About this file

Amendment 0007

View the file

Other files

File Type Posted
Bid_Results_14-B-0002_Greenbrook.pdf PDF
Amendment_6_specs.pdf PDF
Amendment_0006.pdf PDF
Amendment_6_Plans_01-29-14.pdf PDF
Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
Amend_3-_specs.pdf PDF
Amendment_0003.pdf PDF
Amendment_3_Plans.pdf PDF
Amendment_0002.pdf PDF
Amend_1_Plans-_File_1.pdf PDF
Amend_1_Specs.pdf PDF
Amend_1_Plans_-File_2.pdf PDF
Amendment_0001.pdf PDF
Plans_GB_SEG_R2_T_8_Nov_2013_File_2.pdf PDF
Plans_GB_SEG_R2_T_8_Nov_2013_File_3.pdf PDF
Plans_GB_SEG_R2_T_8_Nov_2013_File_4.pdf PDF
Plans_GB_SEG_R2_T_8_Nov_2013_File_5.pdf PDF
Plans_GB_SEG_R2_T_8_Nov_2013_File_1.pdf PDF
Specs_SEGR2T_-_East_Main.pdf PDF
Solicitation.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W16ROE32968183

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

a. Incorporate Revised Specifications

b. Incorporate Revised Bid Schedule attached CLIN 0018 added to Bid Schedule

c. Incorporate Response to Questions (For Informational Purpose Only)

d. Change Bid Opening Date From: 11 Feb 2014 @ 2:00 P.M. EST. To: 12 Feb 2014 @ 2:00 P.M. EST.

NOTE: Bidders must acknow ledge receipt of this amendment by the date specified in the bid (or as amended) by one of the follow ing methods: in the space provided on the SF 1442, by separates letters, or by telegram by signing block 15 below . FAILURE TO ACKNOWLDEGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE

LATE BID, LATE MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 21

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Feb-2014

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-14-B-0002

X 9B. DATED (SEE ITEM 11)

19-Nov-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Feb-2014

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-14-B-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0007

Green Brook Flood Risk Management Project- Segment R2 Levee Extension, Segment T Raising, and East Main Street Storm Sewer Improvements, Borough of Bound Brook, NJ

IFB# W912DS-14-B-0002

Bid Opening hour and date changed from 11 February 2014 at 2:00 PM EST to 12 February 2014 at 2:00

PM EST.

1. The following specifications changes are made with this amendment:

a. Revise and reissue the following specification sections in its entirety.

Section 00 10 00, Bid Schedule.

b. Revise the following specifications sections as indicated:

Section 00800, paragraph 42, Paragraph 42, As built Conditions Survey. Add the following:

f. To facilitate the overall project schedule, the Contractor shall prepare and submit to the Contracting Officer for review as-Built drawings after completing each of the major segments of work as follows:

Segment T Raising (Base Contract), Segment R2 Extension (Option 1), Storm sewer along East Main Street (Options 3, 4, 5, 6 &7), and Electric service to the sluice gate (Option 2). Failure to provide as-builts in a timely manner shall result in withholding of retainage and/or final payment until such time as they are completed in a manner satisfactory to the contracting officer. The final as-builts must be submitted within the contract durations specified for the base contract and options. No additional time shall be added to the duration of the base contract or any of the options.

Section 00 08 00, paragraph 1. Replace with the following:

1. COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK

a. The Contractor shall be required to (i) commence work under this Contract within five (5) calendar days after the date the Contractor receives the Notice to Proceed, (ii) prosecute the work diligently, and

(iii) complete work ready for use, not later than 150 calendar days after the date the Contractor receives the notice to proceed except in case the Contracting Officer determines that seeding is not feasible during the construction period. The Contractor shall accomplish such seeding in the first planting period following the contract completion date as specified in Paragraph 3.1 of Section 32 92 19.

Options may be exercised at the discretion of the Government and are not mandatory.

If Option #1 is exercised, Bid Item No. 0006 and 0007 shall be exercised at the same time. If exercised, Option #1, Bid Item No. 0006 and 0007 shall be exercised within 120 calendar days of the date of the Base Bid NTP. Option 1 shall be completed within 120 calendar days from the date it is exercised.

If Option #2 is exercised, Bid Item No. 0008 and 0009 shall be exercised at the same time. If exercised, Option #2, Bid Item No. 0008 and 0009, shall be exercised within 120 calendar days of the date of the Base Bid NTP. Option 2 shall be completed within 120 calendar days from the date it is exercised.

If Option #3 is exercised, Bid Item No. 0010, 0011, 0012, 0013 and 0014 shall be exercised at the same time. If exercised, Option #3, Bid Item No. 0010, 0011, 0012, 0013 and 0014 shall be exercised within 90 calendar days of the date of the Base Bid NTP. Option 3 shall be completed within 120 calendar days from the date it is exercised.

If exercised, Option #4, Bid Item No. 0015, shall be exercised within 150 calendar days of the date of the Base Bid NTP. Option 4 shall be completed within 90 calendar days from the date it is exercised.

If exercised, Option #5, Bid Item No. 0016, shall be exercised within 150 calendar days of the date of the Base Bid NTP. Option 5 shall be completed within 90 calendar days from the date it is exercised.

If exercised, Option #6, Bid Item No. 0017, shall be exercised within 150 calendar days of the date of the Base Bid NTP. Option 6 shall be completed within 90 calendar days from the date it is exercised.

If exercised, Option #7, Bid Item No. 0018, shall be exercised within 90 calendar days of the date of the Base Bid NTP. Option 7 shall be completed within 90 calendar days from the date it is exercised.

The time stated for completion shall include final cleanup of the premises.

b. Location: The site of work is located in the Borough of Bound Brook, Somerset County, New Jersey.

The Segment R2 site is located adjacent to the eastbound New Jersey Transit Railroad and extends from its current termination point located approximately 2,000 linear feet to the East of Vosseller Avenue up to the southwest corner of the eastbound passenger train platform at the Bound Brook Railroad station, as well as some localized repairs to the north (landside)side of the south wall between the stairs at the east end of the station platform and the underside of the rail road station platform covering the stairway/subway (pedestrian tunnel) entrance. The Segment T site is located along the right bank of Green Brook between the New Jersey Transit Railroad and Vosseller Brook and extends along the right bank of Vosseller Brook approximately 400 linear feet. The East Main Street Storm Sewer improvements site is located along East Main Street from approximately the intersection of East Main Street and Mountain Avenue westward to approximately the intersection of West Main Street and Drake Street.

Additionally, the contractor shall install forty (40) “No Trespassing” signs as directed along the line of protection throughout the Borough of Bound Brook.

c. The Contractor shall furnish all labor, materials, equipment and services (except those furnished by the Government) for the following work:

Base Bid

SEGMENT T LEVEE RAISING

All work necessary to raise 1,900 linear feet of existing levee at Segment T between Station 0+00 at the New Jersey Transit Railroad to Station 19+81.58 located approximately 400 linear feet upstream of the Vosseller/Green Brook confluence. Work includes stripping topsoil from the existing levee, stockpiling for potential reuse or disposal if material is unsuitable stockpiling and reuse of existing levee embankment soil, stripping and reuse of suitable soil removed from the proposed (extended) levee footprint; placement and compaction of embankment fill; access road, guiderail and Modular Block Wall construction; temporary removal of a pedestrian bridge section for placement of riprap and extending an electric handhold; removal and replacement of three underground utility access enclosures; construction of curb wall and railing along pump station and drainage structure 21; removal of wall exhaust fan, installation of a roof exhaust fan, extension and connection of existing electrical service; miscellaneous building repairs; installation of erosion control measures and site restoration; purchase and installation of forty “no trespassing” signs to be installed where directed by the Contracting Officers Representative throughout the Borough of Bound Brook; and utility coordination with PSE & G for the determination of a power source for the permanent electric service for the sluice gate proposed to be installed along the extension of Segment R2.

in accordance with the drawings and specifications.

RAILROAD COORDINATION FIELDWORK AND INSPECTION

Includes all work required by New Jersey Transit to remove and replace railroad tracks and ties for the installation of sheet pile across the track; railroad personnel including, signal men for cable mark outs and inspection of underground work near buried signal/communication lines and flagmen who are needed for all work performed on NJT and Conrail property.

LIABILITY and RAILROAD INSURANCE Contractor shall obtain Liability Insurance for the New Jersey Department of Environmental Protection (NJDEP), Somerset County, and Borough of Bound Brook for the work being performed and Railroad Insurance for New Jersey Transit and Conrail for work being performed on railroad property.

PSE&G IDENTIFY POWER SOURCE

All work necessary to identify location of power source for permanent electric service for the proposed sluice gate proposed to be installed along the extension of Segment R2.

Option 1 – SEGMENT R2 LEVEE EXTENSION All work necessary to extend Segment R-2 levee from its current location at Station 78+26.30 to Station 83+41.45 at the eastbound passenger train platform in Bound Brook. Work includes construction of the stop log closure gate (i.e. foundation, frame/guide, sill plate, seal and retaining wall); stripping and disposal of excavated soil, placement and compaction of levee embankment fill (length 280 feet), installation of geotextile, placement and compaction of stone ballast above and adjacent to the levee;

floodwall (150 linear feet), gate chamber including support of excavation, access hatch, ladder, flap and sluice gate and access road construction; fiber optic line protection, erosion control measures, and site restoration. Electrical work includes wiring approximately 300 linear feet of four (4) #2 wire & one (1) #4 ground in a 1-1/2” Diameter conduit, installation of a NEMA 3R enclosure near the sluice gate, with 6kVA step down transformer, maintenance receptacle and strip heater, one (1) manhole and two (2) handholds, a disconnect switch, control panel and gate motor operator. In addition, work includes localized repair, cleaning, preparation of existing cracks/joints, spalled concrete, and exposed steel reinforcement using epoxy injection and epoxy mortar and installation of carbon fiber reinforcement along the landside face of the South wall between stairs and underneath the Bound Brook Eastbound station platform, in accordance with the drawings and specifications, Option 1 – FIBER OPTIC LINE PROTECTION Includes coordination, investigation, concept review and field work by Zayo personnel and by Lightower Fiber Networks personnel including cable mark out, test pits (if necessary).

Option 2 – PSE&G ELECTRIC SERVICE All work necessary to layout, design and install permanent electric service for the proposed sluice gate.

Option 2 – ELECTRIC FOR MOTORIZED SLUICE GATE All work necessary to install electric lines for running motorized sluice gate. Work includes installation of approximately 350 linear feet of four (4) #2 wire & one (1) #4 ground in a 1-1/2” Diameter conduit including a railroad crossing utilizing a trenchless method to be approved by New Jersey Transit.

Installation includes NEMA 3R enclosure near West Main Street. Enclosure includes a new electric meter and disconnect switch. Additional items include two (2) manholes and one (1) Handhold testing, trench repair; erosion control measures, and site restoration in accordance with the drawings and specifications.

Option 3 - EAST MAIN STREET STORM SEWER All work necessary to interconnect a local depression along East Main Street with drainage to Pump Station 1 (Segment R2 Pump Station) a new storm sewer is proposed to convey flow along East Main Street from approximately the intersection of East Main Street and Mountain Avenue westward to approximately the intersection of West Main Street and Drake Street. At this point it will be connected to the existing drainage system that connects to Pump Station 1 and was constructed as part of Segment R2.

The project requires approximately 743 lineal feet of storm sewer consisting of approximately 267 lineal feet of 30 inch diameter pipe, 147 lineal feet of 38”x24” HEPRCP pipe, and 329 lineal feet of 24 inch diameter pipe. In addition the alignment requires 6 new manholes.

Option 3 – NJ AMERICAN Water Line All work necessary to design, disconnect, remove, install and reconnect 1-inch NJ American Water main at STA 0+71.6 and relocate 10-inch NJ American Water Main near Manhole 2 (STA 2+67).

Option 3 – PSE&G 1” Gas Line All work necessary to design, disconnect, remove, install and reconnect 1-inch permanent PSE&G gas line at STA 0+79.6.

Option 3 – PSEG Electric

All work necessary to design, disconnect, remove, install and reconnect PSE&G electric conduits and manhole at STA 2+81.

Option 3- Relocate Utility Poles All work necessary to relocate two utility poles including disconnect, remove utilities and poles, install new poles and reconnect utilities.

Option 4 – PSE&G 1” Gas Line All work necessary to design, disconnect, remove, install and reconnect 1-inch permanent PSE&G gas line at STA 1+55.5.

Option 5 – PSE&G 12” Gas Line All work necessary to design, disconnect, remove, install and reconnect 12-inch permanent PSE&G gas line at STA 2+94.1.

Option 6 – PSE&G 1” Gas Line All work necessary to design, disconnect, remove, install and reconnect 1-inch permanent PSE&G gas line at STA 3+56.5.

Option 7- 36” Pipe All work necessary to install 108 lineal feet of 36 inch diameter pipe between manholes 3 and 4 in lieu of a 38”x24” HEPRCP pipe in Option 3.

d. All work shall be in accordance with the drawings and specifications or instructions attached hereto and made a part thereof, or to be furnished hereafter by the Contracting Officer and subject in every detail to his supervision, direction, and instructions. (DoD FAR Supplement 52.236-7014).

e. Magnitude of Construction Project: The estimated value of the proposed work is between $1,000,000 and $5,000,000.

2. The following are responses to questions received from bidders (FOR INFORMATIONAL

PURPOSES ONLY):

Question No. 1: Has the existing paint been tested for lead?

Response: No, due to the age of the construction it should be assumed there is lead paint.

Question No. 2: Drawing S-506 shows repairs to the south wall and the ceiling. We assume that the north wall is not getting repair since it is not show. Is this the case?

Response- Yes, only the South Wall and Ceiling get repaired and painted Question No. 3: In addition does the exterior of the wall also get painted?

Response: No.

3. This amendment shall be attached to the specifications and shall be a part thereof.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Base Bid Item

FFP

SEGMENT T LEVEE RAISING

All work necessary to raise 1,900 linear feet of existing levee at Segment T between Station 0+00 at the New Jersey Transit Railroad to Station 19+81.58 located approximately 400 linear feet upstream of the Vosseller/Green Brook confluence. Work includes stripping topsoil from the existing levee, stockpiling for potential reuse or disposal if material is unsuitable, stripping, stockpiling and reuse of existing levee embankment soil; stripping and reuse of suitable soil removed from the proposed (extended) levee footprint; placement and compaction of embankment fill; access road, guiderail and Modular Block Wall construction;

temporary removal of a pedestrian bridge section for placement of riprap and extending an electric handhold; removal and replacement of three underground utility access enclosures; construction of curb wall and railing along pump station and drainage structure 21; removal of wall exhaust fan, installation of a roof exhaust fan, extension and connection of existing electrical service; miscellaneous building repairs; installation of erosion control measures and site restoration, Additional tasks include purchase and installation of forty “no trespassing” signs to be installed where directed by the Contracting Officers Representative throughout the Borough of Bound Brook, and utility coordination with PSEG for the determination of a power source for the permanent electric service for the sluice gate, all work in accordance with the drawings and specifications, but not including Items 0002-0005 on the bid schedule.

FOB: Destination.

NET AMT

0002 1 Job Base Bid Item

FFP

RAILROAD COORDINATION FIELDWORK AND INSPECTION

Includes all work required by New Jersey Transit to remove and replace railroad tracks and ties for the installation of sheet pile across the track; railroad personnel including, signal men for cable mark outs and inspection of underground work near buried signal/communication lines and flagmen who are needed for all work performed on NJT and Conrail property. Allowance amount of $180,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs. Actual payment in excess of allowance amount is subject to availability of funds.

FOB: Destination

0003 1 Job Base Bid Item

FFP

LIABILITY INSURANCE

New Jersey Department of Environmental Protection (NJDEP), Somerset County and Borough of Bound Brook Liability Insurance. The amount bid will be the maximum amount payable. Actual payment will be based on actual costs.

0004 1 Job Base Bid Item

FFP

RAILROAD INSURANCE

New Jersey Transit and Conrail Railroad Insurance. The amount bid will be the maximum amount payable. Actual payment will be based on actual costs.

0005 1 Job Base Bid Item

FFP

PSE&G IDENTIFY POWER SOURCE

All work necessary to identify location of power source for permanent electric service for the proposed sluice gate. Allowance amount of $10,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs.

Actual payment in excess of allowance amount is subject to availability of funds.

0006 1 Job OPTION Option 1

FFP

All work necessary to extend Segment R-2 levee from its current location at Station 78+26.30 to Station 83+41.45 at the eastbound passenger train platform in Bound Brook. Work includes construction of the stop log closure gate (i.e. foundation, frame/guide, sill plate, seal and retaining wall); stripping and disposal of excavated soil, placement and compaction of levee embankment fill (length 280 feet), installation of geotextile, placement and compaction of stone ballast above and adjacent to the levee; floodwall (150 linear feet), gate chamber including support of excavation, access hatch, ladder, flap and sluice gate and access road construction; fiber optic line protection, erosion control measures, site restoration.

Electrical work includes wiring approximately 300 linear feet of four (4) #2 wire & one (1) #4 ground in a 1-1/2” Diameter conduit, installation of a NEMA 3R enclosure near the sluice gate, with 6kVA step down transformer, maintenance receptacle and strip heater, one (1) manhole and two (2) handholds, a disconnect switch, control panel and gate motor operator. In addition, work includes localized repair, cleaning, preparation of existing cracks/joints, spalled concrete, and exposed steel reinforcement using epoxy injection and epoxy mortar and installation of carbon fiber reinforcement along the landside face of the South wall between stairs and underneath the Bound Brook Eastbound station platform, all work in accordance with the drawings and specifications, but not including Item 0007 on the bid schedule.

0007 1 Job OPTION Option 1

FFP

FIBER OPTIC LINE PROTECTION

Includes coordination, investigation, concept review and field work by Zayo and Lightower Fiber Networks personnel including cable mark out and test pits (if necessary). Allowance amount of $25,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs. Actual payment in excess of allowance amount is subject to availability of funds.

0008 1 Job OPTION Option 2

FFP

PSE&G ELECTRIC POWER SERVICE

All work necessary to layout, design and install permanent electric service for the proposed sluice gate. Allowance amount of $50,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs. Actual payment in excess of allowance amount is subject to availability of funds.

0009 1 Job OPTION Option 2

FFP

ELECTRIC FOR MOTORIZED SLUICE GATE

All work necessary to install electric lines for running motorized sluice gate. Work includes wiring approximately 350 linear feet of four (4) #2 wire & one (1) #4 ground in a 1-1/2” Diameter conduit including a railroad crossing utilizing a trenchless method to be approved by New Jersey Transit. Installation includes NEMA 3R enclosure near West Main Street. Enclosure includes a new electric meter and disconnect switch Additional items include two (2) manholes and one

(1) Handhold testing, trench repair; erosion control measures, and site restoration in accordance with the drawings and specifications.

0010 1 Job OPTION Option 3

FFP

EAST MAIN STREET STORM SEWER

All work necessary to interconnect a local depression along East Main Street with drainage to Pump Station 1 (Segment R2 Pump Station) a new storm sewer is proposed to convey flow along East Main Street from approximately the intersection of East Main Street and Mountain Avenue westward to approximately the intersection of West Main Street and Drake Street. At this point it will be connected to the existing drainage system that connects to Pump Station 1 and was constructed as part of Segment R2. The project requires approximately 743 lineal feet of storm sewer consisting of approximately 267 lineal feet of 30 inch diameter pipe, 147 lineal feet of 38”x24” HEPRCP pipe, and 329 lineal feet of 24 inch diameter pipe. In addition the alignment requires 6 new manholes in accordance with the plans and specifications, but not including Items 0011 through 0014 on the bid schedule.

0011 1 Job OPTION Option 3

FFP

Design, disconnect, remove, install and reconnect 1-inch NJ American Water main at STA 0+71.6 and relocate 10-inch NJ American Water Main near Manhole 2 (STA 2+67). Allowance amount of $10,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs. Actual payment in excess of allowance amount is subject to availability of funds.

0012 1 Job OPTION Option 3

FFP

Design, disconnect, remove, install and reconnect 1-inch permanent PSE&G gas line at STA 0+79.6. Allowance amount of $10,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs. Actual payment in excess of allowance amount is subject to availability of funds.

0013 1 Job OPTION Option 3

FFP

Design, disconnect, remove, install and reconnect PSE&G electric conduits and manhole at STA 2+81. Allowance amount of $15,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs. Actual payment in excess of allowance amount is subject to availability of funds.

0014 1 Job OPTION Option 3

FFP

Relocate two utility poles including disconnect, remove utilities and poles, install new poles and reconnect utilities. Allowance amount of $10,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs.

Actual payment in excess of allowance amount is subject to availability of funds.

0015 1 Job OPTION Option 4

FFP

Design, disconnect, remove, install and reconnect 1-inch permanent PSE&G gas line at STA 1+55.5. Allowance amount of $10,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs. Actual payment in

0016 1 Job OPTION Option 5

FFP

Design, disconnect, remove, install and reconnect 12-inch permanent PSE&G gas line at STA 2+94.1. Allowance amount of $10,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs. Actual payment in

0017 1 Job OPTION Option 6

FFP

Design, disconnect, remove, install and reconnect 1-inch permanent PSE&G gas line at STA 3+56.5. Allowance amount of $10,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs. Actual payment in

0018 1 Job OPTION Option 7

FFP

As part of the East Main Street Storm Sewer Improvements, all work necessary to install 108 lineal feet of 36 inch diameter pipe between manholes 3 and 4 in lieu of a 38”x24” HEPRCP pipe include din Option 3.

TOTAL

TOTAL BASE BID ITEMS (CLINS 0001-0005) $______________________

TOTAL OPTIONAL BID ITEMS (CLINS 0006-0018) $_______________________

TOTAL BASE AND OPTION ITEMS (CLINS 0001-0018) $_______________________

NOTES TO BIDDERS

1. The low bidder for purposes of award will be the conforming responsible bidder offering the lowest amount for the Total Base Bid Amount and Optional Bid Amount for all Items.

2. Any bid which is materially unbalanced as to the price for the Base Bid Item and Optional Items may be rejected. An unbalanced bid is one which is based on prices significantly less than cost for some work and prices significantly overstated for other work.

3. Bidders are required to bid on all items or their bids will be rejected.

4. Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations conditions or attachments made by the bidders thereto may render the bid non-responsive and be cause for its rejection.

5. Options may be exercised at the discretion of the Government and are not mandatory.

6. If Option #1 is exercised, Bid Item No. 0006 and 0007 shall be exercised at the same time. If exercised, Option #1, Bid Item No. 0006 and 0007 shall be exercised within 120 calendar days of the date of the Base Bid NTP. Option 1 shall be completed within 120 calendar days from the date it is exercised.

7. If Option #2 is exercised, Bid Item No. 0008 and 0009 shall be exercised at the same time. If exercised, Option #2, Bid Item No. 0008 and 0009, shall be exercised within 120 calendar days of the date of the Base Bid NTP. Option 2 shall be completed within 120 calendar days from the date it is exercised.

8. If Option #3 is exercised, Bid Item No. 0010, 0011, 0012, 0013 and 0014 shall be exercised at the same time. If exercised, Option #3, Bid Item No. 0010, 0011, 0012, 0013 and 0014 shall be exercised within 90 calendar days of the date of the Base Bid NTP. Option 3 shall be completed within 120 calendar days from the date it is exercised.

9. If exercised, Option #4, Bid Item No. 0015, shall be exercised within 150 calendar days of the date of the Base Bid NTP. Option 4 shall be completed within 90 calendar days from the date it is exercised.

11. If exercised, Option #5, Bid Item No. 0016, shall be exercised within 150 calendar days of the date of the Base Bid NTP. Option 5 shall be completed within 90 calendar days from the date it is exercised.

12. If exercised, Option #6, Bid Item No. 0017, shall be exercised within 150 calendar days of the date of the Base Bid NTP. Option 6 shall be completed within 90 calendar days from the date it is exercised.

13. If exercised, Option #7, Bid Item No. 0018, shall be exercised within 90 calendar days of the date of the Base Bid NTP. Option 7 shall be completed within 90 calendar days from the date it is exercised.

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 11-Feb-2014 02:00 PM to 12-Feb-2014 02:00 PM.

CLIN 0001

The CLIN extended description has changed from SEGMENT T LEVEE RAISINGAll work necessary to raise 1,900 linear feet of existing levee at Segment T between Station 0+00 at the New Jersey Transit Railroad to Station 19+81.58 located approximately 400 linear feet upstream of the Vosseller/Green Brook confluence. Work includes stripping topsoil from the existing levee, stockpiling for potential reuse or disposal if material is unsuitable, stripping, stockpiling and reuse of existing levee embankment soil; stripping and reuse of suitable soil removed from the proposed (extended) levee footprint; placement and compaction of embankment fill; access road, guiderail and Modular Block Wall construction; temporary removal of a pedestrian bridge section for placement of riprap and extending an electric handhold; removal and replacement of three underground utility access enclosures;

construction of curb wall and railing along pump station and drainage structure 21; removal of wall exhaust fan, installation of a roof exhaust fan, extension and connection of existing electrical service; miscellaneous building repairs; installation of erosion control measures and site restoration, in accordance with the drawings and specifications, but not including Items 0002-0004 on the bid schedule. to SEGMENT T LEVEE RAISINGAll work necessary to raise 1,900 linear feet of existing levee at Segment T between Station 0+00 at the New Jersey Transit Railroad to Station 19+81.58 located approximately 400 linear feet upstream of the Vosseller/Green Brook confluence. Work includes stripping topsoil from the existing levee, stockpiling for potential reuse or disposal if material is unsuitable, stripping, stockpiling and reuse of existing levee embankment soil; stripping and reuse of suitable soil removed from the proposed (extended) levee footprint; placement and compaction of embankment fill;

access road, guiderail and Modular Block Wall construction; temporary removal of a pedestrian bridge section for placement of riprap and extending an electric handhold; removal and replacement of three underground utility access enclosures; construction of curb wall and railing along pump station and drainage structure 21; removal of wall exhaust fan, installation of a roof exhaust fan, extension and connection of existing electrical service;

miscellaneous building repairs; installation of erosion control measures and site restoration, Additional tasks include purchase and installation of forty “no trespassing” signs to be installed where directed by the Contracting Officers Representative throughout the Borough of Bound Brook, and utility coordination with PSEG for the determination of a power source for the permanent electric service for the sluice gate, all work in accordance with the drawings and specifications, but not including Items 0002-0005 on the bid schedule..

CLIN 0005

The CLIN description has changed from Option 1 to Base Bid Item.

The CLIN extended description has changed from SEGMENT R2 LEVEE EXTENSIONAll work necessary to extend Segment R-2 levee from its current location at Station 78+26.30 to Station 83+41.45 at the eastbound passenger train platform in Bound Brook. Work includes construction of the stop log closure gate (i.e.

foundation, frame/guide, sill plate, seal and retaining wall); stripping and disposal of excavated soil, placement and compaction of levee embankment fill (length 280 feet), installation of geotextile, placement and compaction of stone ballast above and adjacent to the levee; floodwall (150 linear feet), gate chamber including support of excavation, access hatch, ladder, flap and sluice gate and access road construction; fiber optic line protection, erosion control measures, and site restoration in accordance with the drawings and specifications, but not including Item 0006 on the bid schedule. to PSE&G IDENTIFY POWER SOURCEAll work necessary to identify location of power source for permanent electric service for the proposed sluice gate. Allowance amount of $10,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs. Actual payment in excess of allowance amount is subject to availability of funds..

The option status has changed from Option to No Status.

CLIN 0006

The CLIN extended description has changed from FIBER OPTIC LINE PROTECTIONIncludes coordination, investigation, concept review and field work by Zayo and Lightower Fiber Networks personnel including cable mark out and test pits (if necessary). Allowance amount of $25,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs. Actual payment in excess of allowance amount is subject to availability of funds. to SEGMENT R2 LEVEE EXTENSIONAll work necessary to extend Segment R-2 levee from its current location at Station 78+26.30 to Station 83+41.45 at the eastbound passenger train platform in Bound Brook. Work includes construction of the stop log closure gate (i.e. foundation, frame/guide, sill plate, seal and retaining wall); stripping and disposal of excavated soil, placement and compaction of levee embankment fill (length 280 feet), installation of geotextile, placement and compaction of stone ballast above and adjacent to the levee; floodwall (150 linear feet), gate chamber including support of excavation, access hatch, ladder, flap and sluice gate and access road construction; fiber optic line protection, erosion control measures, site restoration. Electrical work includes wiring approximately 300 linear feet of four (4) #2 wire & one (1) #4 ground in a 1-1/2” Diameter conduit, installation of a NEMA 3R enclosure near the sluice gate, with 6kVA step down transformer, maintenance receptacle and strip heater, one (1) manhole and two (2) handholds, a disconnect switch, control panel and gate motor operator. In addition, work includes localized repair, cleaning, preparation of existing cracks/joints, spalled concrete, and exposed steel reinforcement using epoxy injection and epoxy mortar and installation of carbon fiber reinforcement along the landside face of the South wall between stairs and underneath the Bound Brook Eastbound station platform, all work in accordance with the drawings and specifications, but not including Item 0007 on the bid schedule..

CLIN 0007

The CLIN description has changed from Option 2 to Option 1.

The CLIN extended description has changed from PSE&G ELECTRIC POWER SERVICEAll work necessary to layout, design and install permanent electric service for the proposed sluice gate. Allowance amount of $50,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs. Actual payment in excess of allowance amount is subject to availability of funds. to FIBER OPTIC LINE PROTECTIONIncludes coordination, investigation, concept review and field work by Zayo and Lightower Fiber Networks personnel including cable mark out and test pits (if necessary). Allowance amount of $25,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs. Actual payment in excess of allowance amount is subject to availability of funds..

CLIN 0008

The CLIN extended description has changed from ELECTRIC FOR MOTORIZED SLUICE GATEAll work necessary to install electric lines for running motorized sluice gate. Work includes wiring approximately 550 linear feet of four (4) #2 wire & one (1) #4 ground in a 1-1/2” Diameter conduit including a railroad crossing utilizing a trenchless method to be approved by New Jersey Transit. Installation includes two NEMA 3R enclosures, one near West Main Street (Enclosure 1) and a second near the new sluice gate to be located in the gate chamber. Enclosure 1 includes a new electric meter and disconnect switch and enclosure 2 contains two electric panels with a 6kVA step down transformer, a maintenance receptacle and strip heater. A disconnect switch, control panel and gate motor operator are located at the sluice gate. Additional items include two (2) manholes and two (2) Handholds testing, trench repair; erosion control measures, and site restoration in accordance with the drawings and specifications. to PSE&G ELECTRIC POWER SERVICEAll work necessary to layout, design and install permanent electric service for the proposed sluice gate. Allowance amount of $50,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs. Actual payment in excess of allowance amount is subject to availability of funds..

CLIN 0009

The CLIN description has changed from Option 3 to Option 2.

The CLIN extended description has changed from EAST MAIN STREET STORM SEWERAll work necessary to interconnect a local depression along East Main Street with drainage to Pump Station 1 (Segment R2 Pump Station) a new storm sewer is proposed to convey flow along East Main Street from approximately the intersection of East Main Street and Mountain Avenue westward to approximately the intersection of West Main Street and Drake Street. At this point it will be connected to the existing drainage system that connects to Pump Station 1 and was constructed as part of Segment R2. The project requires approximately 743 lineal feet of storm sewer consisting of approximately 267 lineal feet of 30 inch diameter pipe, 147 lineal feet of 38”x24” HEPRCP pipe, and 329 lineal feet of 24 inch diameter pipe. In addition the alignment requires 6 new manholess in accordance with the plans and specifications, but not including Items 0010 through 0013 on the bid schedule. to ELECTRIC FOR MOTORIZED SLUICE GATEAll work necessary to install electric lines for running motorized sluice gate. Work includes wiring approximately 350 linear feet of four (4) #2 wire & one (1) #4 ground in a 1-1/2” Diameter conduit including a railroad crossing utilizing a trenchless method to be approved by New Jersey Transit.

Installation includes NEMA 3R enclosure near West Main Street. Enclosure includes a new electric meter and disconnect switch Additional items include two (2) manholes and one (1) Handhold testing, trench repair; erosion control measures, and site restoration in accordance with the drawings and specifications..

CLIN 0010

The CLIN extended description has changed from Design, disconnect, remove, install and reconnect 1-inch NJ American Water main at STA 0+71.6 and relocate 10-inch NJ American Water Main near Manhole 2 (STA 2+67). Allowance amount of $10,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs. Actual payment in excess of allowance amount is subject to availability of funds. to EAST MAIN STREET STORM SEWERAll work necessary to interconnect a local depression along East Main Street with drainage to Pump Station 1 (Segment R2 Pump Station) a new storm sewer is proposed to convey flow along East Main Street from approximately the intersection of East Main Street and Mountain Avenue westward to approximately the intersection of West Main Street and Drake Street. At this point it will be connected to the existing drainage system that connects to Pump Station 1 and was constructed as part of Segment R2. The project requires approximately 743 lineal feet of storm sewer consisting of approximately 267 lineal feet of 30 inch diameter pipe, 147 lineal feet of 38”x24” HEPRCP pipe, and 329 lineal feet of 24 inch diameter pipe. In addition the alignment requires 6 new manholes in accordance with the plans and specifications, but not including Items 0011 through 0014 on the bid schedule..

CLIN 0011

The CLIN extended description has changed from Design, disconnect, remove, install and reconnect 1-inch permanent PSE&G gas line at STA 0+79.6. Allowance amount of $10,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs. Actual payment in excess of allowance amount is subject to availability of funds. to Design, disconnect, remove, install and reconnect 1-inch NJ American Water main at STA 0+71.6 and relocate 10-inch NJ American Water Main near Manhole 2 (STA 2+67). Allowance amount of $10,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs. Actual payment in excess of allowance amount is subject to availability of funds..

CLIN 0012

The CLIN extended description has changed from Design, disconnect, remove, install and reconnect PSE&G electric conduits and manhole at STA 2+81. Allowance amount of $15,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs. Actual payment in excess of allowance amount is subject to availability of funds. to Design, disconnect, remove, install and reconnect 1-inch permanent PSE&G gas line at STA 0+79.6. Allowance amount of $10,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs. Actual payment in excess of allowance amount is subject to availability of funds..

CLIN 0013

The CLIN extended description has changed from Relocate two utility poles including disconnect, remove utilities and poles, install new poles and reconnect utilities. Allowance amount of $10,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs. Actual payment in excess of allowance amount is subject to availability of funds. to Design, disconnect, remove, install and reconnect PSE&G electric conduits and manhole at STA 2+81. Allowance amount of $15,000 to be included in bid as shown and not changed.

Actual payment will be based on actual costs. Actual payment in excess of allowance amount is subject to availability of funds..

CLIN 0014

The CLIN description has changed from Option 4 to Option 3.

The CLIN extended description has changed from Design, disconnect, remove, install and reconnect 1-inch permanent PSE&G gas line at STA 1+55.5. Allowance amount of $10,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs. Actual payment in excess of allowance amount is subject to availability of funds. to Relocate two utility poles including disconnect, remove utilities and poles, install new poles and reconnect utilities. Allowance amount of $10,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs. Actual payment in excess of allowance amount is subject to availability of funds..

CLIN 0015

The CLIN description has changed from Option 5 to Option 4.

The CLIN extended description has changed from Design, disconnect, remove, install and reconnect 12-inch permanent PSE&G gas line at STA 2+94.1. Allowance amount of $10,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs. Actual payment in excess of allowance amount is subject to availability of funds. to Design, disconnect, remove, install and reconnect 1-inch permanent PSE&G gas line at STA 1+55.5. Allowance amount of $10,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs. Actual payment in excess of allowance amount is subject to availability of funds..

CLIN 0016

The CLIN description has changed from Option 6 to Option 5.

The CLIN extended description has changed from Design, disconnect, remove, install and reconnect 1-inch permanent PSE&G gas line at STA 3+56.5. Allowance amount of $10,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs. Actual payment in excess of allowance amount is subject to availability of funds. to Design, disconnect, remove, install and reconnect 12-inch permanent PSE&G gas line at STA 2+94.1. Allowance amount of $10,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs. Actual payment in excess of allowance amount is subject to availability of funds..

CLIN 0017

The CLIN description has changed from Option 7 to Option 6.

The CLIN extended description has changed from As part of the East Main Street Storm Sewer Improvements, all work necessary to install 147 lineal feet of 36 inch diameter pipe between manholes 3 and 4 in lieu of a 38”x24” HEPRCP pipe include din Option 3. to Design, disconnect, remove, install and reconnect 1-inch permanent PSE&G gas line at STA 3+56.5. Allowance amount of $10,000 to be included in bid as shown and not changed. Actual payment will be based on actual costs. Actual payment in excess of allowance amount is subject to availability of funds..

CLIN 0018 is added as follows:

0018 1 Job OPTION Option 7

FFP

As part of the East Main Street Storm Sewer Improvements, all work necessary to install 108 lineal feet of 36 inch diameter pipe between manholes 3 and 4 in lieu of a 38”x24” HEPRCP pipe include din Option 3.

INSPECTION AND ACCEPTANCE

The following Acceptance/Inspection Schedule was added for CLIN 0018:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

(End of Summary of Changes)