AMD-0002-01_33_00-Submittal-Register.pdf

PDF 529 KB Posted

Attached to
TROY LOCK AND DAM MITER GATE REPLACEMENT HUDSON RIVER TROY, NEW YORK
Solicitation number
W912DS-16-R-0015
Issued by

About this file

Amended 01 33 00 Submittal Register

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 10 PAGES

Troy Lock Miter Gate Replacement

00 01 10 SD-01 Preconstruction Submittals G CTCertified to Transact Business G CTInsurance

00 73 05 SD-01 Preconstruction Submittals

1.5.1 G SLBackground Checks

1.5.2 G SLCompany Enrollment in E-verify

1.5.2 G SLForm I-9

G SODive Plan

1.9 G AOPre-Construction Condition

Survey

1.28 GSuperintendence of

Subcontractors GECDSWork Plan

1.9 GECDSControl Point Installation

GECDSMiter Gate Control Data

1.10 GECDSRegistered Land Surveyor

SD-05 Design Data

GECDSComputations SD-11 Closeout Submittals

1.9 G AOPost-Construction Condition

Survey

01 22 00 SD-01 Preconstruction Submittals 1.2.1Mobilization and Demobilization

1.4 GContract Line Item Breakdown

01 32 01 SD-01 Preconstruction Submittals

3.4 GProject Schedule

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

AMENDMENT 0002

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 10 PAGES

01 33 00 SD-01 Preconstruction Submittals

1.5 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.7 G SOAccident Prevention Plan (APP)

1.8 G SOActivity Hazard Analysis (AHA)

1.7.1Confined Space Entry Plan

1.7.1 G SOCrane Critical Lift Plan

1.5.1.4 G SOCrane Operators

1.7.1 GEM 385-1-1 Requirements

1.7.1Fall Protection and Prevention

(FP&P) Plan

1.7.1 G SONaval Architect Analysis

SD-06 Test Reports 1.12Reports 1.12.1Accident Reports 1.12.3Exposure Reports 1.12.4Crane Reports

SD-07 Certificates 1.14Confined Space Entry Permit 1.13Hot Work Permit 1.12.5Certificate of Compliance 1.11First Aid and CPR

01 45 02 SD-01 Preconstruction Submittals

1.7.2.1 GPay Activity Data

01 45 04 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 10 PAGES

01 45 04 3.2 GContractor Quality Control (CQC) Plan

01 53 11 SD-01 Preconstruction Submittals

3.2 GDewatering Plan

01 57 20 SD-01 Preconstruction Submittals

1.7 GECDNEnvironmental Protection Plan

01 78 00 SD-02 Shop Drawings

1.2.1 GAs-Built Drawings

SD-11 Closeout Submittals

1.2.2 GOperation and Maintenance

(O&M) Manuals

1.2.2.1 GOperation and Maintenance Data

1.2.2.2 GWarranty(s)

1.2.2.3 GData Sheets

1.2.2.4 GTraining

1.2.3 GFinal Records

02 20 15 SD-02 Shop Drawings GRemoval/Reinstallation Plan

02 95 20 SD-01 Preconstruction Submittals

3.6 GQuality Control

03 11 14 SD-02 Shop Drawings GECDSFormwork

SD-03 Product Data Form Materials

03 15 14 SD-06 Test Reports 2.1Expansion Joint Filler, Premolded

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 10 PAGES

03 15 15 SD-02 Shop Drawings

3.2.2 GECDSTesting Apparatus

SD-03 Product Data

2.1.1 GECDSTwo-part Epoxy Grout for

Concrete Anchors SD-07 Certificates

2.1.1Two-part Epoxy Grout for Concrete Anchors

3.3 GQuality Control

03 20 01 SD-02 Shop Drawings

3.1 GECDSReinforcement

SD-06 Test Reports

GECDSReinforcing Steel 03 31 00 SD-03 Product Data

2.1.7Non-Shrink Grout

3.5 G EC-GCuring and Protection

3.3.4 G EC-GCold-Weather Placing

3.3.5 G EC-GHot-Weather Placing

SD-05 Design Data

1.6 G EC-GConcrete Mixture Proportions

SD-06 Test Reports Concrete

3.6Tests and Inspections 05 50 14 SD-01 Preconstruction Submittals

1.6 GECDSWelding Procedure Specifications

(WPS)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 10 PAGES

05 50 14 1.6 GECDSFracture Control Plan (FCP) GECDSWelding Schedules for Structural

Steel GECDSWeld Tracking Log Template

3.1.4.2 GECDSBolted Connection Work Plan

SD-02 Shop Drawings

1.4.2 GECDSDetail Drawings

1.4.2.1 GECDSRevised Detail Models and

Drawings

1.4.2.2 GECDSAs-Fabricated Models and

Drawings

3.1.2 GECDSAssembly Drawings

SD-03 Product Data

3.1.10.3 GECDSPortable Grease Pump

3.1.3 GECDSWelding of Structural Steel

3.3.7 GECDSStructural Steel Welding Repairs

GECDSFracture Critical Member Welding Repairs

2.1.1Materials Orders 2.1.2Materials List

SD-04 Samples 2.2.9Bolts, Nuts, and Washers

SD-06 Test Reports

3.3 GTests, Inspections, and

Verifications

1.4.2 GWeld Tracking Log

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 10 PAGES

05 50 14 weld tracking log template 2.2.9Bolts, Nuts, and Washers

SD-07 Certificates

1.4.1 GQualification of Welders and

Welding Operators

1.4.4 GInspector Qualifications

3.1 GFabrication

3.3.1.1Calibrator

SD-09 Manufacturer’s Field Reports

3.1.4.1 GBolt Holes Mislocated or

Misdrilled

3.3.8 GECDSControl Dimensions and Weight

06 73 01 SD-02 Shop Drawings

1.3 GInstallation Drawings, Templates, and Directions

SD-03 Product Data

1.3 GFRP Grating

1.3 GClips and Anchorage

SD-06 Test Reports

2.1.1 GBearing Strength Testing

2.1.1 GFlexural Properties

2.1.1 GUltraviolet Testing

2.1.1 GShear Strength

2.1.1 GTensile Properties

2.1.1 GToxicity Testing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 10 PAGES

06 73 01 2.1.1 GCoefficient of Lineal Thermal Expansion

2.1.1 GFlame Spread Testing

SD-07 Certificates

1.3 GManufacturer's Sample Warranty

1.3 GManufacturer's Certification of

State Product Approval

1.3 GCertification of Anchorage

System compliance with ASCE 7

1.3 GProof of Certification from a

minimum of two quality assurance programs for its facilities or products (UL, DNV, ABS, USCG, AARR)

SD-08 Manufacturer’s Instructions

1.4 GShipping, Handling, Erection

Procedures

1.4 GCare and Maintenance

Instructions SD-09 Manufacturer’s Field Reports

3.1 GManufacturer's Certification of

Installation

SD-11 Closeout Submittals

3.2.1 GManufacturer's Warranty

09 97 02 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 10 PAGES

09 97 02 GPreparation and Painting Management Program

Quality Control (Inspections) Equipment List

SD-04 Samples

2.1 GSpecial Paint Formulas

2.3.3 GSolvent and Thinners

SD-07 Certificates

1.4.1 GQualified Paint Applicator

1.4.2 GCoating Thickness Gage

Qualification 32 92 10 SD-01 Preconstruction Submittals

3.1Equipment SD-07 Certificates Seeder's Experience Statement

2.1 GSeed

2.1 GFertilizer

35 05 40 SD-01 Preconstruction Submittals GAssembly and Installation Plan

SD-02 Shop Drawings

3.2 GSelf-Lubricated Component Shop

Drawings

3.2 GSelf-Lubricated Component Field

Installation Drawings SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

AMENDMENT 0002

e3endrdh Polygon e3endrdh Polygonal Line

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 10 PAGES

35 05 40 3.2 GSelf-Lubricated Material Product Data

SD-07 Certificates GManufacturer's Experience

Record 1.4Self-Lubricated Material

Manufacturer's Warranty Release Agreement

3.2FCB Material Certifications SD-09 Manufacturer’s Field Reports Post-Assembly QC Report Alignment QC Report Acceptance Test Report

SD-10 Operation and Maintenance Data

3.2 GOperation and Maintenance

Manuals

35 20 16 SD-01 Preconstruction Submittals

1.6 GECDSDelivery Plan

1.4.4.1 GFabrication Drawings

1.4.4.2 GAssembly Drawings

3.2.2 GECDSDiagonals Prestressing

GECDSEmbedded Wall Quoin Finishing Plan

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 10 PAGES

35 20 16 2.1Materials

3.2.2 GECDSDiagonals Prestressing

GECDSInstallation, Adjusting, and Testing Plan

SD-07 Certificates

3.6 GECDNDelivery Manifests

3.6 GECDNDocumentation of Recycling

Activities SD-11 Closeout Submittals

1.6.4 GECDSMiter Gate Fabrication Log

35 20 16.01 SD-03 Product Data

3.2 GECDSEAL Material

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

File details come from the government source that posted it. Updated .