About this file

Specifications Part 1 of 2

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps ol Engin€Grsa*

NEW YORI( DISTRICT

GREEN BROOK FLOOD DATAGE REDUGTIO]I

SEGTE]IT R.2 $OUTH TAI]I $TREET GLOSURE

STRUGTURE A]ID REGRADI]IG OF THE DRIVEWAY AT

RATLROAD AI'ENUE

BOROUGH OF BOUND BROOIG trEW JERSEY

Specifications

Small Business Set - Aside

IFB NO. W912DS-09-B-0021

MAIN TABLE OF CONTENTS

Green Brook Sub-Basin of the Raritan River Green Brook Flood Damage Reduction Project

Segment R-2, South Main Street Closure Structure and Railroad Avenue Regrading Borough of Bound Brook, New Jersey

TITLE

INSTRUCTIONS, CONDITIONS, AND NOTICE TO BIDDERS

(To be inserted for advertising)

BID SCHEDULE

REPRESENTATIONS AND CERTIFICATIONS

(To be inserted for advertising)

CONTRACT CLAUSES

(To be inserted for advertising)

SPECIAL CONTRACT REQUIREMENTS

DTVISION OO _ LIST OF DOCUMENTS

SECTION

00 10 00

00 41 00

00 60 00

00 70 00

00 80 00

00 90 00

00 90 01

00 90 02 00 90 03

00 90 04

00 90 05

DTVISION 01 -

0t 32 01.00 10

WAGE RATES

SUPPLEMENTARY SPECIFICATIONS FOR FEDERAL AID

PROJECTS

APPENDICES:

APPENDIX A PROJECT ITEM NUMBERS

APPENDIX B NJ TRANSIT RAIL OPERATIONS

RAIL SAFETY GUIDELINES FOR

CONTRACTORS NJ TRANSIT RAIL

OPERATIONS SAFETY AND TRAINING

DEPARTMENT JANUARY 2008.

APPENDIX C SPECIFICATIONS FOR PIPELINE

OCCUPANCY ON NJ TRANSIT PROPERTY

EP-2.

APPENDIX D FRESHWATER WETLANDS PERMIT

GENERAL REQUIREMENTS

PROJECT SCHEDULE

DTVISION 02 . EXISTING CONDITIONS

022180.00 18 MONITORING OF EXISTING STRUCTIJRES

DTVISION 03 - CONCRETE

01 33 00 0t 35 29 01 35 45.00 10 01 45 02.00 l0 0l 45 04.00 10 0r 57 20.00 10 0l 57 23.00 10

0r 74 19

03 t l 14.00 10 03 15 14.00 10

03 20 02

03 31 01 .00 10

03 45 00

DTVISION 04 - MASONRY

04 20 00 0423 00

DTVISION 05 - METALS

05 05 23.00 t4 05 12 00 05 2 t t9 05 30 00 05 48 10 05 49 10 05 50 03.00 10

MASONRY

GLASS MASONRY UNITS

WELDING, STRUCTTIRAL

STRUCTURAL STEEL

OPEN WEB STEEL JOIST FRAMING

STEEL DECKS

SLUICE GATE

FLAP GATE

METALWORK FABRICATION, MACHINE WORK,

MISCELLANEOUS PROVISIONS

SUBMITTAL PROCEDURES

SAFETY AND OCCI]PATIONAL HEALTH REQUIREMENTS

CHEMICAL DATA QUALITY CONTROL

QUALITY CONTROL SYSTEM (QCS)

CONTRACTOR QUALITY CONTROL

ENVIRONMENTAL PROTECTION FOR CTVIL WORKS

STORM WATER POLLUTION PREVENTION MEASURES

(EROSION AND SEDTMENTATTON CONTROL)

CONSTRUCTION AND DEMOLITION WASTE

MANAGEMENT

FORMWORK FOR CONCRETE

DGANSION, CONRACTION AND CONSTRUCTION JOINTS

IN CONCRETE FOR CIVL WORKS

STEEL BARS AND WELDED WIRE FABRIC FOR

CONCRETE REINFORCEMENT FOR CryIL WORKS

CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVL

WORKS

PRECAS T- ARCHITECTURAL CONCRETE

DTVISION 06 _ WOOD PLASTICS AND COMPOSITES

06 10 OO ROUGH CARPENTRY

DIVISION 07 _ THERMAL AND MOISTURE PROTECTION

05 50 04.00 10

07 4t L3 07 60 00 07 92 00

DTVISION 08 _ OPENINGS

08 11 13 .00 10 08 33 23 08 71 00 08 91 00

DTVISION 09 - FINISHES

09 06 90 09 90 00 09 97 02

DIVISION 26 - ELECTRICAL

26 00 00.00 20 26 05 00.00 40 26 05 19.00 l0 26 24 16.00 40 26 5t 00

DTVISION 31 - EARTHWORK

31 00 00 31 05 22 31 10 00

METALS: MISCELLANEOUS, STANDARD ARTICLES.

SHOP FABRICATED ITEMS FOR CTVIL WORKS

STRUCTURES

METAL ROOF PANELS

FLASHING AND SHEET METAL

JOINT SEALANTS

STAINLESS STEEL DOORS AND FRAMES

OVERHEAD COILING DOORS

DOORHARDWARE

STAINLESS STEEL WALL LOUVERS AND VENTS

COLOR SCHEDULE

PAINTS AND COATINGS

PAINTING: HYDRAULIC STRUCTURES

BASIC ELECTRICAL MATERIALS AND METHODS<

COMMON WORK RESULTS FOR ELECTRICAL

INSULATED WIRE AND CABLE

PANELBOARDS

INTERIOR LIGHTING

EARTHWORK

GEOTEXTILES USED AS FILTERS

CLEARING FOR CIVL WORKS

DTVISION 32 - EXTERIOR IMPROVEMENTS

PLANT MATERTAL AND MAINTENANCE

BITUMINOUS BASE COURSE

BITUMINOUS - STABILVED BASE C OURSE. SUBBASE. OR

STIBGRADE

BITUMINOUS TACK AND PRIME COATS

HOT-MrX ASPHALT (HMA) FOR ROADS

SEEDING

EXTERIOR PLANTS

DryISION 33 - UTILITIES

31 23 00.01 20

31 2310.00 20 3 t 4 t t6 31 63 26.00 10 31 63 36

32 05 01.00 18 32 t t 26 32 l l 27

32 12 10 32 t2 t6 3292 t9 3293 00

33 30 00 33 40 01 33 71 02.00 20

35 2016.59 35 31 19 35 41 00

EXCAVATION, TRENCHING, AND BACKFILLING FOR

UTILITIES SYSTEMS

EXCAVATION, FILL, BACKFILL FOR STRUCTURES

METAL SHEET PILING

DRILLED FOUNDATION CAISSONS

TEMPORARY SOLIDER PILE WALL SYSTEM

SANITARY SEWERS

STORM DRAINAGE

UNDERGROUND ELECTRICAL DISTRIBUTION

CLOSURE GATES

STONE PROTECTION

LEVEE CONSTRUCTION

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

DTVISION 4I _ MATERIAL PROCESSING AND POWER EQUIPMENT

4t 22 33 .19 10 ELECTRIC POWERED WINCHES

PROJECT IDENTIFICATION SIGN

CIVIL WORKS PROJECT

The graphic format for this 4'x6' sign panel follows the legend guidelines and layout as specified below. The large 4'x 4' section ofthe panel on the right is to be white with black legend. The 2'x 4' section ofthe sign on the left with the full Corps Signature (reverse version) is to be screen-printed Communication Red on the white background. This project is receiving funding under the American Recovery and Reinvestment Act (ARRA), and the sign shall include the ARRA logo. All colors in the ARRA logos have precise color references, shown in the color specifications chart below. Always use the exact color values listed. Do not use screensortintsofanyofthecolorsforanypartofthelogos. TheCMYKvaluesshouldbeusedforprintapplications. TheRGN and HEX# values should be used for on-screen applications.

I:god Group l: One-to tweline desqiption ofCorps relationship to projat.

Color: White Typefie: 1.25" Helvetica Regulr Muimm line lmgth: 19" kgmd Group 2: Divisioa or DistsictNme (optional). Placed below 10.5" rwqse Signature (6" Castle).

Color: White Typefae: 1.25" Helvetica Regule l:god Group 2a: One to thrFline idfltifiBtion of Military or Civil Works sponsor (optioual). Place below Corps Signature to qoss-align with Group 5a-b.

Color; White Typefae: 1.25" Helvetica Regulr Muimm line lmgtl: 19"

If,gfld Group 3 : One to lhrcJine prcjst tide legmd dercribes the work being done uds this confract.

Color: Black Typefare: 3" Helvetica Bold Muimum line lmgth:42" kgmd Group 4: One- twoline idmtification ofprcject or facility (civil works) or nme of sponsoring depaftnilt (military).

Color: Black Typeface: 1.5" Helvetica Regular Muimm line lmgth: 42"

Cross align the first line ofl-egad Group 4 with the first line ofthe Corps Signature (US Amy Corps) as shom.

kgend Groups 5a-b: One- to five-line idmtification ofprim€ contracttrs including;

type (ilchitet, gflqal contactor, etc.), @rponte or fim nme, city, state. Use of I*gend Group 5 is optional.

Color: Black Tyeface 1.25" Helvetica Regular Muimm line lmgth:21".

All tpography is flush left md rag right, uppq md lowq case with initial capitals only as shom. Letter- md word-spaaing to follow Corps standards as spwified in Appendix D of the US Amy Corps of Engineos, "Sign Standuds Manual" EPS-3 I 0-l -6

Color CMYK RGB HEX# Naw 00/00/00/00 0/5t/102 003366 Red 30/100/100/50 t02/0/0 660000 Green 6s/25/100/7 r03/144/62 67903E Lieht Blue 67/37t6/00 89/t4t/t92 598DCO

For a visual copy of the logo refer to Recovery.gov. See attached sheet for fabrication and mounting guidelines.

.4it:

s.25*

105:

2_5!'1.5r'

1_5' g

4.8', 4.5"

2.25" s.5"

1.gvli 1.878" 1.875"

Grccn Brook Flood Darnage Rcduction Project seom€nt Ri! South Main Street Cldbure Structure and- Regradlng Drlveway at Rallroad Avenue

Borqush of Bound Brook SomeB€{ Counly, New Je6ey

Contractor:

Srgn lype Legfld Size (A)

Pmel Size Post Size Speificatim MOmnng Hdohl

Color cID-o1 Various 4 ' x 6 ' 4"x4 ; ' HDO.3 48" wH-

RD/BK

S E C T T O N 0 0 0 8 0 0 Page 32

$qBigeEsr: sffitbfiE sh'Ee*ry b E.jcb *essa|Esr.

{&! ltr rFll SiRv firssr FllEt t{d sno. off- &rs$sgi Fills :.1?

Tfusls€caBdd ffiffi

$jFgErd e*pti @ b iroi*re ffiitffite€EffiftEsE 'Mi {elrls{tmPi*serhs o6drs* @ rsft d tECftfr{t w*4* Ty@ X.trI+hsHFea& lfid*rMfl flr€ hrd$* 4A-tESt!{&S s€F-&m$e litsf{Hskr:silgPslsl$e m*ra&r*rg**, r*aO*ere eswie* Tl@ r.9 HefresEaFfrrt*r *ffir8mSele{Sr*4" regmc,up*wrmry mffff-* Qpekce*l$F bl$$oFqrry

FFdffiEnffnElrmb$P ffiixeqgt$cts -u!u *rsfr*m @sffi€ns$flfrililedh ffi$& €nMSa[* trftEge S-r*$d!rFEgtitr RdeSFf.S:f."', IAtwe@rybnu6hFttrxf r{ rqt*, rypsadfit*rGee|di* htrS@srdy4Sm.

uftr- dssFrd{ggleeltr co$6$d*ffi!* rt€dlgt Fi ,Cffi€n@fE '

SAFETY"FERFCIRIIIASI*E S*G'\iI

The grryhic format, fCIlor, size wrd typ+faces u*d ffr fte sign re to bs reprdued er€tgyas specified be*s#" TtE ti$e wi$r FlrstAid bgo in l}e tsD sectlxr of the s!sr. and fie perfo{mamce re{ord eaptlofts are stanCarC for Xl s$ns of fr-b type. l-egi$d Gnr-lp 2 ffid 3 beb# ldentiff tha preiect ild fire eom{ractorand are to F placed mr ffre sqn as shosrn" Satety record nursbers are nilnt$ on ir$vd$d nsld plates ar$ are scrsff-rnsffi&ed b EF tra*gro$d h alkxu ftr daib re**sions lo posted safety psfurmance record-

'BSFf!p_{p_U.$, 4m1y $ *f Engine*rs""Sls}t eWl@ trlsn$a}'.

EFS3lB-t-S.

,triE.f t.*l ,*f

**FE-I'Y FERFfiRMASCE SIGffi

1".* l--* l.'* lv

"l

"*l-r m.rl

,rtl-t zFf,I *l-

, . t -lSfF,l r[-ifirsf " rT r,€?sl:

;*u.f t_ ffi Safery'1*a.$nb n*quirrye*{

Grm Flod Damage Reduction

G Segmmt R2 South Main Street Cisu€ Structue md Regrading ofthe Driveway

6.. at Railroad Avmue

Ax;u$ efr$and Fss*, $r#{..sE E€ry ssflfrfiErtre MeE$,rry

. . l

Td*dilFilq$d E*i*$€grtr€ot

Projtrt

TW$qed:lw qir*d rq4@ s$*Er' l'lI'l 1T n{xems$s}srEd:e*.

$s fiMS,ES slK+tftrf@tir8@ ff,d muilntlrggil$ds$nm:

ryr lEggs FaiS Fmq S@lls@16 ituB{tr$ C#

S E C T I O N 0 0 0 8 0 0 P a q e 3 3

US ARMY

CORPS OF ENGINEERS, NEW YORK DISTRICT

Green Brook Flood Damage Reduction Project Segment R-2 South Main Street Glosure Structure and Regrading of Railroad Avenue

CONTRACTOR:

FUNDED BY:

COMPLETION DATE:

FOR YOUR SAFETY

1. DO NOT ENTER DESIGNATED WORK AREAS

2. OBEY ALL LOCAL REQUIREMENTS CONCERNING PROHIBITED ACTIVITIES

DISTRICT ENGINEER: COLONEL JOHN R BOULE'

PUBLIC SAFEry SIGN

SECTION

Fa$i{alisfi BBd Msun$n*'G{rideli*er

A6 cel*$etft Ff€ls.t Faq6ac*s sEi16 ffearKndws4E&Eebk Ni!{cared ss rt@d Bdteidbra t€M- ?h. Ekei di b be @d d t *easeft ccal*idigbrigl€ aemsen a-tered *idl $Fltm * tlt sEg !qre!"

e€ lresoriplsE @latfflrw cf teirl'Mamtr: : .

TFr rlBr jtiai* Le b F l&+ adPS fr$ ?5' lft* E*Etr9 affi.

uyFqred- P:!4F iiiEFsr k ttl6r hgo a$ec&a8rmr grlrld?d htDmdks. *

5&s slof$af b !a p.Effie{i s !

n*r68 M*f*edlE rht gti rnt Itstffi 6&-t$tgt*rE bar}}$i- .

ii q86glc6 sFed sr{re cafF lMl€nf@ Rdd bshqtstr a4ti Csgt Et[itgtm ffi ilp trds:t rsr &r h b6 dl+c4 of aqnfi$Ff:

.&t w4rilttfilt Ybrg, pF66*a{ leii*fl dn fiiBFrtet |l} tr€ c*C ** speEss iSadt{d rn8 :9s€d'i6 {3F bgge!:!ra{r{ t*t1d frea$ng ds{ap!!slblft*rtsEm !!e sla$Ed rls6.

TtECta 3wvro$rceolsiEd:

Sn[e4i& l$d& r$*$tllx$]t fiS! Q{isp8 E$reE {rFffi s-rffill e b ir w€* F$led m ft.*l$c!s@d.ffi Im Eftie OWs i6.€oa ml se ancded qrstr sl€ €sFsxr #!h d$G ryt a{fid lc*sr p ${ndto CcfF ars$dr trlc MffiffiKft d*rau{t P gfq}k}*d dii '3ge *.4 iBrdffi sirdl&ilT gili*it€ FEla 6"C75''lo t!.5"1.-" ngi*$ srlie *ten! g*a {6t r}?F "ns& fran UE fotll$fe d ftr HAD $$ trrt Ps5,[ffi t@&tr rlfuifl. Fk$cr $t?-isrt !r e *5i #lS! ilq ll{d.

rpss qrdFhF gEet !8 g|e$#r HBS !!fro69lne!lh@r8of *iilrfirctffi5'b16fi1EISe.

3im w,€ft{6s&€ilhic*[* #gde &$4" nia*F6 sriii{s6 Fr {rsei&sr Ysa* Pllf ld{.! q 'Elii!r:Fd*' te.t31 &F*: 8{B ru aEt .375"li*id{srq ilot6h Iti*l4ilt !o r$qr x[E T{i$6 sf *Er iron€( co[sl#{Ee|l {"t1 &a4 d tu€ bi ita.{i96 llE}El ilead caF aiEr ttt.sffr j{sefrH{€ €tE& Es€{ nBd lpd&t!S.

tRbs Rrdsa,nor.ffi;M a'tt6ts h a' hate. L,al4ES n*&@r iffiaaffierffr{brdmffi sar*ei{r$lH dr$iba8t !"r& slruE ffi &r:FEIee olir*txril k *lFtsEe tBbll&fl s$#n s?@ r'€dfn(atssE W!'h*@q@gEpsrbr a.@ rn6r6lr tFget!$gE-', sfiom b€oq&! ffiGaq dlrffs. 18 ffi meu n*'l e*ina orUee

ET

l l l l i l i l l ll llll llli l i l l l l l L

{Ditn€$sicffi in incfie$)

* Refars b rhe Lr.s, Arrry csps ot En*lreerq *l

"Sign StffdEr& Mantnf. EP-31t]-t-6 | I

{es{q qPe,,q,fi fsdT!$?

r . . 1 , , , , , . i ; 1 . . , ; ; , r . , , , . i i ' ' I l l ' . , , i , , r i ' , ' , , , i i i i i , ; , t

* lJ__JJ_r.{_r.Lrl-leefad essS 4: f#tgf Nme t l ' r r l r r r r r r r r r l ? 1 , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , I *qrd eilD $r c#i|'aE6rif*E Leq:ac gwp 5!: goEiBdtr tAag

3-a sE&s FerllqqEitw SFSI r€Eqd-gq8{rs i i Pni'i:*t-?Ar

1 - l r ' i l a i i : i i t i i i i r ' : f i , i t r l i r r I r i : i r , i t i i ' | . r 1 r . i

3 ' 1 , ' 1 , . i , , ; i , , . i , ' . i i . i , , , , , , , , , ; , , , , i ; ' , , . i i , i l

Le$rd 6q4i 3: CstEcg#aAE

1 ' 1 , r ' , : , ' l i . r i . , 1 , , , i i i , i r , - r , , I i . , . i , ' i i r , r i , i i : , I

I ' l , , , , , , , r . l , , , , , , , , , , . i r , , , , , , , , , , , , , I

E n d o f S e c t i o n

S E C T I O N 0 0 0 8 0 0 P a q e 3 5

State of New Jersey Department of Transportation

Supplemen tary Sp ecifications For

Federal Aid Projects

SECTION 00 90 01 Page I

Edition 2004

SUPPLEMENTARY SPE CIFICATION S

FOR FEDERAL AID PROJECTS

FOR SOUTH MAIN STREET CLOSTJRE STRUCTTJRE

AND RAILROAD AVENT]E REGRADING CONSTRUCTION

IN THE BOROUGH OF BOUND BROOK

COT]NTY OF SOMERSET

AUTHORIZATION OF CONTRACT

The contract for this project is authorized by the provisions of local public contracts law, NJSA 40A: 11-1 et seq.

SPECIFICATIONS TO BE USED

The 2001 U.S. Customary English Standard Specifications for Road and Bridge Construction, of the New Jersey Department of Transportation and as amended herein, shall govern the construction of this project in conjunction with the Contracting Agency Specifications and requirements.

These supplementary specifications also include the following:

Required contract provisions, Federal-Aid construction contracts (form FHWA-1273), pages I to 11 inclusive, revised March 1994.

Standard Federal Equal Employment Opportunity Construction Contract Specifications (Executive Order 11246), pages 1 to 5 inclusive, dated December 1980, revised April 1984.

Notice of Requirements for Affrmative Action to Ensure Equal Employment Opportunity (Executive Order 11246), pages I and2, dated December 1980, revised April 1984.

State of New Jersey Equal Employment Opportunity for Contracts Funded by FHWA, page 1, dated November 1978, revised April 1984.

Equal Employment Opportunity Special Provisions, pages 1 to 11 inclusive, dated February 1976, revised April 1984, November22,1988 and March 1998.

Special Contract Provisions for Investigating, Reporting and Resolving Employment Discrimination and Sexual Harassment Complaints, pages I and 2 inclusive, dated January 1989.

Incentive Prograrrl Disadvantaged Business Enterprise Utilization Attachment for FHWA Funded Contracts, pages I and2,datedApril6, 1993.

SECTION00900l Page2

Emerging Small Business Enterprise Utilization Attachment, FHWA Funded Contracts, pages I to 7 inclusive, dated March 2001.

Disadvantaged Business Enterprise Utilization Attachment, FHWA Funded Contracts, pages I to 7 inclusive, dated September 1987, revised January 1989, September 1992 and May 1995.

WAGE RATES

General wage determinations issued under Davis-Bacon and related acts, published by US Department of Labor, as outlined Section 00900 herein.

GENERAL

All awards shall be made subject to the approval of the Contracting Agency. No construction shall start before approval of said award by the Contracting Agency.

SECTION00900l Page3

DIVISION 1OO. GENERAL PROVISIONS

The 2001 Standard Specifications for road and bridge construction, ofthe New Jersey Departrnent ofTransportation and as amended herein, in conjunction with the requirements of the Contracting Agency, shall govern the construction of this project. In case ofdifference between these sections ofStandard Specifications and the requirements ofthe Contracting Agency, the Contracting Agency requirements shall govern. Go to the New Jersey Departrnent of Transportation's website at http://www.state.nj.us/transportation/ for complete text of the 2001 Standard Specihcations.

SECTION 101 . GENERAL INFORMA'TION

The following sections of the 2001 Standard Specifications are amended herein and shall be utilized in conjunction with the requirements of the Contracting Agency. In case of difference between these sections of Standard Specifications and the requirements of the Contracting Agency, the Contracting Agency requirements shall govern.

101.03 Terms.

THE FIRST SENTENCE IS CHANGED TO:

When the following terms are used in the Contract Documents, the intent and meaning shall be strictly construed as follows:

THE FOLLOWING TERMS ARE ADDED:

CONTRACTING AGENCY. The teTm "CONTRACTING AGENCY" shall mean the U.S. Army Corps of Engineers, New York District.

THE FOLLOWING TERMS ARE CHANGED:

DESIGN tlNIT. The term "Design Unit" means the Contracting Agency's consultant engineering firm, the in-house design unit(s), or both that prepared the Contract Documents for a project. The design unit($ for any particular project shall be as designated by letter to the awarded Contractor.

EXTREME WEATHER CONDITIONS. When, solely as a result of adverse weather, the Contractor is not able to work, the Contractor is entitled to claim that progress of the Work has been affected by extreme weather conditions and may seek an extension of Contract Time consistent with the provisions of Subsection 108.1 1.

HOT MIX ASPHALT (HMA) PAVEMENT. The combination of base course. intermediate course, and surface course of hot mix asphalt.

ON-DUTY POLICE. The term "on-duQy'" with regard to municipal police shall mean that the work of providing traffic safety sewices shall be an extension of regular enployment for, and sanctioned by, the municipality, even if it is on an overtime pay rate basis. The municipal police, while so working, shall be covered by the municipalrty's liability insurance coverage; and must have successfully completed a traffic safety program approved by the Contracting Agency.

PAVEMENT STRUCTURE. The combination of surface, intermediate and base courses, and when specified, a subbase course, placed on a subgrade to support the traffic load and distribute it to the roadbed. These various coluses are defrned as follows:

l. Surface Course. One or more layers of specified material of designed thickness at the top of the pavement structure.

2. Intermediate Course. One or more layers of specified material of designed thickness placed on the base course.

3. Base Course. One or more layers of specified material of designed thickness placed on the subgrade or subbase.

4. Subbase. One or more layers of specified material of designed thickness placed on the subgrade.

SECTION 00 90 0l Page 4

PLANS. The approved plans, typical sections, approved working drawings, and supplemental drawings, or exact reproductions thereof, which show the location, character, dimensions, quantities, and details of the Work to be done. This includes the latest version of all Standard Construction Details in effect at the time of Adverfisement.

Standard Construction Details shall be superseded to the extent shown on the approved plans. Certified working drawings are not plans and not part of the Contract Documents.

SUBSTANTIAL COMPLETION. The term "Substantial Completion" means the point at which the performance of all Work on the Project has been completed except landscaping items (including the planting of trees, shrubs, vines, ground covers, and seedlings), final cleanup, and repair ofunacceptable work, and provided the Contracting Officer has solely determined that:

1. the Project is safe and convenient for use by the public, and

2. failure to complete the Work and repairs excepted above does not result in the deterioration of other completed Wor\ and provided frrther, that the value of landscaping work remaining to be performed, repairs, and cleanup is less than two percent of the Total Adjusted Contract Price.

THE FOLLOWING TERMS ARE DELETED:

CLAIMS REVIEW BOARD

DISPUTE

ENGINEER.

THE TERM *ENGINEER" IS CHANGED TO "CONTRACTING OFFICER:

THE FIRST PAIL\GRAI'H IS CHANGED TO:

CONTRACTING OFFICER. The term "Contracting Officer" means the Contracting Agency's Engineer.

THE FOLLOWING IS ADDED:

Wherever the term "Engineer" is stated in the Contract Documents it will come to mean "Contracting Officer".

RESIDENT ENGINEER.

THE TERM "RESIDENT ENGINEER'' IS CHANGED TO "CONTRACTING OFFICER REPRESENTATIVE":

CONTRACTING OFFICER. The term "Contracting Agency Resident Offrcer" means the field representative of the Contracting Agency having direct supervision of the administration of the Contract, and shall be interpreted to mean Contracting Officer. Wherever the term "Resident Engineer" is stated in the Contract Documents it will come to mean "Contracting Officer"

CONTRACT OFFICER. The term "Contract Officer" where referred to in the Specif,rcation or on the Plans, shall be interpreted to mean "Contracting Officer"

101.04 fnquiries Regarding the Project.

THE FOLLOWING IS ADDED:

Inquiries regarding the various types of work of this Contract shall be directed to the following representatives of the Contracting Agency.

US Army Corps of Engineers New York District 26FederalPlaza New York, NY 10278-0900

All inquiries shall include the following:

a. Name of the company;

b. Telephone number, fax number, and contact person; and

c. Specifics of the inquiry, including anticipated impacts.

SECTION 00 90 0l Page 5

The Conhacting Agency will investigate the information provided in the inquiry and then respond through an addendum only if determined to be necessary.

2. After Award of the Contract. All inquiries shall be directed to the Contracting.

SECTION 102 - BIDDING REQUTREMENTS Al[D CONDTTTONS

This section is deleted.

SECTION 103 . AWARD AI\D EXECUTION OF CONTRACT

This section is deleted.

SECTION 104 - SCOPE OF WORK

104.01 Intent.

THE FIRST PARAGRAPH IS CHANGED TO:

The intent of the Contract Documents is to describe a functionally complete and aesthetically acceptable Project to be constructed and completed by the Contractor in every detail according to the Contact Documents. Any work that may be reasonably inferred from the Contact Documents as being required to produce the intended result shall be supplied whether or not specifically called for.

THE FOLLOWING IS ADDED:

The Railroad Avenue Regrading (Stage I) work to be performed shall include but is not limited to ttre following major items of work:

Mill and remove paved surface from the parking area located to the east of the generator building and along Railroad Avenue near South Main Street; place fill as required and repave both areas; construct curb, guide rail, drainage and riprap protection, install soil erosion and sediment control measures and landscaping; place topsoil, seed and regrade the existing drainage swale.

THE FOLLOWING IS ADDED:

The South Main Street Closure Structure (Stage II) work to be performed under this contract shall include but is not limited to the following:

Establish detour for closing South Main Street south of the Bound Brook Rotary; relocate, test and inspect utilities including gas, water, telephone and sanitary sewer lines; construct the l8-foot wide caisson supported concrete foundation for the 53.5 foot long by l6-foot 4-inch high steel roller gate and for the 63 foot x 12 foot wide x 19 foot 6-inch high masonry block gate house; construct the gate house, 150 linear feet of floodwall, and drainage system including sluice gate and flap valve chambers; install the roller gate and soil erosion and sediment control measures and landscaping; construct sidewalk, curb, pavement and retaining wall.

Demolition of the l-story Bolmer Building addition and removal of the suspected Underground Storage Tank may be awarded as a Bid Option.

104.05 Increased or Decreased Quantities.

THE FOLLOWING IS ADDED:

SECTION 00 90 0l Page 6

The construction contract shall be a lump sum amount, which consists of a Total Base Bid plus Optional ltems.

The Total Lump Sum Bid amount shall include work items listed in Section 00 80 00. They shall be considered for the purpose ofevaluating increased or decreased quantities, ifand where required.

SECTION 105 - CONTROL OF WORI(

This Section is Deleted except for the following:

105.07 Coordination of Contract Documents, THE SUBSECTIONHEADINGAND TEXTARE CHANGED TO:

105.07 Purchase of Contract Documents.

Plans, Specifications, and Proposal Forms shall be obtained by means of downloading the documents posted on the

Internet from http://www2.fbo.gov/spgAJSA/COE/DACA5l/postdatePrevDays_l .htrnl and http://www.fedteds.gov.

105.09 Cooperation with Utilities.

THE ENTIRE TEXT IS CHANGED TO:

A. General. It is understood and agreed that the Contractor has considered in its Proposal all of the permanent and temporary utility facilities in their present, new, or relocated positions to the extent required by the Contract Documents and as revealed by its own investigations; is aware that utility service demands, adverse field conditions and emergencies may affect the Utility's ability to comply with the proposed schedules for utility work; is cognizant of the limited ability of the Contracting Agency to control the actions of the Utility(s), and has made allowances in its Proposal that it is not entitled to any Additional Compensation by reasons of delays, inconvenience or damage sustained by the Contractor due to any interference from utility facilities or the operation of moving or installing them.

The Contractor shall notify, in writing, the Utility(s) involved of the nature and scope of the Project, and of its operations that may affect their facilities or property. The notice shall include an inquiry for all information required to determine the location of the existing utility facilities and the Conhactor shall also provide the portion of the approved Preliminary Schedule relative to that respective Utility. Two (2) copies of such notices and the Utility's responses shall be sent to the Contracting Officer prior to the start of Construction Operations. The Contractor shall also attend a Utility preconstruction conference prior to the start of Construction Operations.

The Contractor shall provide each Utility the portion of the approved Baseline CPM Schedule related to the respective Utility and any approved updates or revisions that affect that Utility.

Information on the Utility(s), including the work to be performed by the Utilifis) on the Project, will be provided in the Special Provisions.

The corporations, companies, agencies, or municipalities owning or controlling the utilities, and the name, title, address, and telephone number of their local representative are as listed below:

PSE&G (cAS prVrSrON)

The attention of the Contractor is called to the presence of a 6" gas main at the project site which requires permanent relocation. The Contractor is advised that the actual relocation of the gas main will be performed by PSE&G personnel, at no cost to the Contractor. However, the Contractor will be responsible for providing access to facilitate PSE&G's construction of their facility. The Contractor shall also be responsible for any clearing deemed necessary by PSE&G to accornplish their relocation, and will be responsible for coordinating their operation with those of PSE&G. The Contractor is advised to contact PSE&G to discuss project details prior to bidding. No specific payment will be made for this work and all costs for same shall be included in the in the contract price bid.

Contact information:

80 Park Plaza

SECTION00900 l PageT

Newark, NJ 07102 Attn: Bill Montague

(973) 430-7063

VERIZON

The attention of the Contractor is called to the presence of telephone line at the project site which will be protected during construction. The Contractor is advised that inspection will be conducted by Verizon personnel. Verizon will be monitoring their lines as the proposed gate foundation is installed by the Contractor. The Contractor is advised to contact Verizon to discuss project details prior to bidding. The Contractor will be responsible for coordinating his operations with those of Verizon's. No specific payment will be made for this work and all costs for same shall be included in the confract price bid.

Contact information:

445 Georges Road, Floor 2od North Brunswick. NJ 08902 Attn: Chris Ogrodnic

(732) 4r8-s60r

NEW JERSEY AMERICAN WATER

The attention of the Contractor is called to the presence of 12" diameter ductile iron pipe (DIP) line at the project site which requires permanent relocation. The Contractor is advised that the actual relocation of the DIP will be performed by New Jersey American Water personnel, at no cost to the Contractor. The Contractor will, however, be responsible for providing access to facilitate New Jersey American Water's consfuction of their perrnanent facility. The Contractor shall also be responsible for any clearing deemed necessary by New Jersey American Water to accornplish their relocation, and will be responsible for coordinating their operation with those of New Jersey American Water. The Contractor is advised to contact New Jersey American Water to discuss project details prior to bidding. No specific payment will be made for this work and all costs for same shall be included in the contract price bid.

Contact information:

P.O. Box 1207 Belle Mead, NJ 08502 Attn: Robert Genito

(908) 43r-32s1

Bidders are advised to verify the above information as its accuracy and completeness is not guaranteed by the Contracting Agency.

THE CONTRACTOR SHALL CONTACT THE UTILITY COMPANIES TO DETERMINE THE

SCHEDULE AND THE TIME REQUIRED FOR THE UTILITY COMPANIES TO PERFORM

RELOCATION WORK.

B. Existing Facilities. The Contractor shall not proceed with any excavation operations until it has determined the exact location of the existing utilrty facilities within the Project from examination of the Contract Documents and through inquiries to the respective Utility(s), and through its own subsurface site investigations, including test pits.

The Conhactor shall notify the Contracting Officer at least ten (10) Business Days in advance of the excavation ofany test pits, or other subsurface investigations.

Regulations. The Contractor shall also comply with all other State and Federal rules, and regulations applicable to work on or in the proximity of utilities. Specif,rc attention is made to:

l. The State's Underground Facility Protection Act. The Contractor shall notify the State's One Call System (l-800-272-1000) and identi$ itself as the State's Contractor and speci$ the route and contract number of the Project before performing Work on the Project.

SECTION 00 90 01 Page 8

D.

2. High voltage line requirements according to NJSA 34:6-47.1 to 47.9,29 CFR 1926.550, and the Utility Accommodation Policy, NJSA 16:25. The Contractor shall obtain written approval from the Department of Labor, Office of Safety Compliance, and the respective Utility(s) if required, for any operations that do not provide the minimum clearances under these regulations. The Contractor shall be responsible for any proposed power outage or de-energization associated with their operations. A copy of the approvals shall be submitted to the Contracting Officer at least five

(5) Business Days in advance of starting those operations.

Notices. The Contractor shall make a written request to the Contracting Officer at least ten (10) Business Days in advance of the notice requirements provided in the Special Provisions for the Contracting Agency to notify Utility(s) to proceed with the Utility(s) utility work. The Contractor shall be cognizant that where joint use poles or duct banks are used, the time frames for work performed by each user are cumulative. The Contractor shall guarantee the site availability for utility operations. The Contracting Agency will notify the Utility(s) to proceed if in the Contracting Agency's opinion the site will be available for a particular item of utility work. The Contractor shall permit the Utility(s) or their agents access to their facilities at all times and shall cooperate with them in performing their work.

The Contractor shall cooperate with the Utillty(s) concerned and shall notiff thern, through the Contracting Officer, not less than ten (10) Business Days in advance of the time it proposes to construct any utility item or perform any work that may endanger or affect their facilities. The Contractor shall have the contractual obligation of coordinating its activities with those of the Utility(s). The Utility(t shall be given the opportunity to inspect the actual material to be installed as well as the installation.

The Contractor shall provide 72 how advance notice to the Contracting Officer of any meetings scheduled with Utility(s) and provide the Contracting Officer with a copy of any correspondence with the Utility(s).

The Contractor shall make separate written notifications, with a copy to the Contracting Officer, a minimum of four (4) Business Days prior to when work may impact or be adjacent to Contracting Agency electrical installations. For ITS facilities, notification shall be to the Bureau of Traffrc Operations at the location and telephone number provided in the Special Provisions. For all other electrical installations, notification shall be made to the Regional Brueau of Electrical Maintenance at the location and telephone number provided in the Special Provisions. No Contracting Agency-owned installation shall be accessed, modified, removed, or dishubed in any rnanner, without first making such notifications and attending a meeting with the Contacting Agency if requested.

Damages. The Contractor shall protect, support, and secure all in-place utility facilities so as to avoid damage to them and any intemrption of service. The Contractor shall not temporadly move existing or completed utility facilities without the Utility(s) written consent, and the facilities shall be as safe and permanent at completion as they were before the Contractor's involvement. In the event the Contractor damages a utility facility, including property service connections, the Contractor shall notify the Utillty($ immediately. The Utility(s) may complete the repairs or allow the Contractor to complete the repairs, with the Contractor responsible for any applicable time and expense. Repairs to Contracting Agency electrical installations shall be as specified in Subsection 105.19 and the additional requirements for the fiber optic network of the Contracting Agency ITS facilities as specified in this Subsection. The frber optic network includes the conduiVcable, junction boxes/cabinets, and hubs.

Within two (2) hours of any damage by the Contractor to the fiber optic network, the Contractor shall notify the Contracting Officer, in writing with a copy to the Traffic Operations contact specifred in the Special Provisions, that the Contractor shall complete the repairs within 48 hours and have the repairs underway within 12 hours after the damage has occurred. If the written notice has not been received from the Contractor within two (2) hours and/or the commencement of the repairs has not started within 12 hours, the Contracting Agency may undertake and conplete the repairs. The cost of repairs made by the Contracting Agency for damages that are determined by the Contracting Officer to be the Contractor's responsibility shall be deducted from subsequent estimates. If the Contractor does not complete the repairs within 48 hours, damages for lost services will be assessed to the Contractor at a minimum of $1000 per hour, or increased based on costs calculated by the Conhacting Agency, and deducted from subsequent estirnates.

Should the Contractor, for its own convenience, cause the Utility(s) to incur costs not covered by the utility agreement, or delay the Utility(s), or incur costs without prior written approval of the Contracting

E.

SECTION 00 90 0l Page 9

Officer, the Contractor shall be responsible for these costs and delays. The Contractor shall pay the Utilify(s) within 30 days of the Utility(s) request for cost reimbursement of any repairs and other incurred costs. If payment has not been made within 30 days, the Contracting Agency may reimburse the Utility(s) for the Contractor generated costs and deduct these expenses frompartial or final payment due the Contractor.

F. Railroads. In addition to the foregoing provisions, the following specific provisions relate to railroads only:

1. Railroad Traffic and Property. Where the Project includes work across, over, under, or adjacent to railroad tracks or railroad ROW, the Contractor shall safeguard the traffic, hacks, and appurtenances, and other Fopefty of the railroad that may be affected by its Work. The Contractor shall corrply with the regulations of the railroad relating to its Work, shall keep traclcs clear of obstructions, and shall provide barricades, warning signs, lights, or other safety devices as required by the railroad. Payment for such safety devices shall be included in the contract lump sum price. Prior to the commencement of any work within the railroad ROW or on railroad facilities, the Contractor shall obtain the railroad's written approval of access, the method of construction, and the schedule of the Work. The Contactor shall provide a copy of the submittal and approval to the Contracting Officer.

The safety and continuity of railroad operations shall be the first priority when working in proximity to the railroad. Railroad approval does not release the Contractor from responsibility or liability for any damage that the railroad may suffer, or for which the Contractor may be held liable, by the acts of the Contactor.

Fouling of railroad facilities' track, power lines, and sigral systems occurs when the railroad parameters for normal operations are jeopardized because obstructions are in close proximity to the facilities. The Contractor shall obtain from the railroad its fouling parameters for the work site and observe the railroad's regulations concerning fouling. Construction equipment or material shall not be stored or operated within the fouling distance of the railroad facilities without written permission of the railroad, with a copy to the Contracting Officer.

The railroad may assign inspectors, engineers, or flagmen during the time the Contractor is engaged in work on railroad property for the general supervision ofconstruction operations, to ensure adherence to the Contract Documents and applicable railroad requirements, and to ensure the use of approved construction methods. Payment for inspectors, engineers and flagmen shall be included in the lunrp sum price.

If materials are to be hauled across the tracks of any railroad, the Contract Documents will provide for any new crossings required or for the use of any existing crossings. If the Contractor elects to use crossings other than those designated, it shall obtain written approval from the railroad with a copy of the approval to the Contracting Officer at least ten (10) Business Days in advance.

2. Railroad Insurance. The applicable insurance provisions are as specified in Subsection 107.23.

f 05.f 9 Maintenance During Construction.

THE THIRD PAIL{GRAI'HS IS CHANGED TO:

Any damage to the Roadway beyond the project limits due to the Contractor's operations shall be repaired at no Additional Compensation. The Contractor shall complete within 24 hours specific repairs directed by the Contracting Agency, except where the requirements are specifred by a Subsection. Nothing in this Subsection shall be construed to limit or change the risks assumed by the Contractor as specifred in Subsection 107.22.

THE SIXTH PAIL{GRAI'HS IS CHANGED TO:

The Contracting Agency may direct the Contractor to construct Bituminous Concrete Patch as specified in Section 402 to maintain sections of traveled way and shoulders in a smooth riding condition at all times including seasonal shutdowns. Payment for Bituminous Concrete Patch shall be included in the contract lump sum price. Areas that are damaged or created by the Contractor's operations will not be paid,

105.22 Substantial Completion.

THE THIRD SENTENCE OF THE FIRST PAIL{GRAI'H IS CHANGED TO:

SECTION 00 90 01 Page 10

If the Contracting Officer determines that the Work is substantially complete, the Contracting Officer will then prepare a letter which states the date of Substantial Completion and establishes a reasonable time within which the Contractor shall perform the final cleanup, and repair unacceptable Work, which time may be prior to Contract Time as modified.

SECTION 106 _ CONTROL OF MATERIAL

This Section is Deleted.

SECTION 107. LEGAL RJLATIONS AI\D RESPONSIBILITY TO PUBLIC

This Section is Deleted except for the following:

107.23 fnsurance.

6. Railroad Insurance.

THE FOLLOWING IS ADDED AFTER THE LAST PARAGRAPH:

Insurance coverage shall be procured and maintained but not limited to the following railroad(s):

CSX Transportation New Jersey Transit Rail Operations Consolidated Rail Operations

SECTION 108. PROSECUTION AND PROGRESS

This Section is Deleted.

SECTION 109 - MEASUREMENT AIID PAYMENT

This Section is Deleted.

SECTION00900l Page 11

DIVISION 2OO - EARTHWORI(

SECTION 202 . ROADWAY EXCAVATION

202.02 Classification.

D. Roadway Excavation, Regulated Waste.

THE SECOND PARAGRAPH DELETED

* * * * * * * * : t * : F 1 . ' 1 . * * * { . * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ; t * d . * r . : * * * * * * * * * * * * * * * * * * * * * * * , t , F * * * * : F : F * * * *

202.09 Milling of HMA

2. ConstructionRequirements.

THE FOLLOWING IS ADDED AFTERTHENINTH PARAGRAPH:

Milled areas shall not be left unpaved for longer than 48 hours, unless approved by the Contracting Officer.

202.15 Basis of Payment.

Deleted.

207.04 Construction Requirements.

* * * * * * * * * * * * * : t : t * * * * * * * * * * { < * { < * * * * * * * * * * * * * * * * * * * * * * * * * * * * t r t * * * * * * * * { . * * * * * * * * * * * * * * * * * . d . * * * * * * * * : t * *

THE FIRST PARGRAPH IS CHANGED TO:

Before excavating, existing subsurface structures which may be affected by or interfere with the proposed construction shall be located. If directed, test pits shall be excavated to obtain the required information. Test pits or portions of a test pit shall be dug by hand when in close proximity to utilities or when directed. Excavation beyond that which is necessary to obtain the required information will not be measured for payment. Test pits shall be backfrlled according to Subsection 203.06.

1. Pipes and Culverts.

THE FIRST PAIIT{GRAI,H IS CHANGED TO:

The width of trench shall be at least 2 feet greater than the outside diameter of the pipe or culvert. When the material at the bottom of the excavation is rock, it shall be removed 6 inches below the pipe and replaced with suitable material.

207.06 Backlilling.

A. Pipes and Culverts.

THE ENTIRE SUBPART A. IS CHANGED TO:

Backfill pipe and culverts with granular sand MATERIAL one (1) foot above top of pipe. Below this level, sand shall be placed in layers not more than six (6) inches thick. Each layer of backfrll shall be compacted with flat-face mechanical tampers. Backfill shall be worked into the haunch area and compacted for all pipe.

All backfill more than one (l) foot above the top of pipes and culverts, except underdrains, may be made with excavated material and compacted in six (6) inches layers as follows:

l. By vibratory soil compactors, if the backfill material is predominately sand or sand and gravel.

2. Flat-faced mechanical tampers may be substituted for the vibratory soil compactors where the shoring and bracing of trenches or other special conditions make the use of vibratory compactors impractical.

SECTION 00 90 01 Page 12

3. Care shall be taken to avoid contact between the pipe and compaction equipment at all times. All damaged pipes shall be removed and replaced at no additional cost to the goverment.

Shoring, bracing, and sheathing shall be withdrawn as the backfilling proceeds. Compaction requirements shall not be compromised due to the removal of sheathing, shoring, trench boxes or other type of excavation support systems.

In rock cuts. the backfill shall be sand.

SECTION 00 90 0l Page 13

DIVISION 3OO . BASE COURSES

SECTION 301 . SOIL AGGREGATE BASE COURSE AND DENSE-GRADED

AGGREGATE BASE COURSE

301.05 Compaction.

THE LAST SENTENCE OF THE FIRST PAIIT\GRAI'H IS CHANGED TO:

The in-place dry density of each compacted layer will be determined according to AASHTO T 191 or T 310 (Direct Transmission Method) and only one (l) of these methods will be used throughout the Project.

2. Compaction Acceptance Testing.

THE THIRD SENTENCE OF THE LAST PARAGRAPH IS CHANGED TO:

One (l) density determination will be made at each of the selected locations using AASHTO T l9l or T 310 (Direct Transmission Method) and only one (l) of these methods will be used throughout the Project.

SECTION 302 - ROAD.MIXED STABILIZATION

302.09 Compaction, Shaping, and Finishing.

A. Compaction.

THE LAST SENTENCE OF THE SECOND PAIL{GRAI'H IS CHANGED TO:

The in-place dry density of each compacted course will be determined according to AASHTO T 191 or T 310 (Direct Transmission Method) except that only one (1) method will be used throughout the Project.

SECTION 00 90 0l Page 14

DIVISION 4OO . SURFACE COURSES

SECTION 403 _ HOT MIX ASPHALT FRICTION COURSE

403.01 Description.

THE ENTIRE SUBSECTION TEXT IS CHANGED TO:

This work includes the construction of Open Graded F'riction Course (OGFC), and Modifred Open Graded Friction Course (MOGFC). The MOGFC shall contain polymer modifred asphalt binder and stabilizing fibers.

403.02 Materials.

THE ENTIRE SIIBSECTIONTEXTIS C}IANGED TO:

The matedals and their use shall conform to Subsection 404.02 except as follows:

l. Aggregate for OGFC and MOGFC shall conform to Subsection 901.10; except that coarse aggregate shall be broken stone of gneiss, granite, quartzite, or trap rock. RAP will not be allowed.

2. Asphalt binder for OGFC shall be PG64-22 as specified in 904.01 and asphalt binder for MOGFC shall be

PG76-22 as specified in 904.01.

3. For MOGFC, a stabilizing additive consisting of mineral fiber or cellulose fiber shall be added to the mix.

The stabilizing additive shall conform to the requirements for stabilizing additives in AASHTO MP 8. Only one (l) type shall be used per mix design. If using mineral fibers, the dosage rate shall be 0.4 percent by weight of total mix. If using cellulose fibers, the dosage rate shall be 0.3 percent by weight of total mix. The dosage rate may be increased, as necessary, to prevent draindown as measured by the Visual Draindown Asphalt Content in amended Section 990, Test Method B-11 Control shall be provided for accurately proportioning the fibers into the mixture within +l- ten (10) percent of the required weight, and the equipment shall ensure uniform dispersion of the fibers. Fibers shall be stored in a dry location with a storage temperature not to exceed 120" F. The supplier of the cellulose or mineral fibers shall certify according to Subsection 106.04 that the material supplied cornplies with AASHTO MP 8. A technical representative from the additive supplier shall be on the site for the fust full day of construction for tecbnical assistance.

403.03 Composition and Preparation of Mixtures.

THE ENTIRE SIIBSECTION TEXT IS CHANGED TO:

A job mix formula (JMF) for each mixture shall be submitted, which shall include a statement naming the source of each component and a report showing the results meet the criteria specified in Table 403-1.

The JMF for each mixture shall establish the percentage of dry weight of aggregate passing each required sieve size and an optimum percentage of asphalt binder based upon the weight of the total mix. The optimum asphalt content for OGFC will be determined according to amended Section 990, Test Method B-12. The optimum asphalt content for MOGFC will be determined according to amended Section 990, Test Method B-l l. The JMF shall be within the design range specifred in Table 403-1.

The Contractor shall prepare compacted test specimens for submittal to the Contracting Agency Laboratory at least four (4) weeks prior to the initial production date. These specimens shall be prepared from material mixed according to the final JMF, using 50 gyrations of the Superpave gyratory cornpactor according to AASHTO T 312. Two (2) specimens will be tested to verify that the final JMF produces a mixture that has a minimum air void content as specified in Table 403-1. Percent air voids will be determined using AASHTO T 209 and either Section 990, NJDOT 8-6 or

AASHTO TP 69.

If required by the Regional Materials Engineer (RME), six (6) specimens will be tested according to AASHTO T

283. For MOGFC, the freeze-thaw option will be utilized. The minimum tensile strength ratio (TSR) will be 80 percent.

Should the ratio fall below this minimum, adjust the mixture so as to satisfy the minimum requirement. Adjustments may include the use of anti-stoipping agents.

For MOGFC only, two (2) test specimens will be tested for abrasion and impact resistance using a modified L.A.

Abrasion Test as per amended Section 990, NJDOT B-11, Section C.6. The maximum loss as calculated by this method shall not be more than 30 percent.

The JMF for each mixture shall be in effect until modification is approved.

SECTION 00 90 01 Page 15

During production, one (l) random acceptance sample will be taken from each lot of 300 tons to verify composition. Air voids and draindown tests shall be conducted as directed by the Conhacting Officer.

If the composition testing results are out of the production control tolerances specified in Table 403-2 for an acceptance sample, the Contractor shall determine if a plant adjustment is needed and immediately run a quality control sanrple. If the quality contol sample is also out of the control tolerances in Table 403-2, corrective action shall be taken immediately. Additional quality control samples shall be taken after the corrective action to ensure that the mix is under control. If two (2) consecutive acceptance samples are outside the tolerances specified in Table 403-2, production shall stop immediately. A plant correction shall be made prior to resuming production. Upon restarting production, no mixture shall be transported to the project before the results of a quality control sample from the mixture indicate that the mixhue meets JMF tolerances. Any mixture produced at initial restarting that does not meet tolerances will be rejected.

Sampling will be performed according to Section 990, NJDOT B-2 or ASTM D 3665. Testing for composition will be performed according to AASHTO T 164, AASHTO T 308, or Section 990, NJDOT B-5. Testing for draindown will be performed according to amended Section 990, Test Method B-11.

Table 403-1 Open…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .