About this file

Amendment 0008

View the file

Other files

File Type Posted
bidabstract.pdf PDF
Amendment 7.pdf PDF
USACE CCRcalculator S-AN-2 Rev1 —
Amendment 6 doc.pdf PDF
W912DS-10-B-0004 Amendment 0005.pdf PDF
Amd4Plans-C-101.pdf PDF
Amendment4Specs.pdf PDF
Amendment 0003 PDF.pdf PDF
Amend2Specs.pdf PDF
Amend2plans.pdf PDF
Plansamd1San2b12182009.pdf PDF
Amend No 1 FBO Post(3).doc.pdf PDF
USACE CCRcalculator S-AN-2.xls XLS spreadsheet
W912DS-10-B-0004-Plans.pdf PDF
W912DS-10-B-0004-Specs.pdf PDF
Anchorage Channel Upland Data Tables.pdf PDF
surveySAN2.dgn —
Upland Testing Report.PDF PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W16ROE93071314

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

a. Provide Revised Wage Rates MJ59.

b.. Extend the Bid Due Date From 20 January 2010 @ 2:00pm EST to 22 January 2010 at 2:00pm EST.

NOTE: Bidders must acknow ledge receipt of this amendment by the date specif ied in the solicitation (or as amended) by one of the follow ing methods. In the space provided on the SF1442, by separate letter, or by telegram, or by signing the block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE

LATE BID, LATE MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-Jan-2010

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-10-B-0004

X 9B. DATED (SEE ITEM 11)

10-Dec-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Jan-2010

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-10-B-0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0008

Current Wage Decisions

General Decision Number: NY080001 10/03/2008 NY1 State: New York Construction Type: Heavy Dredging Counties: New York Statewide.

STATEWIDE

New York All dredging, except self-propelled hopper dredges, on the Atlantic Coast and tributary waters emptying into the Atlantic Ocean.

General Decision Number: NJ080059 11/20/2009 NJ59

State: New Jersey

Construction Type: Heavy

County: Hudson County in New Jersey.

HEAVY CONSTRUCTION PROJECTS

Modification Number Publication Date 0 04/24/2009 1 05/01/2009 2 07/03/2009 3 07/24/2009 4 08/21/2009 5 11/20/2009

* BRNJ0002-018 11/01/2009

Rates Fringes

BRICKLAYER.......................$ 36.70 23.47

Work on high stacks: 22% per hour additional.

* BRNJ0004-001 11/01/2009

Rates Fringes

BRICKLAYER (Cement Mason)........$ 36.70 23.47

CARP0006-013 05/01/2009

Rates Fringes

CARPENTER (Including Form Work)............................$ 39.45 49.75%

The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.

CARP0715-007 05/01/2009

Rates Fringes

Millwright.....................$ 40.27 49.75%

Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.

CARP1456-013 05/01/2008

Rates Fringes

CARPENTER (Dock Builder) Concrete form work..........$ 37.00 27.02 All other work..............$ 37.00 32.90

Work on land pile driving, floating marine construction and the construction of wharves, while handling and working with creosote and creosote-impregnated products: $.25 per hour additional.

Work on hazardous/toxic/contaminated waste removal, on a hazardous/toxic/contaminated waste site, where the worker comes into contact with hazardous/toxic/contaminated waste material, and when A, B or C personal protective equipment is required and used for respiratory, skin or eye protection: 20% per hour additional.

* ELEC0164-008 06/02/2008

Rates Fringes

ELECTRICIAN

Cable splicer...............$ 54.00 54% Electrician.................$ 47.37 54%

Work on line voltage of 440 or 480 volts: 10% per hour additional.

Work from trusses, scaffolds, frames, ladders and poles, 40

ft. or more above the ground or floor (does not include work from a manlift): 20% per hour additional.

Work on radio towers, transmission towers and smokestacks:

21% per hour additional.

ENGI0825-021 07/01/2009

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 42.02 22.50

GROUP 2.....................$ 40.43 22.50

GROUP 3.....................$ 38.52 22.50

GROUP 4.....................$ 36.89 22.50

GROUP 5.....................$ 35.18 22.50

Hazardous waste removal work:

Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: 20% per hour additional.

PAID HOLIDAYS:

New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided

1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday.

DEFINITION OF GROUPS:

GROUP 1:

Backhoe, Including Backhoe Track; Boom; Concrete Paving Machine; Crane (all types, including overhead and straddle traveling type); Drill (down-the-hole drill, rotary drill, self-propelled hydraulic drill, self-powered drill);

Elevating Grader; Excavator; Front End Loader (5 cu. yd.

and over); Piledriver (length of boom, including length of leads, shall determine premium rate applicable)

GROUP 2:

Backhoe Loader Combo; Concrete Pumper; Grader/Blade (Finish);

Hoist; Hydraulic Crane, 10 Tons and under; Front End Loader (2 cu. yd. but less than 5 cu. yd.); Scraper; Side Boom

GROUP 3:

Asphalt Spreader; Bulldozer; Compressor(2 or 3) (in Battery) (within 100 ft.); Crusher; Forklift; Front End Loader (1

cu. yd. and over but less than 2 cu. yd.); Lull; Mechanic;

Paver, Asphalt; Roller, Blacktop; Tractor;

GROUP 4:

Broom; Compressor (Single); Farm Tractor; Front End Loader (under 1 cu. yd.); Roller, Grade; Pump

GROUP 5:

Oiler

IRON0011-012 07/01/2009

Rates Fringes

Ironworkers:

Reinforcing.................$ 34.34 35.60 Structural, Ornamental......$ 37.14 35.60

LABO0172-008 03/01/2009

Rates Fringes

Laborers:

Landsacpe Laborer, Power Tool Operator...............$ 29.45 19.40

Hazardous waste removal work:

Work on a state or federally designated hazardous waste site, where the worker is required to wear Level A, B or C personal protection: $3.00 per hour additional.

Work on a state or federally designated hazardous waste site, where the worker is not required to wear Level A, B, or C personal protection: $1.00 per hour additional.

New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided that the worker works three days for the same employer within a period of ten working days consisting of five working days before and five working days after the day upon which the holiday falls or is observed.

LABO0222-013 05/01/2009

Rates Fringes

LABORER

MASON TENDER:

Cement/Concrete.............$ 28.55 19.42

PAIN0711-023 05/01/2009

Rates Fringes

Painters:

Work on bridges (Major Bridges Designed for Commercial Navigation)......$ 46.50 19.13

PAIN0711-024 11/01/2008

Rates Fringes

Painters:

New Construction Brush and roller...........$ 34.47 16.14 Spray......................$ 37.92 16.14 Steel......................$ 35.81 16.30 Repaint work, on projects on which no major alterations occur.

Brush and roller...........$ 26.67 13.80 Spray......................$ 29.34 13.80 Steel......................$ 27.74 13.93

SUNJ2004-030 01/02/2009

Rates Fringes

LABORER: Common or General......$ 28.82 8.46

LABORER: Pipelayer..............$ 24.05 13.67

TEAM0560-003 05/01/2009

Rates Fringes

TRUCK DRIVER

Dump Truck; Flatbed Truck...$ 32.00 22.68 Off the Road Truck; Pickup Truck.......................$ 31.85 22.68

Hazardous waste removal work:

Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional.

Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional.

Work on a state or federally designated hazardous waste site, in a zone requiring Level B, C or D personal protection for any workers other than the truck driver:

$1.00 per hour additional.

New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided that the employee has been assigned to work, or, "shapes", one day of the calendar week during which the holiday occurs.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in he matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 20-Jan-2010 02:00 PM to 22-Jan-2010 02:00 PM.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .