Amendment 6 doc.pdf

PDF 24 KB Posted

Attached to
Dredging of Achorage Channel, Navigation 50ft. Improvemen, New York and New Jersey Harbor.
Solicitation number
W912DS-10-B-0004
Issued by

About this file

Amendment 0006

View the file

Other files

File Type Posted
bidabstract.pdf PDF
Amendment 8.pdf PDF
Amendment 7.pdf PDF
USACE CCRcalculator S-AN-2 Rev1 —
W912DS-10-B-0004 Amendment 0005.pdf PDF
Amd4Plans-C-101.pdf PDF
Amendment4Specs.pdf PDF
Amendment 0003 PDF.pdf PDF
Amend2Specs.pdf PDF
Amend2plans.pdf PDF
Plansamd1San2b12182009.pdf PDF
Amend No 1 FBO Post(3).doc.pdf PDF
USACE CCRcalculator S-AN-2.xls XLS spreadsheet
W912DS-10-B-0004-Plans.pdf PDF
W912DS-10-B-0004-Specs.pdf PDF
Anchorage Channel Upland Data Tables.pdf PDF
surveySAN2.dgn —
Upland Testing Report.PDF PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W16ROE93071314

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

a. Provide questions and Answ ers for INFORMATION PURPOSES ONLY

b. Provide revisions to the Specifications as detailed on the follow ing pages.

c. Extend the Bid Due Date From 12 January 2010 @ 2:00pm EST to 20 January 2010 at 2:00pm EST.

NOTE: Bidders must acknow ledge receipt of this amendment by the date specif ied in the solicitation (or as amended) by one of the follow ing methods. In the space provided on the SF1442, by separate letter, or by telegram, or by signing the block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE

LATE BID, LATE MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Jan-2010

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-10-B-0004

X 9B. DATED (SEE ITEM 11)

10-Dec-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Jan-2010

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-10-B-0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been added by full text:

AMENDMENT 0006

W912DS-10-B-0004

Amendment No. 6

USACE, NYD Corps of Engineers New York, NY 10278 AMENDMENT NO. 6 for IFB NO. W912DS-10-B-0004

1. The following changes shall be made to the specifications.

1) SPECIFICATIONS:

SECTION 01 13 55.00 18

1-Revise the Allowable Limit in Paragraph 1.3 (provided in amendment 4) NOx EMISSIONS LIMIT as below:

Allocated Air Quality Units

(NOx Emissions Calendar Year Allowable Limit - Tons)

2010 47.1 2011 54.3

2-The Revised Calculator is available at the FBO Website with this amendment

2) QUESTIONS AND ANSWERS

The following questions and answers are provided for information only. Nothing contained below amends or revises any provision of the solicitation.

This is for bidder’s reference only, and is not to be considered as a part of the Contract Documents. Contract award will be based on what is contained in the printed Plans and Specifications in a hard copy format or Electronic Bid Set if provided.

Question-1: The current emission budget is less than half that required to complete the project.

We respectively request the NOx budget be raised significantly.

Answer-1: Revised Emissions limits are provided in this amendment.(Section 01 13 55.00 18 Paragraph 1.3).

Question-2: Is the contract considered over if all available credits have been used?

Answer-2: No

W912DS-10-B-0004

Question-3: Upon Review of the NOx Emissions Calculator provided with Solicitation Number:

W912DS-10-B-0004 (Anchorage) the 20.2 (2010) and 34.6 (2011) tons allowed seem to be inordinately low. Please review.

Answer-3: Revised Emissions limits are provided in this amendment.

Question-4: Can the Corps provide a list of Air Emissions Consultant for air quality monitoring and calculations required in the Air Emissions Requirements, of the Contract Specifications.

Answer-4: The following list is companies that may be helpful to bidders. This list may not be all-inclusive. By providing this list the Government makes no representation as to acceptability of the firm or of their work product nor should the list be construed as endorsing any of the firms. This list is provided for information only. Contractors are free to use any firm it chooses which meets our requirements.

Clean Air Engineering Services ( Palantine, IL) Engine, Fuel and Emissions Engineering (California) M.J. Bradley and Associates (Massachusetts) LFR Levine-Fricke Inc/Air Recon (New Jersey) URS (California) Heaney, Edelstein and Co. (HECO) (New Hampshire) Combustion Engineering Labs (Florida) Clean Air Technologies International (New York) McCullough Engineering (Texas) Southwest Research Institute (Texas) HDR (New York) Weston Solutions (Pennsylvania) Tetra Tech (California) Baker Engineering Hart Crowser Shaw E & I (Tennessee)

Question-5: Do the NOx limits for the contract include the time spent dredging the upland material? I’m assuming they do? Does the equipment used for processing material need to be included in the NOx calculation?

Answer-5 "yes, the time dredging upland is counted, but not the hauling, unloading processing, transportation, etc.

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 14-Jan-2010 02:00 PM to 20-Jan-2010 02:00 PM.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .