12-10-15_PHASE_3_VA_STRATTON_EMERGENCY_ELECTRICAL_UPGRADES.pdf

PDF 14 MB Posted

Attached to
Stratton Department of Veterans Affairs Medical Center, Albany, NY Emergency Electrical Upgrades
Solicitation number
W912DS-16-B-0003
Issued by

About this file

plans

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING 1

BUILDING 2

BUILDING 3

BUILDING 4

BUILDING 54

BUILDING 60

SITE LOCATION

TITLE SHEET

SIGNATURE BLOCK

ENGINEERING LLPFE PROJECT NO: 10-323

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

WALL TYPE 1 DETAIL

2 HR FIRE RATED WALL

NOTE:

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

ENGINEERS, P.C.

D.F. WHEELER

37 West Market Street

Red Hook NY, 12571

Tel: 845-758-3926

Fax: 845-758-3929

SWAY BRACE MULTI-FASTENER ADAPTER

FAST CLAMP

STRUCTURAL: BUILDING 1

CORE WALL FRAMING

237EQ

BEC

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

ENGINEERS, P.C.

D.F. WHEELER

37 West Market Street

Red Hook NY, 12571

Tel: 845-758-3926

Fax: 845-758-3929

STRUCTURAL:

DETAILS

ARCHITECTURAL: BUILDING 1

BUILDING 1 SUB BASEMENT CORE DETAIL - NEW CONSTRUCTION

GENERAL NOTES:

BUILDING 1 BASEMENT CORE DETAIL - NEW CONSTRUCTION

KEYED WORK NOTES:

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

LEGEND:

BUILDING 1 - 2ND, 3RD & FIFTH FLOOR THRU 11TH FLOOR CORE DETAIL - NEW CONSTRUCTION

KEYED WORK NOTES:

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

GENERAL NOTES:

BUILDING 1 FIRST FLOOR CORE DETAIL - NEW CONSTRUCTION

BUILDING 1 FOURTH FLOOR CORE DETAIL - NEW CONSTRUCTION

BUILDING 1 - 12TH FLOOR CORE DETAIL - NEW CONSTRUCTION

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

GENERAL NOTES:

237EQ

BCLS

CEC

NORTH WEST WALL

BEC

TYPE 'A' PARTITION NOTES:

WALL TYPE 1 DETAIL

2 HR FIRE RATED - UL

DESIGN NO. U415 - SYSTEM B

NOTE:

NOTE:

WALL TYPE 2 DETAIL

2 HR FIRE RATED - UL

DESIGN NO. U415 - SYSTEM B

ARCHITECTURAL:

DETAILS

NORTH WEST ELEVATOR WALL ELEVATION

TEMPORARY CONSTRUCTION BARRIER DETAIL

ELEVATION NOTES:

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

PANIC HARDWARE FOR EGRESS DOORS

INTERIOR DOOR FRAMES

SUB-BASEMENT SHAFT CEILING DETAIL

DOOR SCHEDULE

ELECTRICAL:

SYMBOLS & ABBREVIATIONS

POWER SYMBOLS

ABBREVIATIONS

GENERAL SYMBOLS

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

LINE TYPES

FIRE ALARM SYMBOLS

LEGEND AND SCHEDULE OF LIGHTING EQUIPMENT

WIRE AND CONDUIT SCHEDULE

TAG FEEDER SIZE WIRING AND CONDUIT

BUILDING 1 ICRA DETAILS

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

A-WINGB-WING

D-WINGC-WING

BLDG 1 BASEMENT ICRA PLAN

A-WINGB-WING

D-WINGC-WING

BLDG 1 FIRST FLOOR ICRA PLAN

BLDG 1 SECOND FLOOR ICRA PLAN

BLDG 1 THIRD FLOOR ICRA PLAN

BLDG 1 FORTH FLOOR ICRA PLAN

A-WINGB-WING

D-WINGC-WING

A-WINGB-WING

D-WING

C-WING

A-WINGB-WING

D-WINGC-WING

A-WINGB-WING

D-WINGC-WING

BLDG 1 FIFTH FLOOR ICRA PLAN

BLDG 1 SIXTH FLOOR ICRA PLAN

BLDG 1 SEVENTH FLOOR ICRA PLAN

BLDG 1 EIGHTH FLOOR ICRA PLAN

BLDG 1 NINTH FLOOR ICRA PLAN

BLDG 1 TENTH FLOOR ICRA PLAN

A-WINGB-WING

D-WINGC-WING

A-WINGB-WING

D-WINGC-WING

A-WINGB-WING

D-WINGC-WING

A-WINGB-WING

D-WINGC-WING

A-WINGB-WING

D-WINGC-WING

KEY

Class II

Class III

Class IV

Description of Required Infection Control Precautions by Class

During Construction Project Upon Completion of

1. Provide active means to prevent airborne dust from dispersing into atmosphere.

2. Water mist work surfaces to control dust while cutting.

3. Seal unused doors with duct tape.

4. Block off and seal air vents.

5. Place dust mat at entrance and exit of work area.

6. Remove or isolate HVAC system in areas where work is being performed.

1. Wipe work surfaces with disinfectant.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.

4. Remove isolation of HVAC system in areas where work is being performed.

1. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

2. Complete all critical barriers, i.e., sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.

3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

4. Contain construction waste before transport in tightly covered containers.

5. Cover transport receptacles or carts. Tape covering unless solid lid.

6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.

7. Do not remove barriers from work area until completed project is inspected by the owner's Safety Section and Infection Control Department, and thoroughly cleaned by the owner's Environment Services Department.

1. Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Control Department, and thoroughly cleaned by the owner’s Environmental Services Department.

2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

3. Vacuum work area with HEPA filtered vacuums.

4. Wet mop area with disinfectant.

5. Remove isolation of HVAC system in areas where work is being performed.

C l a s s

I I

C l a s s

I I I

I V

528A8-11-812 Emergency Electrical Upgrades Stratton VAMC Infection Risk Areas (10/10/2014)

FLOOR “A” WING CORE “A”-“B” “B” WING CORE “B’-“C” “C” WING CORE “C”-“D” “D” WING CORE “D”-“A” Sub Basement BASEMENT Credit Union, Canteen

Store, Cafeteria, Morgue Warehouse, Supply Warehouse, Kitchen, Pizza Shop, Vending

Room.

Men’s and Woman’s locker Room, The Gym, Canteen store A/C unit, Telephone Operators, Telephone Equipment Room.

Canteen Office, Mail Room, FMS, Supply Office.

Cafeteria A/C unit. Cache area, Cache HVAC unit, Main Kitchen HVAC is on the roof.

Clean Room.

1ST FLOOR Dental, Lobby, Agent Cashier, Patient Funds

File Room, Patient Check-in Reception, Police

2ND FLOOR Waiting Room ICU X-Ray

3RD FLOOR

4TH FLOOR

5TH FLOOR

6TH FLOOR

7TH FLOOR

8TH FLOOR

9TH FLOOR

10TH FLOOR

11TH FLOOR

OTHER

Main Kitchen Dish machine Room, Main kitchen Store Room, SPD HVAC unit.

SPD.

ER/Blue Team/ Eligibility

ICU/CCU,

Dialysis

Operating Room, Anesthesia

Pharmacy

Lab ServiceX-Ray

Out Patient Clinic Medical

Operating Room, ICU/CCU, PACU

Waiting Room, Auditorium Dept. of Labor, DAV, VFW, Vet. Affairs, Labs

Cardiac Rehab Speech, Field Office Wilson Lounge IS Service, Respiratory Care Field Office Field Office Field Office Union Office

Phlebotomy Visio Clinic Surgical Clinic, Podiatry Office

Research Office Research Confrence Room Human Resources, Fiscal Services, Video Conference

Lab - Closed OfficeComputer Room

Medical Offices Office Rehab Office ADHC EEG/EMG Lab Out Patient -Geriatric

Med. Offices, Silver Team, EKG Lab Health Resource Center Driver Rehab., Life Institute Office Office

Chaplain Service Chapel MCCP, Directors Suite Med. Offices, Upbeat Service, Billing Lab NDMS Coordinator

Building #5

Sleep Lab, HoptelWardWard

Ward

Surgical Unit

Cardiac Lab

Blood Drawing

Respiratory Therapy Rehab Medicine

Red Team, Primary Care

Eye Clinic

Training Room Mental Health Clinic Physical Therapy Lab Ward

MEV Buildings 26&27

ENT/GU/ Urology, Audiology

Pulmonary Function

Mental Health Offices Arts & Crafts Therapy Ward

Voluntary, Recreation, Dietetic, Microbiology

Short Term Stay, Out Patient Recovery

Oncology

BLDG 1 ELEVENTH FLOOR ICRA PLAN

A-WINGB-WING

D-WINGC-WING

ONE-LINE RISER DIAGRAM

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

KEYED NOTES:

LEGEND

EXISTING NORMAL POWER DEMOLITION ONE-LINE RISER DIAGRAM

BID OPTION 2

ELECTRICAL: BUILDING 4

SUB-BASEMENT PLANS

BUILDING 4 SUB-BASEMENT FLOOR PLAN

KEYED NOTES:

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

EMERGENCY POWER TO BUILDING #60

ELECTRICAL: BUILDING 1

SUB-BASEMENT PLAN

BUILDING 1 SUB-BASEMENT PLAN

CONSTRUCTION PHASING NOTES:

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

ELECTRICAL PLAN

ELEVATOR SUB-BASEMENT

Δ

Δ

BUILDING 1 PHASE 3 SWITCHBOARD 'B' ROOM - DEMO PLAN

BUILDING 1 PHASE 3 SWITCHBOARD 'B' ROOM - NEW PLAN

NOTES:

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

DEMOLITION NOTES:

INSTALLATION NOTES:SUGGESTED ELECTRICAL SERVICE EQUIPMENT

REPLACEMENT SEQUENCING PLAN:

BUILDING 1 PHASE 3 SWITCHBOARD 'C' ROOM - DEMO PLAN

BUILDING 1 PHASE 3 SWITCHBOARD 'C' ROOM - NEW PLAN

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

DEMOLITION NOTES: INSTALLATION NOTES:SUGGESTED ELECTRICAL SERVICE EQUIPMENT

REPLACEMENT SEQUENCING PLAN:

BID OPTION 2

BASEMENT PLAN

BUILDING 1 BASEMENT PLAN

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

BUILDING 1 BASEMENT CORE DETAIL

KEY NOTE:

FIRST FLOOR PLAN

BUILDING 1 FIRST FLOOR PLAN

BUILDING 1 FIRST FLOOR CORE DETAIL

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

SECOND FLOOR PLAN

BUILDING 1 SECOND FLOOR PLAN

BUILDING 1 SECOND FLOOR CORE DETAIL

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

BID OPTION 1

THIRD FLOOR PLAN

BUILDING 1 THIRD FLOOR PLAN

BUILDING 1 THIRD FLOOR CORE DETAIL

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

NOTES:

FOURTH FLOOR PLAN

BUILDING 1 FOURTH FLOOR PLAN

BUILDING 1 FOURTH FLOOR CORE DETAIL

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

FIFTH FLOOR PLAN

BUILDING 1 FIFTH FLOOR PLAN

BUILDING 1 FIFTH FLOOR CORE DETAIL

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

KEYED NOTES:

SIXTH FLOOR PLAN

BUILDING 1 SIXTH FLOOR PLAN

BUILDING 1 SIXTH FLOOR CORE DETAIL

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

KEYED NOTES:

SEVENTH FLOOR PLAN

BUILDING 1 SEVENTH FLOOR PLAN

BUILDING 1 SEVENTH FLOOR CORE DETAIL

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

NOTES:

EIGHTH FLOOR PLAN

BUILDING 1 EIGHTH FLOOR PLAN

BUILDING 1 EIGHTH FLOOR CORE DETAIL

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

NINTH FLOOR PLAN

BUILDING 1 NINTH FLOOR PLAN

BUILDING 1 NINTH FLOOR CORE DETAIL

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

TENTH FLOOR PLAN

BUILDING 1 TENTH FLOOR PLAN

BUILDING 1 TENTH FLOOR CORE DETAIL

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

ELEVENTH FLOOR PLAN

BUILDING 1 ELEVENTH FLOOR PLAN

BUILDING 1 ELEVENTH FLOOR CORE DETAIL

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

ELECTRICAL: BUILDING 1

12TH - 14TH FLOOR PLAN

BUILDING 1 PHASE 3 TWELFTH FLOOR PLAN

BUILDING 1 PHASE 3 THIRTEENTH FLOOR DEMOLITION PLAN

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

BUILDING 1 PHASE 3 THIRTEENTH FLOOR NEW WORK PLAN

EMERGENCY POWER

BUILDING 3 PHASE 3 - FIRST FLOOR PLAN - NEW PLAN

BUILDING 54 PHASE 3 - (CHILLER PLANT) BASEMENT - NEW PLAN

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

BUILDING 1-S22 SUB-BASEMENT EMERGENCY POWER

COMMUNICATIONS PLAN

PLAN - COMMUNICATIONS PLAN

CHILLER PLANT - COMMUNICATIONS PLAN

KEYED WORK NOTES:

GENERAL NOTE:

BLDG. 1, 2, 3 & 4 SUB-BASEMENT

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

ELECTRICAL: DEMOLITION

ONE-LINE DIAGRAM

EMERGENCY DEMOLITION POWER ONE-LINE DIAGRAM

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

ELECTRICAL: NEW

NEW EMERGENCY POWER ONE-LINE DIAGRAM

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

ELECTRICAL ONE-LINE DIAGRAMS

KEYED NOTES:

NOTE:

ELECTRICAL: PHASE 3

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

ELECTRICAL: DETAILS

EMERGENCY PANEL RECONFIGURATION DETAIL

OF SMOKE/FIRE BARRIERS

CONDUIT PENETRATIONS

PLATE & NOMENCLATURE DETAIL

PANEL BOARD & EQUIPMENT NAME

OF SMOKE/FIRE BARRIERS

CONDUIT PENETRATIONS

TYPICAL CONDUIT CONCRETE PENETRATION DETAIL

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

POWER PANEL & RISER DETAIL

TYPICAL NEW EMERGENCY

POWER PANEL & RISER ENCLOSURE

TYPICAL REPLACEMENT OF EXISTING

NEW RISER INSTALLATION SEQUENCE OF WORK:

DETAILS

TYPICAL TRANSFORMER/ATS ELEVATION

CONCRETE PAD DETAIL

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

SCHEDULE OF NEW ELECTRICAL EQUIPMENT

ELECTRICAL LINE TYPES

BUILDING #1 SWITCHBOARD "B" DEMOLITION ONE-LINE

BUILDING #1 SWITCHBOARD "B" NEW ONE-LINE

FEEDER SCHEDULE

TAG WIRING AND CONDUIT

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

ELECTRICAL LINE TYPES

BUILDING #1 SWITCHBOARD "C" DEMOLITION ONE-LINE

BUILDING #1 SWITCHBOARD "C" NEW ONE-LINE

NOTES:

FEEDER SCHEDULE

TAG WIRING AND CONDUIT

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

ELECTRICAL: PHASE 3 & 4

POWER PANELS

POWER PANEL - (EDP-BEC) POWER PANEL - (B-BEC)

POWER PANEL - (1-BEC)

POWER PANEL - (2-BEC) POWER PANEL - (3-BEC)

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

POWER PANEL - (4-BEC)

POWER PANEL - (5-BEC) POWER PANEL - (6-BEC)

POWER PANEL - (7-BEC) POWER PANEL - (8-BEC) POWER PANEL - (9-BEC)

POWER PANEL - (10-BEC) POWER PANEL - (11-BEC) POWER PANEL - (EDP-CEC)

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

EXISTING

POWER PANEL - (B-CEC) POWER PANEL - (1-CEC) POWER PANEL - (2-CEC)

POWER PANEL - (3-CEC) POWER PANEL - (4-CEC) POWER PANEL - (5-CEC)

POWER PANEL - (6-CEC) POWER PANEL - (7-CEC) POWER PANEL - (8-CEC)

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

POWER PANEL - (9-CEC) POWER PANEL - (10-CEC) POWER PANEL - (11-CEC)

POWER PANEL - (EDP-BCLS)

POWER PANEL - (B-BCLS) POWER PANEL - (1-BCLS)

POWER PANEL - (2-BCLS)

POWER PANEL - (3-BCLS)

POWER PANEL - (4-BCLS)

POWER PANEL - (12-CEC)

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

ELECTRICAL: PHASE 3 & 4

POWER PANEL - (5-BCLS) POWER PANEL - (6-BCLS) POWER PANEL - (7-BCLS)

POWER PANEL - (8-BCLS) POWER PANEL - (9-BCLS) POWER PANEL - (10-BCLS)

POWER PANEL - (11-BCLS)

POWER PANEL - (12-BCLS)

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

BID OPTION 1

Old Panel Name / # New Panel Name / # Location

B-65-E B-65-EQ B - WING

1-65-E 1-65-EQ B - WING

2-65-E 2-65-EQ B - WING

3-65-E 3-65-EQ B - WING

4-65-E 4-65-EQ B - WING

5-65-E 5-65-EQ B - WING

6-65-E 6-65-EQ B - WING

7-65-E 7-65-EQ B - WING

8-65-E 8-65-EQ B - WING

9-65-E 9-65-EQ B - WING

10-65-E 10-65-EQ B - WING

B-65-E B-65-EQ C - WING

1-65-E 1-65-EQ

2-65-E 2-65-EQ

3-65-E 3-65-EQ

4-65-E 4-65-EQ

5-65-E 5-65-EQ

6-65-E 6-65-EQ

7-65-E 7-65-EQ

8-65-E 8-65-EQ

9-65-E 9-65-EQ

10-65-E 10-65-EQ

C - WING

C - WING

C - WING

C - WING

C - WING

C - WING

C - WING

C - WING

C - WING

C - WING

EXISTING ELECTRIC PANEL RENAMING SCHEDULE

ELS EC-2 C - WING

ELECTRICAL: ALL PHASES

POWER PANELS & SCHEDULE

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

EXISTING POWER PANEL - (LS-EDP)

EXISTING POWER PANEL - (CR-EDP)

EXISTING POWER PANEL - (EQ-EDP)

Location

Voltage AIC Rtg.

Ï/W Manufacturer Interior Model # Mains MCB MOUNTINGPhase SCHED. SHEETNew Panel Name / #

ESSENTIAL EQUIPMENT SYSTEM PANELS RENAMING SCHEDULE

SCHEDULE OF EXISTING CONDUIT RUNS REQUIRING SEISMIC BRACING

Old Panel Name / # New Panel Name / # Old Location New Location Voltage AIC Rtg. Ø/W MCB EDP-Main EDP-Main Bldg 1, Subbsmt Corr. B Bldg 1, rm S-16 277/480 35K 3Ø/4W 800A SB-47(E) SB-47(E) Bldg 1, rm S-10 Bldg 1, rm S-10 120/208 22K 3Ø/4W 150A EDP-A EDP-AEQ Bldg 1, Subbsmt Corr. A Bldg 1, rm S-10 120/208 22K 3Ø/4W 400A EDP-B EDP-BEQ Bldg 1, rm S-16 Bldg 1, rm S-16 120/208 3Ø/4W 400A EDP-C EDP-CEQ Bldg 1, rm S-19 Bldg 1, rm S-19 120/208 3Ø/4W 400A EDP-D EDP-DEQ Bldg 1, rm S6A Bldg 1, rm S6A 120/208 3Ø/4W 400A EP-1 OR-EC Bldg 1, rm S-22 Bldg 1, rm S-22 277/480 3Ø/4W 400A

B-237E B-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A 1-237E 1-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A 2-237E 2-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A 3-237E 3-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A 4-237E 4-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A 5-237E 5-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A 6-237E 6-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A 7-237E 7-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A 8-237E 8-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A 9-237E 9-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A

10-237E 10-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A 11-237E 11-237EQ Bldg 1, CORE Bldg 1, CORE 120/208 3Ø/4W 400A

11-237A(E) 11-237AEQ Bldg 1, A wing Bldg 1, A wing 120/208 22K 3Ø/4W 100A 11-237(MER A) 11-237MERAEQ Bldg 1, rm A1106b Bldg 1, rm A1106b 120/208 22K 3Ø/4W 100A 11-237(MER B) 11-237MERBEQ Bldg 1, rm B1103a Bldg 1, rm B1103a 120/208 22K 3Ø/4W 100A 11-237(MER C) 11-237MERCEQ Bldg 1, rm C1103d Bldg 1, rm C1103d 120/208 22K 3Ø/4W 100A

P-2 SB-CH12EQ Bldg 1, rm S-22 Bldg 1, rm S-22 277/480 3Ø/4W 400A Sub Panel #1 SB-COND EQ Bldg 1, rm S-22 Bldg 1, rm S-22 277/480 3Ø/4W 200A

Mains 800A 225A 400A 400A 400A 400A 400A 225A 225A 225A 225A 225A 225A 225A 225A 225A 225A 225A 400A 225A 225A 225A 225A 400A 250A

SB-142A (E) SB-142A EQ 120/208 22K 3Ø/4W 100A225A

MOUNTING

SURFACE

RECESSED

SURFACE

13-232 13-232LS Bldg 1, ELEV. MACH. RM 120/208 22K 3Ø/4W 150A225ABldg 1, ELEV. MACH. RM Bldg 1, rm S-19 Bldg 1, rm S-19

22K 22K 22K 22K

22K

22K 22K

SB-275 SB-275EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 400A400A SB-275A SD-275EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A225A 13-233A 13-233AEQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W -1200A 12-233A 12-233AEQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 150A225A 12-233B 12-233BEQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 150A225A 13-233B 13-233BEQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W -800A 13-238B 13-238BEQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W -800A 13-238A 13-238AEQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W -1200A 12-238A 12-238AEQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 150A225A 12-238B 12-238BEQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 100A225A

6-130 6-130EQ Bldg 1, CW Bldg 1, CW 120/208 22K 3Ø/4W 125A 3-111 3-111EQ Bldg 1, CW Bldg 1, CW 120/208 22K 3Ø/4W 125A225A 6-110 6-110EQ Bldg 1, CW Bldg 1, CW 120/208 22K 3Ø/4W 125A

3-147-A2 3-147-A2EQ Bldg 1, CW Bldg 1, CW 120/208 22K 3Ø/4W 125A225A MDP-308-C1 (CCTV) MDP-308-C1EQ Bldg 1, CW Bldg 1, CW 120/208 22K 3Ø/4W

7-244 7-244EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 8-244 8-244EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 9-244 9-244EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 150A225A

10-244 10-244EQ Bldg 1, CORE Bldg 1, CORE 120/208 22K 3Ø/4W 150A225A

RECESSED

SURFACE

SURFACE

SURFACE

SURFACE

SURFACE

SURFACE

RECESSED

SURFACE

125A225A

225A

225A

125A225A 125A225A

PANEL SCHEDULES

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

POWER PANEL REPLACEMENT SCHEDULE

GENERAL PANEL DEMOLITION NOTES:

GENERAL PANEL INSTALLATION NOTES:

SWITCHBOARD S-22 CIRCUIT BREAKER REPLACEMENT SCHEDULE

POWER PANEL - (B-237EQ) POWER PANEL - (1-237EQ) POWER PANEL - (2-237EQ)

POWER PANEL - (3-237EQ) POWER PANEL - (4-237EQ) POWER PANEL - (5-237EQ)

POWER PANEL - (6-237EQ) POWER PANEL - (7-237EQ) POWER PANEL - (8-237EQ)

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

POWER PANEL - (9-237EQ) POWER PANEL - (10-237EQ) POWER PANEL - (11-237EQ)

POWER PANEL - (11-237AEQ) POWER PANEL - (11-237 MER AEQ) POWER PANEL - (11-237 MER BEQ)

POWER PANEL - (11-237 MER CEQ) POWER PANEL - (EDP-BEQ) POWER PANEL - (EDP-CEQ)

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

POWER PANEL - (13-232LS) POWER PANEL - (SB-CH12 EQ)

POWER PANEL - (SB-COND EQ)

POWER PANEL - (SB-142A EQ)

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

POWER PANEL - (SB-275)

POWER PANEL - (12-240)

POWER PANEL - (12-238A)

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

POWER PANEL - (13-233B)POWER PANEL - (13-233A)

POWER PANEL - (12-233B)

POWER PANEL - (13-238A)

POWER PANEL - (13-238B)

POWER PANEL - (12-233A)

POWER PANEL - (12-238B)

POWER PANEL - (9-244)

Middletown, NY 10940 t 845-343-1481; fx 845-343-4986 www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 845-454-9705

100% C.D. 12-10-15

POWER PANEL - (MDP-308-C1 (CCTV))

POWER PANEL - (3-111)POWER PANEL - (6-130)

POWER PANEL - (3-147-A2)

POWER PANEL - (8-244)

POWER PANEL - (7-244)

POWER PANEL - (6-110)

POWER PANEL - (10-244)

File details come from the government source that posted it. Updated .