NEW YORK DISTRICT

Invitation for Bid

REPAIR AUTO HOBBY SHOP, B2415 RM

PN: PTFL095000

MCGUIRE AIR FORCE BASE

MCGUIRE AFB

NEW JERSEY

RFP No. W912DS-15-B-0016

Specifications

THIS PAGE IS BLANK

COVER SHEET

NEW YORK DISTRICT

CORPS OF ENGINEERS

NEW YORK, NEW YORK 10278-0090

REQUEST FOR PROPOSALS

FOR

REPAIR AUTO HOBBY SHOP, B2415 RM

MCGUIRE AIR FORCE BASE

MCGUIRE AFB

NEW JERSEY

1. Attached is REQUEST FOR PROPOSALS (RFP) NO. W912DS-15-B-0016

2. BIDS/OFFERS MUST BE SET FORTH full, accurate, and complete information as required by this Invitation for Bids, including attachments. The penalty for making false statements in bids is prescribed under Title 18, United States Code, Section 1001.

3. SUBMISSION OF BIDS/OFFERS: Complete details concerning proper submission of bids are contained in the INSTRUCTIONS, CONDITIONS, AND NOTICE TO BIDDER (Section 00 21 16).

4. Note the REQUIREMENT FOR AFFIRMATIVE ACTION of the EQUAL OPPORTUNITY clause as it applies to the contract resulting from this solicitation.

(See paragraph NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY in Section 00 21 16 of this

RFP).

5. REPRESENTATIONS AND CERTIFICATIONS – SECTION 00 45 00

Bidders and Offerors are required to complete the REPRESENTATIONS AND CERTIFICATIONS and submit them with their bids.

Within Section 00 45 00, note in particular the PROHIBITION SEGREGATED FACILITIES. Failure of a bidder or Offeror to agree to the certification will render his bid or offer non-responsive to the terms of solicitations involving awards of contracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity Clause (1984 APR).

6. This project is funded by the Department of Defense and is NOT a Civil Works program. Buy American Act - Construction Materials (May 1993) in accordance with FAR 52.225-5 DOES NOT applies.

7. Please review all bonds and accompanying documents required to be submitted.

Bonds, Powers of Attorney, statements of authenticity and continuing validity, and all related documents MUST NOT bear computer printer-generated signatures and/or seals. Documents bearing signatures and/or seals generated as part of a document, as opposed to being affixed to the document after its generation, will not be accepted.

Submission of such documents may render the bid or offer non-responsive and ineligible for award.

CHECKLIST - 1

US ARMY ENGINEER DISTRICT, NEW YORK

INVITATION FOR BID NO. W912DS-15-B-0016

CHECK LIST FOR BIDDERS

ATTACHED IS IFB NO. W912DS-15-B-0016

REPAIR AUTO HOBBY SHOP, B2415 RM

MCGUIRE AIR FORCE BASE

MCGUIRE AFB

NEW JERSEY

ALL INFORMATION REQUIRED BY THE TERMS OF THIS SOLICITATION

MUST BE FURNISHED. MISTAKES OR OMISSIONS MAY RENDER YOUR

OFFER INELIGIBLE FOR AWARD. IMPORTANT ITEMS FOR YOU TO CHECK

ARE INCLUDED IN BUT NOT LIMITED TO THOSE LISTED BELOW. THIS

INFORMATION IS FURNISHED ONLY TO ASSIST YOU IN SUBMITTING A

PROPER BID

__HAVE YOU ACKNOWLEDGED ALL AMENDMENTS?

__HAVE YOU COMPLETED THE “REPRESENTATIONS AND CERTIFICATIONS”

(SECTION 00600) PORTION OF THE SOLICITATION?

__IS YOUR DUNS NUMBER LISTED ON THE STANDARD FORM 1442?

__IS YOUR BID PROPERLY SIGNED?

__IS YOUR BID GUARANTEE PROPERLY SIGNED BY BOTH THE BIDDER AND

SURETY AND ARE ALL SEALS AFFIXED?

__DO THE BID BOND AND ACCOMPANYING DOCUMENTS BEAR

SIGNATURES AND SEALS AFFIXED AFTER THE DOCUMENT WAS

GENERATED, AS OPPOSED TO COMPUTER PRINTER-GENERATED

SIGNATURES AND/OR SEALS?

__HAVE YOU ENSURED THAT YOU HAVE NOT RESTRICTED YOUR OFFER

BY ALTERING THE PROVISIONS OF THE SOLICITATION?

__WHEN REQUIRED, HAVE YOU ENTERED A UNIT PRICE FOR EACH PRICE

ITEM? (THE SOLICITATION SPECIFICALLY STATES WHEN THIS IS

NECESSARY.)

CHECKLIST - 2

__ARE DECIMALS IN YOUR PRICES IN THE PROPER PLACE? ARE YOUR

FIGURES LEGIBLE?

__IF YOU HAVE MADE ERASURES OR CORRECTIONS ON YOUR BID, ARE

THEY INITIALED BY THE PERSON SIGNING THE BID?

__DOES THE ENVELOPE CONTAINING YOUR BID PROPERLY IDENTIFY

THAT IT ISA SEALED BID AND DOES IT CONTAIN THE CORRECT

SOLICITATION NUMBER AND BID OPENING TIME?

__WILL YOUR OFFER/BID ARRIVE ON TIME? (SEE PARAGRAPH ENTITLED

“LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS” IN

THE INSTRUCTIONS, CONDITIONS, AND NOTICE TO BIDDER, SECTION 00

21 16 OF THE SOLICITATION.)

NOTE: THERE ARE INCREASED SECURITY MEASURES AT JACOB K.

JAVITS FEDERAL BUILDING, 26 FEDERAL PLAZA THAT MAY AFFECT THE

TIME IT TAKES TO ENTER THE BUILDING. BIDDERS IS RESPONSIBLE TO

ENSURE THAT ITS BID IS SUBMITTED TIMELY.

TOC ‐ 1

TABLE OF CONTENTS

DIVISON 01 – GENERAL REQUIREMENTS

010000 STATEMENT OF WORK

01 12 00.00 18 DESIGN AND RECORD DRAWING REQUIREMENTS

01 32 01.00 18 PROJECT SCHEDULE

01 33 00.00 18 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENT SAFETY REQUIREMENTS

01 35 60 STORM WATER POLLUTION PREVENTION

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 02.00 18 QUALITY CONTROL SYSTEM (QCS)

01 45 04.00 18 CONTRACTOR QUALITY CONTROL CONSTRUCTION

01 45 20.00 18 TESTING FOR MECHANICAL AND ELECTRICAL SYSTEMS

01 45 30.00 18 CONTRACTOR WARRANTY MANAGEMENT

01 52 60.00 18 CONSTRUCTION INDOOR AIR QUALITY (IAQ)

01 54 00 AFFIRMATIVE PROCUREMENT

01 62 35 RECYCLED/RECOVERED MATERIALS

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00.00 18 CLOSEOUT SUBMITTALS

01 78 23.00 18 OPERATION AND MAINTENANCE DATA

013560 STORM WATER POLLUTION PREVENTION

015400 AFFIRMATIVE PROCUREMENT

DIVISON 02 – EXISTING CONDITIONS

020800 ASBESTOS REMOVAL (APF FUNDED)

020810 LEAD‐BASED PAINT (LBP) ABATEMENT (APF FUNDED)

024119 SELECTIVE DEMOLITION

TOC ‐ 2

DIVISON 03 – CONCRETE

033053 MISCELLANEOUS CAST‐IN‐PLACE CONCRETE

DIVISON 04 – MASONRY

042000 UNIT MASONRY (BRICK LEDGE PORTION ‐ APF FUNDED)

042003 BRICK MASONRY (APF FUNDED)

047200 CAST STONE MASONRY (APF FUNDED)

DIVISON 05 – METALS

051200 STRUCTURAL STEEL FRAMING

052100 STEEL JOIST FRAMING

053100 STEEL DECKING

054000 COLD‐FORMED METAL FRAMING

055000 METAL FABRICATIONS

055100 METAL STAIRS

055213 PIPE AND TUBE RAILINGS

055400 STEEL LOUVERED GATES

DIVISON 06 – WOOD, PLASTICS, AND COMPOSITES

061053 MISCELLANEOUS ROUGH CARPENTRY

062023 INTERIOR FINISH CARPENTRY

064116 PLASTIC LAMINATE FACED ARCHITECTURAL CABINETS

DIVISON 07 – THERMAL AND MOISTURE PROTECTION

071113 BITUMINOUS DAMPPROOFING

072100 THERMAL INSULATION

072419 WATER‐DRAINAGE EXTERIOR INSULATION AND FINISH SYSTEM (EIFS)

072500 WEATHER BARRIERS

072600 VAPOR RETARDERS

074113.16 STANDING‐SEAM METAL ROOF PANELS

074213.53 METAL SOFFIT PANELS

076200 SHEET METAL FLASHING AND TRIM

TOC ‐ 3

077253 SNOW GUARDS

078413 PENETRATION FIRESTOPPING

079200 JOINT SEALANTS

079500 EXPANSION CONTROL

DIVISON 08 – OPENINGS

081113 HOLLOW METAL DOORS AND FRAMES (SEE SCHEDULE ON DRAWINGS FOR APF FUNDED ITEMS)

083113 ACCESS DOORS AND FRAMES

083323 OVERHEAD COILING DOORS

084113 ALUMINUM‐FRAMED ENTRANCES AND STOREFRONTS (SEE SCHEDULE ON DRAWINGS FOR APF

FUNDED ITEMS)

085113 ALUMINUM WINDOWS

086200 UNIT SKYLIGHTS

087100 DOOR HARDWARE

088000 GLAZING

089119 FIXED LOUVERS

089516 WALL VENTS

DIVISON 09 – FINISHES

092216 NON‐STRUCTURAL METAL FRAMING

092900 GYPSUM BOARD

093000 TILING

095113 ACOUSTICAL PANEL CEILINGS

096513 RESILIENT BASE AND ACCESSORIES

096516 RESILIENT SHEET FLOORING

096519 RESILIENT TILE FLOORING

099113 EXTERIOR PAINTING

099123 INTERIOR PAINTING

099600 HIGH‐PERFORMANCE COATINGS

TOC ‐ 4

DIVISON 10 – SPECIALTIES

101423 PANEL SIGNAGE

102800 TOILET ACCESSORIES

104413 FIRE PROTECTION CABINETS

104416 FIRE EXTINGUISHERS

DIVISON 12 – FURNISHINGS

122113 HORIZONTAL LOUVER BLINDS

123623.13 PLASTIC LAMINATE AND STAINLESS STEEL CLAD COUNTERTOPS

124813 ENTRANCE FLOOR MATS AND FRAMES

DIVISON 32 – EXTERIOR IMPROVEMENTS (APF FUNDED)

321216 ASPHALT PAVING (APF FUNDED)

323113 CHAIN LINK FENCES AND GATES (APF FUNDED)

Repair Auto Body Shop JBMDLAUTOBODYSHP

SECTION 01 00 00

STATEMENT OF WORK

05/12

1.1 [Enter Appropriate Subpart Title Here]

PART I - GENERAL

1.01 DESCRIPTION OF WORK:

A. The contractor shall provide all plant, supervision, management, quality control, labor, tools, equipment, appliances and materials and perform all work necessary to renovate/repair the existing Auto Hobby Shop facility and associated support facilities located in building 2415 Vandenberg Avenue, McGuire AFB, New Jersey.

B. This project shall be performed in strict accordance with the specifications and drawings forming parts thereof, subject to the terms and conditions of the contract.

1.02 LOCATION:

Building 2415 is located on Joint Base McGuire-Dix-Lakehurst (JB MDL), NJ.

1.03 PRINCIPAL FEATURES:

A. The work to be performed includes the principal features listed below.

This general outline of principal features does not in any way limit the responsibility of the contractor to perform all work and furnish all plant, labor, and material required by the specifications and drawings to perform a complete and permanent job to adequately fulfill the intent of these specifications and to deliver a work product(s) that is fit for its intended purpose. The inspection clause of any resultant contract for this work shall not in any way be interpreted as waiving the Government's requirement that the work product(s) be fit for its intended purpose. Government inspections do not in any way constitute acceptance of work quality or fitness until the final acceptance inspection is made.

1. Demolition of the low roof area above the vehicle bays.

2. Increasing the height of the walls at the present low roof areas above the vehicle bays.

3. Installation of a new standing seam roof over the entire building area.

4. Installation of a brick façade at the exterior of the building.

5. Installation of floor mounted automobile lifts.

6. Installation of new exterior frames, doors and overhead coiling doors.

7. Replacement of the lighting, exhaust, ventilation and heating system in the auto hobby shop.

8. Construction of a new climate controlled office and administration area in the auto hobby shop.

9. Construction of a new storage mezzanine over the office area.

10. Conversion of the former carwash area into a covered storage area by installing a new roof and louvered gates.

11. Replacement of the existing fence with a chain-link fence around the site.

12. Repair and sealing of the existing driving surface around the building

13. Installation of new furnishings in the auto hobby shop.

SECTION 01 00 00 Page 1

1.04 ENVIRONMENTAL COMPLIANCE:

A. The contractor is required to comply with all applicable State and Federal laws, State and Federal regulations, and Air Force Instructions in effect at the time of performance of this contract. The laws and regulations include, but are not limited to: Environmental and Occupational Safety and Health. The contractor shall be responsible for compliance with construction and operating permits, and is also responsible for penalties, fines, or natural resource damage claims that may be required or assessed by the State of New Jersey, Federal or Local Governments resulting from contractor performance, or failure to perform, during the course of this contract. The Government will inspect for environmental compliance at its discretion, and will notify the Contracting Officer (CO) of any discrepancies found (see paragraph 1.19 for CO authority). In addition, the contractor may be subject to contractual sanctions including, but not limited to withholding, offset, termination, suspension, debarment, and adverse past performance assessment.

B. CONFORMANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEMS: The contractor shall perform work under this contract consistent with the relevant policy and objectives identified in this section and in the JB MDL environmental management system (EMS). The contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified in this section and by the JB MDL EMS (administered by the 87 CES/CEAN). The contractor shall also provide monitoring and measurement information as necessary for the 87 CES/CEAN to address environmental performance relative to the environmental, energy, and transportation management goals. In the event an environmental nonconformance or noncompliance associated with the contracted services is identified, the contractor shall take corrective and/or preventative actions. In the case of a noncompliance, the contractor shall respond and take corrective action immediately. In the case of a nonconformance, the contractor shall respond and take corrective action based on the time schedule established by the EMS Site Coordinator (87 CES/CEAN). In addition, the contractor shall ensure that their employees are aware of the roles and responsibilities identified in this section and how these requirements affect their work performed under this contract.

All on-site contractor personnel shall complete yearly EPA sponsored environmental training specified for the type of work conducted on-site by the contractor. The CO's Representative will verify that the contractor has received EMS Awareness Training provided by the 87 CES/CEAN during the pre-construction conference for their project site or location.

C. SOLID WASTE, HAZARDOUS WASTE AND HAZARDOUS MATERIALS: The contractor is responsible for the proper handling, disposal, and costs of solid and hazardous wastes and hazardous materials generated by or utilized during the course of its activities. Proper handling also includes recycling and material recovery. The terms solid and hazardous wastes, and hazardous materials, include, but are not limited to, those defined in the Federal Water Pollution Control Act, the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, the Solid Waste Disposal Act, the Clean Air Act, and the Toxic Substances Control Act, the New Jersey Solid Waste Management Act, the New Jersey Water Pollution Control Act, the New Jersey Air Pollution Control Act and the regulations promulgated pursuant to those Acts. The contractor shall also be responsible for any enforcement action that may be taken by the State of New Jersey, other State or the Federal Government related to handling, transportation and the proper disposal of solid and hazardous waste and hazardous materials. If

SECTION 01 00 00 Page 2 notification, certifications, documentation, manifests, permits or any other written materials are required by law to be obtained, prepared and/or submitted, the contractor shall prepare same and provide a written copy to the CO, and a copy to the Environmental Flight (87 CES/CEAN) within the timeframes set forth in the law and regulations governing the action.

Hazardous waste manifests must be signed by the Environmental Flight Hazardous Waste Coordinator, Building 2403. JB MDL is not responsible for any hazardous materials brought on base by the contractor that may become hazardous waste during the course of performance. Contractor shall remove those materials from the base at their own expense and risk.

1. Source Separation of Solid Waste: Wastes shall be placed in closed metal containers that are emptied on a regular schedule. Solid waste shall be separated and placed in individual containers in a manner that facilitates recycling of the various categories of waste. Contractor is responsible for the handling and the associated costs of disposal for all solid wastes generated. Cardboard and all types of metal shall be source separated and recycled. Recyclable materials shall be delivered to the Recycling Center, building #2321 or an appropriate off-site facility.

2. Hazardous Material Handling: Any hazardous material or chemical to be used or stored by the contractor must be approved, in writing, by the CO prior to the contractor bringing it on the Base. The contractor must utilize an AF Form 3000, Material Approval Submittal, listing each container of hazardous material stored, kept, or utilized, to include Material Safety Data Sheets (MSDS). MSDS sheets must also be displayed on-site for access by contractor employees as well as the Government, per OSHA requirements.

3. Solid Waste Disposal Report: Monthly the contractor shall submit a solid waste disposal report and/or recycling report to the CO with a copy to 87 CES/CEAN. For each waste, the report shall state the classification (using the definitions provided in this section), amount, location, and name of the business receiving the solid waste. The contractor shall include copies of the waste handling facilities' weight tickets, receipts, bills of sale, and other sales documentation. In lieu of sales documentation, the contractor may submit a statement indicating the disposal location for the solid waste which is signed by an officer of the contractor firm authorized to legally obligate or bind the firm. The sales documentation or contractor certification shall include the receiver's tax identification number and business, EPA or State registration number, along with the receiver's delivery and business addresses and telephone numbers. For each solid waste retained by the contractor for his own use, the contractor shall submit on the solid waste disposal report the information previously described in this paragraph. Prices paid or received shall not be reported to the CO unless required by other provisions or specifications of this Contract or public law.

D. CLEAN AIR ACT PERMITS: JB MDL is responsible for obtaining and renewing all air permits for all stationary sources on Base that are owned by the Government and for mobile sources such as Government vehicles. Permits are required for boilers 1 MMBtu/Hr and larger, emergency generators larger than 100KW, stationary reciprocating engines larger than 37KW (not including emergency generators), and tanks containing fuel or anything other than air distillates greater than 10,000 gallons. The contractor shall provide written notification to the CO and 87 CES/CEAN office sixty (60) days prior to bringing any equipment of this threshold size on base. It is the contractor's responsibility to apply for, submit fees and obtain air permits for all contractor-owned and contractor installed air pollution sources.

Amendment of JB MDL"s (Dix, McGuire and/or Lakehurst)'s Title V air permit will be required for all sources meeting and exceeding New Jersey Department

SECTION 01 00 00 Page 3 of Environmental thresholds. The contractor, if maintaining equipments as part of scope, such as the central heat plant, is responsible for compliance with the Government's air permits and shall maintain all documentation and record keeping required to support those permits in a format acceptable to and approved by the CO. The documentation must be prepared and maintained by the contractor and readily available for on-site inspection by environmental regulators. Air permitting requirements for equipment that is to be installed as part of this contract shall be coordinated with the 87 CES/CEAN Air Program Manager. All permits must be obtained prior to the equipment arriving on base and prior to installation. Permit fees for equipment to be installed shall be paid for by the contractor.

E. LAND USE: Development, including building of docks, piers, bulkheads, bridges, pipelines, cables and filling, dredging or removing of sand or other materials near or on navigable waterways requires a permit. Activities that occur within 300 feet of a wetland may require a permit. Where permits are required, the contractor shall prepared the permit application(s), in coordination with the 87 CES/CEAN Water Program Manager and submit the appropriate fee(s).

F. WATERS AND WATER SUPPLY: It is not permissible to discharge any materials to the navigable waters of the United States without a permit.

Accordingly, discharges to or in areas that may reasonably reach or impact wetland areas and all other watercourses, including ditches, is prohibited without a permit. All discharges to storm drains, including but not limited to, soils and sediments contained in water runoff or dewatering operations, are prohibited. An appropriate soil erosion control plan shall be developed and utilized by the contractor for construction projects to ensure that discharges do not occur. Contractor shall comply with JBMDL's Storm Water Pollution Prevention Plans for each area of the base, copies of which are available in 87 CES/CEAN, in Building 2403 at McGuire, Building 5 at Lakehurst, and Building 5317 at Dix. Projects that disturb one acre or larger during the construction process will require an application to either the Burlington County Soil Conservation District (BCSCD), or Ocean County Soil Conservation District as appropriate for each area, as well as a request for authorization (RFA) for authority to discharge storm water from a small construction activity general permit from the New Jersey Department of Environmental Protection (NJDEP). These submittals shall be prepared by the contractor. The RFA is submitted electronically to the NJDEP. All fees are submitted to the New Jersey Department of Environmental Protection shall be paid by the contractor. Please see Specification Section 01356 Stormwater Pollution Prevention, which is incorporated in its entirety by reference here, and appropriate engineering drawings of this contract for more specific erosion and sediment control requirements.

Projects which involve the installation or repair of water mains, wells, or drinking water treatment systems may require permits from the NJDEP. The contractor shall prepare the required permit application in coordination with 87CES/CEAN Water Program Manager. All fees are submitted to the New Jersey Department of Environmental Protection shall be paid by the contractor.

Projects which involve installation of wastewater systems shall be designed to discharge to the JBMDL sanitary sewer system. The discharge of untreated industrial waste is prohibited.

G. LEAD PAINT AND ASBESTOS: If lead paint and/or asbestos materials are to be abated or removed pursuant to this contract, see specification Sections 02081 and/or 02080 respectively for contractor requirements. If this contract does not contain those Sections, and lead paint and/or asbestos is

SECTION 01 00 00 Page 4 found or suspected during the execution of this contract, the contractor, at their expense, shall have those substances tested by a certified laboratory in accordance with the protocol set forth in New Jersey and Federal law. If the contractor positively identifies these materials at the action level set forth in the law and regulations, he must notify the CO by providing the laboratory results and cease work in those areas that might disturb those items until abatement issues are addressed and resolved. Work may continue as long as the suspected or identified materials are not disturbed.

H. NOTIFICATION OF ENVIRONMENTAL SPILLS: In the event that the contractor spills or releases any unpermitted substance, hazardous substance or hazardous waste into the environment, the contractor shall immediately report the incident to the Fire Department, the CO, and the designated Government representative. The contractor shall be liable for the costs of clean up and remediation of any spills or the release of such substance into the environment.

I. FUEL STORAGE: Gas or diesel fuels shall not be stored on the construction site, or on Base, without prior written approval from the CO.

Appropriate containers shall be utilized.

J. Environmental Protection Plan: The contractor shall prepare and submit for review and approval an environmental protection plan that details how the contractor intends to fulfill the requirements of the paragraphs 1.04 A through I, above. The plan shall be submitted at least 30 days prior to construction start.

1.05 HEALTH AND SAFETY PLAN:

A. Prior to commencing work, the contractor shall prepare and submit a site/contract specific health and safety plan in accordance with Occupational Safety and Health Act (OSHA) 1910 standards, that are applicable to construction, for review by the CO. The plan will include worker's safety, confined spaces, OSHA training, handling of hazardous materials (including Safety Data Sheets (SDS)) such as asbestos and fuel discharges, and other site safety considerations. Government approval of plan is required prior to starting work.

1.06 AS-BUILT DRAWINGS:

A. During construction, the contractor shall prepare and continuously maintain in their field office, one working set of contract drawings, legibly marked up in red pencil or ink to show deviations, addenda and change orders which modify the work scope. The contractor shall additionally prepare and maintain all as-built information on CD(s) in AutoCAD Version 2000 or 2000 lite format. No other format will be acceptable. Drawings developed using a more current version of AutoCad shall be saved as AutoCad 2000 or AutoCAD 2000 Lite Drawings. All Drawings shall be complete, legible, and shall be capable of being opened and reviewed by Government personnel using AutoCad 2000/2000 Lite. Site Plans shall include GPS (X, Y, and Z) location of:

Each corner and non-linear feature on each facility; Each utility feature (i.e., valve, elbow, pipe, transformer, manhole, handhole, junction, joint, etc) along with appropriate attribute data (material type, size, capacity, manufacturer, installation date, function, etc); Surface features (i.e., sidewalks, curbs, pavements, landscaping, etc) with appropriate attribute data (material, sizes, installation date, strength, subgrade, etc). All GPS data shall be submitted in NJ State Plane Coordinate system, NAD 83, and shall be submitted in survey feet. All electronic submissions shall be compliant with the Spatial Data Standards for Facilities, Infrastructure, and

SECTION 01 00 00 Page 5

Environment (SDSFIE). The Hard Copy drawings and the corresponding electronic (AutoCAD) drawings shall be reviewed by the Government for currency prior to all payment requests. One copy of the in-process working drawings and electronic drawings on CD shall be submitted to the Government at both the 30% and 70% actual construction completion levels. On completion of work and before final acceptance inspection, the contractor shall review the as-builts for neatness and legibility and correct or replace them as necessary to identify in bold red text, showing all variations or changes made to the construction design. The drawings shall be delivered to the CO, along with the final CD containing the electronic version of the drawings, prior to requesting final payment. If a choice of materials and/or methods is permitted, the as-built drawings shall define the construction actually provided. Representation of such variations shall conform to standard drafting practice and include short supplementary notes, legends and details as required to fully describe the actual conditions. Utilities shall be located using Survey Grade GPS for X, Y, and Z coordinates. Legibility and clear portrayal of the as-built construction and marked prints shall be subject to review and approval by the CO.

1.07 DATABASE:

A. These specifications and accompanying drawings were prepared using data derived from the original construction drawings and from site visits. The construction shown shall not be construed as exact or complete nor are minor variations covered. It is recognized that site conditions referred to vary and that those building and site conditions ordinarily encountered and generally recognized as inherent in work of this character may include variations. The contractor shall be responsible for determining the exact conditions at the site and building and shall accept them as they exist at the time of contract award, regardless of whether or not the contractor visited the site prior to award. The contractor shall verify all measurements of existing conditions before ordering sized materials. If materials are ordered on the basis of what is shown on the construction drawings without verification of existing conditions, the contractor does so at his/her own risk and expense. All existing field conditions shall be accounted for in all required shop drawings. Actual dimensions and elevations take precedence over any shown in the contract drawings.

1.08 SPECIFICATION DIVISION:

A. These specifications are divided into several trade sections for convenience only and not to establish the units of work required of any trade. The contractor shall be responsible for the allocation and coordination of the work between appropriate trades.

1.09 SUBMITTALS:

A. Items shall be submitted after receipt of Notice to Proceed, within time limits prescribed on the Material Approval Submittals List and in accordance with Section 01300, SUBMITTALS. Materials or equipment shall not be ordered, released for production, shipped or installed until submissions have been approved by the CO. All submittals shall be verified by the contractor as being in full compliance with requirements of these project specifications and/or drawings. Submittals received without the contractor's certification will be returned, without action, for the contractor's certification and re-submittal. The CO will not accept partial submittals for approval of materials and/or equipment for review. The CO reserves the right to accept for review partial submittals (in order to expedite construction if necessary) under the condition that the review timeframe is waived. The

SECTION 01 00 00 Page 6 contractor shall be responsible for submitting for approval, at one time, all items of material and/or equipment that are part of a given system, i.e., for an air conditioning system. Submittals shall be made at the same time for piping, insulation, condensing units, air-handlers, pumps, valves, shop drawings, controls and other components that make-up the required work feature. This requirement shall hold for heating systems, hardware schedules, electrical materials and equipment, roofing systems and all other items required by Material Approval Submittal List. The submittal schedule shall include, among other items, the CPM schedule and the Quality Assurance Plan (both discussed further below).

1.10 PASS AND IDENTIFICATION:

A. The contractor shall obtain the necessary passes and/or identification for entry into JB MDL for himself, all employees and subcontractors prior to commencement of work. Procedures and limitations for entry control are addressed in depth in the Installation Entry Control Procedures at the end of this section. The Government reserves the right to refuse to issue a pass to any and all employees of the contractor for any reason deemed appropriate by the Government and in doing so shall not be entitled to equitable adjustment or relief under the Contract Disputes Act. The Entry Screening Facility may be contacted at (609) 754-3938/3628/2200. The Government will issue passes depending on the type of work to be completed and the length of the contract. The maximum length of these passes is 30 days. The contractor shall be responsible for obtaining additional passes upon the expiration of each pass issued. The Government may inspect at its discretion, all vehicles including those with vehicle passes.

B. Prior to entering JB MDL, commercial/over-sized vehicles shall be inspected at Checkpoint 9 located on Saylors Pond Road at the Dix Area of JB MDL for the Dix and the McGuire Areas. The contractor shall anticipate delays during the inspection process as well as delays due to vehicle queues.

C. Conditions caused by Force Majeure (acts of war, terrorism, nature, etc.) shall be addressed via contract time extension, where warranted, at no cost only. The contractor shall anticipate that in the event of heightened alert, access to JB MDL may be denied for approximately three to five days.

The contractor shall also anticipate that during periods of heightened alert, time required to access JB MDL may increase.

D. Whenever the government takes action, in its sovereign capacity under these conditions, the contractor shall not be entitled to any additional monies or damages.

1.11 SCHEDULE OF WORK:

A. Work shall normally be accomplished during the standard 8-hour day, 5-day week, 7:30 AM to 4:15 PM, Monday through Friday excluding Federal holidays. The CO must approve work outside these hours at least one (1) workday prior to proposed work.

B. The contractor shall notify the CO or his representatives two working days prior to moving to the work site to commence work and one working day prior to resumption of work at the site after an interruption of more than two (2) working days.

1.12 INSPECTION:

A. Inspection of work by the Government is for the sole benefit of the

SECTION 01 00 00 Page 7

Government. The contractor is fully responsible for supplying all necessary quality and technical inspections during the normal progress of work. Review of work in progress by the Government at any time prior to the Final Acceptance Inspection does not constitute interim or final acceptance. At the discretion of the CO, inspection may be directed of work-phased work segments at their completion and prior to initiation of any further work. If phased inspection is directed, the contractor shall notify the CO in writing at least fourteen (14) days prior to expected completion of the phase to be inspected. Such inspection shall not relieve the contractor for variations or unacceptable conditions discovered up to and including the Final Acceptance Inspection. Destructive testing may be required and shall be performed by the contractor at the direction of the CO. Work tested in this fashion shall be compensated only if found to conform to the contract requirements.

1. The contractor shall provide the COTR with a daily report log (Contractor Production Report (CPR)). This log shall be reviewed and agreed/disagreed to by both the contractor and COTR. This log shall identify the number of personnel on site (general contractor and/or sub contractor(s)) and the work accomplished that day. A copy (with signatures) shall be presented to the COTR as part of the documentation of daily progress.

1.13 PRELIMINARY AND FINAL INSPECTIONS:

A. The contractor shall request scheduling of the final and pre-final inspections in writing a minimum of ten (10) work days in advance of project completion. The request for scheduling will be in writing to the CO.

Deficiencies shall be corrected within fourteen (14) days of the pre-final inspection.

1.14 COORDINATION OF TRADES:

A. The contract drawings are in part diagrammatic and show the general arrangement of work features and trades. The contractor must have competent personnel on the work site to coordinate all fieldwork and shop drawings of the various trades prior to installation and/or submission of field or shop drawings for approval.

B. The contractor shall prepare and submit Coordination Drawings, depicting all major equipment items, including but not limited to, duct runs, major conduit and piping runs, structural components, and roof openings, thereby eliminating physical interference among building systems, subsystems and components. Additional items shall be included by the contractor as necessary to coordinate supporting items (such as structural reinforcing, etc.). Approval of these drawings is necessary 30 days prior to the scheduled installation of any and all Heating, Ventilating and Air Conditioning equipment and ductwork.

C. Preparation of additional layout drawings, rough-in location detail sketches and the like may be required in the performance of this work, but are not required to be submitted for Government review or approval. If and when these additional drawings and/or sketches are prepared, they shall be made available for Government viewing upon request.

D. The contractor shall allot spaces to the various trades prior to installation of the work and shall retain all responsibility for the elimination of interference between all work items and systems. Should interference exist between an existing item to remain and a new item and it is not possible to correct by shifting locations, or in spaces where all the various installations cannot be accommodated, the contractor shall propose a

SECTION 01 00 00 Page 8 new suitable substitute size, type or model and submit the proposal to the Contracting Officer for review and written approval before acquiring and/or using the substituted item. The decision of the CO shall be final. If it is possible to eliminate the interference by relocation or rerouting, then the contractor has the authority to make a no cost change to do so, while documenting the change on the redlined As-Built drawings. Changes involving a cost increase made by the contractor without prior written approval by the CO involved will not be considered for an upward cost adjustment. Changes made by the contractor that will reduce costs are to be submitted to the CO in writing, for acceptance prior to implementation, for potential credit modification.

1.15 UTILITIES:

A. The Government shall make all reasonable amounts of domestic water and electricity available to the contractor without charge. The Contractor shall carefully conserve any utilities furnished by the Government. The Contractor, at his/her expense and in a workmanlike manner satisfactory to the Contracting Officer's Technical Representative (COTR), shall install and maintain all necessary temporary connections and distribution lines, and all meters (if necessary) to measure the amount of each utility used. The Contractor shall furnish to the CO for approval, a complete system layout drawing showing type of materials to be used and method of installation for all temporary electrical and water systems. The Contractor shall make arrangements with the COTR, as to the method of determining the amount of water and electricity being used. Telephone service is the responsibility of the Contractor, and shall be coordinated with the COTR and the local communication company. Before final acceptance of the work by the Government, the Contractor shall remove all temporary connections, distribution lines, meters and associated paraphernalia.

B. BASE FIRE HYDRANT USE PERMIT: Prior to the contractor using any fire hydrant on base as source of water, the contractor shall obtain a Permit to Use Fire Hydrant from the Utility Section of the 87th Civil Engineer Squadron. The contractor will be responsible for providing all the equipment necessary to connect to the fire hydrant including, but not limited to the following: fire hydrant wrench, backflow device, hoses and if necessary a valve. The contractor shall adhere to the Fire Hydrant Use Rules and Regulations which are attached to the end of this Section during the use of any fire hydrant. The contractor shall provide the COTR with a copy of the approved Fire Hydrant Use Permit prior to using any fire hydrant on base.

C. INTERRUPTION OF UTILITIES: Contractor shall perform the work under their contract with a minimum of outage time for all utilities. Contractor shall give written notification to the CO at least ten (10) working days in advance of his need for a proposed utility outage. Contractor will provide temporary heat and/or domestic hot water if outage is expected to be longer than eight (8) hours continuous duration. This time period shall include start-up and cool-down periods. The utilities may be interrupted only when approved in writing by the CO. Because of mission requirements, utility interruptions may have to be scheduled at a time other than that requested by the contractor.

D. ROAD CLOSURE: Contractor will provide two (2) weeks written notification to CO prior to roadway closures for utility runs. Contractor shall attempt to maintain traffic flow by working half roadway at a time.

1.16 TOILET FACILITIES:

SECTION 01 00 00 Page 9

A. Government toilet facilities will not be available for contractor's or subcontractor's personnel use. Contractor shall provide temporary sanitation facilities: All temporary sewer and sanitation facilities shall be self-contained units with both urinals and stool capabilities. Ventilate the units to control odors and fumes and empty and clean them at least once a week or more often if required by the CO. The doors shall be self-closing.

The exterior of the unit will match the base standard color, "Dark Brown".

Locate the facility behind the construction fence or out of the public view.

COTR shall approve location.

1.17 CONSTRUCTION SIGN:

A A construction sign shall be erected on the construction site. The location of the sign will be facing the street. The exact location will be coordinated by the COTR. Instructions on how to construct the sign are attached to the end of this Section. Color of sign shall be in accordance with Federal Standard 595; background shall be Federal Color #20040 and lettering shall be #23617.

1.18 EMERGENCIES:

A In case of an emergency, the CO, Security Forces personnel, Base Fire Chief, and Base Operations Officer, or their representatives, shall have the authority to order the contractor to stop work and clear the area of personnel and equipment. The contractor shall comply with such an order with all possible speed. After clearing the work site as instructed, the contractor shall immediately inform the CO of all verbal or written stop work orders. In the case of being halted by Security Forces personnel, the Fire Chief or Base Operations Officer, the contractor shall notify the CO in writing and provide explanation for the stoppage.

1.19 AUTHORITY:

A Except as noted below, the term "Contracting Officer" as used in this specification includes the authorized representative of the CO acting within the limits of his/her authority. With respect to all paragraphs of the specifications citing "approval by the Contracting Officer" and all paragraphs cited in Material Approval Submittals, of the solicitation, the term "Contracting Officer" means only those individuals properly appointed as a CO within the Contracting Squadron; no other Government personnel has the authority to grant such approval. This includes the Contracting Officer's Technical Representative (COTR). The COTR has authority to review Material Submittal packages and recommend approval by the CO. At the Final Acceptance Inspection, the COTR will perform the inspection and recommend acceptance or conditional acceptance to the CO.

1.20 PROJECT CLOSE OUT SUBMITTALS:

A At the completion of construction and before final payment, the contractor shall submit to the CO the following information, if required, for record and operation purposes. Close out submittals shall be submitted as specified in the various sections of the specifications and as one (1) complete package.

1. As-built drawings as specified in paragraph 1.06

2. Operation and maintenance data/manuals.

3. Guarantees, warranties.

SECTION 01 00 00 Page 10

4. Keys and keying schedule.

5. Spare parts and maintenance materials.

6. Special tools/fixtures/devices.

7. Real Property Records (see Capitalization Instructions attached to this section).

1.21 CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE (COTR):

A The Commander, 87th Civil Engineering Squadron or his representative, is designated as the COTR. This designation includes, but is not limited to the following specific functions of this contract:

1. Technical administration and review of work in process.

2. Recommending approval/disapproval of shop drawings, samples and materials.

3. Reviewing and recommending approval/disapproval by the CO all applications for progress payments.

4. Reporting to the CO any work stoppage or discovered non-conforming work items.

5. Recommending destructive testing of work by the contractor to the CO.

Testing materials not otherwise specified to be performed by the contractor or others.

6. Conducting Pre-Final and Final Acceptance Inspections to develop a recommendation to the CO for accepting/not-accepting the work.

1.22 DRAWINGS ACCOMPANYING SPECIFICATIONS:

A Drawings accompanying the specifications are the property of the Government and shall not be used for purposes other than those contemplated by the specifications.

1.23 BASE REGULATIONS:

A The contractor shall conform to all Base regulations and directives, as identified specifically at the pre-construction conference, that pertain to security, safety, traffic, fire and personnel clearances insofar as they apply to the contractor's activities or as directed by the Contracting Officer. The contractor shall be responsible for providing and placing barricades, lighting and safety devices during construction activities.

1.24 COORDINATION OF WORK OPERATIONS:

A The work to be performed under this contract is on an active military base. The contractor shall coordinate work operations with the COTR prior to starting work under this contract. The contractor shall have a superintendent who speaks, reads, writes and understands the English language; has authority to act for the contractor and to be available on the job site throughout each work day. The contractor shall be responsible for his quality control at all times. A specific individual shall be designated as the contractor's quality control inspector and identified to the COTR at

SECTION 01 00 00 Page 11 the pre-construction conference.

1.25 CONTRACTOR'S PARKING:

A The contractor's employees shall park in the areas assigned by the COTR.

1.26 CONTRACTOR'S EMPLOYEE RESTRICTIONS:

A The contractor's employees shall be restricted to areas within this scope of work plus direct routes to and from the site as may be approved in the pre-construction conference with regard to work scheduling and material handling.

1.27 GOVERNMENT FURNISHED PROPERTY (GFP): N/A

1.28 REAL PROPERTY RECORDS:

A Within fourteen (14) workdays of construction completion, and prior to final payment, the contractor shall complete the attached Capitalization Instructions which include the "Building Checklist" and other associated documents. The Checklist, including the scope of work, real property installed equipment listing, letter of final inspection, list of discrepancies and drawings are to be returned to the CO. Once reviewed and final concurrence from the JB MDL Real Estate Management Office (REMO), located in Building 5318, Dix Area, is received and all deficiencies have been corrected, then the contractor may submit the invoice for final contract payment. Should the Checklist be returned to the contractor for corrections, the contractor shall make the corrections and return the Checklist within fourteen (14) workdays.

1.29 DELAYS DURING CONSTRUCTION:

A No Government delays or interruptions are expected. However if at any time during construction should a situation be encountered which serves to delay the execution of all work for an indefinite period of time and upon receipt of a written suspension notification from the Contracting Officer, the contractor shall demobilize his work crews as well as those of his subcontractors as soon as possible. In that event, the contracting officer will furnish advance notice for restarting the job and allow a remobilization period (the length of which to be commensurate with the delay period, but no longer than 60 days) prior to required work recommencement. Otherwise, the length of work suspension will be identified in the written suspension notification. The contractor shall not be required to "standby" for an indefinite duration unless specifically directed to do so. (Note: this paragraph does not apply to national emergencies, sovereign acts or Force Majeure, which are covered under other contract provisions.)

1.30 PHYSICAL DATA

A Information and data furnished or referred to below are furnished for the Contractor's information. However, it is expressly understood that the Government will not be responsible for any interpretation or conclusion drawn there from by the Contractor. (FAR 52.236-4) (APR 1984)

1. Weather Conditions: Climatologically data determined from records of the U.S. Weather Bureau Station, U.S. Weather Bureau Station, Wrightstown, NJ;

Mean Annual Temperature: 54.4 degrees F Mean Annual Precipitation: 43.01 inches

SECTION 01 00 00 Page 12

1.31 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER

A This provision specifies the procedure for determination of time extension for usually severe weather in accordance with the contract clause entitled "Default: (Fixed Price Construction)." In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:

1 The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.

2 The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.

B The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.

MONTHLY ANTICIPATED ADVERSE WEATHER DELAY WORK DAYS BASED ON (5) DAY WORK WEEK

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV

DEC

(9) (7) (8) (8) (7) (7) (6) (7) (5) (7) (5) (7)

C Upon acknowledgment of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor will record on the daily CPR log, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled workday. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days.