12-10-15_PHASE_3_VA_STRATTON_EMERGENCY_ELECTRICAL_UPGRADES.pdf
PDF 14 MB Posted
- Attached to
- Stratton Department of Veterans Affairs Medical Center, Albany, NY Emergency Electrical Upgrades
- Solicitation number
- W912DS-16-B-0003
About this file
plans
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING 1
BUILDING 2
BUILDING 3
BUILDING 4
BUILDING 54
BUILDING 60
SITE LOCATION
TITLE SHEET
SIGNATURE BLOCK
ENGINEERING LLPFE PROJECT NO: 10-323
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
WALL TYPE 1 DETAIL
2 HR FIRE RATED WALL
NOTE:
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
ENGINEERS, P.C.
D.F. WHEELER
37 West Market Street
Red Hook NY, 12571
Tel: 845-758-3926
Fax: 845-758-3929
SWAY BRACE MULTI-FASTENER ADAPTER
FAST CLAMP
STRUCTURAL: BUILDING 1
CORE WALL FRAMING
237EQ
BEC
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
ENGINEERS, P.C.
D.F. WHEELER
37 West Market Street
Red Hook NY, 12571
Tel: 845-758-3926
Fax: 845-758-3929
STRUCTURAL:
DETAILS
ARCHITECTURAL: BUILDING 1
BUILDING 1 SUB BASEMENT CORE DETAIL - NEW CONSTRUCTION
GENERAL NOTES:
BUILDING 1 BASEMENT CORE DETAIL - NEW CONSTRUCTION
KEYED WORK NOTES:
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
LEGEND:
BUILDING 1 - 2ND, 3RD & FIFTH FLOOR THRU 11TH FLOOR CORE DETAIL - NEW CONSTRUCTION
KEYED WORK NOTES:
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
GENERAL NOTES:
BUILDING 1 FIRST FLOOR CORE DETAIL - NEW CONSTRUCTION
BUILDING 1 FOURTH FLOOR CORE DETAIL - NEW CONSTRUCTION
BUILDING 1 - 12TH FLOOR CORE DETAIL - NEW CONSTRUCTION
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
GENERAL NOTES:
237EQ
BCLS
CEC
NORTH WEST WALL
BEC
TYPE 'A' PARTITION NOTES:
WALL TYPE 1 DETAIL
2 HR FIRE RATED - UL
DESIGN NO. U415 - SYSTEM B
NOTE:
NOTE:
WALL TYPE 2 DETAIL
2 HR FIRE RATED - UL
DESIGN NO. U415 - SYSTEM B
ARCHITECTURAL:
DETAILS
NORTH WEST ELEVATOR WALL ELEVATION
TEMPORARY CONSTRUCTION BARRIER DETAIL
ELEVATION NOTES:
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
PANIC HARDWARE FOR EGRESS DOORS
INTERIOR DOOR FRAMES
SUB-BASEMENT SHAFT CEILING DETAIL
DOOR SCHEDULE
ELECTRICAL:
SYMBOLS & ABBREVIATIONS
POWER SYMBOLS
ABBREVIATIONS
GENERAL SYMBOLS
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
LINE TYPES
FIRE ALARM SYMBOLS
LEGEND AND SCHEDULE OF LIGHTING EQUIPMENT
WIRE AND CONDUIT SCHEDULE
TAG FEEDER SIZE WIRING AND CONDUIT
BUILDING 1 ICRA DETAILS
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
A-WINGB-WING
D-WINGC-WING
BLDG 1 BASEMENT ICRA PLAN
A-WINGB-WING
D-WINGC-WING
BLDG 1 FIRST FLOOR ICRA PLAN
BLDG 1 SECOND FLOOR ICRA PLAN
BLDG 1 THIRD FLOOR ICRA PLAN
BLDG 1 FORTH FLOOR ICRA PLAN
A-WINGB-WING
D-WINGC-WING
A-WINGB-WING
D-WING
C-WING
A-WINGB-WING
D-WINGC-WING
A-WINGB-WING
D-WINGC-WING
BLDG 1 FIFTH FLOOR ICRA PLAN
BLDG 1 SIXTH FLOOR ICRA PLAN
BLDG 1 SEVENTH FLOOR ICRA PLAN
BLDG 1 EIGHTH FLOOR ICRA PLAN
BLDG 1 NINTH FLOOR ICRA PLAN
BLDG 1 TENTH FLOOR ICRA PLAN
A-WINGB-WING
D-WINGC-WING
A-WINGB-WING
D-WINGC-WING
A-WINGB-WING
D-WINGC-WING
A-WINGB-WING
D-WINGC-WING
A-WINGB-WING
D-WINGC-WING
KEY
Class II
Class III
Class IV
Description of Required Infection Control Precautions by Class
During Construction Project Upon Completion of
1. Provide active means to prevent airborne dust from dispersing into atmosphere.
2. Water mist work surfaces to control dust while cutting.
3. Seal unused doors with duct tape.
4. Block off and seal air vents.
5. Place dust mat at entrance and exit of work area.
6. Remove or isolate HVAC system in areas where work is being performed.
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
2. Complete all critical barriers, i.e., sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
4. Contain construction waste before transport in tightly covered containers.
5. Cover transport receptacles or carts. Tape covering unless solid lid.
6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
7. Do not remove barriers from work area until completed project is inspected by the owner's Safety Section and Infection Control Department, and thoroughly cleaned by the owner's Environment Services Department.
1. Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Control Department, and thoroughly cleaned by the owner’s Environmental Services Department.
2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
3. Vacuum work area with HEPA filtered vacuums.
4. Wet mop area with disinfectant.
5. Remove isolation of HVAC system in areas where work is being performed.
C l a s s
I I
C l a s s
I I I
I V
528A8-11-812 Emergency Electrical Upgrades Stratton VAMC Infection Risk Areas (10/10/2014)
FLOOR “A” WING CORE “A”-“B” “B” WING CORE “B’-“C” “C” WING CORE “C”-“D” “D” WING CORE “D”-“A” Sub Basement BASEMENT Credit Union, Canteen
Store, Cafeteria, Morgue Warehouse, Supply Warehouse, Kitchen, Pizza Shop, Vending
Room.
Men’s and Woman’s locker Room, The Gym, Canteen store A/C unit, Telephone Operators, Telephone Equipment Room.
Canteen Office, Mail Room, FMS, Supply Office.
Cafeteria A/C unit. Cache area, Cache HVAC unit, Main Kitchen HVAC is on the roof.
Clean Room.
1ST FLOOR Dental, Lobby, Agent Cashier, Patient Funds
File Room, Patient Check-in Reception, Police
2ND FLOOR Waiting Room ICU X-Ray
3RD FLOOR
4TH FLOOR
5TH FLOOR
6TH FLOOR
7TH FLOOR
8TH FLOOR
9TH FLOOR
10TH FLOOR
11TH FLOOR
OTHER
Main Kitchen Dish machine Room, Main kitchen Store Room, SPD HVAC unit.
SPD.
ER/Blue Team/ Eligibility
ICU/CCU,
Dialysis
Operating Room, Anesthesia
Pharmacy
Lab ServiceX-Ray
Out Patient Clinic Medical
Operating Room, ICU/CCU, PACU
Waiting Room, Auditorium Dept. of Labor, DAV, VFW, Vet. Affairs, Labs
Cardiac Rehab Speech, Field Office Wilson Lounge IS Service, Respiratory Care Field Office Field Office Field Office Union Office
Phlebotomy Visio Clinic Surgical Clinic, Podiatry Office
Research Office Research Confrence Room Human Resources, Fiscal Services, Video Conference
Lab - Closed OfficeComputer Room
Medical Offices Office Rehab Office ADHC EEG/EMG Lab Out Patient -Geriatric
Med. Offices, Silver Team, EKG Lab Health Resource Center Driver Rehab., Life Institute Office Office
Chaplain Service Chapel MCCP, Directors Suite Med. Offices, Upbeat Service, Billing Lab NDMS Coordinator
Building #5
Sleep Lab, HoptelWardWard
Ward
Surgical Unit
Cardiac Lab
Blood Drawing
Respiratory Therapy Rehab Medicine
Red Team, Primary Care
Eye Clinic
Training Room Mental Health Clinic Physical Therapy Lab Ward
MEV Buildings 26&27
ENT/GU/ Urology, Audiology
Pulmonary Function
Mental Health Offices Arts & Crafts Therapy Ward
Voluntary, Recreation, Dietetic, Microbiology
Short Term Stay, Out Patient Recovery
Oncology
BLDG 1 ELEVENTH FLOOR ICRA PLAN
A-WINGB-WING
D-WINGC-WING
ONE-LINE RISER DIAGRAM
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
KEYED NOTES:
LEGEND
EXISTING NORMAL POWER DEMOLITION ONE-LINE RISER DIAGRAM
BID OPTION 2
ELECTRICAL: BUILDING 4
SUB-BASEMENT PLANS
BUILDING 4 SUB-BASEMENT FLOOR PLAN
KEYED NOTES:
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
EMERGENCY POWER TO BUILDING #60
ELECTRICAL: BUILDING 1
SUB-BASEMENT PLAN
BUILDING 1 SUB-BASEMENT PLAN
CONSTRUCTION PHASING NOTES:
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
ELECTRICAL PLAN
ELEVATOR SUB-BASEMENT
Δ
Δ
BUILDING 1 PHASE 3 SWITCHBOARD 'B' ROOM - DEMO PLAN
BUILDING 1 PHASE 3 SWITCHBOARD 'B' ROOM - NEW PLAN
NOTES:
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
DEMOLITION NOTES:
INSTALLATION NOTES:SUGGESTED ELECTRICAL SERVICE EQUIPMENT
REPLACEMENT SEQUENCING PLAN:
BUILDING 1 PHASE 3 SWITCHBOARD 'C' ROOM - DEMO PLAN
BUILDING 1 PHASE 3 SWITCHBOARD 'C' ROOM - NEW PLAN
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
DEMOLITION NOTES: INSTALLATION NOTES:SUGGESTED ELECTRICAL SERVICE EQUIPMENT
REPLACEMENT SEQUENCING PLAN:
BID OPTION 2
BASEMENT PLAN
BUILDING 1 BASEMENT PLAN
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
BUILDING 1 BASEMENT CORE DETAIL
KEY NOTE:
FIRST FLOOR PLAN
BUILDING 1 FIRST FLOOR PLAN
BUILDING 1 FIRST FLOOR CORE DETAIL
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
SECOND FLOOR PLAN
BUILDING 1 SECOND FLOOR PLAN
BUILDING 1 SECOND FLOOR CORE DETAIL
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
BID OPTION 1
THIRD FLOOR PLAN
BUILDING 1 THIRD FLOOR PLAN
BUILDING 1 THIRD FLOOR CORE DETAIL
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
NOTES:
FOURTH FLOOR PLAN
BUILDING 1 FOURTH FLOOR PLAN
BUILDING 1 FOURTH FLOOR CORE DETAIL
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
FIFTH FLOOR PLAN
BUILDING 1 FIFTH FLOOR PLAN
BUILDING 1 FIFTH FLOOR CORE DETAIL
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
KEYED NOTES:
SIXTH FLOOR PLAN
BUILDING 1 SIXTH FLOOR PLAN
BUILDING 1 SIXTH FLOOR CORE DETAIL
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
KEYED NOTES:
SEVENTH FLOOR PLAN
BUILDING 1 SEVENTH FLOOR PLAN
BUILDING 1 SEVENTH FLOOR CORE DETAIL
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
NOTES:
EIGHTH FLOOR PLAN
BUILDING 1 EIGHTH FLOOR PLAN
BUILDING 1 EIGHTH FLOOR CORE DETAIL
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
NINTH FLOOR PLAN
BUILDING 1 NINTH FLOOR PLAN
BUILDING 1 NINTH FLOOR CORE DETAIL
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
TENTH FLOOR PLAN
BUILDING 1 TENTH FLOOR PLAN
BUILDING 1 TENTH FLOOR CORE DETAIL
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
ELEVENTH FLOOR PLAN
BUILDING 1 ELEVENTH FLOOR PLAN
BUILDING 1 ELEVENTH FLOOR CORE DETAIL
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
ELECTRICAL: BUILDING 1
12TH - 14TH FLOOR PLAN
BUILDING 1 PHASE 3 TWELFTH FLOOR PLAN
BUILDING 1 PHASE 3 THIRTEENTH FLOOR DEMOLITION PLAN
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
BUILDING 1 PHASE 3 THIRTEENTH FLOOR NEW WORK PLAN
EMERGENCY POWER
BUILDING 3 PHASE 3 - FIRST FLOOR PLAN - NEW PLAN
BUILDING 54 PHASE 3 - (CHILLER PLANT) BASEMENT - NEW PLAN
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
BUILDING 1-S22 SUB-BASEMENT EMERGENCY POWER
COMMUNICATIONS PLAN
PLAN - COMMUNICATIONS PLAN
CHILLER PLANT - COMMUNICATIONS PLAN
KEYED WORK NOTES:
GENERAL NOTE:
BLDG. 1, 2, 3 & 4 SUB-BASEMENT
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
ELECTRICAL: DEMOLITION
ONE-LINE DIAGRAM
EMERGENCY DEMOLITION POWER ONE-LINE DIAGRAM
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
ELECTRICAL: NEW
NEW EMERGENCY POWER ONE-LINE DIAGRAM
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
ELECTRICAL ONE-LINE DIAGRAMS
KEYED NOTES:
NOTE:
ELECTRICAL: PHASE 3
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
ELECTRICAL: DETAILS
EMERGENCY PANEL RECONFIGURATION DETAIL
OF SMOKE/FIRE BARRIERS
CONDUIT PENETRATIONS
PLATE & NOMENCLATURE DETAIL
PANEL BOARD & EQUIPMENT NAME
OF SMOKE/FIRE BARRIERS
CONDUIT PENETRATIONS
TYPICAL CONDUIT CONCRETE PENETRATION DETAIL
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
POWER PANEL & RISER DETAIL
TYPICAL NEW EMERGENCY
POWER PANEL & RISER ENCLOSURE
TYPICAL REPLACEMENT OF EXISTING
NEW RISER INSTALLATION SEQUENCE OF WORK:
DETAILS
TYPICAL TRANSFORMER/ATS ELEVATION
CONCRETE PAD DETAIL
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
SCHEDULE OF NEW ELECTRICAL EQUIPMENT
ELECTRICAL LINE TYPES
BUILDING #1 SWITCHBOARD "B" DEMOLITION ONE-LINE
BUILDING #1 SWITCHBOARD "B" NEW ONE-LINE
FEEDER SCHEDULE
TAG WIRING AND CONDUIT
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
ELECTRICAL LINE TYPES
BUILDING #1 SWITCHBOARD "C" DEMOLITION ONE-LINE
BUILDING #1 SWITCHBOARD "C" NEW ONE-LINE
NOTES:
FEEDER SCHEDULE
TAG WIRING AND CONDUIT
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
ELECTRICAL: PHASE 3 & 4
POWER PANELS
POWER PANEL - (EDP-BEC) POWER PANEL - (B-BEC)
POWER PANEL - (1-BEC)
POWER PANEL - (2-BEC) POWER PANEL - (3-BEC)
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
POWER PANEL - (4-BEC)
POWER PANEL - (5-BEC) POWER PANEL - (6-BEC)
POWER PANEL - (7-BEC) POWER PANEL - (8-BEC) POWER PANEL - (9-BEC)
POWER PANEL - (10-BEC) POWER PANEL - (11-BEC) POWER PANEL - (EDP-CEC)
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
EXISTING
POWER PANEL - (B-CEC) POWER PANEL - (1-CEC) POWER PANEL - (2-CEC)
POWER PANEL - (3-CEC) POWER PANEL - (4-CEC) POWER PANEL - (5-CEC)
POWER PANEL - (6-CEC) POWER PANEL - (7-CEC) POWER PANEL - (8-CEC)
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
POWER PANEL - (9-CEC) POWER PANEL - (10-CEC) POWER PANEL - (11-CEC)
POWER PANEL - (EDP-BCLS)
POWER PANEL - (B-BCLS) POWER PANEL - (1-BCLS)
POWER PANEL - (2-BCLS)
POWER PANEL - (3-BCLS)
POWER PANEL - (4-BCLS)
POWER PANEL - (12-CEC)
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
ELECTRICAL: PHASE 3 & 4
POWER PANEL - (5-BCLS) POWER PANEL - (6-BCLS) POWER PANEL - (7-BCLS)
POWER PANEL - (8-BCLS) POWER PANEL - (9-BCLS) POWER PANEL - (10-BCLS)
POWER PANEL - (11-BCLS)
POWER PANEL - (12-BCLS)
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
BID OPTION 1
Old Panel Name / # New Panel Name / # Location
B-65-E B-65-EQ B - WING
1-65-E 1-65-EQ B - WING
2-65-E 2-65-EQ B - WING
3-65-E 3-65-EQ B - WING
4-65-E 4-65-EQ B - WING
5-65-E 5-65-EQ B - WING
6-65-E 6-65-EQ B - WING
7-65-E 7-65-EQ B - WING
8-65-E 8-65-EQ B - WING
9-65-E 9-65-EQ B - WING
10-65-E 10-65-EQ B - WING
B-65-E B-65-EQ C - WING
1-65-E 1-65-EQ
2-65-E 2-65-EQ
3-65-E 3-65-EQ
4-65-E 4-65-EQ
5-65-E 5-65-EQ
6-65-E 6-65-EQ
7-65-E 7-65-EQ
8-65-E 8-65-EQ
9-65-E 9-65-EQ
10-65-E 10-65-EQ
C - WING
C - WING
C - WING
C - WING
C - WING
C - WING
C - WING
C - WING
C - WING
C - WING
EXISTING ELECTRIC PANEL RENAMING SCHEDULE
ELS EC-2 C - WING
ELECTRICAL: ALL PHASES
POWER PANELS & SCHEDULE
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
EXISTING POWER PANEL - (LS-EDP)
EXISTING POWER PANEL - (CR-EDP)
EXISTING POWER PANEL - (EQ-EDP)
Location
Voltage AIC Rtg.
Ï/W Manufacturer Interior Model # Mains MCB MOUNTINGPhase SCHED. SHEETNew Panel Name / #
ESSENTIAL EQUIPMENT SYSTEM PANELS RENAMING SCHEDULE
SCHEDULE OF EXISTING CONDUIT RUNS REQUIRING SEISMIC BRACING
Old Panel Name / # New Panel Name / # Old Location New Location Voltage AIC Rtg. Ø/W MCB EDP-Main EDP-Main Bldg 1, Subbsmt Corr. B Bldg 1, rm S-16 277/480 35K 3Ø/4W 800A SB-47(E) SB-47(E) Bldg 1, rm S-10 Bldg 1, rm S-10 120/208 22K 3Ø/4W 150A EDP-A EDP-AEQ Bldg 1, Subbsmt Corr. A Bldg 1, rm S-10 120/208 22K 3Ø/4W 400A EDP-B EDP-BEQ Bldg 1, rm S-16 Bldg 1, rm S-16 120/208 3Ø/4W 400A EDP-C EDP-CEQ Bldg 1, rm S-19 Bldg 1, rm S-19 120/208 3Ø/4W 400A EDP-D EDP-DEQ Bldg 1, rm S6A Bldg 1, rm S6A 120/208 3Ø/4W 400A EP-1 OR-EC Bldg 1, rm S-22 Bldg 1, rm S-22 277/480 3Ø/4W 400A
B-237E B-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A 1-237E 1-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A 2-237E 2-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A 3-237E 3-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A 4-237E 4-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A 5-237E 5-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A 6-237E 6-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A 7-237E 7-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A 8-237E 8-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A 9-237E 9-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A
10-237E 10-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A 11-237E 11-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 3Ø/4W 400A
11-237A(E) 11-237AEQ Bldg 1, A wing Bldg 1, A wing 120/208 22K 3Ø/4W 100A 11-237(MER A) 11-237MERAEQ Bldg 1, rm A1106b Bldg 1, rm A1106b 120/208 22K 3Ø/4W 100A 11-237(MER B) 11-237MERBEQ Bldg 1, rm B1103a Bldg 1, rm B1103a 120/208 22K 3Ø/4W 100A 11-237(MER C) 11-237MERCEQ Bldg 1, rm C1103d Bldg 1, rm C1103d 120/208 22K 3Ø/4W 100A
P-2 SB-CH12EQ Bldg 1, rm S-22 Bldg 1, rm S-22 277/480 3Ø/4W 400A Sub Panel #1 SB-COND EQ Bldg 1, rm S-22 Bldg 1, rm S-22 277/480 3Ø/4W 200A
Mains 800A 225A 400A 400A 400A 400A 400A 225A 225A 225A 225A 225A 225A 225A 225A 225A 225A 225A 400A 225A 225A 225A 225A 400A 250A
SB-142A (E) SB-142A EQ 120/208 22K 3Ø/4W 100A225A
MOUNTING
SURFACE
RECESSED
SURFACE
13-232 13-232LS Bldg 1, ELEV. MACH. RM 120/208 22K 3Ø/4W 150A225ABldg 1, ELEV. MACH. RM Bldg 1, rm S-19 Bldg 1, rm S-19
22K 22K 22K 22K
22K
22K 22K
SB-275 SB-275EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 400A400A SB-275A SD-275EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A225A 13-233A 13-233AEQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W -1200A 12-233A 12-233AEQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 150A225A 12-233B 12-233BEQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 150A225A 13-233B 13-233BEQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W -800A 13-238B 13-238BEQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W -800A 13-238A 13-238AEQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W -1200A 12-238A 12-238AEQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 150A225A 12-238B 12-238BEQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A225A
6-130 6-130EQ Bldg 1, CW Bldg 1, CW 120/208 22K 3Ø/4W 125A 3-111 3-111EQ Bldg 1, CW Bldg 1, CW 120/208 22K 3Ø/4W 125A225A 6-110 6-110EQ Bldg 1, CW Bldg 1, CW 120/208 22K 3Ø/4W 125A
3-147-A2 3-147-A2EQ Bldg 1, CW Bldg 1, CW 120/208 22K 3Ø/4W 125A225A MDP-308-C1 (CCTV) MDP-308-C1EQ Bldg 1, CW Bldg 1, CW 120/208 22K 3Ø/4W
7-244 7-244EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 8-244 8-244EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 9-244 9-244EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 150A225A
10-244 10-244EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 150A225A
RECESSED
SURFACE
SURFACE
SURFACE
SURFACE
SURFACE
SURFACE
RECESSED
SURFACE
125A225A
225A
225A
125A225A 125A225A
PANEL SCHEDULES
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
POWER PANEL REPLACEMENT SCHEDULE
GENERAL PANEL DEMOLITION NOTES:
GENERAL PANEL INSTALLATION NOTES:
SWITCHBOARD S-22 CIRCUIT BREAKER REPLACEMENT SCHEDULE
POWER PANEL - (B-237EQ) POWER PANEL - (1-237EQ) POWER PANEL - (2-237EQ)
POWER PANEL - (3-237EQ) POWER PANEL - (4-237EQ) POWER PANEL - (5-237EQ)
POWER PANEL - (6-237EQ) POWER PANEL - (7-237EQ) POWER PANEL - (8-237EQ)
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
POWER PANEL - (9-237EQ) POWER PANEL - (10-237EQ) POWER PANEL - (11-237EQ)
POWER PANEL - (11-237AEQ) POWER PANEL - (11-237 MER AEQ) POWER PANEL - (11-237 MER BEQ)
POWER PANEL - (11-237 MER CEQ) POWER PANEL - (EDP-BEQ) POWER PANEL - (EDP-CEQ)
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
POWER PANEL - (13-232LS) POWER PANEL - (SB-CH12 EQ)
POWER PANEL - (SB-COND EQ)
POWER PANEL - (SB-142A EQ)
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
POWER PANEL - (SB-275)
POWER PANEL - (12-240)
POWER PANEL - (12-238A)
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
POWER PANEL - (13-233B)POWER PANEL - (13-233A)
POWER PANEL - (12-233B)
POWER PANEL - (13-238A)
POWER PANEL - (13-238B)
POWER PANEL - (12-233A)
POWER PANEL - (12-238B)
POWER PANEL - (9-244)
Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705
100% C.D. 12-10-15
POWER PANEL - (MDP-308-C1 (CCTV))
POWER PANEL - (3-111)POWER PANEL - (6-130)
POWER PANEL - (3-147-A2)
POWER PANEL - (8-244)
POWER PANEL - (7-244)
POWER PANEL - (6-110)
POWER PANEL - (10-244)
File details come from the government source that posted it. Updated .