Amendment4Specs.pdf
PDF 772 KB Posted
- Attached to
- Dredging of Achorage Channel, Navigation 50ft. Improvemen, New York and New Jersey Harbor.
- Solicitation number
- W912DS-10-B-0004
About this file
Amendment 0004 Specs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| bidabstract.pdf | ||
| Amendment 8.pdf | ||
| Amendment 7.pdf | ||
| USACE CCRcalculator S-AN-2 Rev1 | — | |
| Amendment 6 doc.pdf | ||
| W912DS-10-B-0004 Amendment 0005.pdf | ||
| Amd4Plans-C-101.pdf | ||
| Amendment 0003 PDF.pdf | ||
| Amend2Specs.pdf | ||
| Amend2plans.pdf | ||
| Plansamd1San2b12182009.pdf | ||
| Amend No 1 FBO Post(3).doc.pdf | ||
| USACE CCRcalculator S-AN-2.xls | XLS spreadsheet | |
| W912DS-10-B-0004-Plans.pdf | ||
| W912DS-10-B-0004-Specs.pdf | ||
| Anchorage Channel Upland Data Tables.pdf | ||
| surveySAN2.dgn | — | |
| Upland Testing Report.PDF |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W16ROE93071314
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
a. Provide FAR Clause’s that w ere inadvertently omitted.
b. Provide revisions to the Specifications and Draw ings as detailed on the follow ing pages.
The Bid opening date remains unchanged, 12 January 2010 @ 2:00pm EST.
NOTE: Offerors must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the follow ing methods: in the space provided on the SF 1442, by separate letter, by telegram or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFICED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH
THE SUBMISSION, MOFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Jan-2010
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-10-B-0004
X 9B. DATED (SEE ITEM 11)
10-Dec-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Jan-2010
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS-10-B-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following have been added by full text:
AMENDMENT 0004
W912DS-10-B-0004
Amendment No. 4
USACE, NYD Corps of Engineers New York, NY 10278
AMENDMENT NO. 4 FOR IFB NO. W912DS-10-B-0004
1. The following changes shall be made to the specifications and plans.
1) Specifications:
Section 00 80 00.0018 Section 00 80 00.00 18 Para 1.4 f., page 63 of 122, Typo: revise to “Five (5) copy of prints of Record drawings”.
Section 00 80 00.00 18 Para 1.24 f. 1, page 77 of 122;
Typo: Revise “30 calendar days” To: “15 calendar days”.
Section 00 80 00.00 18 Para 1.42 a., Page 86 of 122;
Replace Paragraph 1.42a with the new revised paragraph below (Delete the 2nd through 4th paragraphs discussing the boat):
“a. TRANSPORTATION BY BOAT:
The Contractor shall provide on-call round trip transportation by boat for the Government representatives. The general schedule, pick up points and times will be discussed at the pre-construction meeting. This requirement is unlikely to exceed two daily round trips on a regular basis. The contractor shall provide all fuel, maintenance and repairs for the boat until the contract completion date.”
Section 00 80 00.00 18 Para 1.45 2 B) HARS 2, Page 90 of 122;
Typo: Second line, replace (10) with "(7)"
Section 00 80 00.00 18 Para 1.45 2 C), Page 91 of 122 Typo: Second sub para. Edit for clarification and replace with new revised paragraph below:
"Information to be provided by the Contractor within 5 calendar days of being informed of being the Apparent Low Bidder includes ten (10) copies of the following information:”
Section 01 13 55.00 18 Replace section 01 13 55.00 18 with new attached section 01 13 55.00 18.
Section 01 32 01.00 18 Section 01 32 01.00 18 page 4 Para 3.3.2.4 Typo: Re-letter the bullets with the revised letters from “a to h”
Section 01 35 26 Section 01 35 26 Page 8, Para 1.12.2 Accident Notification Typo: delete “NASA NPG 8621.1” and replace with “ENG Form 3394”
Section 01 45 02.00 18 Section 01 45 02.00 18 page 4, Para 1.6.3 Typo: CQC Cross reference should be 01 45 10.00 18
Section 01 45 02.00 18 page 4, Para 1.6.3.1 Typo: CQC Cross reference should be 01 45 10.00 18
Section 01 45 10.00 18 Section 01 45 10.00 18 Page 2, Para 3.2.2 d.
Typo: Cross Ref to 01330 should be changed to new format/number; “01 33 00.00 18.”
2) DRAWINGS:
1-The following drawing, have been amended C-101
SECTION 00700 - CONTRACT CLAUSES
The following have been added by full text:
52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)
If the Contractor has knowledge that any actual or potential labor dispute is delaying or threatens to delay the timely performance of this contract, the Contractor shall immediately give notice, including all relevant information, to the Contracting Officer.
(End of clause)
52.222-3 CONVICT LABOR (JUN 2003)
(a) Except as provided in paragraph (b) of this clause, the Contractor shall not employ in the performance of this contract any person undergoing a sentence of imprisonment imposed by any court of a State, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, or the U.S. Virgin Islands.
(b) The Contractor is not prohibited from employing persons--
(1) On parole or probation to work at paid employment during the term of their sentence;
(2) Who have been pardoned or who have served their terms; or
(3) Confined for violation of the laws of any of the States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, or the U.S. Virgin Islands who are authorized to work at paid employment in the community under the laws of such jurisdiction, if--
(i) The worker is paid or is in an approved work training program on a voluntary basis;
(ii) Representatives of local union central bodies or similar labor union organizations have been consulted;
(iii) Such paid employment will not result in the displacement of employed workers, or be applied in skills, crafts, or trades in which there is a surplus of available gainful labor in the locality, or impair existing contracts for services;
(iv) The rates of pay and other conditions of employment will not be less than those paid or provided for work of a similar nature in the locality in which the work is being performed; and
(v) The Attorney General of the United States has certified that the work-release laws or regulations of the jurisdiction involved are in conformity with the requirements of Executive Order 11755, as amended by Executive Orders 12608 and 12943.
52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT - OVERTIME COMPENSATION.
(JUL 2005)
(a) Overtime requirements. No Contractor or subcontractor employing laborers or mechanics (see Federal Acquisition Regulation 22.300) shall require or permit them to work over 40 hours in any workweek unless they are paid at least 1 and 1/2 times the basic rate of pay for each hour worked over 40 hours.
(b) Violation; liability for unpaid wages; liquidated damages. The responsible Contractor and subcontractor are liable for unpaid wages if they violate the terms in paragraph (a) of this clause. In addition, the Contractor and subcontractor are liable for liquidated damages payable to the Government. The Contracting Officer will assess liquidated damages at the rate of $10 per affected employee for each calendar day on which the employer required or permitted the employee to work in excess of the standard workweek of 40 hours without paying overtime wages required by the Contract Work Hours and Safety Standards Act.
(c) Withholding for unpaid wages and liquidated damages. The Contracting Officer will withhold from payments due under the contract sufficient funds required to satisfy any Contractor or subcontractor liabilities for unpaid wages and liquidated damages. If amounts withheld under the contract are insufficient to satisfy Contractor or subcontractor liabilities, the Contracting Officer will withhold payments from other Federal or Federally assisted contracts held by the same Contractor that are subject to the Contract Work Hours and Safety Standards Act.
(d) Payrolls and basic records.
(1) The Contractor and its subcontractors shall maintain payrolls and basic payroll records for all laborers and mechanics working on the contract during the contract and shall make them available to the Government until 3 years after contract completion. The records shall contain the name and address of each employee, social security number, labor classifications, hourly rates of wages paid, daily and weekly number of hours worked, deductions made, and actual wages paid. The records need not duplicate those required for construction work by Department of Labor regulations at 29 CFR 5.5(a)(3) implementing the Davis-Bacon Act.
(2) The Contractor and its subcontractors shall allow authorized representatives of the Contracting Officer or the Department of Labor to inspect, copy, or transcribe records maintained under paragraph (d)(1) of this clause. The Contractor or subcontractor also shall allow authorized representatives of the Contracting Officer or Department of Labor to interview employees in the workplace during working hours.
(e) Subcontracts. The Contractor shall insert the provisions set forth in paragraphs (a) through (d) of this clause in subcontracts that may require or involve the employment of laborers and mechanics and require subcontractors to include these provisions in any such lower tier subcontracts. The Contractor shall be responsible for compliance by any subcontractor or lower-tier subcontractor with the provisions set forth in paragraphs (a) through (d) of this clause.
52.222-7 WITHHOLDING OF FUNDS (FEB 1988)
The Contracting Officer shall, upon his or her own action or upon written request of an authorized representative of the Department of Labor, withhold or cause to be withheld from the Contractor under this contract or any other Federal contract with the same Prime Contractor, or any other Federally assisted contract subject to Davis-Bacon prevailing wage requirements, which is held by the same Prime Contractor, so much of the accrued payments or advances as may be considered necessary to pay laborers and mechanics, including apprentices, trainees, and helpers, employed by the Contractor or any subcontractor the full amount of wages required by the contract. In the event of failure to pay any laborer or mechanic, including any apprentice, trainee, or helper, employed or working on the site of the work, all or part of the wages required by the contract, the Contracting Officer may, after written notice to the Contractor, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased.
The following have been modified:
52.225-21 REQUIRED USE OF AMERICAN IRON, STEEL, AND OTHER MANUFACTURED GOODS—
BUY AMERICAN ACT—CONSTRUCTION MATERIALS (MAR 2009)
(a) Definitions. As used in this clause—
Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.
Materials purchased directly by the Government are supplies, not construction material.
Domestic construction material means—
(1) An unmanufactured construction material mined or produced in the United States; or
(2) A construction material manufactured in the United States.
Foreign construction material means a construction material other than a domestic construction material.
Manufactured construction material means any construction material that is not unmanufactured construction material.
Steel means an alloy that includes at least 50 percent iron, between .02 and 2 percent carbon, and may include other elements.
United States means the 50 States, the District of Columbia, and outlying areas.
Unmanufactured construction material means raw material brought to the construction site for incorporation into the building or work that has not been—
(1) Processed into a specific form and shape; or
(2) Combined with other raw material to create a material that has different properties than the properties of the individual raw materials.
(b) Domestic preference.
(1) This clause implements—
(i) Section 1605 of the American Recovery and Reinvestment Act of 2009 (Recovery Act) (Pub. L. 111-5), by requiring, unless an exception applies, that all iron, steel, and other manufactured goods used as construction material in the project are produced in the United States; and
(ii) The Buy American Act (41 U.S.C. 10a - 10d) by providing a preference for unmanufactured domestic construction material.
(2) The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraph (b)(3) and (b)(4) of this clause.
(3) This requirement does not apply to the construction material or components listed by the Government as follows:
______________ NONE____________________________
(4) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(3) of this clause if the Government determines that—
(i) The cost of domestic construction material would be unreasonable.
(A) The cost of domestic iron, steel, or other manufactured goods used as construction material is unreasonable when the cumulative cost of such material will increase the cost of the contract by more than 25 percent;
(B) The cost of unmanufactured construction material is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available quantities and of a satisfactory quality; or
(iii) The application of the restriction of section 1605 of the Recovery Act or the Buy American Act to a particular construction material would be inconsistent with the public interest.
(c) Request for determination of inapplicability of Section 1605 of the Recovery Act or the Buy American Act.
(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(4) of this clause shall include adequate information for Government evaluation of the request, including—
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Cost;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(4) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed cost comparison table in the format in paragraph (d) of this clause.
(iii) The cost of construction material shall include all delivery costs to the construction site and any applicable duty.
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to section 1605 of the Recovery Act or the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable cost of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(4)(i) of this clause.
(3) Unless the Government determines that an exception to section 1605 of the Recovery Act or the Buy American Act applies, use of foreign construction material is noncompliant with section 1605 of the American Recovery and Reinvestment Act or the Buy American Act.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Cost Comparison
Construction Material Unit of Quantity Cost (Dollars)* Description Measure
Item 1:
Foreign construction material _______ _______ _______ Domestic construction material_______ _______ _______
Item 2:
Foreign construction material _______ _______ _______ Domestic construction material_______ _______ _______ (List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.)
(Include other applicable supporting information.)
(* Include all delivery costs to the construction site.])
The following have been deleted:
52.236-1 Performance of Work by the Contractor APR 1984
(End of Summary of Changes)
SAN2 SAN2
SECTION 01 13 55.00 18
AIR EMISSIONS REQUIREMENTS
(nyd 09)
PART 1 GENERAL
1.1 BACKGROUND
The Contractor shall comply with the air emissions requirements of this section which are intended to ensure compliance with the Federal Clean Air Act and limit the emission of Nitrogen Oxides (NOx)produced by the combustion of fossil fuels.
1.2 AIR EMISSIONS CONSULTANT (AEC)
The Contractor shall retain an independent firm having a minimum of 3 years of experience in calculating air emissions for equipment in the utility, process, construction or manufacturing industries to assist the Contractor in fulfilling the requirements of this section.
1.3 NOx EMISSIONS LIMIT
a. The Contractor shall not adversely affect the attainment plans established by the States of New York and New Jersey. The Government has allocated Air Quality Units for this contract; therefore the Contractor is limited to the following allowable NOx emissions per calendar year unless the Contractor is able to obtain additional Air Quality Units at its own expense.
Allocated Air Quality Units
(NOx Emissions Calendar Year Allowable Limit - Tons)
2010 20.2 2011 34.6
b. NOx emissions shall be calculated for all marine based equipment, with a maximum horsepower output of greater than or equal to 25, operated in the area as shown on the map at the end of this Section. Emissions from the following equipment, including their auxiliary engines, shall be calculated: dredges, tugs, scows, drill boats, survey boats, supply boats, crew boats, tenders and other water based equipment associated with the Contractor's dredging operation. Emissions shall be calculated for activities directly related to the performance of the contract.
c. The Contractor is responsible for ensuring that contract emissions do not exceed the calendar year Allocated Air Quality Units (NOx Emissions Allowable Limit - Tons) for NOx in a given calendar year. Once the Contractor reaches Allocated Air Quality Units (NOx Emissions Allowable
SECTION 01 13 55.00 18 Page 1
Limit - Tons) in a given calendar year, all water based equipment must cease operations for the remainder of the calendar year unless the Contractor is able to obtain additional Air Quality Units at its own expense. The Contractor will not be entitled to additional time or money in the event that the Contractor exhausts the Allocated Air Quality Units (NOx Emissions Allowable Limit - Tons) made available by the Government and must stop work.
d. The Government has developed an Air Emissions Calculator that must be used by the Bidder during the preparation of its bid to ensure that NOx emissions of all equipment associated with the contract are within the calendar year Allocated Air Quality Units (NOx Emissions Allowable Limit - Tons). The calculator may be downloaded from fedteds.gov web site with the plans and specs.
1.4 AIR EMISSIONS SUBMITTAL REQUIREMENTS
1.4.1 The Contractor shall submit ten (10) copies of the following information within Five (5) calendar days of being notified of being the apparent low bidder.
A. The qualifications of the Contractor's Air Emissions Consultant (AEC).
B. Air Emissions Calculator
The Contractor shall use the air emissions calculator to estimate the emissions of NOx and provide printed versions of all emission calculation tabs.
The following is provided to describe the calculator and the input data required.
List all engines to be used on the contract on a separate line.
The calculator requires knowledge of the equipment to be used on the project, including the engine horsepower, year of manufacture (its model year), and its regulatory "Tier" level (i.e., Tier 1, Tier 2).
The calculator consists of four worksheets within a Microsoft® Excel workbook.
The four worksheets are:
- Instructions
- Dredge Inputs and Calcs
- Vessel Input and Calcs
- Emission Summary
The Instruction Worksheet provides for descriptions of the field names and the action required to input data on the Input and Calculations Worksheet.
Input and Calculations Worksheet: These worksheet are where the Contractor inputs information about the equipment that is or will be operating for this contract, such as the dredge engine type and name, "Tier" level, horsepower, NOx Control Method and expected number of hours of operation.
Operating hours are those hours that the diesel engine is actually running or operating (not the total time spent onsite) and will be entered for each month of work. Each engine shall be entered on a separate line. Data is only entered on this worksheet; no entries are to be made on the Emission
SECTION 01 13 55.00 18 Page 2
Summary worksheet.
If an emission control technology such as a fuel emulsion or a catalytic converter is used, or will be used, to reduce NOx emissions, there is a column on the worksheet, entitled NOx Control Method, to incorporate the reduction that the technology is recognized to achieve. The NOx emission control systems effectiveness must be approved by the U.S. Environmental Protection Agency (EPA).
This worksheet also calculates the estimated emissions from the equipment information entered.
The Emission Summary worksheet presents the emission estimates by year.
This worksheet is provided to help the Contractor adjust the technology or timing of their dredging operations to ensure that the estimated NOx emissions do not exceed the Allocated Air Quality Units in a given calendar year, thereby indicating whether the projected emissions are at an acceptable level.
C. Certification from the independent Air Emissions Consultant stating the following:
1)That the information provided in 1.4.1.A and 1.4.1.B is accurate;
2)That the construction schedule developed by the Contractor with its' associated marine equipment is within the calendar year Allocated Air Quality Units (NOx Emissions Allowable Limit - Tons); and
3)That any technologies, techniques, or methods identified to reduce emissions are approved by the U.S. Environmental Protection Agency (EPA).
D. Information as identified in Section 00 80 00.00 18, paragraph 1.45.C, Air Emissions Information to be submitted by the Contractor.
E. Should the Contractor choose to provide additional Air Quality Units at its own expense for this contract, the Contractor must provide evidence that these additional Air Quality Units are available to the Contractor, are appropriate for use on this contract for the calendar year they are to be used and can be obtained by the Contractor within 35 calendar days of being notified of being the apparent low bidder.
1.4.2 The Contractor shall submit the following information within 35 calendar days of being notified of being the apparent low bidder. If there are no changes to Contractor's 5 calendar day submission, the Contractor shall resubmit the information noting on the cover letter that there were no changes to the respective items.
A. Air Emissions Calculator (described in 1.4.1.B above).
B. Certification from an independent Air Emissions Consultant stating the following:
1)That the information provided in 1.4.2.A is accurate;
2)That the construction schedule developed by the Contractor with its' associated equipment is within the calendar year Allocated Air Quality Units (NOx Emissions Allowable Limit - Tons); and
3)That any technologies, techniques, or methods identified to reduce
SECTION 01 13 55.00 18 Page 3 emissions are approved by the U.S. Environmental Protection Agency (EPA).
C. Should the Contractor choose to provide additional Air Quality Units for this contract at its own expense, the Contractor must provide documentation that the Air Quality Units are appropriate for use on this contract for the calendar year they are to be used and provide evidence in the form of a contract or agreement, that these additional Air Quality Units are available for use by the Contractor by the 35th calendar day after being notified of being the apparent low bidder.
1.4.3 Information to be provided monthly during the execution of the contract.
A.Air Emissions Calculator and Narrative
1)The Air Emissions calculator and Narrative shall be updated monthly and submitted electronically. Updated calculations, narrative and other information associated with this task are due 10 days after the end of the month.
2)The Air Emissions Calculator shall be updated monthly to reflect actual hours worked, equipment actually used, and daily runtime per reportable engine, and other applicable information, on the data logging sheet provided at the end of this section; and actual emission control methods used during the previous month; and
3)Revise future emissions to reflect future hours of work remaining, equipment and emission control method adjustments.
4)A narrative explaining the changes from the baseline (Air Emissions Calculator submitted within 30 calendar days after award) to the updated Air Emissions Calculator shall be submitted.
B.Certification from an independent Air Emissions Consultant stating the following:
1)That the information provided in 1.4.3.A is accurate;
2)That the construction schedule developed by the Contractor with its' associated equipment is within the calendar year Allocated Air Quality Units (NOx Emissions Allowable Limit - Tons); and
3)That any technologies, techniques, or methods used to reduce emissions are approved by the U.S. Environmental Protection Agency (EPA).
C. If after the NTP is issued and during the execution of the Contract the Contractor chooses to provide additional Air Quality Units at its own expense, the Contractor must provide, at least two weeks prior to the use of the Air Quality Units, documentation that these additional Air Quality Units are appropriate for use on this contract for the calendar year they are to be used.
1.5 OPERATIONAL MONITORING, RECORDKEEPING, AND REPORTING
The Contractor shall be required to measure and record the following parameters: date and time stamp, engine hours of operation, engine load, engine speed, engine temperature, and fuel use rates on all diesel-powered engines associated with actual dredging equipment and the primary auxiliary
SECTION 01 13 55.00 18 Page 4 power generator. This information can be obtained by downloading data from the electronic engine management control system, if available. If the electronic engine management system does not provide the requested data or there is no electronic management system, the Contractor shall install appropriate data logging equipment on all reportable diesel-powered engines associated with actual dredging equipment and the primary auxiliary power generator to gather this information. The submittals shall be in one of the following file formats: (1) text format, either comma or tab delimited or (2) Microsoft Excel. Submittals will be rejected that require proprietary software for access.
The Contractor shall provide an initial 24-hour data log sample from the electronic engine management systems for each diesel-powered engine as stated above to the COR within 30 days of starting dredge work.
Additionally, for each applicable engine, the Contractor will provide engine make, model, manufacturer, engine management system software name and version, year built, and engine horsepower rating. The Contactor shall provide access to the Government and its contractors to check equipment, to view installation of equipment if none exists, and/or to observe the download of data from the engine management systems. Upon request, the Contractor shall provide additional data log samples for a duration determined by the COR.
The COR reserves the right to require the Contractor to maintain daily records on engines whose electronic engine management system are down. An example of the log sheet to fill out once per day for keeping these requested records is attached at end of this section.
1.6 IN-USE TESTING OF DREDGING EQUIPMENT
The Contractor shall cooperate with and assist the Government and its contractor(s) in obtaining measurements of emissions from the major engines powering the dredge(s) and associated equipment. The Government will be responsible for the testing program and the required equipment, while the Contractor will be responsible for making such minor physical modifications to the dredging equipment as may be necessary for successful emission testing. (Such modifications may include the installation of sampling ports on exhaust ducts or mounting brackets to support measuring equipment.) The Government and its emission testing contractor(s) will provide specific instructions on any physical modifications the Contractor is required to make after the issuance of the NTP.
The Contractor shall notify the COR of any plans to substitute or add major pieces of equipment to allow the Government to determine whether additional emission testing will be warranted. Engines with test equipment attached shall not be removed from the contract area without written consent from the COR.
1.7 MEASUREMENT AND PAYMENT
No separate payment shall be made for this item.
-- End of Section --
SECTION 01 13 55.00 18 Page 5 e3enmjas Text Box
U.S. Army Corps of Engineers - New York District PJ4 SAN2 Contract 10 Vessel Data Logging Sheet Page 7
MONTH:
YEAR:
Page: of
Vessel Name:
Engine Information Activity Information
Date Engine Name Engine Type (Propulsion, Auxiliary, etc.)
Daily Runtime (hours)
Daily Fuel Consumption
(tons or gallons)
# of Daily Trips to
HARS or Reef
Average Transit Time
Within 3- Nautical Mile Line (hours)
Average Loaded Speed (knots)
Average Unloaded
Speed (knots)
U.S. Army Corps of Engineers - New York District SAN2 Contract 10 Dredge Data Logging Sheet Page 8
MONTH:
YEAR:
Page: of
Dredge/Barge Name:
Date Engine Name Engine Type
(Main, Aux, Pump, etc)
Daily Runtime (hours)
Daily Fuel Consumption
(tons or gallons)
Sediment Type
Daily Dredged Volume (cubic yards)
Scow Capacity
(cubic yards)
Daily Number of
Scows Filled
Engine Information Activity Information
| 01 13 55.00 18R.pdf |
| 01 13 55.00 18 - AIR EMISSIONS REQUIREMENTS |
| PART 1 GENERAL |