W16ROE60211044
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is:
1. Reissue the entire bid schedule. Please see attached.
2. Section 00 90 02, revise WQC. Please see attached.
3. Revise Section 00 73 00, Paragraph 2: Order of Work, Paragraph 12: Field Office, Paragraph 58 Endangered Species act, Stew ardship Education Interpretive Sign (ESA-SEIS).
4. Revise and resubmit draw ings: G-002, C-103, C-207, C-208, C-303, C-501, C-506
NOTE: Bidders must acknow ledge receipt of this amendment by the date specified in the bid (or as amended) by one of the follow ing methods: In the space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE
MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 34
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-May-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-16-B-0001
X 9B. DATED (SEE ITEM 11)
29-Apr-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-May-2016
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS-16-B-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION/CONTRACT FORM
CLIN 0002
The CLIN extended description has changed from STA 336+00 to STA 466+00 to STA 336+00 to STA 466+00 "Estimated Quantities".
CLIN 0004
The CLIN extended description has changed from STA 130+00 to STA 185+00 to STA 130+00 to STA 185+00 "Estimated Quantities".
CLIN 0005
The CLIN extended description has changed from STA 195+00 to STA 195+00 "Estimated Quantities".
The following have been modified:
NOTES:
1. Tapering are included in the items and exact locations are on the plan sheets.
2. Low bidder for the purpose of award will be the conforming bidder offering the lowest amount for the total base bid and optional bid items.
3. Any bid which is materially unbalanced may be rejected. An unbalanced bid is one, which is based on the prices significantly less than cost for some work and prices, which are significantly overstated for other work.
4. Bidders are required to bid on all items or their bids will be rejected.
5. Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions, or attachments made by the bidder himself thereto may render the bid non-responsive and may be caused for its rejection.
6. All Option items may be awarded within 200 days of notice to proceed.
7. No additional time will be added for the Options.
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
Section 00 10 00
BID SCHEDULE
Atlantic Coast of New York
Fire Island Inlet to Montauk Point Fair Harbor to Seaview, Contract 3A
Suffolk County, NY
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Mobilization and Demobilization
FFP
FOB: Destination
MILSTRIP: W16ROE60211044
PURCHASE REQUEST NUMBER: W16ROE60211044
NET AMT
Section 00 10 00 - SOLICITATION/CONTRACT FORM
0002 1,600,000 Cubic
Yard
Hydraulic Beach Fill
FFP
STA 336+00 to STA 466+00 "Estimated Quantities" FOB: Destination
0003 38.50 Acre Dune Planting
FFP
STA 336+00 to STA 466+00
0004 210,000 Cubic
Hydraulic Beach Fill
STA 130+00 to STA 185+00 "Estimated Quantities"
0005 23,000 Cubic
Hydraulic Beach Fill stock pile
STA 195+00 "Estimated Quantities"
0006 13,000 Linear
Foot
Sand Fence
Crossover (Non-ADA)
FFP
THIS CLIN IS FOR INFORMATIONAL PURPOSES ONLY
0007AA 29 Each Crossover (Non-ADA) Type A
0007AB 9 Each Crossover (Non-ADA) Type B
Crossover (ADA)
FFP
0008AA 2 Each Crossover (ADA) Type C
0008AB 2 Each Crossover (ADA) Type D
0009 2 Each Vehicular Crossover
0010 1 Job Removal and Disposal of
FFP
Existing Crossovers
0011 1 Job Vibration Monitoring
0012 1,000 Linear
Foot
Stabilization Mats
Demolition of Deck Structures
FFP
0013AA 1 Job Location 1 Station 358+00
0013AB 1 Job Location 2 Station 359+00
0013AC 1 Job Location 3 Station 363+40
0013AD 1 Job Location 4 Station 364+25
0014 1 Job Demolition of Residential
FFP
Structure Location Station 404+50
0015 1 Job Existing Septic System
FFP
Abandonment Location Stations 404+50
0016 1 Job OPTION Option 1 Additional Insurance:
FFP
Additional Insurance in accordance with SUPPLEMENTARY CONDITIONS
OPTION Option 2 Relocation of
FFP
Residential and Septic. THIS CLIN IS FOR INFORMATIONAL PURPOSES
ONLY
0017AA 1 Job OPTION Relocation of Residential
FFP
Structure Location 362+00
0017AB 1 Job OPTION Existing Septic System
FFP
Abandonment Station 362+00
0017AC 1 Job OPTION Construction of Septic System
FFP
Location 362+00
0017AD 1 Job OPTION Existing Septic System
FFP
Abandonment Stations 385+75
OPTION Option 3 Crossover
FFP
0018AA 1 Job OPTION Monte Cristo
FFP
Station 387+53 Type A
0018AB 1 Job OPTION Casino
FFP
Station 389+31 Type A
0018AC 1 Job OPTION Pirates
FFP
Station 391+12 Type A
0018AD 1 Job OPTION Seabreeze
FFP
Station 385+62 Type A
0018AE 1 Job OPTION Clipper
FFP
Station 417+68 Type A
0018AF 1 Job OPTION Sextant
FFP
Station 405+25 Type D
0018AG 1 Job OPTION Compass
FFP
Station 403+13 Type A
TOTALS
TOTAL BASE – NO OPTIONS (CLINs 0001 thru 0015) $_________________
TOTAL OPTIONS (CLINS 0016 thru 0018) $_________________
TOTAL BASE PLUS OPTIONS (CLINs 0001 thru 0018) $_________________
NOTES:
1. Tapering are included in the items and exact locations are on the plan sheets
2. Low bidder for the purpose of award will be the conforming bidder offering the lowest amount for the total base bid and optional bid items.
3. Any bid which is materially unbalanced may be rejected. An unbalanced bid is one, which is based on the prices significantly less than cost for some work and prices, which are significantly overstated for other work.
4. Bidders are required to bid on all items or their bids will be rejected.
5. Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions, or attachments made by the bidder himself thereto may render the bid non-responsive and may be caused for its rejection.
6. All Option items may be awarded within 200 days of notice to proceed.
7. No additional time will be added for the Options.
Fire Island Inlet to Montauk Point, Fire Island Stabilization Project. Fire Island to Moriches Inlet, Contract 3A, Fair Harbor to Seaview. FIMI 3A, Suffolk County, NY.
Amendment 0002
AMENDMENT 0002 to BID SCHEDULE, WAGE RATES, DRAWINGS and SPECIFICATIONS for Fire Island Inlet to Montauk Point, Fire Island Stabilization Project. Fire Island to Moriches Inlet, Contract 3A, Fair Harbor to Seaview. FIMI 3A, Suffolk County, NY.
TO OFFERORS
The following changes shall be made to the bid schedule, wage rates, drawings and specifications.
BID SCHEDULE
1. The bid schedule have been REVISED and REISSUED:
WAGE RATES
1. The following WAGE RATE have been REVISED and REISSUED:
General Decision Number: NY160012 05/06/2016 NY12
DRAWINGS
1. The following DRAWINGS have been REVISED but NOT REISSUED:
- None
2. The following DRAWINGS have been REVISED and REISSUED:
a. G-002 - added abbreviations and notes for excavation and re-grading existing dunes.
b. C-103 - stockpile grading and access routes
c. C-207, C-208 - swapping Cottage Walk and Surfview Walk for crossover type change
d. C-303 - revised Robins Rest existing condition on cross sections
e. C-501 - revised Cottage Walk and Surfview Walk crossover type change
f. C-506 - removed Cottage Walk detail and added Surfview Walk detail
3. The following DRAWINGS have been ADDED:
- None
SPECIFICATIONS:
1. The following SPECIFICATION SECTIONS have REVISED but NOT REISSUED:
SECTION 00 73 00:
Revised Paragraphs’ as below
1. Paragraph 2: ORDER OF WORK
Replace Paragraph 2 in its entirety as below:
“2. ORDER OF WORK
The contractor shall proceed with the placement of beach fill in a continuous manner along the shoreline from the east to the west, or as directed by the Contracting Officer.
The work in Robert Moses State Park, CLINS 0004 and 0005, must be the first increment of beach fill placement.
The contractor shall establish and work within approximately 500-1000 foot wide beach work zone/closure areas, one work zone at a time. No community will be left without access to the beach at any time. Within each work zone/closure area, the contractor shall remove any existing dune crossover structures and install the associated timber pilings for the new pedestrian crossover prior to the placement of dune material in a community, in advance of beach fill placement operations. Minimal excavation and regrading of existing topography will be allowed for the installation of new timber piles.
After beach fill and dune placement completion and acceptance of a new dune section within a work zone/closure area, the contractor shall place the on-grade mesh stabilization mats, where the existing dune crossovers have been removed, from the landward limit of the new crossover to 15 feet seaward of the seaward toe of the dune, to be used as temporary pedestrian dune crossovers prior to proceeding to the next work zone/closure area. The on-grade mesh stabilization mats shall remain in place and be maintained for the community to access the beach until the initiation of the new timber dune crossover decking structure at each location. Within three (3) weeks after acceptance of a specific new dune section, the contractor shall complete the associated new timber dune crossover decking structures within that work zone/closure area, and reopen the new crossovers to the community for pedestrian use. Timber decking for all dune crossover structures within a previously established work zone shall be completed prior to decking work start in the next established work zone.”
2. Paragraph 12; FIELD OFFICE
Additional item is added at the end of Paragraph 12 as below and a sample is provided:
“-The Contractor shall also provide 10 magnetic signs for vehicular use during bird monitoring:
8 1/2" x 11" magnetic placard, red letters on white background, landscape.
Corps logo (castle) at top with the following text:
"U.S. Army Corps of Engineers" Font: Calibri-Bold, Size 72
"New York District" Font: Calibri, size 72
Corp logo should occupy topo 1/3 of page.”
3. Paragraph 58: ENDANGERED SPECIES ACT, STEWARDSHIP EDUCATION
INTERPRETIVE SIGN (ESA-SEIS)
Revise “4 ESA SEIS signs” to “8 ESA SEIS signs”
2. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:
SECTION 00 90 02:
Amended WQC added in this amendment
3. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:
- None
WAGE RATES:
General Decision Number: NY160012 05/06/2016 NY12
Superseded General Decision Number: NY20150012
State: New York JC 05/06/2016
Construction Types: Building, Heavy, Highway and Residential
Counties: Nassau and Suffolk Counties in New York.
BUILDING CONSTRUCTION PROJECTS, RESIDENTIAL CONSTRUCTION
PROJECTS (including single family homes and apartments up to and including 4 stories), HEAVY CONSTRUCTION PROJECTS, HIGHWAY
CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis‐Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/08/2016 1 02/05/2016 2 02/19/2016 3 02/26/2016 4 03/04/2016 5 03/11/2016 6 04/08/2016 7 05/06/2016
ASBE0012‐001 12/28/2015
Rates Fringes
Asbestos Workers/Insulator Includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.....................$ 64.36 32.46
HAZARDOUS MATERIAL HANDLER.......$ 39.00 12.75
BOIL0005‐001 01/01/2013
Rates Fringes
BOILERMAKER......................$ 49.47 33%+22.87+a
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Thanksgiving Day, Memorial Day, Independence Day, Labor Day and Good Friday, Friday after Thanksgiving, Christmas Eve Day and New Year's Eve
BRNY0001‐001 07/01/2015
Rates Fringes
BRICKLAYER.......................$ 56.77 24.75
MASON ‐ STONE....................$ 48.71 28.41
CARP0290‐001 07/01/2014
Rates Fringes
Carpenters:
Building....................$ 43.03 33.96 Heavy & Highway.............$ 43.03 33.96 Residential.................$ 33.58 27.26
CARP0740‐001 07/01/2015
Rates Fringes
MILLWRIGHT.......................$ 49.50 51.31
CARP1556‐008 07/01/2015
Rates Fringes
Carpenters:
DIVERS TENDERS..............$ 45.47 45.95
DIVERS......................$ 63.82 45.95
DOCKBUILDERS................$ 50.50 45.95
PILEDRIVERMAN...............$ 43.61 45.07
CARP1556‐011 07/01/2015
Rates Fringes
Carpenters:
TIMBERMEN...................$ 45.60 45.97
CARP2287‐003 07/01/2014
Rates Fringes
CARPENTER
Soft Floor Layers...........$ 49.88 43.40
ELEC0025‐001 04/25/2015
Rates Fringes
ELECTRICIAN......................$ 50.45 16%+22.57
* ELEC0025‐002 04/30/2016
Rates Fringes
Electricians:
Maintenance Unit............$ 42.20 12%+$16.83 Telephone Unit..............$ 36.78 16%+$17.33 Wiring for single or multiple family dwellings and apartments up to and including 3 stories.........$ 27.35 13%+11.35
ELEC1049‐002 03/29/2015
Rates Fringes
Line Construction:
Substation and Switching structures pipe type cable installation and maintenance jobs or projects; Railroad electrical distribution/ transmission systems maintenance (when work is not performed by railroad employees) Overhead and Underground transmission/distribution line work. Fiber optic, telephone cable and equipment;
Groundman..................$ 30.46 21.08 Heavy Equipment Operator...$ 40.61 24.31 Lineman & Cable Splicer....$ 50.76 27.58 Material Man...............$ 44.16 25.46
ELEV0001‐002 03/17/2013
ELEVATOR MECHANIC
Elevator Constructor........$ 57.01 27.605+a+b Modernization and Repair....$ 45.14 27.455+a+b
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Good Friday, President's Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.
b. PAID VACATION: An employee who has worked less than 5 years shall recieve vacation pay credit on the basis of 4% of his hourly rate for all hours worked; an employee who has worked 5 to 15 years shall receive vacation pay credit on the basis of 6% of his hourly rate for all hours worked;
an employee who has worked 15 or more years shall receive vacation pay credit on the basis of 8% of his hourly rate for all hours worked.
ENGI0138‐001 06/01/2015
BUILDING CONSTRUCTION
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 58.90 32.50+a GROUP 2.....................$ 55.91 32.50+a GROUP 3.....................$ 53.91 32.50+a GROUP 4.....................$ 47.45 32.50+a GROUP 5.....................$ 45.50 32.50+a
NOTES:
Hazmat premiums:
Level A 3.50 Level B 2.50 Level C 1.50 Level D 1.00
Oiler on truck cranes with boom length of 100 ft. or more
.25
FOOTNOTE:
a. Paid Holidays: New Year's Day, Lincoln's Birthday, Washington's Birthday or President's Day (in lieu of Lincoln's or Washington's Birthday), Good Friday, Memorial Day, Indpendence Day, Labor Day, Veteran's Day, Thanksgiving Day, Christmas Day or days celebrated as such.
Any holiday that falls on a Saturday will be celebrated on Friday.
POWER EQUIPMENT OPERATOR CASSIFICATIONS
GROUP 1: Asphalt spreader, backhoe crawler capacity over cater‐ piller 225 and lomatsu 300, Boiler (thermoplastic), Cherry picker, over 50 tons, CMI or maxim spreader, concrete pump (with oiler), crane (crawler truck), crane (on barge), crane (stone setting), crane (structural steel), crane (with clam shell), derrick, dragline, dredge, gradall, grader, hoist (3 drum), loading machine (bucket) cap of 10 yds or over micro‐trap, with compressor (negative air machine), milling machine, large pile driver, power winch, Stone setting/structural steel, power winch (truck mounted/stone steel) powerhouse, road paver scoop, carry‐all, scraper in tandem shovel, sideboom tractor, sideboom tractor (used in tank work), stone spreader (self propelled tank work), zamboni (ice machine)
GROUP 2: Backhoe, boom truck, bulldozer, cherypicker, conveyor (multi), dinky locomotive, forklift, hoist, 2 drum, loading machine, loading machine (front end) mechanicl compactors, (machine drawn), mulch machine (machine‐fed), power winch, other than stone/structural steel, power winch (truck mounted other than stone steel) pump (hydraulic, with boring machine), roller, (asphalt), scoop (carry‐all scraper), tower crane (maintenance man), trenching machine
GROUP 3: Comrpessor (structural steel), Compressor (2 or more in battery), concrete finishing mchine, concrete spreader, conveyor, curb machine (asphalt or concrete), curing machine, fireman, hoist (1 drum), micro‐trap, (self contained, negative air machine), pump (4 inches or over), pump (hydraulic), pump (jet), pump (sumbersible), pump (well point), pulvi‐mixer, ridge cutter, roller (dirt), striping machine, vac‐all, welding and burning, welding machine (pile work), welding machine (structural steel)
GROUP 4: Compressor, compressor (on crane), compressor (pile work), compressor (stone setting), concrete breaker, concrete saw or cutter, forklift (walk behind, power operated), generator‐pile work, generator, hydra hammer, mechanical compactors (hand operated), oiler (truck crane), pin puller, portable heaters, powerbroom, power buggies, pump (double action diaphgrgm), pump (gypsum), trench machine (hand), welding machine
GROUP 5: Batching plant (on site of job), generator (small), mixer (with skip), mixer (2 small with or without skip), mixer (2 bag or over, with or without skip), mulch machine, oiler, pump (centrifugal, up to 3 inches), root cutter, stump chipper, tower crane (oiler), tractor (caterpillar or wheel vibrator)
ENGI0138‐002 06/01/2015
HEAVY & HIGHWAY
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 62.07 32.75+a GROUP 2.....................$ 58.03 32.75+a GROUP 3.....................$ 55.98 32.75+a GROUP 4.....................$ 49.35 32.75+a GROUP 5.....................$ 47.39 32.75+a GROUP 6.....................$ 35.19 10.40+a
NOTES:
Hazmat premiums:
Level A 3.50 Level B 2.50 Level C 1.50 Level D 1.00
Truck and Crawler Cranes long boom premiums:
boom lengths (including jib) 100‐149 ft 1.00 boom lenghts (including jib) 150‐249 ft 1.50 boom lenghts (including jib) 250‐349 ft 2.00 boom lengths (including jib) 350 ft 3.00
Cranes using clamshell buckets .25
Front end loader 10 yds and above .25 Oiler on truck cranes with boom length of 100 ft. or more .25
FOOTNOTE:
a. Paid Holidays: New Years Day, Lincoln's Birthday, Washington's Birthday or Presidents Day (in lieu of Lincoln's or Washington's Birthday, Good Friday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, Christmas Day or days celebrated as such. Any holiday that falls on Saturday will be celebrated on Friday.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt spreader, backhoe crawler (capacity over caterpiller 225 and komatsu 300), boiler (thermoplastic), boring machine (post hole), cgherry picker (over 50 ton), CMI or maxim spreader, concrete pump, with oiler, crane (crawler truck), crane (on barge), crane (stone setting) crane (structural steel), crane (with clam shell), derrick, dragline, dredge, gradall, grader, hoist (3 drums), loading machine (bucket) capacity of 10 yards or over, micro‐trap (with compressor‐negative air machine), milling machine (large), piledriver, power winch (stone setting structural steel), power winch (truck mounted/stone steel), power‐house, road paver, scoop, carry all (scraper in tandem), shovel, sideboom tractor, sideboom tractor (used in tank work), stone spreader (self‐propelled), tank work, tower crane
GROUP 2: Bulldozer, Backhoe, Boom Truck, Boring machine/augur, Cherrypicker, Conveyor (multi), Dinky Locomotive, Forklift, Hoist (2 drum), Loading Machine, Loading Machine (front end), Mechanical Compactor (machine drawn), Mulch Machine (machine‐ fed), Power Winch (other than stone/structural steel), Power Winch (truck mounted/other than stone steel), Pump Hydraulic (with boring machine), Roller (asphalt), Scoop (carry‐all, scraper), Tower Crane (maintenance man), Trenching Machine, Vermeer Cutter, Work Boat
GROUP 3: Curb Machine (asphalt or concrete), Maintenance Engineer (small equipment), Maintenance engineer (well‐point) Mechanic (fieldman), Micro‐Trap (self contained, negative air machine), Milling Machine (small), Pulvi‐mixer, Pump (4 inches or over), Pump Hydraulic, Pump Jet, Pump Submersible, Pump (well point), Roller Dirt, Vac‐All, Welding and burning, Compressor (structural steel), Compressor (2 or more battery), Concrete Finishing Machine, Concrete Spreader, Conveyor, Curing Machine, Fireman, Hoist (one drum), Ridge Cutter, Striping Machine, Welding Machine (pile work), Welding Machine (structural Steel).
GROUP 4: Compressor, Compressor on crane, Compressor (pile work), Compressor (stone setting), Concrete Breaker, Concrete Saw or Cutter, Fork Lift (walk behind, power operated), Generator‐ Pile Work, Generator, Hydra Hammer, Mechanical Compoactors (hand operated), Oiler (truck crane), Pin Puller, Portable Heaters, Powerbroom, Power buggies, Power Grinders, Pump (double action diaphragm), Pump gypsum, Pump (single action 1 to 3 inches), Trench Machine hand, Welding Machine
GROUP 5: Batching Plant (on site of job), Generator (small), Grinder, Mixer (with skip), Mixer (2 small with or without skip), Mixer (2 bag or over, with or without skip), Mulch Machine, Oiler, Pump (centrifugal, up to 3 inches), Root Cutter, Stump Chipper, Tower Crane (oiler), Track Tamper (2 engineers, each), Tractor (caterpillar or wheel), Vibrator, Work boat (deckhand), GROUP 6: Well drillers
IRON0046‐003 07/01/2014
Rates Fringes
IRONWORKER
METALLIC LATHERS AND
REINFORCING IRONWORKERS.....$ 40.60 30.56
IRON0197‐001 07/01/2015
Rates Fringes
IRONWORKER
STONE DERRICKMAN............$ 44.84 38.03
IRON0361‐001 01/01/2016
IRONWORKER (STRUCTURAL)..........$ 49.00 68.61
IRON0580‐001 07/01/2015
Rates Fringes
IRONWORKER, ORNAMENTAL...........$ 43.20 47.42
LABO0066‐001 07/01/2015
BUILDING
Rates Fringes
Laborers:
Laborers....................$ 34.85 30.19 Plasterers Tenders..........$ 34.85 30.19
LABO0078‐001 02/01/2013
Rates Fringes
LABORERS
BUILDING CONSTRUCTION
ASBESTOS (Removal, Abatement, Encapsulation or Decontamination of asbestos); LEAD; &
HAZARDOUS WASTE LABORERS
(Hazardous Waste, Hazardous Materials, Biochemical and Mold Remediation, HVAC, Duct Cleaning, Re‐spray Fireproofing, etc).........$ 35.90 14.75
LABO1298‐001 06/01/2014
HEAVY & HIGHWAY
Rates Fringes
Laborers:
Asphalt Rakers; Formsetters.$ 39.68 25.85+a Asphalt Shovelers, Roller
Boys & Tampers..............$ 38.54 25.85+a Regular Laborers............$ 35.05 25.85+a
A. FOOTNOTES:
Laborers working in a hazardous material hot zone shall receive an additional 20% premium.
Where the contract provides for night work outside the regular hours of work, the employees shall be paid at straight time plus a 25% night work premium for the 8 hours worked during the night.
Firewatch work performed after regular hours shall be paid an additional 10% premium. Second and Third Shift work will be paid at a 10% premium.
Contractor requesting laborers certified for hazardous material work and/or employed on hazardous material shall be required to pay an additional 10% premium.
PAIN0009‐002 11/01/2015
Rates Fringes
PAINTER
GLAZIERS....................$ 43.95 36.82
Painters, Drywall Finishers.$ 41.75 20.87 Spray, Scaffold, Sandblasting................$ 42.50 21.87
PAIN0806‐010 10/01/2014
Rates Fringes
Painters:
Stuctural Steel and Bridge..$ 48.75 35.63
PAIN1974‐002 12/26/2012
Rates Fringes
Painters:
DRYWALL TAPERS/POINTERS.....$ 43.82 22.01
PLAS0262‐003 02/01/2016
PLASTERER........................$ 44.43 28.15
PLAS0780‐001 07/01/2014
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 45.88 39.70
* PLUM0200‐001 05/01/2016
Rates Fringes
PLUMBER
BUILDING CONSTRUCTION:......$ 50.48 34.30
RESIDENTIAL CONSTRUCTION:...$ 29.96 13.41
PLUM0638‐001 06/27/2012
Rates Fringes
PLUMBER
SERVICE FITTERS.............$ 26.30 2.55
SPRINKLER FITTERS,
STEAMFITTERS................$ 51.25 49.54
Service Fitter work shall consist of all repair, service and maintenance work on domestic, commercial and industrial refrigeration, air conditioning and air cooling, stoker and oil burner apparatus and heating apparatus etc., including but not exclusively the charging, evacuation, leak testing and assembling for all machines for domestic, commercial and industrial refrigeration, air conditioning and heating apparatus. Also, work shall include adjusting, including capacity adjustments, checking and repairing or replacement of all controls and start up of all machines and repairing all defects that may develop on any system for domestic, commercial and industrial refrigeration and all air conditioning, air cooling, stoker and oil burner apparatus and heating apparatus regardless of size or type.
ROOF0154‐001 10/01/2012
ROOFER...........................$ 38.50 28.59
SHEE0028‐002 07/31/2014
Rates Fringes
SHEET METAL WORKER
BUILDING CONSTRUCTION.......$ 50.91 36.70
RESIDENTIAL CONSTRUCTION....$ 27.22 16.48
TEAM0282‐002 07/01/2015
Rates Fringes
TRUCK DRIVER.....................$ 37.895 39.35+a
FOOTNOTES:
a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Election Day, Veterans' Day (Armistice Day), Thanksgiving Day, Day after Thanksgiving and Christmas Day. Employees working two (2) days in the calendar week in which a holiday falls are to be paid for such holiday, provided that they shape each remaining workday during such calendar week.
WELDERS ‐ Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198‐005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non‐union rates. Example: SULA2012‐007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG‐OH‐0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis‐Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)
File details come from the government source that posted it. Updated .