12-10-15_PHASE_4_VA_STRATTON_EMERGENCY_ELECTRICAL_UPGRADES.pdf
PDF 15 MB Posted
- Attached to
- Stratton Department of Veterans Affairs Medical Center, Albany, NY Emergency Electrical Upgrades
- Solicitation number
- W912DS-16-B-0003
About this file
plans
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING 26
BUILDING 27
BUILDING 1
BUILDING 2
BUILDING 3
BUILDING 4
BUILDING 60
SITE LOCATIONSITE LOCATION
TITLE SHEET
SIGNATURE BLOCK
ENGINEERING LLPFE PROJECT NO: 10-323
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
WALL TYPE 1 DETAIL1
2 HR FIRE RATED WALL
NOTE:
ENGINEERS, P.C.
D.F. WHEELER
37 West Market Street Red Hook NY, 12571
Tel: 845-758-3926 Fax: 845-758-3929
SWAY BRACE MULTI-FASTENER ADAPTER2
FAST CLAMP3
STRUCTURAL: BUILDING 1
CORE WALL FRAMING
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601
ARCHITECTURAL: BUILDING 1
GENERAL NOTES:
BUILDING 1 BASEMENT CORE DETAIL - NEW CONSTRUCTION1
KEYED WORK NOTES:
LEGEND:
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601
BUILDING 1 - 2ND, 3RD & FIFTH FLOOR THRU 11TH FLOOR CORE DETAIL - NEW CONSTRUCTION2
KEYED WORK NOTES:
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
GENERAL NOTES:
BUILDING 1 FIRST FLOOR CORE DETAIL - NEW CONSTRUCTION1
BUILDING 1 FOURTH FLOOR CORE DETAIL - NEW CONSTRUCTION3
LEGEND:
BUILDING 1 12TH FLOOR CORE DETAIL - NEW CONSTRUCTION1
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
GENERAL NOTES: LEGEND:
NOTE:
AEC
DEC
SOUTH EAST WALL
ADLS
TYPE 'A' PARTITION NOTES:
WALL TYPE 1 DETAIL1
2 HR FIRE RATED - UL
DESIGN NO. U415
ARCHITECTURAL:
DETAILS
NEW RISER INSTALLATION SEQUENCE OF WORK:
SOUTH EAST ELEVATOR WALL ELEVATION3
TEMPORARY CONSTRUCTION BARRIER DETAIL2
ELEVATION NOTES:
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
PANIC HARDWARE FOR EGRESS DOORS5
INTERIOR DOOR FRAMES4
DOOR SCHEDULE
ELECTRICAL:
SYMBOLS & ABBREVIATIONS
POWER SYMBOLS ABBREVIATIONS
GENERAL SYMBOLS
LINE TYPES
FIRE ALARM SYMBOLS
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
WIRE AND CONDUIT SCHEDULE
TAG FEEDER SIZE WIRING AND CONDUIT
BUILDING 1 ICRA DETAILS
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
A-WINGB-WING
D-WINGC-WING
BLDG 1 BASEMENT ICRA PLAN0
A-WINGB-WING
D-WINGC-WING
BLDG 1 FIRST FLOOR ICRA PLAN1 BLDG 1 SECOND FLOOR ICRA PLAN2 BLDG 1 THIRD FLOOR ICRA PLAN3 BLDG 1 FORTH FLOOR ICRA PLAN4
A-WINGB-WING
D-WINGC-WING
A-WINGB-WING
D-WING
C-WING
A-WINGB-WING
D-WINGC-WING
A-WINGB-WING
D-WINGC-WING
BLDG 1 FIFTH FLOOR ICRA PLAN5 BLDG 1 SIXTH FLOOR ICRA PLAN6 BLDG 1 SEVENTH FLOOR ICRA PLAN7 BLDG 1 EIGHTH FLOOR ICRA PLAN8 BLDG 1 NINTH FLOOR ICRA PLAN9
BLDG 1 TENTH FLOOR ICRA PLAN10
A-WINGB-WING
D-WINGC-WING
A-WINGB-WING
D-WINGC-WING
A-WINGB-WING
D-WINGC-WING
A-WINGB-WING
D-WINGC-WING
A-WINGB-WING
D-WINGC-WING
KEY
Class II Class III Class IV
Description of Required Infection Control Precautions by Class During Construction Project Upon Completion of
1. Provide active means to prevent airborne dust from dispersing into atmosphere.
2. Water mist work surfaces to control dust while cutting.
3. Seal unused doors with duct tape.
4. Block off and seal air vents.
5. Place dust mat at entrance and exit of work area.
6. Remove or isolate HVAC system in areas where work is being performed.
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
2. Complete all critical barriers, i.e., sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
4. Contain construction waste before transport in tightly covered containers.
5. Cover transport receptacles or carts. Tape covering unless solid lid.
6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
7. Do not remove barriers from work area until completed project is inspected by the owner's Safety Section and Infection Control Department, and thoroughly cleaned by the owner's Environment Services Department.
1. Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Control Department, and thoroughly cleaned by the owner’s Environmental Services Department.
2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
3. Vacuum work area with HEPA filtered vacuums.
4. Wet mop area with disinfectant.
5. Remove isolation of HVAC system in areas where work is being performed.
C la ss
II
C la ss
II
I /
IV
528A8-11-812 Emergency Electrical Upgrades Stratton VAMC Infection Risk Areas (10/10/2014) FLOOR “A” WING CORE “A”-“B” “B” WING CORE “B’-“C” “C” WING CORE “C”-“D” “D” WING CORE “D”-“A”
Sub Basement BASEMENT Credit Union, Canteen
Store, Cafeteria, Morgue Warehouse, Supply Warehouse, Kitchen, Pizza Shop, Vending
Room.
Men’s and Woman’s locker Room, The Gym, Canteen store A/C unit, Telephone Operators, Telephone Equipment Room.
Canteen Office, Mail Room, FMS, Supply Office.
Cafeteria A/C unit. Cache area, Cache HVAC unit, Main Kitchen HVAC is on the roof.
Clean Room.
1ST FLOOR Dental, Lobby, Agent Cashier, Patient Funds
File Room, Patient Check-in Reception, Police
2ND FLOOR Waiting Room ICU X-Ray
3RD FLOOR
4TH FLOOR
5TH FLOOR
6TH FLOOR
7TH FLOOR
8TH FLOOR
9TH FLOOR
10TH FLOOR
11TH FLOOR
OTHER
Main Kitchen Dish machine Room, Main kitchen Store Room, SPD HVAC unit.
SPD.
ER/Blue Team/ Eligibility
ICU/CCU,
Dialysis
Operating Room, Anesthesia
Pharmacy
Lab ServiceX-Ray
Out Patient Clinic Medical
Operating Room, ICU/CCU, PACU
Waiting Room, Auditorium Dept. of Labor, DAV, VFW, Vet. Affairs, Labs
Cardiac Rehab Speech, Field Office Wilson Lounge IS Service, Respiratory Care Field Office Field Office Field Office Union Office
Phlebotomy Visio Clinic Surgical Clinic, Podiatry Office
Research Office Research Confrence Room Human Resources, Fiscal Services, Video Conference
Lab - Closed OfficeComputer Room
Medical Offices Office Rehab Office ADHC EEG/EMG Lab Out Patient -Geriatric
Med. Offices, Silver Team, EKG Lab Health Resource Center Driver Rehab., Life Institute Office Office
Chaplain Service Chapel MCCP, Directors Suite Med. Offices, Upbeat Service, Billing Lab NDMS Coordinator
Building #5
Sleep Lab, HoptelWardWard
Ward
Surgical Unit
Cardiac Lab
Blood Drawing
Respiratory Therapy Rehab Medicine
Red Team, Primary Care
Eye Clinic
Training Room Mental Health Clinic Physical Therapy Lab Ward
MEV Buildings 26&27
ENT/GU/ Urology, Audiology
Pulmonary Function
Mental Health Offices Arts & Crafts Therapy Ward
Voluntary, Recreation, Dietetic, Microbiology
Short Term Stay, Out Patient Recovery
Oncology
BLDG 1 ELEVENTH FLOOR ICRA PLAN11
A-WINGB-WING
D-WINGC-WING
ONE-LINE RISER DIAGRAM
KEYED NOTES:
LEGEND
EXISTING NORMAL POWER DEMOLITION ONE-LINE RISER DIAGRAM1
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
BID OPTION 2
ELECTRICAL: BUILDING 1
SUB-BASEMENT PLAN
BUILDING 1 SUB-BASEMENT PLAN1
CONSTRUCTION PHASING NOTES:
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601
BUILDING 1 PHASE 4 SWITCHBOARD 'A' ROOM - DEMOLITION PLAN1 BUILDING 1 PHASE 4 SWITCHBOARD 'A' ROOM - NEW PLAN2
NOTES:
KEYED DEMOLITION NOTES:
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
SUGGESTED ELECTRICAL SERVICE EQUIPMENT
REPLACEMENT SEQUENCING PLAN:
BUILDING 1 PHASE 4 - SWITCHBOARD 'D' ROOM - DEMO PLAN1 BUILDING 1 PHASE 4 - SWITCHBOARD 'D' ROOM - NEW PLAN2
KEYED NOTE:
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
SUGGESTED ELECTRICAL SERVICE EQUIPMENT
REPLACEMENT SEQUENCING PLAN:
BID OPTION 3
BASEMENT PLAN
BUILDING 1 BASEMENT PLAN1
BUILDING 1 BASEMENT CORE DETAIL2
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
FIRST FLOOR PLAN
BUILDING 1 FIRST FLOOR PLAN1
BUILDING 1 FIRST FLOOR CORE DETAIL2
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
SECOND FLOOR PLAN
BUILDING 1 SECOND FLOOR PLAN1
BUILDING 1 SECOND FLOOR CORE DETAIL2
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
THIRD FLOOR PLAN
BUILDING 1 THIRD FLOOR PLAN1
BUILDING 1 THIRD FLOOR CORE DETAIL2
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
FOURTH FLOOR PLAN
BUILDING 1 FOURTH FLOOR PLAN1
BUILDING 1 FOURTH FLOOR CORE DETAIL2
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
FIFTH FLOOR PLAN
BUILDING 1 FIFTH FLOOR PLAN1
BUILDING 1 FIFTH FLOOR CORE DETAIL2
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
SIXTH FLOOR PLAN
BUILDING 1 SIXTH FLOOR PLAN1
BUILDING 1 SIXTH FLOOR CORE DETAIL2
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
BID OPTION 1
SEVENTH FLOOR PLAN
BUILDING 1 SEVENTH FLOOR PLAN1
BUILDING 1 SEVENTH FLOOR CORE DETAIL2
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
BID OPTION 1
EIGHTH FLOOR PLAN
BUILDING 1 EIGHTH FLOOR PLAN1
BUILDING 1 EIGHTH FLOOR CORE DETAIL2
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
BID OPTION 1
NINTH FLOOR PLAN
BUILDING 1 NINTH FLOOR PLAN1
BUILDING 1 NINTH FLOOR CORE DETAIL2
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
BID OPTION 1
TENTH FLOOR PLAN
BUILDING 1 TENTH FLOOR PLAN1
BUILDING 1 TENTH FLOOR CORE DETAIL2
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
BID OPTION 1
ELEVENTH FLOOR PLAN
BUILDING 1 ELEVENTH FLOOR PLAN1
BUILDING 1 ELEVENTH FLOOR CORE DETAIL2
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
BID OPTION 1
& 1-S22 EMERGENCY POWER
BUILDING 26 AND 27 EMERGENCY POWER1
BUILDING 1-S22 SUB-BASEMENT EMERGENCY POWER2
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601
COMMUNICATIONS PLAN
PLAN - COMMUNICATIONS PLAN1CHILLER PLANT - COMMUNICATIONS PLAN2
KEYED WORK NOTES:
GENERAL NOTES:
BLDG. 1, 2, 3 & 4 SUB-BASEMENT
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601
ELECTRICAL: DEMOLITION
ONE-LINE DIAGRAM
EMERGENCY DEMOLITION POWER ONE-LINE DIAGRAM1
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601
ELECTRICAL: NEW
NEW EMERGENCY POWER ONE-LINE DIAGRAM1
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
BID OPTION 1 BID OPTION 1
ELECTRICAL ONE-LINE DIAGRAM1
KEYED NOTE:
ELECTRICAL: PHASE 4
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
ELECTRICAL: DETAILS
POWER PANEL & RISER DETAIL1 EMERGENCY PANEL RECONFIGURATION DETAIL2
OF SMOKE/FIRE BARRIERS7
CONDUIT PENETRATIONS PLATE & NOMENCLATURE DETAIL5
PANEL BOARD & EQUIPMENT NAME
OF SMOKE/FIRE BARRIERS4
CONDUIT PENETRATIONS
TYPICAL CONDUIT CONCRETE PENETRATION DETAIL3
KEYED NOTES:
POWER PANEL & RISER ENCLOSURE6
TYPICAL REPLACEMENT OF EXISTING
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
TYPICAL NEW EMERGENCY
DETAILS
TYPICAL TRANSFORMER/ATS ELEVATION 1
CONCRETE PAD DETAIL2
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
SCHEDULE OF NEW ELECTRICAL EQUIPMENT
ELECTRICAL LINE TYPES
BUILDING #1 SWITCHBOARD "A" DEMOLITION ONE-LINE1 BUILDING #1 SWITCHBOARD "A" NEW ONE-LINE2
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
WIRE & CONDUIT SCHEDULE
GENERAL NOTE:
ELECTRICAL LINE TYPES
BUILDING #1 SWITCHBOARD "D" DEMOLITION ONE-LINE1 BUILDING #1 SWITCHBOARD "D" NEW ONE-LINE2
WIRE & CONDUIT SCHEDULE
DEMOLITION NOTES:
INSTALLATION NOTES:
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
GENERAL NOTE:
POWER PANELS
POWER PANEL - (EDP-AEC) POWER PANEL - (B-AEC) POWER PANEL - (1-AEC)
POWER PANEL - (2-AEC) POWER PANEL - (3-AEC) POWER PANEL - (4-AEC)
POWER PANEL - (5-AEC) POWER PANEL - (6-AEC) POWER PANEL - (7-AEC)
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
ELECTRICAL: PHASE 3 & 4
POWER PANEL - (8-AEC) POWER PANEL - (9-AEC) POWER PANEL - (10-AEC)
POWER PANEL - (11-AEC) POWER PANEL - (EDP-DEC) POWER PANEL - (B-DEC)
POWER PANEL - (1-DEC) POWER PANEL - (2-DEC) POWER PANEL - (3-DEC)
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
ELECTRICAL: PHASE 3 & 4
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
POWER PANEL - (4-DEC) POWER PANEL - (5-DEC) POWER PANEL - (6-DEC)
POWER PANEL - (9-DEC)POWER PANEL - (8-DEC)POWER PANEL - (7-DEC)
POWER PANEL - (10-DEC) POWER PANEL - (11-DEC)
BID OPTION 1
Old Panel Name / # New Panel Name / # Location
B-20-E B-20-EQ A - WING
1-20-E 1-20-EQ A - WING
2-20-E 2-20-EQ A - WING
3-20-E 3-20-EQ A - WING
4-20-E 4-20-EQ A - WING
5-20-E 5-20-EQ A - WING
6-20-E 6-20-EQ A - WING
7-20-E 7-20-EQ A - WING
8-20-E 8-20-EQ A - WING
9-20-E 9-20-EQ A - WING
10-20-E 10-20-EQ A - WING
B-188-E B-188-EQ D - WING
1-188-E 1-188-EQ
2-188-E 2-188-EQ
3-188-E 3-188-EQ
4-188-E 4-188-EQ
5-188-E 5-188-EQ
6-188-E 6-188-EQ
7-188-E 7-188-EQ
8-188-E 8-188-EQ
9-188-E 9-188-EQ
10-188-E 10-188-EQ
D - WING
D - WING
D - WING
D - WING
D - WING
D - WING
D - WING
D - WING
D - WING
D - WING
11-20-E 11-20-EQ A - WING
11-188-E 11-188-EQ D - WING
EXISTING ELECTRIC PANEL RENAMING SCHEDULE
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
POWER PANEL - (1-ADLS)POWER PANEL - (B-ADLS)
POWER PANEL - (2-ADLS) POWER PANEL - (3-ADLS) POWER PANEL - (4-ADLS)
POWER PANEL - (5-ADLS) POWER PANEL - (6-ADLS) POWER PANEL - (7-ADLS)
POWER PANEL - (EDP-ADLS)
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
POWER PANEL - (10-ADLS)POWER PANEL - (9-ADLS)
POWER PANEL - (11-ADLS)
POWER PANEL - (8-ADLS)
ELECTRICAL: ALL PHASES
POWER PANELS & SCHEDULE
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
Location Voltage AIC Rtg. Ø/W Manufacturer Interior Model # Mains MCB MOUNTINGPhase SCHED. SHEETNew Panel Name / #SCHEDULE OF EXISTING CONDUIT RUNS REQUIRING SEISMIC BRACINGESSENTIAL EQUIPMENT SYSTEM PANELS RENAMING SCHEDULE Old Panel Name / # New Panel Name / # Old Location New Location Voltage AIC Rtg. Ø/W MCB
EDP-Main EDP-Main Bldg 1, Subbsmt Corr. B Bldg 1, rm S-16 277/480 35K 3Ø/4W 800A SB-47(E) SB-47(E) Bldg 1, rm S-10 Bldg 1, rm S-10 120/208 22K 3Ø/4W 150A EDP-A EDP-AEQ Bldg 1, Subbsmt Corr. A Bldg 1, rm S-10 120/208 22K 3Ø/4W 400A EDP-B EDP-BEQ Bldg 1, rm S-16 Bldg 1, rm S-16 120/208 3Ø/4W 400A EDP-C EDP-CEQ Bldg 1, rm S-19 Bldg 1, rm S-19 120/208 3Ø/4W 400A EDP-D EDP-DEQ Bldg 1, rm S6A Bldg 1, rm S6A 120/208 3Ø/4W 400A EP-1 OR-EC Bldg 1, rm S-22 Bldg 1, rm S-22 277/480 3Ø/4W 400A
B-237E B-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A 1-237E 1-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A 2-237E 2-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A 3-237E 3-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A 4-237E 4-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A 5-237E 5-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A 6-237E 6-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A 7-237E 7-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A 8-237E 8-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A 9-237E 9-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A
10-237E 10-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A 11-237E 11-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 3Ø/4W 400A
11-237A(E) 11-237AEQ Bldg 1, A wing Bldg 1, A wing 120/208 22K 3Ø/4W 100A 11-237(MER A) 11-237MERAEQ Bldg 1, rm A1106b Bldg 1, rm A1106b 120/208 22K 3Ø/4W 100A 11-237(MER B) 11-237MERBEQ Bldg 1, rm B1103a Bldg 1, rm B1103a 120/208 22K 3Ø/4W 100A 11-237(MER C) 11-237MERCEQ Bldg 1, rm C1103d Bldg 1, rm C1103d 120/208 22K 3Ø/4W 100A
P-2 SB-CH12EQ Bldg 1, rm S-22 Bldg 1, rm S-22 277/480 3Ø/4W 400A Sub Panel #1 SB-COND EQ Bldg 1, rm S-22 Bldg 1, rm S-22 277/480 3Ø/4W 200A
Mains 800A 225A 400A 400A 400A 400A 400A 225A 225A 225A 225A 225A 225A 225A 225A 225A 225A 225A 400A 225A 225A 225A 225A 400A 250A
SB-142A (E) SB-142A EQ 120/208 22K 3Ø/4W 100A225A
MOUNTING
SURFACE
RECESSED
SURFACE
13-232 13-232LS Bldg 1, ELEV. MACH. RM 120/208 22K 3Ø/4W 150A225ABldg 1, ELEV. MACH. RM Bldg 1, rm S-19 Bldg 1, rm S-19
22K 22K 22K 22K
22K
22K 22K
SB-275 SB-275EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 400A400A SB-275A SD-275EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A225A 13-233A 13-233AEQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W -1200A 12-233A 12-233AEQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 150A225A 12-233B 12-233BEQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 150A225A 13-233B 13-233BEQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W -800A 13-238B 13-238BEQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W -800A 13-238A 13-238AEQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W -1200A 12-238A 12-238AEQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 150A225A 12-238B 12-238BEQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A225A
6-130 6-130EQ Bldg 1, CW Bldg 1, CW 120/208 22K 3Ø/4W 125A 3-111 3-111EQ Bldg 1, CW Bldg 1, CW 120/208 22K 3Ø/4W 125A225A 6-110 6-110EQ Bldg 1, CW Bldg 1, CW 120/208 22K 3Ø/4W 125A
3-147-A2 3-147-A2EQ Bldg 1, CW Bldg 1, CW 120/208 22K 3Ø/4W 125A225A MDP-308-C1 (CCTV) MDP-308-C1EQ Bldg 1, CW Bldg 1, CW 120/208 22K 3Ø/4W
7-244 7-244EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 8-244 8-244EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 9-244 9-244EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 150A225A
10-244 10-244EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 150A225A
RECESSED
SURFACE
SURFACE
SURFACE
SURFACE
SURFACE
SURFACE
RECESSED
SURFACE
125A225A
225A
225A
125A225A 125A225A
PANEL SCHEDULES
POWER PANEL REPLACEMENT SCHEDULE POWER PANEL REPLACEMENT SCHEDULE
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
GENERAL PANEL DEMOLITION NOTES: GENERAL PANEL INSTALLATION NOTES:
POWER PANEL - (EDP-DEQ) POWER PANEL - (EDP-AEQ)
POWER PANEL - (EDP-MAIN-EQ) POWER PANEL - (SB-47(E))
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601
ELECTRICAL: REPLACEMENT
POWER PANEL SCHEDULE
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
POWER PANEL - (B-308 SECT. 2)
POWER PANEL - (B-31) POWER PANEL - (B-160) POWER PANEL - (B-180)
POWER PANEL - (B-196) POWER PANEL - (B-47-A) POWER PANEL - (B-47-B)
POWER PANEL - (B-47-C) POWER PANEL - (B-308 SECT. 1)
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
POWER PANEL - (2-160)
POWER PANEL - (B-283A)
POWER PANEL - (B-283B)
POWER PANEL - (1-160)
POWER PANEL - (1-161) POWER PANEL - (1-180) POWER PANEL - (1-181)
POWER PANEL - (1-196) POWER PANEL - (1-197)
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
POWER PANEL - (2-161) POWER PANEL - (2-181)
POWER PANEL - (2-196) POWER PANEL - (2-197) POWER PANEL - (3-160)
POWER PANEL - (3-161) POWER PANEL - (3-180) POWER PANEL - (3-181)
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
POWER PANEL - (5-160)
POWER PANEL - (3-196) POWER PANEL - (3-197) POWER PANEL - (4-160)
POWER PANEL - (4-161) POWER PANEL - (4-180) POWER PANEL - (4-181)
POWER PANEL - (4-196) POWER PANEL - (4-197)
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
POWER PANEL - (6-181 SECT. 1)
POWER PANEL - (5-161) POWER PANEL - (5-180) POWER PANEL - (5-181)
POWER PANEL - (5-196) POWER PANEL - (5-197) POWER PANEL - (6-160)
POWER PANEL - (6-161) POWER PANEL - (6-180)
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
POWER PANEL - (7-197)
POWER PANEL - (6-181 SECT. 2)
POWER PANEL - (6-196) POWER PANEL - (6-197)
POWER PANEL - (7-160) POWER PANEL - (7-161) POWER PANEL - (7-180)
POWER PANEL - (7-181) POWER PANEL - (7-196)
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
POWER PANEL - (9-180)
POWER PANEL - (8-160) POWER PANEL - (8-161) POWER PANEL - (8-180)
POWER PANEL - (8-181) POWER PANEL - (8-196) POWER PANEL - (8-197)
POWER PANEL - (9-160) POWER PANEL - (9-161)
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
POWER PANEL - (10-197)
POWER PANEL - (9-181) POWER PANEL - (9-196) POWER PANEL - (9-197)
POWER PANEL - (10-160) POWER PANEL - (10-161) POWER PANEL - (10-180)
POWER PANEL - (10-181) POWER PANEL - (10-196)
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
POWER PANEL - (4-31)
POWER PANEL - (11-196)
POWER PANEL - (LPP-M) POWER PANEL - (1-10)
POWER PANEL - (2-10) POWER PANEL - (3-10) POWER PANEL - (4-10)
POWER PANEL - (3-31A) POWER PANEL - (3-31B)
File details come from the government source that posted it. Updated .