS AFTER STA. 23+98.2510.
FIXED PILE CONNECTIONS LOCATED IN 4/S-301.9.
FLOODWALLS SHALL BE STAINED AND HAVE AN ANTI-GRAFFITI COATING.
MAXIMUM 1" OFFSET ON BOTH SIDES OF H-PILES ALLOWED FOR REBARS PASSING THRU THE PILES. 11.
8.
GATE STORAGE SECTION STA 23+98.25 TO STA. 24+28.25 LOCATED IN 3/S-520.7.
BATTER PILES BOTTOM TIP ELEVATION SHALL MATCH THE VERTICAL PILES BOTTOM TIP ELEVATION.6.
THE PILE LENGTHS ARE STATED FOR ESTIMATING PURPOSES ONLY. THE ACTUAL PILE LENGTHS SHALL BE BASED ON THE PILE LOAD TEST.5.
THE PILES LENGTH ARE NOT SHOWN TO SCALE.4.
MINIMUM OF 6" CRUSH STONE BASE, SHOWN SCHEMATICALLY, OR MUD SLAB TO FACILITATE CONSTRUCTION AS PART OF CONTRACTOR'S MEANS AND METHODS.3.
ALL SECTIONS CALLOUTS AND DIMENSIONS ARE TYPICAL ALONG LENGTH OF T-WALL, UNLESS OTHERWISE SPECIFIED.2.
WHERE REINFORCEMENT TRANSVERSE TO WALL ALIGNMENT IS INTERRUPTED BY PILES, SHIFT BAR TO NEAREST SIDE OF PILE.1.
NOTES:
S T
IR
R U
P S R
E M
O V
E D
N O
T E C
H A
N G
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
IS
S
U E D
A T
E
New York District of Engineers
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W Y
O R
K
N Y
N E
W Y
O R
K D
IS
T R
IC
T
H U
R R
IC
A N
E S
T O
R M D
A M
A G
E R
E D
U C
T
IO
N
R A
R
IT
A N B
A Y S
A N
D Y H
O O
K B
A Y
P O
R T M
O N
M O
U T
H
N J
P H
A S
E I I, C
O N
T R
A C
B E
C
B E
C
A N
S I
D
S-304
T/PILASTER EL +15.0
T/GATE EL +13.0
#8 @ 8" O.C.
B/SSP EL -20.0
V-GROOVED CASTER (2 TOTAL)
CLOSURE GATE MONOLITH
SEE NOTE 3
PROTECTED SIDEFLOOD SIDE
EL SEAL PL +5.24
EMBEDDED SUPPORTS
C.R.S SEAL PLATE AND
SUPPORTS, TYP.
GATE TRACK AND EMBEDDED
THROUGH CUT OFF WALL, TYP
REINFORCEMENT BARS
CUT 1-1/2" HOLES TO PASS
SUPPORTS, TYP.
GATE TRACK AND EMBEDDED
2 - #5 BARS
#10 @ 9" O.C. , E.F.
F L
O O
D W
A L L S
E C
T
IO
N S
B R
O A
D W
A Y G
A T
E T
Y P
IC
A L
T/GATE EL +13.0
B/SSP EL -20.0
TYP
HP 12X84 PILES,
5'-6"
MIN.
COVER
CLEAR
4"
#5 TIES @12" O.C.
S-304
SECTION THROUGH PILASTER
SCALE 1/2" = 1'
PROTECTED SIDEFLOOD SIDE
B/FTG EL -2.5 B/FTG EL -2.5
T/PILE CAP EL +1.0 T/PILE CAP EL +1.0
T/CONC SEAL EL +5.2 T/CONC SEAL EL +5.2
CONNECTIONS
4/S-301 FOR PILE
DETAIL
SEE TYPICAL
0 5'
SCALE 2" = 5'
10'
" =1'2
SCALE:
0 1' 2' 4' 8'
#10 @ 9" O.C. , E.F.
1" RECESSED PANEL
4'-0"
4" CLR.
AS SHOWN
34 #11 VERTICAL BARS
4'-0"
EMBEDMENT
1'-4" MIN.
2'-9"
E M
B E
D M
E N
T
M
IN
EMBEDMENT
1'-6" MIN.
1'-3" "2
15'-21'-3"
W8x31 TYP.
V-GROOVED TRACK
"2 15'-2
"2
4" CL.
(SEE NOTE 5 & 6)
PILE LENGTH, 60FT
(SEE NOTE 5 & 6)
PILE LENGTH, 60FT
BOT. EL. -20
CUTOFF WALL
PZ22
BOT. EL. -20
CUTOFF WALL
PZ22
C FLOODWALL ALIGNMENTL
C FLOODWALL ALIGNMENTL
PILES CONNECTION ARE FIXED
NOTES:
PILES CONNECTION ARE FIXED
NOTES:
S-304
STA. 47+94.11 TO STA. 48+43.5
GATE SECTION THROUGH STORAGE SLAB
SCALE 2/5" = 1'
-0
-3
FLUTED FIN FINISH, TYP.
S-304
GATE SECTION THROUGH PILASTER NO 3 & 4
SCALE 2/5" = 1'
S
E P
MAXIMUM 1" OFFSET ON BOTH SIDES OF H-PILES ALLOWED FOR REBARS PASSING THRU THE PILES. 9.
FIXED PILE CONNECTIONS LOCATED IN 4/S-301.8.
FLOODWALLS SHALL BE STAINED AND HAVE AN ANTI-GRAFFITI COATING.7.
BATTER PILES BOTTOM TIP ELEVATION SHALL MATCH THE VERTICAL PILES BOTTOM TIP ELEVATION.6.
THE PILE LENGTHS ARE STATED FOR ESTIMATING PURPOSES ONLY. THE ACTUAL PILE LENGTHS SHALL BE BASED ON THE PILE LOAD TEST.5.
THE PILES LENGTH ARE NOT SHOWN TO SCALE.4.
MINIMUM OF 6" CRUSH STONE BASE, SHOWN SCHEMATICALLY, OR MUD SLAB TO FACILITATE CONSTRUCTION AS PART OF CONTRACTOR'S MEANS AND METHODS.3.
ALL SECTIONS CALLOUTS AND DIMENSIONS ARE TYPICAL ALONG LENGTH OF T-WALL, UNLESS OTHERWISE SPECIFIED.2.
WHERE REINFORCEMENT TRANSVERSE TO WALL ALIGNMENT IS INTERRUPTED BY PILES, SHIFT BAR TO NEAREST SIDE OF PILE.1.
NOTES:
S T
IR
R U
P S R
E M
O V
E D
N O
T E C
H A
N G
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
IS
S
U E D
A T
E
New York District of Engineers
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W Y
O R
K
N Y
N E
W Y
O R
K D
IS
T R
IC
T
H U
R R
IC
A N
E S
T O
R M D
A M
A G
E R
E D
U C
T
IO
N
R A
R
IT
A N B
A Y S
A N
D Y H
O O
K B
A Y
P O
R T M
O N
M O
U T
H
N J
P H
A S
E I I, C
O N
T R
A C
| S-001 STRUCTURAL GENERAL NOTES |
| S-101 FLOODWALL PLAN OVERVIEW PART 1 |
| S-301 TYPICAL FLOOD WALL SECTIONS |
| S-302 TYPICAL FLOOD WALL SECTIONS |
| S-303 CAMPBELL GATE TYPICAL FLOODWALL SECTIONS |
| S-304 BROADWAY GATE TYPICAL FLOODWALL SECTIONS |
| S-310 FLOOD WALL SECTIONS FOR MCBOA PIPE |
| S-511 DRAINAGE STRUCTURE DETAIL C1-1 (STATION 16+30) |
| S-512 DRAINAGE STRUCTURE DETAIL C1-MAIN (STATION 19+14) |
| S-513 DRAINAGE STRUCTURE DETAIL C2-4 (STATION 24+60) |
| S-514 DRAINAGE STRUCTURE DETAIL C2-3 (STATION 28+05) |
| S-515 DRAINAGE STRUCTURE DETAIL C2-MAIN (STATION 33+40) |
| S-516 DRAINAGE STRUCTURE DETAIL C2-2 (STATION 39+75) |
| S-517 DRAINAGE STRUCTURE DETAIL C2-1 (STATION 47+25) |
| S-520 TYPICAL FLOOD TRANSITION DETAIL |
| E-100 Amend 2.pdf |
| CPS_Contract 4_E-100 |
| CPS_Contract 4_ES-001 |
| CPS_Contract 4_ES-100 |
| CPS_Contract 4_ES-109 |
| CPS_Contract 4_ES-109A |
| CPS_Contract 4_ES-109B |
| CPS_Contract 4_ES-110 |
| CPS_Contract 4_ES-111 |
| CPS_Contract 4_ES-111A |
| CPS_Contract 4_ES-112 |
| CPS_Contract 4_ES-112A |
| CPS_Contract 4_ES-113 |
| CPS_Contract 4_ES-114 |
| CPS_Contract 4_ES-115 |
| CPS_Contract 4_ES-116 |
File details come from the government source that posted it. Updated .