Amendment 0005

View the file

Other files

File Type Posted
Bid_Results_14-B-0002_Greenbrook.pdf PDF
Amendment_0007.pdf PDF
Amendment_6_specs.pdf PDF
Amendment_0006.pdf PDF
Amendment_6_Plans_01-29-14.pdf PDF
Amendment_0004.pdf PDF
Amend_3-_specs.pdf PDF
Amendment_0003.pdf PDF
Amendment_3_Plans.pdf PDF
Amendment_0002.pdf PDF
Amend_1_Plans-_File_1.pdf PDF
Amend_1_Specs.pdf PDF
Amend_1_Plans_-File_2.pdf PDF
Amendment_0001.pdf PDF
Plans_GB_SEG_R2_T_8_Nov_2013_File_2.pdf PDF
Plans_GB_SEG_R2_T_8_Nov_2013_File_3.pdf PDF
Plans_GB_SEG_R2_T_8_Nov_2013_File_4.pdf PDF
Plans_GB_SEG_R2_T_8_Nov_2013_File_5.pdf PDF
Plans_GB_SEG_R2_T_8_Nov_2013_File_1.pdf PDF
Specs_SEGR2T_-_East_Main.pdf PDF
Solicitation.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W16ROE32968183

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

a. Incorporate Responses to Questions (For Informational Purpose Only)

b. Change Bid Opening Date From: 24 Jan 2014 @ 2:00 P.M. EST To: 04 Feb 2014 @ 2:00 P.M. EST.

NOTE: Bidders must acknow ledge receipt of this amendment by the date specified in the bid (or as amended) by one of the follow ing methods: in the space provided on the SF 1442, by separates letters, or by telegram by signing block 15 below . FAILURE TO ACKNOWLDEGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE

LATE BID, LATE MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Jan-2014

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-14-B-0002

X 9B. DATED (SEE ITEM 11)

19-Nov-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Jan-2014

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-14-B-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0005

Green Brook Flood Risk Management Project- Segment R2 Levee Extension, Segment T Raising, and East Main Street Storm Sewer Improvements, Borough of Bound Brook, NJ

IFB# W912DS-14-B-0002

Bid Opening hour and date are changed to 4 February 2014 at 2:00PM local time.

1. The following are responses to questions received from bidders (FOR

INFORMATIONAL PURPOSES ONLY):

Question No. 1: Drawing G1005, Sheet #6 – Segment R-2 Soil Disposal. The note on this drawing states that all excavated material is above the regulatory levels and must be properly disposed of at no additional cost to the Government… but is not considered to be above RCRA threshold for hazardous waste for soils in this area. Obviously the Government has performed testing, but has not provided the information regarding the test results for this soil to determine the contaminates that are making this above the clean fill limits. Without any analytical information, we would need to assume worst case scenario and the government would be penalized if the hazardous allowed less expensive disposal. Please provide all testing information available.

RESPONSE: No tests have been taken. Contractor should make estimate based on information provided considering the site is a railroad area and contaminants would be typical of that use. Tests to be conducted by the contractor are identified in the specifications and Drawing G1005 Amendment 1.

Question No 2. Drawing S504, Sheet #45, Section A. This calls for 2 each C-10 x 3.5 aluminum channels to make one stop log. The first number is the depth of the channel and the second number is the pounds per foot. Our supplier confirms that this is not a section that is produced. Further research has shown that aluminum channels (Structural) ASTM B221 Alloy 5086-HIII is available in the following dimensions: Depth 10”, Web thickness 0.310, flange width 4.25”, flange thickness 0.50”, weight per foot

8.36 lbs/lf. This material does not meet the specs of ASTM B221 Alloy 6061-T6. It does not conform to the 7” height dimension shown on Section A or come close the approximate weight of stop log on Drawing S504 of 90 lbs. per stop log. An alternate maybe aluminum channel (extruded) ASTM B308 Alloy 6061-T6 this is available in 10” depth, Web thickness 0.250, flange width 3.50”, flange thickness 0.41” and approximate

W912DS-14-B-0002

weight of 6.14 lb/lf. This would meet the 7” height dimension shown on Section A, it would meet our Alloy requirement of 6061-T6. It would not however meet your ASTM requirement of B221. The weight per stop log would be approximately 154 lbs. plus the rubber and accessories. Please provide how to proceed with these items.

In addition, the finishing requirements per the specifications seem to indicate that these should be painted including the galvanizing and stainless steel. Please confirm the painting requirement for the stop log structures and appurtenant items.

RESPONSE: Second number is the flange width, not the pounds per foot. ASTM B308 (Standard Specification for Aluminum-Alloy 6061-T6 Standard Structural Profiles) does not conflict with ASTM B221 (Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes).

Contractor should use the section described below:

Aluminum channel (extruded) ASTM B308 Alloy 6061-T6, with a 10” depth, flange width 3.50”, Web thickness 0.250, and a flange thickness 0.41”. Note on Sheet S-504 near Stop Log Layout Plan has been revised to reflect approximate weight of 150 LBS.

Painting is only required where two dissimilar metals will be in contact with each other or concrete during project operation and or storage.

2. This amendment shall be attached to the specifications and plans and shall be a part thereof.

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 24-Jan-2014 02:00 PM to 04-Feb-2014 02:00 PM.

(End of Summary of Changes)