Text version

W16ROE60281246

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

a. Answ er Bidders Questions: Responses to bidder inquires are provided "(For Info purposes only)" and does not revise solicitation, plans and specifications.

b. Bid Opening Date remains the same: 10 May 2016 at 2:00 P.M. EST at 26 Federal Plaza, Room 1841, New York, NY 10278.

NOTE: Bidders must acknow ledge receipt of this amendment by the date specified in the bid (or as amended) by one of the follow ing methods: In the space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE

MODIFICATION OF BID, OR LATE WIT HDRAWAL OF BID (FAR 14.304)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-May-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-16-B-0003

X 9B. DATED (SEE ITEM 11)

03-Mar-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-May-2016

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-16-B-0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0008

Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the

Offerors “for Information only” and do not revise the solicitation, plans or specifications

ANSWER TO CONTRACTORS QUESTIONS (Questions 9-10)

The following questions and answers are provided for information only. Nothing contained in the questions and answers amends or revises any provisions of the solicitation.

Questions and Answers

FOR INFORMATION PURPOSES ONLY

9. Question: Key Note 1 on A-100 Phase 3 drawings says to caulk all existing penetrations, existing penetrations are not shown on the drawings. How are we to ascertain an accurate quantity?

Answer: The quantity of penetrations is dependent on the final configuration implemented by the contractor. The work required by the contractor is for complete fire-stopping of the new walls installed by the contractor including penetrations through the new wall by existing systems.

10. Question: Key Note 2 Drawing E-110 Phase 3 says to provide new fire rated panels at new and existing Pull boxes. Existing pull boxes are not shown. How many fire rated access panels is the GC to carry?

Answer: At minimum, the access panels are to be located at each platform provided as indicated by detail 2 on drawing A-701 and as required for the installation of the electrical systems. Work platforms are to remain for use by owner. The contractor is to leave the platforms indicated by detail 2 on drawing A-701 in place for access to the electrical pull boxes. On each personnel

W912DS-16-B-0003

platform (7 total) platforms shall consist of three (3) C4 x 5.4 steel channels embedded in existing wall spanning approximately 11' similar as the W8X31 as shown on detail 3/S-101. The three (3) C channels shall be located adjacent to each new shaft wall and one approximately at the center with lateral bracing at 5'4" maximum spacing consisting of C4x5.4 steel channel. Each platform flooring material grating shall be Light Gage Galvanized Steel 19-W-4, 1-1/4"x1/8" spanning the entire shaft area (approximately 30 square feet per floor). Cut and patch as required.

(End of Summary of Changes)