W16ROE60211044

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1) The Bid opening due date has been extended from 16 June 2016 to 21 June 2016 at 2:00 P.M. Eastern Standard Time (EST) at 26 Federal Plaza, Room 1843, New York N.Y. 10278.

2) Revise and Reissue the Bid Schedule.

3) Revise Specification, Section 06 13 33, paragraph 2.1.1.2.

4) Revise and Reissue sub paragraph 14, Insurance Procured by Contractor in Section 00 73 00.

5) Revise Note 6 of the Bid Schedule.

6) Answ er Bidder Questions.

NOTE: Bidders must acknow ledge receipt of this amendment by date specified in the bid (or as amended) by one of the follow ing methods:

In the space provided on the SF 1442, by separate letter, or by signing block 15 below .

FAILURE TO ACKNOWLEDGE AMENDMENT BY DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE

LATE BID, LATE MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 17

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Jun-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-16-B-0001

X 9B. DATED (SEE ITEM 11)

29-Apr-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Jun-2016

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-16-B-0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES

The following have been added by full text:

AMENDMENT 0007

Section 00 10 00

BID SCHEDULE

Atlantic Coast of New York Fire Island Inlet to Montauk Point

Fair Harbor to Seaview, Contract 3A Suffolk County, NY

Amendment # 0007

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Mobilization and Demobilization

FFP

FOB: Destination

PURCHASE REQUEST NUMBER: W16ROE60211044

NET AMT

0002 1,600,000 Cubic

Yard

Hydraulic Beach Fill

FFP

STA 336+00 to STA 466+00 "Estimated Quantities"

0003 38.50 Acre Dune Planting

FFP

STA 336+00 to STA 466+00 "Estimated Quantities"

0004 210,000 Cubic

Hydraulic Beach Fill

STA 130+00 to STA 185+00 "Estimated Quantities"

0005 23,000 Cubic

Hydraulic Beach Fill stock pile

STA 195+00 "Estimated Quantities"

0006 13,000 Linear

Foot

Sand Fence "Estimated Quantities"

Crossover (Non-ADA)

FFP

THIS CLIN IS FOR INFORMATIONAL PURPOSES ONLY

INFORMATIONAL ONLY

0007AA 29 Each Crossover (Non-ADA) Type A

0007AB 9 Each Crossover (Non-ADA) Type B

Crossover (ADA)

FFP

0008AA 2 Each Crossover (ADA) Type C

0008AB 2 Each Crossover (ADA) Type D

0009 2 Each Vehicular Crossover

0010 1 Job Removal and Disposal of

FFP

Existing Crossovers

0011 1 Job Vibration Monitoring

0012 1,000 Linear

Foot

Stabilization Mats "Estimated Quantities"

Demolition of Deck Structures

FFP

0013AA 1 Job Location 1 Station 358+00

0013AB 1 Job Location 2 Station 359+00

0013AC 1 Job Location 3 Station 363+40

0013AD 1 Job Location 4 Station 364+25

0014 1 Job Demolition of Residential

FFP

Structure Location Station 404+50

0015 1 Job Existing Septic System

FFP

Abandonment Location Stations 404+50

0016 1 Job OPTION Option 1 Additional Insurance:

FFP

Additional Insurance in accordance with SUPPLEMENTARY CONDITIONS

OPTION Option 2 Relocation of

FFP

Residential and Septic. THIS CLIN IS FOR INFORMATIONAL PURPOSES

ONLY

0017AA 1 Job OPTION Relocation of Residential

FFP

Structure Location 362+00

0017AB 1 Job OPTION Existing Septic System

FFP

Abandonment Station 362+00

0017AC 1 Job OPTION Construction of Septic System

FFP

Location 362+00

0017AD 1 Job OPTION Existing Septic System

FFP

Abandonment Stations 385+75

0017AE 1 Job OPTION Additional Insurance Riggers

FFP

Additional Insurance in accordance with SUPPLEMENTARY CONDITIONS -14

OPTION Option 3 Crossover

FFP

0018AA 1 Job OPTION Monte Cristo

FFP

Station 387+53 Type A

0018AB 1 Job OPTION Casino

FFP

Station 389+31 Type A

0018AC 1 Job OPTION Pirates

FFP

Station 391+12 Type A

0018AD 1 Job OPTION Seabreeze

FFP

Station 385+62 Type A

0018AE 1 Job OPTION Clipper

FFP

Station 417+68 Type A

0018AF 1 Job OPTION Sextant

FFP

Station 405+25 Type D

0018AG 1 Job OPTION Compass

FFP

Station 403+13 Type A

TOTAL BASE – NO OPTIONS (CLINs 0001 thru 0015) $_________________

TOTAL OPTIONS (CLINS 0016 thru 0018) $_________________

TOTAL BASE PLUS OPTIONS (CLINs 0001 thru 0018) $_________________

NOTES:

1. Tapering are included in the items and exact locations are on the plan sheets

2. Low bidder for the purpose of award will be the conforming bidder offering the lowest amount for the total base bid and optional bid items.

3. Any bid which is materially unbalanced may be rejected. An unbalanced bid is one, which is based on the prices significantly less than cost for some work and prices, which are significantly overstated for other work.

4. Bidders are required to bid on all items or their bids will be rejected.

5. Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions, or attachments made by the bidder himself thereto may render the bid non-responsive and may be caused for its rejection.

6. All Option items may be awarded within 200 days of notice to proceed. NO Additional time will be added the contract duration to complete optional Items.

Fire Island Inlet to Montauk Point Fire Island Stabilization Project

Fair Harbor to Seaview Contract 3A

Amendment # 0007

To Bidders The following changes shall be made to the drawings and specifications.

DRAWINGS

1. The following DRAWINGS have been REVISED and REISSUED:

-None

2. The following DRAWINGS have been ADDED:

- None

SPECIFICATIONS:

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

-None

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

-None

3. The following SPECIFICATION SECTIONS have been REVISED but REISSUED:

-Revised and Reissue sub paragraph 14, Insurance Procured By Contractor in Section 00 73 00

4. The following SPECIFICATION SECTIONS have been REVISED but NOT REISSUED:

-Specification section 06 13 33 page three paragraph 2.1.1.2. Revise paragraph 2.1.1.2 in its entirety and replace as below:

“All framing lumber including headers, stringers, decking, and stairs shall be treated southern yellow pine. Each piece of treated lumber or timber shall be branded, by the producer, in accordance with AWPA M6. Treat wood to be used in contact with salt water or salt water splash in accordance with AWPA U1 (Material Subject to Marine Borer Exposure) with 0.6 ACQ - Alkaline copper Quaternary. The Contractor shall be responsible for the quality of treated wood products.”

Questions and Answers:

(Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors “for information only ”and do not revise the solicitation, plans or specifications.)

RFI #1: Question:

In spec section 06 13 33 page three paragraph 2.1.1.2 of the Fire Island Stabilizaton Contract 3A it states that timber piles are green hart. Would this be correct and not a typo? Would treated yellow pine suffice of as a sufficient replacement?

Answer #1:

This is not correct. Treated southern yellow pine would suffice and revised in this amendment.

RFI # 2 Question:

a. Addendum #6, 14. Insurance procured by Contractor, a. (1) states: (1) Commercial General Liability Insurance in limits of not less than Five Million Dollars ($5,000,000) combined single limit per occurrence for bodily injury, death, personal injury and property damage, including but not limited to coverage for Broad Form Property Damage. Such coverage shall not contain any environmental exclusion clause and there shall be no exclusions for property damage arising out of explosion, collapse or underground property damage hazards and no exclusion for waterfront activities.

Please confirm that all required limits may be met with a combination of underlying and excess limits.

b. Addendum #6, 14. Insurance procured by Contractor, a. (1) indicates that the Commercial General Liability policy “shall not contain any environmental exclusion clause . . . “ We do have a pollution exclusion in our Commercial General Liability policy as is the industry standard. However, we have a separate Contractors Legal Liability policy and a separate Vessel Pollution policy. (We also have limited sudden and accidental Pollution coverage included in our P&I policy.) Please confirm that this is acceptable.

c. Addendum #6, 14. Insurance procured by Contractor, a. (1) also indicates that our Commercial General Liability cannot contain an exclusion for waterfront activities.

Our CGL excludes waterfront activities in connection with dredging because our

Protection & Indemnity and Marine General Liability policies provide the coverage.

Please confirm that this is acceptable.

Answer #2:

The answer to a, b and c is yes, this is acceptable. RFI #2, is answered in this amendment.

(End of Summary of Changes)