ENGINEERING DIVISION

U.S. ARMY CORPS OF ENGRS 26 FEDERAL PLAZA

NEW YORK NY 10278-0090

W16ROE92156474

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to:

1. Provide responses to Bidders' questions (FOR INFORMATIONAL PURPOSES ONLY).

2. Include revisions to the Draw ings (Plans).

3. Include revisions to the Specifications.

The Bid Opening date of 15 October 2009 at 2:00 p.m. EST remains unchanged.

NOTE: Offerors must acknow ledge receipt of this amendment by the date specif ied in the bid (or as amended) by one of the follow ing methods: In the space provided on the SF 1442, by separate letter, by telegram, or by signing Block 15 of SF 30. FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH LATE

BID, LATE MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Oct-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-09-B-0021

X 9B. DATED (SEE ITEM 11)

29-Aug-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Oct-2009

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE E3L0000

FACILITY CODECODE

EMAIL:TEL:

W912DS-09-B-0021

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

Q & A PER AMEND. #5

QUESTIONS AND ANSWERS

The following are responses to questions received from bidders – FOR INFORMATIONAL PURPOSES ONLY:

Question No. 1: Section 00 90 02 - Appendix A details many items that are to be included in our lump sum pricing. There are numerous items listed that are not clearly shown in the plan documents or specs. Please provide the locations in the plans/specs of the items listed below and indicate which proposal items these activities are to be paid under:

10j: SS steel angles (See Sheet A-503) 12: Broken/Crushed Stone (See Sheet C-503) 13: Granular Sand Material (See Sheet C-503) 14: Borrow Excavation – Zone 2 (See Sheet C-501) 15: Geotextile (See Sheet C-501) 16: Topsoil/Seeding (See Sheet C-501) 17: Washed Crushed Stone 3/8” 30: Handholds 33: Welded Wire Fabric (See Sheet S-501) 37d: 18” Diameter Steel Pipe 37f: 12” Diameter Steel Sleeve (See Sheet C-107) 37g: 12” Diameter Steel Sleeve 37h: 26” Diameter Steel Sleeve 37i: 32” Diameter Steel Sleeve 39a: Subbase 39b: Dense Graded Aggregate Base Course (See Sheet C-501) 51a: Bituminous Curb 59: Work done by NJT 60: Anti-Graffiti Coating (see Specification 09 90 00 Section 3.7.1) 90: Utility Crossing Pipe

Response: Items 17, 30, 37d, 37g, 37h, 37i, 39a, 51a, 59 and 90 have been eliminated.(See revised Section 00 90 02 - Appendix A included in this amendment). The other items were included in the contract documents. These items are located on the drawings and specs as noted above and may appear throughout other portions of the plans and specs

Question No. 2 On Sheet G-003, there are several hatchings listed that are not shown on the plan documents. Are these various hatchings required?

Response: Hatch symbols have been revised as shown on amended sheet G-003.

Question No. 3: Specification Section 09 06 90, Page 2 lists the Continental Cast Stone Manufacturing Inc. Color #7112 as the color for the precast coping. This color does not exist;

please provide a new color code.

Response: Color #7112 is revised to Color #1112 Cool Grey. See revised specification 09 06 90 included in this amendment. .

Question No. 4: detail on plan sheet 84 shows scour slab at walls I1 & I2 although all site plans do not show this slab – please clarify the limits of this slab

Response: The scour protection should be placed on each side of the I-wall as shown in Section A (sheet 84) for the entire length of each I-wall. i.e. from Sta. 10+00 to Sta. 10+13.50 for Monolith No. I1 and from Sta. 11+84.75 to Sta. 11+96.75 for Monolith No. I2.

Question No. 5: according to vendors asce 100# railing does not exist – please provide alternate

Response: The callouts for the rail should have been "100 LB A.R.E.A. RAIL”. See revised Sheet S-325 included in this amendment.

Question No. 6: please provide spacing for e-clips on rail

Response: The spacing of the e-clips on the rail is 24-in on center. See revised Sheet S-325 included in this amendment.

Question No. 7: please provide detail for “removable handrail”

Response: See revised Sheet S-112 included in this amendment for locations of removable handrails. The handrails that make up the swing gates can be removed at the hinges. For the handrail that is on the west side of the roadway and south of the roller gate, the post at the north end can be removed along with the plate and walkway supports beneath by removing bolts at the base plates of the gate post and walkway supports (see Sheet S-319). Once the north end of the handrail is unbolted the south end of the handrail can be pulled out of the slots in the post as shown on Sheet C-503.

Question No. 8: Considering the work area, the fire department’s parking lot will most likely get damaged although the plans do not require it to be reconstructed. Please clarify.

Response: Asphalt Parking lot should be repaved and is called out with a note on amended Sheet C-104.

Question No. 9: Is topsoil required? If so please provide limits and method of payment

Response: Yes topsoil and seeding is required. See revised sheets LP-101 & LP-102 for Topsoil and seeding limits.

Question No. 10: If required, please provide limits of permanent fertilizer & seed

Response: See response to comment No. 9.

Question No. 11: Considering the fact that 9-28-09 is a holiday and there still remains many unanswered questions, please postpone the bid to 1 week after all questions are answered. We respectfully request that the new bid date not be on a holiday, the day after a holiday or a Monday.

Response: New Bid date was provided in Amendment 0004.

Question No. 12: The temporary shoring limits indicated on plan sheet 50 do not match the temporary shoring indicated by note #6 on sheet 56.

Response: Temporary shoring in note 6, sheet 56 is temporary support of utilities during construction. Temporary shoring limits shown on sheet 50 are for temporary retaining structures at perimeter of excavation.

Question No. 13: If the shoring on sheet #56 is additional, please add the limits required on sheet #50.

Response: Temporary shoring in note 6, sheet 56 is temporary support of utilities during construction and the limits should be established by the contractor within the work easement for the project. The temporary shoring limits shown on sheet #50 are for temporary retaining structures at perimeter of excavation.

Question No. 14: Section 05 12 00, 2.1.1 Structural Steel. Material is listed as A36, A572 Gr 50, A992 and weathering steel. (Structural shapes are noted as A992) What is the grade of material?

Response: Section 05 12 00, included in this amendment, has been revised to show that A36 is Grade 36. A572 and A992 are both Grade 50 as noted in the spec.

Question No. 15: Section 05 12 00, 2.2.4.1 Anchor bolts listed as A307. 304 Stainless steel?

What grade are the anchor bolts?

Response: Section 05 12 00, included in this amendment, has been revised to show the grade of the anchor bolts. A307 is Grade 60 and Type 304 is Condition A, Class C.

Question No. 16: Section 05 12 00, 2.4 Shop Primer. Verify, All exposed steel receives SP 6 blast and one coat of alkyd primer.

Response: Exposed steel is to receive surface preparation and coatings in accordance with specifications sections 05 12 00 and 09 97 02.

Question No. 17: Section 05 12 00, 2.5 Galvanizing. Is anything Galvanized?

Response: Yes, galvanized items are indicated as such on the contract documents.

Question No. 18: Section 05 50 03.00 10, 2.3 Testing. Required material test and analyses. What is required here. It says samples are to be tested. Is this CVN testing beyond material mill certs?

Response: Refer to the specifications sections covering the items of work, unless otherwise specified or authorized, to determine required material tests and analyses. Section 05 50 03.00 10, paragraph 2.3 describes testing requirements in general, not specifics for each item of work.

Question No. 19: Section 05 50 03.00 102.3.1 Nondestructive Testing. When doubt exists to the soundness of any material. The Government may call for additional testing…Material will be replaced. Does this refer to welds or the steel material?

Response: It refers to any materials covered by Section 05 50 03.00 10.

Question No. 20: Section 05 50 03.00 10 2.3.2 Tests of Structural Units. This test can’t be performed in the shop as noted in the specs.

Response: Refer to the specifications sections covering the items of work, unless otherwise specified or authorized, to determine required tests. Section 05 50 03.00 10, paragraph 2.3.2 describes testing requirements in general, not specifics for each item of work.

Question No. 21: Section 05 50 03.00 102.3.3.3 Test Coupons. Is this stating we have to cut test coupons from the fabricated steel, send it for testing and then repair the damage?

Response: Yes, the Government reserves the right to require such actions.

Question No. 22: Sheet 27 shows haybales at the roadway inlets although considering the staging required for this project and available roadway width, they will be in conflict with the daytime traffic. Please clarify any daily procedures or traffic control for these haybales.

Response Final Soil erosion and sedimentation control certificate is the responsibility of the contractor. Concur; hay bales may pose a traffic concern within the roadway. A sediment trap or other method which captures or filters runoff from the 1-year storm and is able to convey high flow into the storm sewer system may be used if approved by the Soil Conservation District.

Question No. 23: Sheet 29, sanitary sewer profile, shows existing 18” steel storm sewer pipe which is indicated to “encase pipe if necessary”. We cannot determine “if necessary” prior to bid. Please add separate pay item for this work.

Response: Since available data indicates that the sanitary sewer in close proximity to the drainage system, bidders should include the cost of encasing the sanitary sewer in Bid Item No.1.

Question No. 24: Please verify that the steel sheetpiling for the “I” retainings does NOT receive any coatings, i.e. coat tar epoxy, galvanizing, etc.

Response: Section 31 41 16 specifies coating sheet pile in accordance with Section 09 97 02, which shows System No. 6 applicable to sheet piles.

Question No. 25: Sheet 2, general note 15 – provide backfill limits of structural material.

Response: Limits of backfill is dependent on extent and type of temporary retaining structures, as designed by contractor's engineer, and shown approximately on sheet S-402.

Question No. 26: Sheet 3, drilled shaft note 1 puts an unnecessary burden on the contractor considering the high cost of drilled shafts and the staging for this projecting. Please create separate line items for the shafts with unit pricing per foot for diameter, soil and rock.

Response: Information shown on sheet. S-601 for estimated top of rock elevations and rock socket lengths are based on the project geotechnical report. The 10% limit described in note 1 on G-003 minimizes the potential cost incurred by the contractor for unforeseen conditions differing from those in the project geotechnical report. Bids for drilled shaft work shall be in accordance with contract documents.

Question No. 27: Here is a question regarding the exterior glass block units to be used at the above referenced project: The block units specified "Vistabrik solid glass" are not available in the market anymore. Please advise which type should be used. For example: there are Solid Vistabrik units which are 7 5/8" x 7 5/8" x 3" thick only in clear and stipple finish, no LX inserts or there are Hollow units which are 7 3/4" x 7 3/4" x 3 7/8" with LX inserts, etc.

Response: 8" x 8" x 3" (nominal) thick Vistabrik Solid Glass Block units or an approved equal are acceptable. The Thickness of louver above the glass block will match the thickness of Vistabrik Solid Glass Block. See revised sheet A-503 and Section 04 23 00 included in this amendment.

Question No. 28: In reference to the Monitoring of Existing Structures, specification section 02 21 80.00 18; what frequency shall the structures listed be monitored? Furthermore, if vibration monitoring is required will it be addressed as a change order or should it be included in our base bid?

Response: The frequency of monitoring shall be as noted in revised Section 02 21 80.00 18.

Monitoring of Railroad structures shall follow New Jersey Transit criteria. Section 00 90 04 covers monitoring associated with pipe installation on New Jersey Transit property.

An assessment shall be made prior to construction as described in Section 02 21 80.00 18 to determine if vibration monitoring is required and the cost of this assessment should be included under Base Bid item 1. If vibration monitoring is deemed necessary the cost would be negotiated under the Changes Clause of the contract.

Question No. 29. The plan sheets for the storage building do not indicate whether any of the interior finishes are to be painted. Please verify if any of the interior appurtenances are to be painted.

Response: Interior will receive concrete seal on the walls and floor as noted on revised Sheet A- 503 included in this amendment.

Question No. 30: Note 16 on plan sheet CT-501 mentions “TEMPORARY PAVEMENT BYPASS IN DETOUR NO. 1”. Please clarify the location and scope of work required for the temporary pavement bypass and detour no. 1. In furtherance to the traffic control, we are still unclear as to the locations of many traffic control devices; such as arrowboards, construction barrier, temporary crash cushions, drums, cones, etc.

Response: Note 16 has been deleted on revised Sheet CT-501 included in this amendment.

Also, see the comment response to question No.8 in Amendment 0004.

Question No. 31: Framing Plan 1/ A -102 notes 1 ½” Type ‘B’ Deck Using J – Hooks or Similar to Attach Deck to Joists. Deck Mfgr’s have no knowledge of this application. Specs call for deck to be welded.

Response: It is acceptable to use self tapping screws or pins. These items will need to be reviewed (Shop drawings, catalog cut and deck information) and approved.

Question No. 32: General Note 11 on Drawing A-001 – Does this note only apply to misc. steel in the Building?

Response: This note applies to the steel angles, plates and lintels shown on the Architectural Building Sheets.

Question No. 33: Several of the S – 300 series drawings call for steel and bolts to be (C.R.S.)

Please advise what this notation/abbreviation stands for. Do not want to Assume Cold Rolled Steel.

Response: See Abbreviations on sheet G-002.

Question No. 34: Why is only steel sheet piling permitted within the railroad ROW?

Response: Per New Jersey Transit Railroad requirements only sheet pile systems are permitted within their right of way. Soldier pile with lagging is not permitted.

Question No. 35: There is a shallow bedrock condition such that at subgrade weathered rock is anticipated. The plan note indicates that according to NJT, only steel sheet piling is permitted within the railroad ROW. However, no significant toe penetration is possible below subgrade and the vibratory or impact driving energy to seat the sheet pile tips may negatively impact the condition of the tracks above. An appropriately designed and installed steel soldier pile, timber lagging, and tieback wall will provide better control over impacts to the tracks. Will the

USACOE permit a performance-based excavation support system design that may include soldier piles in the NJT ROW?

Response: See response to question 34.

Question No. 36: It appears that specification section 00 08 00 is missing pages 1 to 31; it starts at page 32 and ends at page 35. Furthermore, this section is not listed in any table of contents.

Response: See revised Section 00 08 00 included in Amendment 0004.

Question No. 37: It has been brought to our attention by the Town of Bound Brook that the demolition of the existing building on the corner of South Main Street and Main Street (including the addition) is to be demolished under a contract awarded by the Town of Bound Brook. Please advise.

Response: See Amendment 0004.

REVISED PLANS PER AMEND. #5

PLANS (DRAWINGS) CHANGES:

The following are REVISED and REISSUED:

Sheets G-003, CT-501, LP-101, A-503, LP-102, S-112, S-325, and C-104

REVISED SPECS PER AMEND. #5

SPECIFICATIONS CHANGES:

Each of the following is REVISED and REISSUED in its entirety:

1. Main Table of Contents

2. Section 00 09 02

3. Section 04 23 00

4. Section 05 12 20

5. Section 09 06 90

6. Section 02 21 80.00 18

(End of Summary of Changes)