AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purposes of this amendment is to:
1) Incorporate the Site Visit Information,
2) Incorporate Revised Price Schedule and
3) Incorporate revised Wage Rates NJ150027, dated 08/28/2015 NJ27
The Bid Due Date remains the same at Thursday, 24 September 2015 at 2PM EST.
NOTE: Bidders must acknow ledge receipt of this amendment by the date specified in the bid (or as amended) by one of the follow ing methods: In the space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE
MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 24
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Sep-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-15-B-0016
X 9B. DATED (SEE ITEM 11)
25-Aug-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Sep-2015
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS-15-B-0016
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 21 16 - INSTRUCTIONS, CONDITIONS AND NOTICE TO OFFEROR
The following have been modified:
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visit is scheduled for Thursday, 10 September 2015 at 0900 hours. Site map with meeting location is included as a separate attachment in the FBO posting of this amendment.
POC for site visits is:
Ms. Donna Skoviak 609-562-1740 Madonna.L.skoviak@usace.army.mil
***All visitors must submit the following information by Close of Business Tuesday, 8 September 2015.
Failure to submit all information by 8 September 2015 will exclude the parties from access to the bases.
Please submit the following information:
Name (First, Middle, Last) Phone number Company name and address Driver's License Number including state where issued Last four (4) digits of social security numbers Date of birth (month/day/year)
(End of provision)
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
REVISED PRICE SCHEDULE
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
RENOVATE & REPAIR BLDG 2415 -NAF PORTION
FFP
Provide all labor, equipment, appliances, and materials, and furnish and perform all work in strict accordance with the specifications, schedules, and drawings forming parts thereof, subject to the terms and conditions of the contract to renovate and repair building 2415 as indicated in the contract documents as the NAF portion of the project except for items below.
FOB: Destination
MILSTRIP: W16ROE51745420
NET AMT
0002 1 Job
RENOVATE & REPAIR BLDG 2415 -APF PORTION
Provide all labor, equipment, appliances, and materials, and furnish and perform all work in strict accordance with the specifications, schedules, and drawings forming parts thereof, subject to the terms and conditions of the contract to renovate and repair building 2415 as indicated in the contract documents as the Fire detection, reporting, and suppression system for the Auto Hobby Shop, APF portion of the project.
0003 1 Job $75,000.00 $75,000.00
FINAL RECORD DRAWING – NAF
FFP
All work for the Final Record Drawing Submission (See paragraph 10 of Section 00 73 00). NAF Portion of the project.
0004 1 Job $25,000.00 $25,000.00
FINAL RECORD DRAWING – APF
All work for the Final Record Drawing Submission (See paragraph 10 of Section 00 73 00). APF Portion of the project.
0005 1 Job
OPTION
OPTION 1: EXTERIOR APF PORTION
FFP
Provide all labor, equipment, appliances, and materials, and furnish and perform all work in strict accordance with the specifications, schedules, and drawings forming parts thereof, subject to the terms and conditions of the contract to renovate and repair building 2415 as indicated in the contract documents as the Exterior APF portion of the project to include but not limited to Exterior Insulation and Finish System (EIFS), doors, windows, pavement and fencing.
0006 1 Job
OPTION
OPTION 2: INSTALLATION OF BRICK VENEER
FFP
Provide all labor, equipment, appliances, and materials, and furnish and perform all work in strict accordance with the specifications, schedules, and drawings forming parts thereof, subject to the terms and conditions of the contract to renovate and repair building 2415 as indicated in the contract documents as part of the APF portion of the project. In lieu of EIFS, install Brick Veneer and cast stone exterior as shown in the contract documents. NOTE: this cost shall include only the difference between the Brick/Cast stone and EIFS.
0007 50 Cubic
OPTION Yard
OPTION 3: REMOVAL & DISPOSAL OF
CONCRETE
FFP
Removal and disposal of unknown concrete, including excavation and backfill.
NAF Portion of the project.
0008 100 Linear
OPTION Foot
OPTION 4: HAND DIGGING
FFP
Hand digging around unidentified/unmarked utilities, if found.
0009 100 Linear
OPTION Foot
OPTION 5: FIX BROKEN UTILITY LINE
FFP
Fix broken 4" to 6" diameter unidentified/unmarked utility line.
TOTALS
TOTAL BASE (CLINs 0001 thru 0004) $____________________________
TOTAL OPTIONS (CLINs 0005 thru 0009) $__________________________
GRAND TOTAL (BASE + OPTIONS ) (CLINs 0001 thru 0009) $_________________
NOTES
1. Bidders are required to bid on the Base Bid and all Optional Bid Items or their bids will be rejected.
2. Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions or attachments made by the bidder himself thereto may render the bid non-responsive and be cause for its rejection.
3. Bid Acceptance Period: Bidders Bids are to be valid for 90 calendar days for bid acceptance from the submission.
4. Line Item Numbers 0003 and 0004 are pre-priced at $75,000.00 and $25,000.00 respectively, it’s a firm fixed line item, and the price shown may not be changed. See paragraph 10 of Section 00 73 00.
5. Option #2: if the cost represents savings it shall be clearly noted in parenthesis, i.e.
6. The Basis of evaluation will be the lowest responsive/responsible bidder calculated based on values of each CLIN: Base Bid (sum of CLIN 0001 thru 0004) plus sum of Options Numbers 1, 3, 4 & 5 (CLINs 0005, 0007, 0008, 0009), Option Number 2 (CLIN 0006) will be added/subtracted following notation in note 5 above.
7. Options #1 thru #5 may be exercised, at the Government’s discretion, within 210 calendar days from the date the contractor received the Notice to Proceed. Exercise of any or all options will not alter the project completion date of the contract. The Government is under no obligation to award any Optional Item.
8. Bid Acceptance Period: Bids are valid for 90 calendar days for bid acceptance from the Bid Opening Due Date.
REVISED WAGES 8-28-15
General Decision Number: NJ150027 08/28/2015 NJ27
Superseded General Decision Number: NJ20140027
State: New Jersey ke 8/31/15
Construction Type: Building
County: Burlington County in New Jersey.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/02/2015 1 01/23/2015 2 02/27/2015 3 03/20/2015 4 03/27/2015 5 06/05/2015 6 06/12/2015 7 07/31/2015 8 08/28/2015
ASBE0014-003 05/01/2015
BURLINGTON COUNTY (City of Beverly; Townships of Cinnaminson, Delanco, Delron, Edgewater Park, Evesham, Hainesport and Lumberton; Borough of Maple Shade; Township of Medford; Borough of Medford Lakes; Townships of Moorestown and Mt. Laurel;
Borough of Palmyra; Township of Riverside; Borough of Riverton;
Townships of Shamong, Southampton, Tabernacle, Westhampton and Willingboro)
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR (Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement).......................$ 44.44 31.65
ASBE0089-003 07/02/2013
BURLINGTON COUNTY (Townships of Bordentown, Burlington, Chesterfield, Easthampton, Florence, Mansfield, Mt. Holly, New Hanover, North Hanover, Pemberton, Springfield and Woodland)
ASBESTOS WORKER/HEAT & FROST
INSULATOR ((includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement))......................$ 40.32 30.18
PAID HOLIDAYS:
The last day prior to the Christmas and New Year's Day observed holiday: 4 hrs. pay.
BRNJ0002-013 05/01/2014
Rates Fringes
Bricklayer.....................$ 38.25 28.26
Work on high stacks: 22% per hour additional.
BRNJ0007-012 07/01/2013
Marble setter...................$ 55.32 28.39
BRNJ0007-014 07/01/2014
Rates Fringes
TERRAZZO WORKER/SETTER...........$ 48.88 32.18
BRNJ0007-017 06/01/2013
Rates Fringes
Tile finisher..................$ 39.56 22.60 Tile setter....................$ 45.16 27.20
Tile finisher:
Work grouting all epoxy: $10.00 additional per day.
CARP0006-009 11/01/2014
Rates Fringes
CARPENTER (Scaffold Builder).....$ 43.74 56%
The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.
CARP0006-010 11/01/2014
Rates Fringes
CARPENTER
Including Acoustical Ceiling Installation, Drywall Hanging, Formwork, Batt and Blown Insulation...$ 43.74 56%
CARP0029-006 11/01/2014
Rates Fringes
Soft floor layer...............$ 43.74 56%
CARP0454-009 05/01/2013
PILEDRIVERMAN....................$ 39.65 29.12
PAID HOLIDAYS:
New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day; provided that the worker works any of the three days in the five-day work week preceding the holiday and the first work day after the holiday.
CARP0715-007 05/01/2014
Rates Fringes
Millwright.....................$ 43.88 56%
Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.
ELEC0269-017 03/01/2015
BURLINGTON COUNTY (north of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to the Burlington - Mt. Holly road;
then, south-southeast along the Burlington - Mt. Holly road to the town of Mt. Holly, includes Mt. Holly; then, east along the Pennsylvania Railroad to the town of New Lisbon, includes New Lisbon; then, continuing along the Pennsylvania Railroad to the Ocean County line)
Electrician and cable splicer (Includes Low Voltage Wiring)....$ 48.57 61.48%
ELEC0351-001 09/29/2014
ATLANTIC COUNTY; BURLINGTON COUNTY (south of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to the Burlington
- Mt. Holly road; then, south-southeast along the Burlington - Mt. Holly road to the town of Mt. Holly, does not include Mt.
Holly; then, east along the Pennsylvania Railroad to the town of New Lisbon, does not include New Lisbon; then, continuing along the Pennsylvania Railroad to the Ocean County line);
CAMDEN, CAPE MAY, CUMBERLAND, GLOUCESTER AND SALEM COUNTIES:
Electricians:
Cable splicer on lead cable.$ 46.51 72.54% + .65 Electrician and cable splicer.....................$ 44.51 75.35% + .65
ELEV0005-004 01/01/2015
Rates Fringes
Elevator mechanic..............$ 51.62 28.385
PAID HOLIDAYS:
New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day, and Christmas Day.
PAID VACATION:
Employer contributes 2% of basic hourly rate as vacation pay credit for 6 months to 5 years of service, and 4% for 5 years or more of service.
* ENGI0825-020 07/01/2015
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 47.70 28.65
GROUP 2.....................$ 45.48 28.65
GROUP 3.....................$ 43.57 28.65
GROUP 4.....................$ 41.94 28.65
GROUP 5.....................$ 40.23 28.65
Hazardous waste removal work:
Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: 20% per hour additional.
New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided
1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday.
DEFINITION OF GROUPS:
GROUP 1:
Backhoe, Including Backhoe Track; Boom; Concrete Paving Machine; Crane (all types, including overhead and straddle traveling type); Drill (down-the-hole drill, rotary drill, self-propelled hydraulic drill, self-powered drill);
Elevating Grader; Excavator; Front End Loader (5 cu. yd.
and over); Piledriver (length of boom, including length of leads, shall determine premium rate applicable); Trencher
GROUP 2:
Backhoe Loader Combo; Concrete Pumper; Grader/Blade (Finish);
Hoist; Hydraulic Crane, 10 Tons and under; Front End Loader (2 cu. yd. but less than 5 cu. yd.); Scraper; Side Boom
GROUP 3:
Asphalt Spreader; Bulldozer;Compressor(2 or 3) (in Battery) (within 100 ft.); Forklift; Front End Loader (1 cu. yd.
and over but less than 2 cu. yd.); Lull; Mechanic; Paver, Asphalt; Roller, Blacktop; Tractor;
GROUP 4:
Bobcat/Skid Loader; Compressor (Single); Farm Tractor; Front End Loader (under 1 cu. yd.); Hydroseeder; Roller, Grade;
Pump, Hydraulic
GROUP 5:
Oiler
* IRON0068-011 07/01/2015
(Lumberton)
Rates Fringes
IRONWORKER
Reinforcing.................$ 43.90 20.78 Structural and Ornamental...$ 45.89 20.78
* IRON0350-009 07/01/2015
BURLINGTON COUNTY (south and east of a line starting from the point on the Atlantic-Burlington county line where the
Atlantic-Burlington county line crosses Route 206; then, following a line northeast through Wharton State Park to the town of Chatsworth; then, continuing along the same line, to the Burlington-Ocean county line)
Ironworkers:
Reinforcing.................$ 45.77 28.75 Structural and Ornamental...$ 46.77 28.75
* IRON0399-005 07/01/2015
BURLINGTON COUNTY (north and west of a line starting from the point on the Atlantic-Burlington county line where the Atlantic-Burlington county line crosses Route 206; then, following a line northeast through Wharton State Park to the town of Chatsworth; then, continuing along the same line, to the Burlington-Ocean county line)
IRONWORKER (Structural, Reinforcing and Ornamental)......$ 44.60 27.25
LABO0008-001 05/01/2011
Rates Fringes
Asbestos Removal Laborer.........$ 28.37 21.62
The removal, abatement, enclosure and decontamination of personal protective equipment, chemical protective clothing and machinery relating to asbestos and/or toxic and hazardous waste or materials which shall include but not necessarily be limited to: the erection, moving, servicing and dismantling of all enclosures, scaffolding and barricades; the operation of all tools and equipment normally used in the removal or abatement of asbestos and toxic or hazardous waste or materials; the labeling, bagging, cartoning, crating, or other packaging of materials for disposal; the clean-up of the worksite; and all other work incidental to the removal, abatement, encapsulation, enclosure, and decontamination of asbestos and toxic or hazardous waste or materials; and, in addition, all work tasks involved in the maintenance and operation of energy resource recovery plants (co-generation plants)
LABO0222-006 07/01/2012
LABORER
MASON TENDER:
Brick/Cement/Concrete.......$ 29.85 23.07
LABO0222-008 07/01/2012
Rates Fringes
Laborers:
Asphalt Shoveler, Asphalt Spreader, Landscape Laborer, Pipelayer, Power Toole Operator and Screedman...................$ 29.35 23.07
PAIN0021-032 05/01/2015
BURLINGTON COUNTY (south of a line drawn between these cities:
Florence to Bustleton to Columbus to Jobstown to Pemberton to Ongs Hat to Chatsworth to Whiting to Pinewald to Ocean Gate to Seaside Heights)
Glazier........................$ 40.60 26.25
Work at 30 ft. above the working surface, or on a swing stage: $1.00 per hour additional.
PAIN0711-011 05/01/2014
BURLINGTON COUNTY (north of a line drawn between these cities:
Florence to Bustleton to Columbus to Jobstown to Pemberton to Ongs Hat to Chatsworth to Whiting to Pinewald to Ocean Gate to Seaside Heights)
Glazier........................$ 41.61 20.46
Work welding or using a cutting torch: $1.00 per hour additional.
Work on a swing stage scaffold; on a pipe scaffold providing the working height of the platform is 30 ft. or above; and on motorized lifts provided that the height of the lift platform is above the second floor or above thirty feet:
$1.00 per hour additional.
PAIN0711-018 05/01/2014
Rates Fringes
DRYWALL FINISHER/TAPER...........$ 38.00 20.35
PAIN0711-019 05/01/2014
Rates Fringes
PAINTER (Brush & Roller).........$ 37.72 20.19 PAINTER (Spray)..................$ 40.28 19.98
PLAS0592-036 05/01/2015
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 39.17 31.06
PLUM0009-015 07/01/2014
BURLINGTON COUNTY (north of a line drawn from the town of Burlington City, includes Burlington City; then, along County Road Route 541 East, also known as High St., until it reaches the city of Mt. Holly, includes the city of Mt. Holly; then, along Madison Ave. in Mt. Holly to State Road Route 38 East;
then, along State Road Route 38 East until it crosses over State Road Route 206 and becomes County Road Route 530; then, along County Road Route 530 to Magnolia Road, includes Pemberton Borough; then, south on Magnolia Road in Pemberton Township to Magnolia New Lisbon Road (Route 545); then, south on Mt. Holly Misery Road to State Road Route 70 East; then, along State Road Route 70 East to the Ocean County line)
PIPEFITTER (Including HVAC Pipe Installation)...............$ 44.78 33.70 Service and Repair..........$ 34.93 14.41 PLUMBER (Excluding HVAC Pipe Installation)....................$ 44.78 33.70 Service and Repair..........$ 34.93 14.41
PLUM0322-008 05/01/2014
BURLINGTON COUNTY (south of a line drawn from the town of
Burlington City, does not include Burlington City; then, along County Road Route 541 East, also known as High St., until it reaches the city of Mt. Holly, does not include the city of Mt.
Holly; then, along Madison Ave. in Mt. Holly to State Road Route 38 East; then, along State Road Route 38 East until it crosses over State Road Route 206 and becomes County Road Route 530, does not include Pemberton Borough; then, south on Magnolia Road in Pemberton Township to Magnolia New Lisbon Road (Route 545); then, south on Mt. Holly Misery Rd. to State Road Route 70 East; then, along State Road Route 70 East to the Ocean County line)
PIPEFITTER (Including HVAC Pipe Installation)...............$ 41.02 33.44 PLUMBER (Excluding HVAC Pipe Installation)....................$ 41.02 33.44
ROOF0030-027 05/01/2015
Rates Fringes
Roofer
SHINGLES....................$ 25.00 18.02
SLATE AND TILE..............$ 28.00 18.02
ALL OTHER WORK..............$ 33.65 28.15
Mopper, and operator of felt-laying machine: $.50 per hour additional.
Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine is used: $.50 per hour additional.
PAID HOLIDAY:
The last working day before Christmas, to be paid at the rate of four hours pay.
SFNJ0669-006 04/01/2015
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 47.15 21.96
SFNJ0692-002 05/01/2013
Within 15 miles beyond the city limits of Philadelphia.
Sprinkler fitter (Fire Sprinklers)......................$ 48.65 21.57
SHEE0027-009 06/01/2012
Rates Fringes
SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 43.08 32.52
TEAM0469-003 05/01/2015
BURLINGTON COUNTY (east of a line drawn from the New Jersey Turnpike to the Delaware River)
Truck drivers:
Dump Truck..................$ 37.75 29.09 Off the Road Truck..........$ 37.60 29.09
Hazardous waste removal work:
Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional.
Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional.
Work on a state or federally designated hazardous waste site where the worker is not working in a zone requiring Level A, B or C personal protection: $1.00 per hour additional.
New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day.
VACATION PAY CREDIT:
Workers working or receiving pay for 80 days within a year receive one week paid vacation (48 hours); 125 days receive two weeks paid vacation (96 hours); 145 days receive 15 days paid vacation (120 hours); 15 years seniority and 145 days receive 4 weeks paid vacation (160 hours).
TEAM0676-002 05/01/2015
BURLINGTON COUNTY (west of a line drawn from the New Jersey Turnpike to the Delaware River)
Truck drivers:
Dump Truck Drivers..........$ 32.20 23.485 Off the Road Truck..........$ 32.55 23.485
Hazardous waste removal work:
Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous materials, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional.
Work on a state or federally designated hazardous waste site, where personal protection A, B, C or D is NOT required:
$1.00 per hour additional.
SHIFT WORK:
An owner mandated irregular shift staring any time other than between 6:00 am and 8:00 am to receive $1.00 per hour, for each hour worked, in addition to the regular rate of pay.
PAID HOLIDAYS:
New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day (or the day after Thanksgiving, at the option of the contractor), Thanksgiving Day, the afternoon of the day before Christmas (Dec. 24) provided that the worker works in the morning, and Christmas Day, provided that the worker works or is available for work on at least two days in the week in which the holiday occurs.
BEREAVEMENT PAY:
In case of a death in the worker's immediate famiy (mother, father, wife, husband, children, brother, sister, current mother-in-law, current father-in-law, grandparents), the worker shall be allowed leave not to exceed three (3) days straight-time pay, provided that he or she shall receive no pay unless the day of death and the burial day falls on a regular work day, and not on days off, holidays, vacation, Saturdays or Sundays.
SUNJ2004-003 01/02/2009
Rates Fringes
LABORER: Common or General......$ 19.27 12.42
PLASTERER........................$ 42.33 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)