Amendment 0004 to W912DS-16-B-0015

View the file

Other files

File Type Posted
W912DS-16-B-0015_Bid_Abstract.pdf PDF
W912DS-16-B-0015_AMD06.pdf PDF
AMEND_6_Specs.pdf PDF
Plan_sheet_L-101-_p014-Planting-plan_Mod6.pdf PDF
W912DS-16-B-0015_AMD05.pdf PDF
Revised_L-502_Amendment_04.pdf PDF
W912DS-16-B-0015-AMD03.pdf PDF
W912DS-16-B-0015-AMD02.pdf PDF
W912DS-16-B-0015_AMD01.pdf PDF
W912DS-16-B-0015.pdf PDF
W912DS-16-B-0015_Plans.pdf PDF
W912DS-16-B-0015_Specifications.pdf PDF
W912DS-16-B-0015_Sampling.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this modification is to revise the bid schedule, amend a draw ing sheet, and extend the bid opening date.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 18

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Mar-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-16-B-0015

X 9B. DATED (SEE ITEM 11)

19-Dec-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Mar-2017

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

NOTE: Bidders must acknow ledge receipt of this amendment by date specified in the bid (or as amended) by one of the following methods: In the space provided on the SF 1442, by separate letter, or by signing block 15 below FAILURE TO ACKNOWLEDGE AMENDMENT BY DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE

MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).

W912DS-16-B-0015

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

1. The Bid Opening date is hereby changed from 15 March 2017 to 28 March 2017. The Bid Opening time remains unchanged at 2:00PM EST.

2. Construction Wage Rate Requirement NY170003 dated 02/10/2017 is hereby replaced with the current Construction Wage Rate Requirement dated 03/03/2017.

3. No more Requests for Information will be accepted at this time. Please bid the project as shown.

4. AMENDED PROJECT DRAWING SHEETS. The following plan sheet has been revised:

a. L-502

5. The Bid Schedule (CLINS 0005AA, 0005AB, 0005AE, 0010AA) has been revised as follows:

AMENDMENT 04 – REVISED BID SCHEDULE

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Mobilization and Demobilization

FFP

NET AMT

0002 24.30 Acre Herbivory Fence

(ESTIMATED QUANTITY)

0003 1 Job Access Roads & Staging Area

Site Clearing and Grubbing

(FOR INFORMATION ONLY)

0004AA 26.30 Acre Site Clearing and Grubbing

0004AB .50 Acre Non-Hazardous Material

FFP

With Regulatory Exceedances (Base)

(ESTIMATED QUANTITY)

Additional cost for disposal of non-hazardous material with regulatory exceedances at an approved upland offsite disposal facility removed under Payment Item

0004AA

Planting and Seeding

0005AA 140,160 Each Low Marsh Plants

0005AB 140,920 Each High Marsh Plants

0005AC 11,100 Each Shrubs

0005AD 28,400 Each Upland & Scrub/Shrub Grasses

0005AE 10.0 Acre Seeding

Earthwork

0006AA 18,000 Cubic

Yard

Unclassified Excavation and Onsite Placement

0006AB 500 Cubic

Disposal of Excavated Material

Unsuitable for Upland Placement (Base)

Additional cost for disposal of material unsuitable for onsite upland placement at an approved upland offsite disposal facility excavated under Payment of 0006AA

0006AC 2,000 Cubic

Disposal of Non-Hazardous Material

With Regulatory Exceedances (Base)

Additional cost for disposal of non-hazardous material with regulatory exceedances at an approved upland offsite disposal facility under Payment Item 0006AA

0006AD 19,000 Cubic

Clean Sand, Imported Fill

0007 1 Job Floating Turbidity Barrier

0008 1 Job Silt Fence

0009 1 Job Fencing

Soil Erosion and Sediment Control

0010AA 10.0 Acre Temporary Seed

0010AB 1 Job Straw Mulch

0010AC 1 Job Inlet Protection

0011 28.50 Acre Final Grading

0012 .30 Acre

OPTION OPTION #1

FFP

Site Clearing & Grubbing: Non-Hazardous Material with Regulatory Exceedances

(ESTIMATED QUANTITY)

Additional cost for disposal of non-hazardous material with regulatory exceedances

0013 .25 Acre

OPTION OPTION #2

FFP

Grubbing: Non-Hazardous Material with Regulatory Exceedances

(ESTIMATED QUANTITY)

Additional cost for disposal of non-hazardous material with regulatory exceedances

0014 .20 Acre

OPTION OPTION #3

FFP

Site Clearing and Grubbing: Non-Hazardous Material with Regulatory Exceedances

(ESTIMATED QUANTITY)

Additional cost for disposal of non-hazardous material with regulatory exceedances

0015 600 Cubic

OPTION OPTION #4

Earthwork: Disposal of Excavated Material Unsuitable for Upland Placement.

Additional cost for disposal of material unsuitable for onsite upland placement at an approved upland offsite disposal facility excavated under Payment Item

0006AA

0016 500 Cubic

OPTION OPTION #5

Earthwork: Disposal of Excavated Material Unsuitable for Upland Placement.

Additional cost for disposal of material unsuitable for onsite upland placement at an approved upland offsite disposal facility excavated under Payment Item

0017 500 Cubic

OPTION OPTION #6

Earthwork: Disposal of Excavated Material Unsuitable for Upland Placement.

Additional cost for disposal of material unsuitable for onsite upland placement at an approved upland offsite disposal facility excavated under Payment Item

0018 400 Cubic

OPTION OPTION #7

Earthwork: Disposal of Excavated Material Unsuitable for Upland Placement.

Additional cost for disposal of material unsuitable for onsite upland placement at an approved upland offsite disposal facility excavated under Payment Item

0019 600 Cubic

OPTION OPTION #8

Earthwork: Disposal of Excavated Material Unsuitable for Upland Placement.

Additional cost for disposal of material unsuitable for onsite upland placement at an approved upland offsite disposal facility excavated under Payment Item

0020 500 Cubic

OPTION OPTION #9

Earthwork: Disposal of Excavated Material Unsuitable for Upland Placement.

Additional cost for disposal of material unsuitable for onsite upland placement at an approved upland offsite disposal facility excavated under Payment Item

0021 500 Cubic

OPTION OPTION #10

Earthwork: Disposal of Excavated Material Unsuitable for Upland Placement.

Additional cost for disposal of material unsuitable for onsite upland placement at an approved upland offsite disposal facility excavated under Payment Item

0022 400 Cubic

OPTION OPTION #11

Earthwork: Disposal of Excavated Material Unsuitable for Upland Placement.

Additional cost for disposal of material unsuitable for onsite upland placement at an approved upland offsite disposal facility excavated under Payment Item

TOTAL BASE ITEMS (LINE ITEMS 0001 THROUGH 0011): ______________________________________

TOTAL OPTION ITEMS (LINE 0012 THROUGH 0022): __________________________________________

TOTAL ALL ITEMS (LINE 0001 THROUGH 0022): _____________________________________________

NOTES FOR PRICE SCHEDULE:

1. Bidders are required to bid on both the Base Bid Items and the Optional Items on the Price Schedule or their bid will be rejected.

2. The low bidder for the purpose of award will be the conforming responsible bidder offering the lowest amount for the Total Base Bid & Optional Items.

3. Any bid which is materially unbalanced as to the price for the Base Bid Items and Optional Items may be rejected.

An unbalanced bid is one that is based on price significantly less than the cost for some work and prices are significantly overstated for other work.

4. Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions or attachments made by the bidders thereto may render the bid non-responsive and be cause for its rejection.

5. The Optional Items 0012 -0022, if awarded, will be awarded within 240 calendar days from date of issuance of Notice to Proceed. The Government is under no obligation to award any Optional Item. No additional time will be added.

6. Price Schedule descriptions above are for information only. Measurement and payment sections of the specifications govern.

7. The planting zones and number of plants and/or plugs for the vegetative species within the various planting zones are shown on Sheet L-101 (Planting Plan) and Sheet L-502 (Planting & Herbivory Fencing Details).

(End of Summary of Changes)

General Decision Number: NY170003 03/03/2017 NY3

Superseded General Decision Number: NY20160003

State: New York

Construction Types: Building, Heavy, Highway and Residential

Counties: Bronx, Kings, New York, Queens and Richmond Counties in New York.

BUILDING & RESIDENTIAL CONSTRUCTION PROJECTS (includes single family homes and apartments up to and including 4 stories), HEAVY AND HIGHWAY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.

The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2017 1 01/13/2017 2 02/03/2017 3 02/10/2017 4 02/17/2017 5 03/03/2017

ASBE0012-001 06/27/2016

Rates Fringes

Asbestos Workers/Insulator Includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.....................$ 64.91 33.06

HAZARDOUS MATERIAL HANDLER.......$ 39.00 12.75

BOIL0005-001 01/01/2013

Rates Fringes

BOILERMAKER......................$ 49.47 33%+22.87+a

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Thanksgiving Day, Memorial Day, Independence Day, Labor Day and Good Friday, Friday after Thanksgiving, Christmas Eve Day and New Year's Eve

BRNY0001-001 07/01/2016

Rates Fringes

BRICKLAYER.......................$ 56.77 24.75

MASON - STONE....................$ 62.67 30.59

BRNY0001-002 07/01/2016

Rates Fringes

Pointer, cleaner and caulker.....$ 50.43 25.26

BRNY0004-001 01/01/2017

Rates Fringes

MARBLE MASON.....................$ 57.74 34.11

BRNY0007-001 01/01/2017

Rates Fringes

TERRAZZO FINISHER................$ 50.86 34.04

TERRAZZO WORKER/SETTER...........$ 52.46 34.06

BRNY0020-001 01/01/2017

Rates Fringes

MARBLE FINISHER..................$ 46.01 32.53

BRNY0024-001 01/01/2017

Rates Fringes

BRICKLAYER

MARBLE POLISHERS............$ 40.89 25.20

BRNY0052-001 06/06/2016

Rates Fringes

Tile Layer.......................$ 48.51 26.37

BRNY0088-001 12/07/2015

TILE FINISHER....................$ 42.42 29.13

CARP0001-009 07/01/2016

Rates Fringes

CARPENTER

Carpenters..................$ 52.50 45.58 Soft Floor Layers...........$ 52.50 45.58

CARP0740-001 07/01/2016

Rates Fringes

MILLWRIGHT.......................$ 51.50 51.71

CARP1556-006 07/01/2016

Rates Fringes

Dock Builder & Piledrivermen

DOCKBUILDERS................$ 51.63 47.95

CARP1556-007 07/01/2016

Rates Fringes

Diver Tender.....................$ 46.44 47.95 Diver............................$ 65.38 47.95

CARP1556-011 07/01/2016

Rates Fringes

Carpenters:

TIMBERMEN...................$ 46.99 47.56

* ELEC0003-001 05/11/2016

Rates Fringes

ELECTRICIAN

Electricians................$ 54.00 96.033%+a Jobbing, and maintenance and repair work.............$ 25.30 15.13+a

PAID HOLIDAYS:

a. New Years Day, Martin Luther King, Jr.'s Birthday, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Election Day, Thanksgiving Day, the day after Thanksgiving Day, and Christmas Day

ELEC1049-001 04/03/2016

QUEENS COUNTY

Line Construction (Substation and Switching structures pipe type cable installation and maintenance jobs or projects;

Railroad electrical distribution/transmission systems maintenance (when work is not performed by railroad employees) Overhead and Underground transmission/distribution line work. Fiber optic, telephone cable and equipment) Groundman...................$ 31.37 21.72 Heavy Equipment Operator....$ 41.82 25.06 Lineman and Cable Splicer...$ 52.28 28.39 Tree Trimmer................$ 30.09 14.12

ELEV0001-002 03/17/2013

Rates Fringes

ELEVATOR MECHANIC

Elevator Constructor........$ 57.01 27.605+a+b Modernization and Repair....$ 45.14 27.455+a+b

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Good Friday, President's Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.

b. PAID VACATION: An employee who has worked less than 5 years shall recieve vacation pay credit on the basis of 4% of his hourly rate for all hours worked; an employee who has worked 5 to 15 years shall receive vacation pay credit on the basis of 6% of his hourly rate for all hours worked;

an employee who has worked 15 or more years shall receive vacation pay credit on the basis of 8% of his hourly rate for all hours worked.

ENGI0014-001 07/01/2016

Rates Fringes

POWER EQUIPMENT OPERATOR

(HEAVY & HIGHWAY)

GROUP 1....................$ 92.76 31.15

GROUP 2....................$ 76.51 31.15

GROUP 3....................$ 78.96 31.15

GROUP 4....................$ 77.07 31.15

GROUP 5....................$ 75.55 31.15

GROUP 6....................$ 72.53 31.15

GROUP 7....................$ 73.90 31.15

GROUP 8....................$ 71.78 31.15

GROUP 9....................$ 70.24 31.15

GROUP 10....................$ 67.16 31.15

GROUP 11....................$ 62.73 31.15

GROUP 12....................$ 64.13 31.15

GROUP 13....................$ 64.63 31.15

GROUP 14....................$ 48.73 31.15

GROUP 15....................$ 45.27 31.15

POWER EQUIPMENT OPERATOR

(PAVEMENT-HEAVY & HIGHWAY)

Asphalt Plants..............$ 59.14 31.15+a Asphalt roller..............$ 69.91 31.15+a Asphalt spreader............$ 71.78 31.15+a

POWER EQUIPMENT OPERATOR

(STEEL ERECTION)

Compressors, Welding Machines....................$ 45.34 31.15 Cranes, Hydraulic Cranes, 2 drum derricks, Forklifts, Boom Trucks......$ 76.43 31.15 Three drum derricks.........$ 79.54 31.15

POWER EQUIPMENT OPERATOR

(UTILITY)

Horizontal Boring Rig.......$ 68.25 31.15 Off shift compressors.......$ 56.70 31.15 Utility Compressors.........$ 44.98 31.15

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Tower crane

GROUP 2: Backhoes, power shovel, Hydraulic clam shells, moles and machines of a similar type

GROUP 3: Mine hoists and crane, etc. used as mine hoists

GROUP 4: Gradalls, keystones, cranes (with digging buckets), bridge cranes, trenching machines, vermeer cutter and machines of a similar nature

GROUP 5: Piledrivers, derrick boats, tunnel shovels

GROUP 6: All drills, and machines of a similar nature

GROUP 7: Back filling machines, cranes, mucking machines, dual drum pavers

GROUP 8: Mixers (concrete w/loading attachments), concrete pavers, cableways, land derricks, power house (low pressure units), concrete pumps

GROUP 9: Concrete plants, well drilling machines, stone crushers double drum hoist, power house (other than above)

GROUP 10: Concrete mixers

GROUP 11: Elevators

GROUP 12: Concrete breaking machine, Hoists (single drum), load masters, locomotive and dinkies over 10 tons

GROUP 13: Vibratory console

GROUP 14: Compressors (portable 3 or more in battery), tugger machine (caissons), well point pumps, chum drill

GROUP 15: Boilers, (high pressure, compressors (portable, single, or 2 in battery, not over 100' apart), pumps (river cofferdam and welding machines (except where arc is operated by members of local 15) push button machines, all engines irrespective of power (power pac) used to drive auxilliary equipment, air, hydraulic etc.

PREMIUMS ON CRANES (Crawler or Truck):

100' to 149' boom - add .50 150' to 249' boom - add .75 250' to 349' boom - add 1.00 350' to 450' boom - add 1.50

Premiums for Cranes on Steel Erection:

100' to 149' boom - add 1.75 150' to 249' boom - add 2.00 250' to 349' boom - add 2.25 350' to 450' boom - add 2.75 Tower crane - add 2.00

FOOTNOTE:

a. Paid Holidays: New Year's Day; Lincoln's Birthday;

Washington's Birthday; Memorial Day; Independence Day;

Labor Day; Veterans Day; Columbus Day; Election Day;

Thanksgiving Day; and Christmas Day; provided the employee works one day the payroll week in which the holiday occurs.

ENGI0014-002 07/01/2016

Rates Fringes

Power Equipment Operator

BUILDING & RESIDENTIAL

GROUP 1....................$ 71.85 31.15+a GROUP 2....................$ 76.12 31.15+a GROUP 3....................$ 69.39 31.15+a GROUP 4....................$ 63.12 31.15+a GROUP 5....................$ 47.26 31.15+a

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Double drum

GROUP 2: Stone derrick, cranes, hydraulic cranes, boom trucks

GROUP 3: 4 pole Hoist, Single Drum Hoists

GROUP 4: Fork lift, house cars, plaster (platform machine), plaster bucket, concrete pump and all other equipment used for hoisting material

GROUP 5: Compressors, welding machines (cutting concrete work), paint spraying, sand blasting, pumps (with the exclusion of concrete pumps), house car (settlement basis only), all engines irrespective of power (power pac) used to drive auxiliary equipment, air, hydraulic, etc., boilers

Premiums for Cranes:

100'-149' boom - add 1.75 150'-249' boom - add 2.00 250'-349' boom - add 2.25 350'-450' boom - add 2.75 Tower cranes add 2.00

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Lincoln's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Columbus Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day in the payroll week in which the holiday occurs

ENGI0015-001 07/01/2016

Rates Fringes

POWER EQUIPMENT OPERATOR

HEAVY AND HIGHWAY

GROUP 1....................$ 65.94 32.95

GROUP 2....................$ 63.98 32.95

GROUP 3....................$ 60.69 32.95

GROUP 4....................$ 57.42 32.95

GROUP 5....................$ 39.70 32.95

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Cherrypickers 20 tons and over and loaders (rubber-tired and/or tractor type with a manfufacturer's rated capacity of six cubic yards and over

GROUP 2: Backhoes, Basin Machines, Groover, Mechanical Sweepers, Bobcat, Boom Truck, Barrier Transport (Barrier Mover) and machines of a similar nature, Boat Captains, Boat Operators, operation of Churn Drills and machines of a similar nature, Stetco Silent Hoist and machines of a similar nature, Vac-alls, Meyers Machines, John Beam and machines of a similar nature, Ross Carriers and Travel Lifts and machines of a similar nature, Bulldozers, Scrapers, and Turn-a Pulls, Tugger Hoist (used exclusively for handling excavated material), Tractors with attachments, Hyster and Roustabout Cranes, Cherrypickers, Austin Western, Grove and machines of a similar nature, Scoopmobiles, Monorails, Conveyors, Trenchers, Loaders- Rubber-tired and Tractor, Barber Greene, Eimco Loaders and Eimco Backhoes, Mighty Midget and similar breakers and tampers, Curb and Gutter Pavers and Motor Patrol, Motor Graders and all machines of a similar nature, Locomotives ten (10) tons or under, Mini-Max, Break-Tech and machines of a similar nature, Milling Machines, robotic and demolition machines and machines of a similar nature including Bobcat, Pile Rig Rubber-tired Excavator (37,000 lbs. and under), 2 man auger GROUP 3: Minor Equipment such as Tractors, Post Hole Diggers and Drivers, Ditch Witch (Walk Behind), Road Finishing Machines, Rollers (five (5) tons and under), Tugger Hoists, Dual Purpose Trucks, Fork Lifts and Dempsey Dumpsters

GROUP 4: Oilers for the following equipment: (all gasoline, electric, diesel, or air operated) gradalls and concrete pumps or similarly equipment manned by two-men

GROUP 5: Oilers for the following equipment: (all gasoline, electric, diesel, or air operated) shovels, cranes (draglines), backhoes, pavers, trenching machines, gunite machines, compressors (3 or more in battery)

Premiums for Cranes:

100'-149' boom - add 1.75 150'-249' boom - add 2.00 250'-349' boom - add 2.25 350'-450' boom - add 2.75 Tower cranes add 2.00

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Lincoln's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Columbus Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day in the payroll week in which the holiday occurs

ENGI0015-002 07/01/2016

Rates Fringes

POWER EQUIPMENT OPERATOR

BUILDING

GROUP 1....................$ 65.94 32.95

GROUP 2....................$ 63.98 32.95

GROUP 3....................$ 57.42 32.95

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Oiler GROUP 2: Oilers on Crawler Cranes, Backhoes, Trenching machines, Gunite machines, Compressors (3 or more in Battery) GROUP 3: Gradalls: Concrete Pumps, Power Houses - All equipment in same is manned by two (2) men only, Driving

Truck Cranes

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Lincoln's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Columbus Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day in the payroll week in which the holiday occurs

IRON0040-002 07/01/2016

BRONX, NEW YORK, RICHMOND

Rates Fringes

IRONWORKER, STRUCTURAL...........$ 49.50 69.74

IRON0046-003 07/01/2014

Rates Fringes

IRONWORKER

METALLIC LATHERS AND

REINFORCING IRONWORKERS.....$ 40.60 30.56

IRON0197-001 07/01/2016

Rates Fringes

IRONWORKER

STONE DERRICKMAN............$ 46.34 38.50

IRON0361-002 07/01/2016

KINGS, QUEENS

Rates Fringes

Ironworkers:

(STRUCTURAL)................$ 49.50 69.74

IRON0580-001 07/01/2015

Rates Fringes

IRONWORKER, ORNAMENTAL...........$ 43.20 47.42

LABO0006-001 07/01/2016

Rates Fringes

LABORER (Cement and Concrete Workers).........................$ 42.48 17.35

LABO0029-001 07/01/2016

Laborers:

Heavy Blasters (hydraulic trac drill).....................$ 45.78 33.94 Blasters...................$ 44.93 33.94 Hydraulic Trac Drill.......$ 40.12 33.94 Jackhammers, Chippers, Spaders, Concrete Breakers, All Other Pneumatic Tools, Walk Behind Self-Propelled Hydraulic Asphalt and Concrete Breaker...........$ 38.23 33.94 Powder Carriers............$ 34.20 33.94

LABO0078-001 02/01/2013

Rates Fringes

LABORERS

BUILDING CONSTRUCTION

ASBESTOS (Removal, Abatement, Encapsulation or Decontamination of asbestos); LEAD; &

HAZARDOUS WASTE LABORERS

(Hazardous Waste, Hazardous Materials, Biochemical and Mold Remediation, HVAC, Duct Cleaning, Re-spray Fireproofing, etc).........$ 35.90 14.75

LABO0079-001 01/01/2017

Rates Fringes

Laborers Building Construction Demolition Laborers Tier A.....................$ 38.48 26.17 Tier B.....................$ 27.06 19.38 Mason Tenders...............$ 39.80 27.30

CLASSIFICATIONS

TIER A: Responsible for the removal of all interior petitions and structural petitions that can consist of sheet rock, block or masonry. Also, all structural slab openings for ducts, mechanical, shafts, elevators, slab openings and exterior walls where the building is not being completely demolitioned.

TIER B: Responsible for shoveling of debris into containers, pushing containers from the inside to the outside of the building.

LABO0147-001 07/01/2016

Rates Fringes

LABORERS (FREE AIR & TUNNEL).....$ 72.67 47.72

Maintenance Men, Inside Muck Lock Tenders, Pump Men, Electricians, Cement Finishers, Caulkers, Hydraulic Men, Shield Men, Monorail Operators, Motor Men, Conveyor Men, Powder Carriers, Pan Men, Riggers, Chuck Tenders, Track Men Painters, Nippers, Brakemen, Cable Men, Hose Men, Grout Men, Gravel Men, Form Workers, Concrete Workers, Tunnel Laborers, Mole Nipper (one (1) Mole Sipper per Working Shaft per Shift for up to and including Two (2) Moles

LABO0731-001 07/01/2016

Rates Fringes

LABORER

Building, Heavy and Residential Construction LABORER: (Asbestos, Lead, Hazardous Waste Removal (including soil)/CEMENT/CONCRETE......$ 41.00 38.53

UTILITY LABORER............$ 40.85 38.53

Paid Holidays: Labor Day and Thanksgiving Day

LABO1010-001 07/01/2016

Rates Fringes

Laborers:

HIGHWAY CONSTRUCTION

Fence Installer & Repairer.$ 41.48 38.30

FORMSETTERS................$ 45.35 38.30

LABORERS...................$ 41.48 38.30

Landscape Planting & Maintenance................$ 41.48 38.30 Maintenance Safety Surface.$ 41.48 38.30 Slurry/Sealcoater/Play Equipment Installer........$ 41.48 38.30 Small Equipment Operator (Not Operating Engineer)...$ 41.48 38.30 Small Power Tools Operator.$ 41.48 38.30

FOOTNOTES:

a. PAID HOLIDAYS: Memorial Day, Fourth of July, Labor Day, Columbus Day, Election Day and Thanksgiving Day, provided the employee has worked one (1) day in the calendar week in which the said holiday occurs.

LABO1010-002 07/01/2016

Rates Fringes

Laborers-Asphalt Construction:

Micro Paver.................$ 45.95 38.30 Raker.......................$ 45.35 38.30 Screedperson................$ 45.95 38.30 Shoveler (Production Paving Only)................$ 42.06 38.30 Small Equipment Operator (Asphalt)...................$ 42.06 38.30

PAIN0009-001 11/01/2016

Rates Fringes

GLAZIER..........................$ 44.70 38.42

PAINTER

Painters, Drywall Finishers, Lead Abatement Worker......................$ 42.50 26.62 Spray, Scaffold and Sandblasting................$ 45.50 26.62

PAIN0806-001 10/01/2016

Rates Fringes

Painters:

Structural Steel and Bridge.$ 49.50 30.35

PAIN1974-001 12/28/2016

Rates Fringes

Painters:

Drywall Tapers/Pointers.....$ 47.82 22.66

PLAS0262-001 02/01/2017

Rates Fringes

PLASTERER........................$ 45.28 25.30

PLAS0262-002 02/01/2017

KINGS AND QUEENS COUNTIES

Rates Fringes

PLASTERER........................$ 45.28 25.30

PLAS0780-001 07/01/2016

CEMENT MASON/CONCRETE FINISHER...$ 49.72 31.81

PLUM0001-001 07/01/2016

Rates Fringes

PLUMBER

MECHANICAL EQUIPMENT AND

SERVICE

Any repair and/or replacement of the present plumbing system that does not change the existing roughing..........$ 39.92 14.41

PLUMBERS:...................$ 67.25 29.30

PLUM0638-001 12/28/2016

Rates Fringes

PLUMBER

SERVICE FITTERS.............$ 26.30 2.55

SPRINKLER FITTERS,

STEAMFITTERS................$ 61.81 48.30

Service Fitter work shall consist of all repair, service and maintenance work on domestic, commercial and industrial refrigeration, air conditioning and air cooling, stoker and oil burner apparatus and heating apparatus etc., including but not exclusively the charging, evacuation, leak testing and assembling for all machines for domestic, commercial and industrial refrigeration, air conditioning and heating apparatus. Also, work shall include adjusting, including capacity adjustments, checking and repairing or replacement of all controls and start up of all machines and repairing all defects that may develop on any system for domestic, commercial and industrial refrigeration and all air conditioning, air cooling, stoker and oil burner apparatus and heating apparatus regardless of size or type.

ROOF0008-003 07/01/2016

Rates Fringes

ROOFER...........................$ 41.50 30.87

SHEE0028-002 07/31/2014

Rates Fringes

SHEET METAL WORKER

BUILDING CONSTRUCTION.......$ 50.91 36.70

RESIDENTIAL CONSTRUCTION....$ 27.22 16.48

TEAM0282-001 07/01/2015

TRUCK DRIVER

Asphalt.....................$ 39.96 44.7525+a Euclids & Turnapulls........$ 40.06 44.7525+a High Rise...................$ 48.36 42.9525+a

FOOTNOTES:

PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Election Day, Veterans' Day (Armistice Day), Thanksgiving Day, Day after Thanksgiving and Christmas Day. Employees working two (2) days in the calendar week in which a holiday falls are to be paid for such holiday, provided that they shape each remaining workday during such calendar week.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION