Hurricane and Storm Damage Reduction Project, Port Monmouth, NJ, Phase II-Contract 3
Solicitation number
W912DS-16-B-0008
Issued by

About this file

Amendment 0004

View the file

Other files

File Type Posted
Bid_Abstract.pdf PDF
Amendment_0004_Spec_Section_01_22_00.00_10.pdf PDF
Amendment_0004_Freshwater_Wetland_Permit.pdf PDF
W912DS-16-B-0008-0003.pdf PDF
PRMT_Ct3_Amend__3.pdf PDF
Amend_3_Specs.pdf PDF
Amendment_0002_Specifications.pdf PDF
Amendment_0002__Plans.pdf PDF
Amendment_0002.pdf PDF
Amendment_0001.pdf PDF
Amendment_0001_-_Plans.pdf PDF
Amendment_0001_-_Specs.pdf PDF
W912DS-16-B-0008.pdf PDF
Specifications.pdf PDF
Plans.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W16ROE60772514

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is:

1. Bid opening date remains 23 June 2016 at 2:00 P.M. EST

2. Revise and Reissue Bid Schedule.

3. Reissue Specification Section 00 90 02.2 - Freshw ater Wetland Permit.

4. Reissue Specification Section 01 22 00.00 10 - Measurement and Payment.

5. Revise and Not-Reissue Specification Section 00 73 00, Paragraph 1a.

6. Answ er bidder questions.

NOTE: Bidder must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by the follow ing method:

in the space provided on the SF 1442, by separate letter by signing block 15 below .

FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 15

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Jun-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-16-B-0008

X 9B. DATED (SEE ITEM 11)

06-May-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Jun-2016

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-16-B-0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHARGES

Hurricane and Storm Damage Reduction Project, Port Monmouth, NJ

Phase II-Contract 3

SECTION 00 10 00

BID SCHEDULE

Amendment 0004

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Floodwall

All work necessary to construct the concrete T-wall between STA 4+30.32 and STA 26+85 including wall foundation sheet pile cut-off wall in accordance with the drawings and specifications, but not including Bid Items 0002-0005, and Bid Items 0009-0017.

PURCHASE REQUEST NUMBER: W16ROE60772514

NET AMT

0002 1 Job Excavation, Stockpile, and Backfill

All work necessary to perform the excavation required for the project including but not limited to shoring and dewatering, to stockpile excavated material, and backfill satisfactory material in accordance with the drawings and specifications but not including any work in Bid Item 0015.

0003 13,221 Cubic

Yard

Haul and Dispose of Unsatisfactory Material at Offsite Location. All work necessary to haul and dispose of unsatisfactory material at an approved off-site location in accordance with the drawings and specifications, but not including any work in Bid Item 0002.

“Estimated Quantities”

0004 8,861 Cubic

Borrow Material All work necessary to obtain borrow material satisfactory for backfill and transport it to the project site in accordance with the drawings and specifications, but not including any work in Bid Item 0002. “Estimated Quantities”

0005 1 Job Floodwall Appurtenant items

All work necessary to construct the articulating cellular concrete blocks with filter fabric, drainage swales with erosion control matting, stormwater outlet pipes, manholes, manhole covers, armor rock, bedding stone, planting at dune tie-in, removal and plugging of existing culvert and utility mains, saw cut pavement and re-built pavement, traffic control and signs, removal and replacement of beam guide rail, chain link fence, clearing and grubbing, planting and seeding, erosion and sediment control measures, and site restoration, in accordance with the drawings and specifications, but not including Bid Items 0002-0004, and Bid Items 0009-0017.

0006 1 Job Sheetpile Wall

All work necessary to construct the sheetpile wall between STA -0+07 and STA 0+15 including but not limited to clearing and grubbing, erosion and sediment control measures, seeding, and site restoration, in accordance with the drawings and specifications, but not including Bid Items 0011-0017.

0007 1 Job Sheetpile Spliced Wall

All work necessary to construct the sheetpile spliced wall between STA 0+15 and STA 4+30.32 including but not limited to clearing and grubbing, excavation, corrosion protection, fabrication and welding, erosion and sediment control measures, seeding, and site restoration, in accordance with the drawings and specifications, but not including Bid Items 0011-0017

0008 1 Job Road Closure Gate

All work necessary to construct the road closure gate including but not limited to roller gate, gate structure, winches, new electrical service, exterior electrical power panel with circuitry, wiring and conduit, water and sanitary pipes (disconnect, remove, temporary by-pass, install and reconnect permanent pipes), signage, traffic control, erosion and sediment control measures, and site restoration, in accordance with the drawings and specifications, but not including Bid Items 0002-0004 and Bid Items 0009-0017.

0009 40,426 Linear

Foot

Steel H-Piles All work necessary to install steel piles for floodwall and road closure gate in accordance with the drawings and specifications, but not including Bid Items 0010-0017. “Estimated Quantities”

0010 6 Each Test piles

All work necessary to install test piles, perform load tests, and prepare summary report on test results in accordance with the drawings and specification Section 31 62 16.16, but not including Bid Items 0011-0017.

0011 1 Job $50,000.00 $50,000.00 Telecommunications Utility

Disconnect, remove, install and reconnect permanent Verizon telecommunications lines and service connections, providing all labor, equipment and material for this work, including poles, cables, and traffic protection. Not to exceed allowance amount of $50,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs up to the not to exceed amount.

$50,000.00

0012 1 Job $110,000.00 $110,000.00 Electric Utility Materials and

Inspection. Provide specified electrical re-routing materials, provide inspection services for installation and connection of JCP&L electrical lines and service connections, and dispose of removed utility poles owned by JCP&L. Not to exceed allowance amount of $110,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs up to the not to exceed amount.

$110,000.00

0013 1 Job Electric Utility Installation

Disconnect, remove, install and reconnect permanent JCP&L poles, electrical lines and service connections.

0014 1 Job $10,000.00 $10,000.00 Cable Utility

Design, disconnect, remove, install and reconnect permanent Comcast cable lines and service connections, providing all labor, equipment and material for this work.

Not to exceed allowance amount of $10,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs up to the not to exceed amount.

$10,000.00

0015 1 Job $55,000.00 $55,000.00 Natural Gas Utility

Install and remove temporary gas bypass, disconnect and remove existing gas pipe, install and reconnect permanent New Jersey Natural Gas pipe, providing all labor, equipment and material for this work, including excavation, traffic control, restoration, and dewatering required to perform this work, except for supply and installation of steel sleeve which is included in Bid Item 0008. Not to exceed allowance amount of $55,000 to be included in bid as shown and not changed.

Actual payment will be based on actual costs up to the not to exceed amount.

$55,000.00

0016 1 Job Vibration Monitoring of Structures

All work necessary to monitor the vibration of structures, in accordance with the drawings and specifications.

0017 1 Job Osprey Nesting Platforms

All work necessary to remove two existing nesting platforms and install three new platforms, in accordance with the drawings and specifications.

0018 0.04 Credits Wetland Mitigation Bank Credits

Purchase credits from a NJDEP approved wetland mitigation bank certified to sell credits in Watershed Management Area 12 for project impacts to freshwater wetlands. “Estimated Quantities”

0019 0.63 Credits Wetland Mitigation Bank Credits

Purchase credits from a NJDEP approved wetland mitigation bank certified to sell credits in Watershed Management Area 12 for project impacts to freshwater wetlands. “Estimated Quantities”

0020 1,800 Cubic

OPTION OPTION 1

Contaminated Non-Hazardous Material. All Work for Handling, Transport, Treatment and Off-Site Disposal of Upland Material Exceeding NJDEP Non- Residential Soil Cleanup Criteria and classified as Contaminated Non-Hazardous (ID 27 Waste) suitable for landfill cover, roadway subbase and recycling facilities, complete. “Estimated Quantities”

0021 2,000 Cubic

OPTION OPTION 2

Alternate Off-site Disposal Location- Butler Park Baseball Outfield. The change in cost (decrease, increase, or no change) for work necessary to haul and dispose of 2000 cy of Bid Item 0003 material meeting NJDEP criteria for Residential Direct Contact Soil Cleanup Criteria at Butler Park baseball outfield (across from the Seabrook-Wilson House, Port Monmouth) instead of at an approved off-site location utilized in Bid Item 0003. “Estimated Quantities”

0022 4,000 Cubic

OPTION OPTION 3

Alternate Off-site Disposal Location-Thorne Middle School Soccer Fields. The change in cost (decrease, increase, or no change) for work necessary to haul and dispose of 4000 cy of Bid Item 0003 material meeting NJDEP criteria for Residential Direct Contact Soil Cleanup Criteria at Thorne Middle School soccer fields, (70 Murphy Road, Port Monmouth) instead of at an approved off-site location utilized in Bid Item 0003. “Estimated Quantities”

0023 4,000 Cubic

OPTION OPTION 4

Alternate Off-site Disposal Location - Croydon Hall Synthetic Turf Field. The change in cost (decrease, increase, or no change) for work necessary to haul and dispose of 4000 cy of Bid Item 0003 material meeting NJDEP criteria for Residential Direct Contact Soil Cleanup Criteria at Croydon Hall Synthetic Turf Field (900 Leonardville Road, Leonardo) instead of at an approved off-site location utilized in Bid Item 0003. “Estimated Quantities”

0024 1 Job

OPTION OPTION 5

Liability Insurance. New Jersey Department of Environmental Protection (NJDEP), Monmouth County, and Middletown Township Liability Insurance. The amount bid will be the maximum amount payable. Actual payment will be based on actual costs.

TOTALS

TOTAL BASE NO OPTIONS (CLINs 0001 thru 0019) $_______________

TOTAL OPTIONS (CLINS 0020 thru 0024) $_______________

TOTAL BASE PLUS OPTIONS (CLINs 0001 thru 0024) $_______________

NOTES:

1. Bidders are required to bid on all items on the Bid Schedule or their bid will be rejected.

2. The low bidder for the purpose of award will be the confirming responsible bidder offering the lowest price for the Total

Base Bid and Optional Bid Amount for all Items. The Government is under no obligation to award the optional items.

3. Any bid which is materially unbalanced as to prices for the Base Bid and Optional Items may be rejected. An unbalanced bid is one in which the price of one or more contract line items is significantly over or understated as indicated by the application of cost or price analysis techniques.

4. Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions or attachments made by the bidders thereto may render the bid non-responsive and be cause for its rejection.

5. The Options may be exercised at the discretion of the Government and are not mandatory.

6. If Option #1 is exercised, Bid Item No. 0020 shall be exercised within 410 calendar days of issuance of the Base Bid NTP. No additional time shall be added to the contract duration.

7. If Option #2 is exercised, Bid Item No. 0021 shall be exercised within 410 calendar days of issuance of the Base Bid

8. If Option #3 is exercised, Bid Item No. 0022 shall be exercised within 410 calendar days of issuance of the Base Bid

9. If Option #4 is exercised, Bid Item No. 0023 shall be exercised within 410 calendar days of issuance of the Base Bid

10. If Option #5 is exercised, Bid Item No. 0024 shall be exercised within 60 calendar days of issuance of the Base Bid

11. Quantities for Options 2, 3 and 4 are the capacities of the alternate disposal sites. Exercise of any or all of these options will reduce the quantity of unsatisfactory material to be disposed of at an approved offsite location as part of Bid Item 0003.

Hurricane and Storm Damage Reduction Project, Port Monmouth, NJ

Phase II-Contract 3

Amendment # 0004

TO BIDDERS

The following changes shall be made to the drawings and specifications.

DRAWINGS

1. The following DRAWINGS have been REVISED and REISSUED:

- None

2. The following DRAWINGS have been ADDED:

- None

SPECIFICATIONS:

1. The following SPECIFICATION SECTIONS have been REISSUED and are provided in their entirety herein:

- 00 10 00 Bid Schedule

- 00 90 02.2 Freshwater Wetland Permit

- 01 22 00.00 10 Measurement And Payment

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

- None

3. The following SPECIFICATION SECTIONS have been REVISED and NOT-REISSUED:

- Specification Section 00 73 00, paragraph 1a is revised as follows:

1. COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK

a. The Contractor shall be required to commence work under this contract within 5 calendar days after the date the Contractor receives the Notice to Proceed, complete all work and remove all of his equipment from the contract area within 549 calendar days. The time stated for completion shall include final cleanup of the premises except in case the Contracting Officer determines that seeding and exterior planting is not feasible during the construction period

(FAR 52.211-10). The Contractor shall accomplish such seeding and exterior planting in the first planting period as specified in Paragraph 3.1.1 of Section 32 92 19 and Paragraph 3.2.1 of Section 32 93 00, respectively, following the contract completion date.

Options may be exercised at the discretion of the Government and are not mandatory.

If Option #1 is exercised, Bid Item No. 0020 shall be exercised within 410 calendar days of issuance of the Base Bid NTP. No additional time shall be added to the contract duration.

If Option #2 is exercised, Bid Item No. 0021 shall be exercised within 410 calendar days of issuance of the Base Bid NTP. No additional time shall be added to the contract duration.

If Option #3 is exercised, Bid Item No. 0022 shall be exercised within 410 calendar days of issuance of the Base Bid NTP. No additional time shall be added to the contract duration.

If Option #4 is exercised, Bid Item No. 0023 shall be exercised within 410 calendar days of issuance of the Base Bid NTP. No additional time shall be added to the contract duration.

If Option #5 is exercised, Bid Item No. 0024 shall be exercised within 60 calendar days of issuance of the Base Bid NTP. No additional time shall be added to the contract duration.

QUESTIONS AND ANSWERS:

(Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors “for information only” and do not revise the solicitation, plans or specifications.)

Question No. 1: We are also having no luck in obtaining a price for the Road Closure Gates. I send the information to various miscellaneous metals contractors (PMW & Well-Fab) that provide similar products for other USACE projects in NJ and both decline to provide pricing because the welding & painting specs are completely unreasonable. They describe the gate fabrication specifications as someone’s dream. We will need more time to locate a miscellaneous metals fabricator that will provided us with a quote or if the USACE has a fabricator source that can supply us with price to construct the gates to the present requirements in the contract. We hereby request an extension of time to the bid date of June 21, 2016 to allow us to locate a supplier for Road Closure Gates.

Response: The AISC website https://www.aisc.org/find/FindCertifiedCompany.aspx?id=5542 may be consulted to search for fabrication shops having the required fabrication certificate.

Question No. 2: According to the DEP permit, "the permittee shall adhere to a seasonal restriction on the use of heavy construction equipment/machinery within 300 meters of the "Pews Creek West" osprey nest from April 1 through August 31 of each calendar year." This distance applies to most if not all of the contractual work. Is it the intention of the permit to restrict all contract work during this period?

Response: All contract work is not restricted during this period. This restriction only applies to work within 300 meters of the Pews Creek West osprey nesting platform which covers about one-third of the project alignment until new nesting platforms are installed and the Pews Creek West osprey nesting platform can be removed. In addition, no removal or installation of any osprey nesting platforms is permitted between March 1 and August 31.

Question No. 3: Can you please confirm what constitutes unsatisfactory material item number 3.

Response: Refer to Section 31 00 00, paragraph 1.3.2 and Section 31 23 00.00 20, paragraph 2.1.2 for explanation of unsatisfactory material.