South Main Street Closure Structure & RR Ave Regrading SMAIN
Section 00 90 01 Page 1
SECTION 00 90 01
STATE OF NEW JERSEY
DEPARTMENT OF TRANSPORTATION
SUPPLEMENTARY SPECIFICATIONS
FOR
FEDERAL AID PROJECTS
Section 00 90 06 Page 1
SECTION 00 90 06
APPENDIX E
SPECIFICATIONS FOR
PIPELINE OCCUPANCY OF
CONSOLIDATED RAIL CORPORATION PROPERTY
(CE-8, 5/1/95)
CE-8
5/1/95
SPECIFICATIONS
FOR
PIPELINE OCCUPANCY
OF
CONSOLIDATED RAIL CORPORATION
PROPERTY
i
INDEX
Page
1.0 GENERAL
1.1 Scope
1.2 Definitions
1.3 Application for Occupancy
1.4 Right of Entry
1.5 Site Inspection
1.6 Information Required for Submission
1.7 Notification to Proceed with Construction
2.0 GENERAL REQUIREMENTS
2.1 Use of a Casing Pipe
2.2 Location of Pipeline on the Right-of-Way
2.3 Depth of Installation
2.4 Pipelines within Limits of a Dedicated Highway
2.5 Modification of Existing Facilities
2.6 Abandoned Facilities
2.7 Conflict of Specifications
2.8 Insulation
2.9 Corrosion Protection and Petroleum Leak Prevention
3.0 SOIL INVESTIGATION
3.1 General
3.2 Location
3.3 Sampling
3.4 Boring Logs
3.5 Additional Information
4.0 DESIGN REQUIREMENTS
ii
4.1 Design Loads
4.2 Design Assumptions
4.3 Casing Pipe
4.4 Carrier Pipe
4.5 Casing Pipe End Seals
4.6 Vents
4.7 Signs
4.8 Warning Tape
4.9 Shut-off Valves
4.10 Cathodic Protection
4.11 Manholes
4.12 Box Culverts
4.13 Drainage
4.14 Pipelines on Bridges
5.0 CONSTRUCTION REQUIREMENTS
5.1 Method of Installation
5.2 Grouting
5.3 Soil Stabilization
5.4 Dewatering
5.5 Safety Requirements
5.6 Blasting
5.7 Temporary Track Supports
5.8 Protection of Drainage Facilities
5.9 Support of Excavation Adjacent to Track
5.10 Inspection and Testing
5.11 Reimbursement of Conrail Costs
APPENDIX
PLATE I Pipe Data Sheet PLATE II Plan (crossing) PLATE III Profile (crossing) iii
PLATE IV Plan & Profile (longitudinal occupancy) PLATE V Section (longitudinal occupancy) PLATE VI Plan & Section (highway crossing under RR bridge) PLATE VII Elevation & Section (pipe on highway bridge over RR) PLATE VIII Test Boring Log PLATE IX Lateral Pressure Diagram PLATE X Folding of Plans
Publication Standards Sources
- 1 -
Specifications For Pipeline Occupancy Of Consolidated Rail Corporation Property
1.0 GENERAL
1.1 Scope
a. This specification shall apply to the design and construction of pipelines carrying flammable or non-flammable substances and casings containing wires and cables across and along Conrail property and facilities. This specification shall also apply to tracks owned by others (sidings, industry tracks, etc.) over which Conrail operates its equipment.
b. It is to be clearly understood that Conrail owns its right-of-way for the primary purpose of operating a railroad. All occupancies shall therefore be designed and constructed so that rail operations and facilities are not interfered with, interrupted or endangered. In addition, the proposed facility shall be located to minimize encumbrance to the right-of-way so that the railroad will have unrestricted use of its property for current and future operations.
1.2 Definitions
a. Conrail - Consolidated Rail Corporation
b. Contract Administration - Conrail's Contract Administration Department
c. Owner (Applicant) - Individual, corporation or municipality desiring occupancy of Conrail property.
d. Professional Engineer Engineer licensed in the state where the facilities are to be constructed.
e. Carrier Pipe - Pipe used to transport the product.
f. Casing Pipe - Pipe through which the carrier pipe is installed.
g. Sidings or industry tracks Tracks located off of Conrail’s right-of-way, serving an industry.
1.3 Application For Occupancy
a. Individuals, corporations or municipalities desiring occupancy of Conrail property by pipeline occupations must agree, upon approval of the engineering and construction details by Conrail, to execute an appropriate Conrail occupational agreement and pay any required fees and/or rentals specified therein.
b. The application for an occupancy shall be by letter addressed to Robert J. Dempsey, Consolidated Rail Corporation, 3501 Island Ave., Philadelphia, PA., 19153, giving the following:
(1) Full name of Owner.
(2) Complete mailing address of the applicant.
(3) Name and title of person who will sign the agreement.
(4) The State in which the applicant is incorporated.
- 2 -
c. All applications shall be accompanied with six (6) copies of all design and construction plans and three (3) copies of all specifications and engineering computations for the proposed occupancy. On extensive projects, only those plans involving work on, or affecting Conrail property and operations, shall be submitted. Included shall be a plan showing the extent of the total project upon which that portion of the work affecting Conrail is clearly defined.
d. All of the above plans, specifications and computations must be prepared by and bear the seal of a Professional Engineer.
1.4 Right Of Entry
a. No entry upon Conrail property for the purpose of conducting surveys, field inspections, obtaining soils information or any other purposes associated with the design and construction for the proposed occupancy, will be permitted without a proper entry permit prepared by Conrail. The applicant must pay the associated fees and execute the entry permit.
b. It is to be clearly understood that the issuance of an entry permit does not constitute authority to proceed with any construction. Construction can not begin until a formal agreement is executed by Conrail and the Owner receives permission, from the designated inspection agency of Conrail, to proceed with the work.
1.5 Site Inspection
a. For longitudinal occupancy of Conrail property a site inspection along the proposed pipeline route may be required before final design plans are prepared. When a site inspection is required, the applicant and/or his engineer must meet with representatives of Conrail to view the entire length of the proposed occupancy.
b. Prior to the site inspection the applicant must submit the following information:
(1) A plan view of the proposed route showing all tracks, both Conrail right-of-way lines and all other facilities located on the right-of-way. The distance from the proposed pipeline to the adjacent track and to the right-of-way lines must be shown.
(2) A complete "Pipe Data Sheet" (See Plate I)
(3) Typical cross sections along the proposed route. (See Plate V)
c. Site inspections for pipe crossings are not required unless, in the opinion of Conrail, the size and location of the facility warrant an inspection.
1.6 Information Required for Submission
1.6.1 Plans and Computations
a. Plans for proposed pipeline occupancies shall be submitted to and approved by Conrail prior to Conrail's issuance of an agreement and start of construction.
b. Plans are to be prepared in sizes as small as practical (8½” x 11”, 8½” x 14” or 8½” x 17”). Larger size plans shall be folded, individually, by the applicant to an 8 1/2 inch by 11 inch (216 x 279 mm) size, as shown on Plate X, prior to submission.
Where more than one plan is involved, the folded plans shall be assembled into complete sets by the applicant before submission. Failure of the applicant to comply with these requirements may be sufficient cause for rejection of the application.
- 3 -
c. Plans shall be drawn to scale and shall include the following (See Plates I to VII):
(1) Plan view of proposed pipeline in relation to all Conrail facilities and facilities immediately adjacent to Conrail including, but not limited to, tracks, buildings, signals, pole lines, other utilities and all other facilities that may affect or influence the pipeline design and construction. (See Plate II)
(2) The location, in feet (meters), of the pipe crossing from the nearest Conrail Milepost and/or from the centerline of a Conrail bridge, giving the Conrail bridge number. If the above is not available, provide distance to the nearest highway grade crossing of the railroad.
(3) In all cases, the name of the State and County in which the proposed facilities are located must be shown. In States where Townships, Ranges and Sections are used, show the distance in feet to the nearest Section line and identify the Section number, Township and Range.
(4) The profile of the ground above the centerline of the pipe, from field survey, showing relationship of the pipeline and/or casing pipe to the ground levels, the tracks and other facilities, (See Plate III). For longitudinal occupations, the top of rail profile of the adjacent track shall be shown on the pipeline profile, (See Plate IV).
(5) All Conrail property lines indicated by dimensions, in feet (meters), to the centerline of adjacent track, as well as the overall width of the Conrail right-of-way. If the pipeline is in a public highway, the limits of the dedicated highway right-of-way, as well as the limits of any paving, sidewalks etc., shall be defined, by dimensions in feet (meters), from the centerline of the dedicated right-of-way.
(6) The angle of the crossing in relation to the centerline of the track(s). (See Plate II)
(7) On pipelines having valves, the distance in feet (meters) along the pipeline from the crossing to the nearest valves and/or control stations.
(8) A separate "Pipe Data Sheet" (See Plate I) shall be submitted on an 8 1/2 inch by 11 inch (216 x 279 mm) sheet, for each crossing.
d. The plan shall be specific, on Conrail property and under tracks that are not on Conrail property, as to the:
(1) Method of installation. (See Section 5.1)
(2) Size and material of the casing pipe. (See Section 4.3)
(3) Size and material of the carrier pipe. (See Section 4.4)
These items can not have an alternative and any application that is received that indicates options in any of the above items will not be processed.
e. Once the application has been approved by Conrail, no variance from the plans, specifications, method of installation, construction, etc., as approved in the occupancy document, will be considered or permitted without the payment to Conrail of additional fees for the re-processing of the application.
f. All plans and computations associated with the work under the agreement shall be prepared by, and bear the seal of, a Professional Engineer. If not so imprinted, the application will be given no further consideration. This requirement also applies to all data
- 4 -submitted by the Owner's contractor. Contractor's plans and computations that are not stamped will be returned and construction will not be permitted to proceed.
1.6.2 Specifications
a. Project specifications, for all work on and affecting the railroad right-of-way, shall be included with the submission. All pertinent requirements of this document shall be included.
1.7 Notification to Proceed with Construction
a. After approval of the engineering plans and specifications and execution of the occupational agreement, the Owner will be notified of the appropriate Conrail Area Engineer's Office that must be contacted prior to start of construction. The Area Engineer's Office will provide Conrail's inspection of the project and coordinate all other construction aspects of the project that relate to Conrail (flagging, track work, protection of signal cables, etc.).
b. The Area Engineer's Office must be notified a minimum of fourteen (14) working days prior to desired start of construction.
2.0 GENERAL REQUIREMENTS
2.1 Use of a Casing Pipe
a. A casing pipe will be required for all pipeline crossings carrying liquid flammable or non-flammable substances under pressure.
b. For flammable and nonflammable gas pipelines the casing pipe may be omitted provided the carrier pipe meets the requirements provided in the AREA manual Chapter 1, Part 5, Section 5.2.3. Conrail may require use of a casing pipe at locations where increased risks from specific site conditions (track speed, traffic density, etc.) are present.
c. For non-pressure sewer or drainage crossings, where the installation can be made by open cut (see Section 5.1.2) or reinforced concrete pipe can be jacked under the railroad (see Section 5.1.4), the casing pipe may be omitted.
d. Pressure pipelines that do not cross under the track but are located within 25 feet (7.6
m) of the centerline of any track or closer than 45 feet (13.7 m) to nearest point of any bridge, building or other important structure, shall be encased.
e. The casing pipe shall be laid across the entire width of the right-of-way, except where a greater length is required to comply with Section 4.3.1.f. of this specification, even though such extension is beyond the right-of-way. For non-pressure sewer or drainage crossings, where a casing is used for carrier pipe installation purposes only, the casing need only to extend from the boring pit to the receiving pit.
2.2 Location of Pipeline on the Right-of-Way
a. Pipelines laid longitudinally on Conrail's right-of-way shall be located as far as practicable from any tracks or other important structures and as close to the railroad property line as possible. Longitudinal pipelines must not be located in earth embankments or within ditches located on the right-of-way.
- 5 -
b. Pipelines shall be located, where practicable, to cross tracks at approximate right angles to the track, but preferably at not less than 45 degrees.
c. Pipelines shall not be placed within a culvert, under railroad bridges, nor closer than 45 feet (13.7 m) to any portion of any railroad bridge, building, or other important structure, except in special cases, and then by special design, as approved by Conrail’s AVP - Engineering.
d. Pipelines shall not be located within the limits of a turnout (switch) when crossing the track. The limits of the turnout extend from the point of the switch to the last long timber.
e. Pipeline installations shall not be designed as an open cut installation where the pipeline is to be located within the limits of a grade crossing. If it is shown that no other method of installation is possible, the owner will be responsible for reimbursing Conrail for all costs associated with the removal and reconstruction of the grade crossing.
f. Pipelines carrying liquefied petroleum gas shall, where practicable, cross the railroad where tracks are carried on embankment.
g. Uncased gas pipelines must not be located within 25 feet (7.6 m) of any track.
2.3 Depth of Installation
2.3.1 Pipelines conveying non-flammable substances
a. Casing/carrier pipes placed under Conrail track(s) shall be not less than 5½ feet (1.7 m) from base of rail to top of pipe at its closest point, except that under sidings or industry tracks this distance may be 4½ feet (1.4 m) as approved by Conrail. On other portions of the right-of-way, where the pipe is not directly beneath any track, the depth from ground surface or from bottom of ditch to top of pipe shall not be less than 3 feet (0.9 m). Where 3 feet (0.9 m) of cover can not be provided from bottom of ditch, a 6 inch (152 mm) thick concrete slab shall be provided over the pipeline for protection.
b. Pipelines laid longitudinally on Conrail's right-of-way, 50 feet (15.2 m) or less from centerline track, shall be buried not less than 4 feet (1.2 m) from ground surface to top of pipe. Where the pipeline is laid more than 50 feet (15.2 m) from centerline of track, the minimum cover shall be at least 3 feet (0.9 m).
2.3.2 Pipelines conveying flammable substances
a. Casing pipes under Conrail track(s) shall be not less than 5½ feet (1.7 m) from base of rail to top of pipe at its closest point, except that under sidings or industry tracks this distance may be 4½ feet (1.4 m) as approved by Conrail. On other portions of the right-of-way, where the pipe is not directly beneath any track, the depth from ground surface or from bottom of ditch to top of pipe shall not be less than 3 feet (0.9 m). Where 3 feet (0.9 m) of cover can not be provided from bottom of ditch, a 6 inch (152 mm) thick concrete slab shall be provided over the pipeline for protection.
b. Uncased gas pipelines, under Conrail track(s), shall not be less than 10 feet (3.0 m) from the base of rail to the top of the pipe at its closest point. At all other locations where crossing the right-of-way, the minimum ground cover must be 6 feet (1.8 m). Where it is not possible to obtain the above depths, use of a casing pipe will be required.
c. Pipelines laid longitudinally on Conrail's right-of-way, 50 feet (15.2 m) or less from centerline track, shall be buried not less than 6 feet (1.8 m) from ground surface to top of
- 6 -pipe. Where the pipeline is laid more than 50 feet (15.2 m) from centerline of track, the minimum cover shall be at least 5 feet (1.5 m).
- 7 -
2.4 Pipelines within Limits of a Dedicated Highway
a. Pipelines within the limits of a dedicated highway are subject to all the requirements of this specification and must be designed and installed in accordance with them.
b. The limits of the dedicated highway (right-of-way) must be clearly shown on the plans.
c. Construction can not begin until an agreement has been executed between Conrail and the Owner and proper notification has been given to Conrail's Area Engineer. (See Section 1.7)
2.5 Modification of Existing Facilities
a. Any replacement or modification of an existing carrier pipe and/or casing shall be considered as a new installation, subject to the requirements of this specification.
2.6 Abandoned Facilities
a. The owner of all abandoned pipe crossings and other occupancies shall notify Conrail, in writing, of the intention to abandon.
b. Abandoned pipelines shall be removed or completely filled with cement grout, compacted sand or other methods as approved by Conrail.
c. Abandoned manholes and other structures shall be removed to a minimum distance of 2 feet (0.6 m) below finished grade and completely filled with cement grout or compacted sand.
2.7 Conflict of Specifications
a. Where laws or orders of public authority prescribe a higher degree of protection than specified herein, then the higher degree so prescribed shall be deemed a part of this specification.
2.8 Insulation
a. Pipelines and casings shall be suitably insulated from underground conduits carrying electric wires on Conrail property.
2.9 Corrosion Protection and Petroleum Leak Prevention
a. Pipelines on Conrail property that carry petroleum products or hazardous liquids shall be designed in accordance with current federal, state and/or local regulations that mandate leak detection automatic shutoff, leak monitoring, and sacrificial anodes and/or exterior coatings to minimize corrosion and prevent petroleum releases.
3.0 SOIL INVESTIGATION
3.1 General
a. Test borings or other soil investigations, approved by Conrail, shall be made to determine the nature of the underlying material for all pipe crossings 60 inches (1524 mm) in diameter and larger under track(s). (See Section 1.4 relative to procedures)
b. Test borings or other soil investigations, approved by Conrail, may be required when, in the judgment of Conrail, they are necessary to determine the adequacy of the design and
- 8 -construction of pipe crossings less than 60 inches (1524 mm) in diameter and for other facilities located on the right-of-way.
3.2 Location
a. Borings shall be made on each side of the track(s), on the centerline of the pipe crossing, and as close to the track(s) as practicable. (See Section 1.4 relative to procedures)
b. Test boring logs shall be accompanied with a plan, drawn to scale, showing the location of the borings in relation to the track(s) and the proposed pipe.
3.3 Sampling
a. Test borings shall be made in accordance with current ASTM Designation D 1586 except that sampling must be continuous from the ground surface to 5 feet (1.5 m) below the proposed invert unless rock is encountered before this depth. Where rock is encountered, it is to be cored using a Series "M" Double Tube Core Barrel, with a diamond bit, capable of retrieving a rock core at least 1 5/8" (41.3 mm) in diameter. Individual core runs are not to exceed 5 feet (1.5 m) in length.
3.4 Boring Logs
a. Test boring logs shall comply with Plate VIII and clearly indicate all of the following:
(1) Boring number as shown on the required boring location plan.
(2) Ground elevation at each boring using same datum as the pipeline construction plans.
(3) Engineering description of soils or rock encountered.
(4) Depth and percent recovery of all soil samples.
(5) Depth from surface for each change in strata.
(6) Blows for each 6 inches (152 mm) of penetration for the standard penetration test described in ASTM D 1586. Blows for lesser penetrations should be recorded.
(7) Percent recovery and Rock Quality Designation (RQD) for all rock cores.
(8) Depth to ground water while sampling and when it has stabilized in the bore hole.
b. The location of the carrier pipe and/or casing pipe shall be superimposed on the boring logs before submission to Conrail.
c. All borings shall be sealed, for their full depth, with a 4-3-1 bentonite-cement-sand grout after accurate ground water readings have been taken and recorded.
d. Soil samples taken from auger vanes or return washwater are not acceptable.
3.5 Additional Information
a. When directed by Conrail, additional borings may be required for the purpose of taking undisturbed thin-wall piston samples or Dennison type samples for laboratory testing to determine the index and engineering properties of certain soil strata.
- 9 -
4.0 DESIGN REQUIREMENTS
4.1 Design Loads
4.1.1 General Requirements
a. All pipes, manholes and other facilities shall be designed for the external and internal loads to which they will be subjected.
b. To allow for placement of additional track(s) or shifting of the existing track(s), all proposed pipelines or structures shall be designed as if a railroad loading is directly above the facility.
4.1.2 Earth Load
a. The dead load of the earth shall be considered as 120 pounds per cubic foot (18.9 kN/m3) unless soil conditions warrant the use of a higher value.
4.1.3 Railroad Load (live load and impact)
a. The railroad live load used shall be a Cooper E-80 loading. This loading consists of 80 kip (356 kN) axle loads spaced 5 feet (1.5 m) on centers.
b. An impact factor of 1.75 (multiply live load by the impact factor) shall be used for depth of cover up to 5 feet (1.5 m). Between 5 and 30 feet (1.5 and 9.1 m), the impact factor is reduced by 0.03 per foot (0.1 per m) of depth. Below a depth of 30 feet (9.1 m), the impact factor is one.
c. The values shown in Table 1 shall be used for the vertical pressure on a buried structure for the various heights of cover.
Table 1 Live loads, including impact, for various heights of cover for a Cooper E-80 loading.
Height of Cover Load feet (meter) lb/sq ft (kPa)
2 (0.6) 3800 (162.8) 3 (0.9) 3150 (150.8) 4 (1.2) 2850 (136.5) 5 (1.5) 2550 (122.1) 6 (1.8) 2250 (107.7) 7 (2.1) 1950 (93.4) 8 (2.4) 1700 (81.4) 9 (2.7) 1500 (71.8)
10 (3.0) 1300 (62.2) 12 (3.7) 1000 (47.9) 14 (4.3) 800 (38.3) 16 (4.9) 625 (29.9) 18 (5.5) 500 (23.9) 20 (6.1) 400 (19.2) 25 (7.6) 250 (12.0) 30 (9.1) 150 (7.2)
d. To determine the horizontal pressure caused by the railroad loading on a sheet pile wall or other structure adjacent to the track, the Boussinesq analysis shall be used. The load on
- 10 -the track shall be taken as a strip load with a width equal to the length of the ties, 8½ feet (2.6 m). The vertical surcharge, q (psf), caused by each axle, shall be uniform and equal to the axle load divided by the tie length and the axle spacing, 5 feet (1.5 m). For the E-80 loading this results in;
q = 80,000 / (8.5 X 5) = 1882 psf. (q = 356 / (2.591 x 1.524) = 90.1 kPa)
The horizontal pressure due to the live load surcharge at any point on the wall or other structure is p h and can be calculated by the following:
p h
= (2q/π)(β-sin β(cos2∝)) (See PLATE IX)
e. The vertical and horizontal pressures given above shall be used unless an alternate design method is approved by Conrail. Proposals to use an alternate design method must include acceptable references and a statement explaining the justification for choosing the alternate method.
4.2 Design Assumptions
a. To design a casing pipe or an uncased carrier pipe for the external loads on Conrail’s right-of-way, the following design assumptions shall be used, unless site conditions indicate more conservative values are required:
b. Flexible Pipe (Steel, DIP, CMP, Tunnel Liner Plate)
(1) Steel Pipe (Bored and jacked in place)
• Spangler’s Iowa formula shall be used for design with:
(a) Deflection lag factor - Df = 1.5
(b) Modulus of soil reaction - E´ = 1080 psi (7.45 MPa)
(c) Bedding constant - Kb = 0.096
(d) Soil loading constant - Ku´ = 0.13
(e) Allowable deflection of pipe - 3% of pipe diameter
(2) Ductile Iron Pipe (Open Cut)
• ANSI Specification A 21.50 shall be used for design with:
(a) Pipe laying condition = Type 3 (see Sec. 5.1.2 for backfill requirements on RR R/W)
(b) Earth load - ANSI A 51.50 prism method
(3) Corrugated Steel Pipe & Corrugated Structural Steel Plate Pipe (Open Cut)
• AREA Chapter 1, Part 4, Sections 4.9 & 4.10 shall be used for design with:
(a) Soil stiffness factor - K = 0.33
(b) Railroad impact as per Section 4.1.3.b. of this specification.
(4) Tunnel Liner Plate (Tunneled)
• AREA Chapter 1, Part 4, Section 4.16 shall be used for design with:
(a) Soil stiffness factor - K = 0.33
(b) Railroad impact as per Section 4.1.3.b. of this specification.
c. Rigid Pipe (RCP, Vitrified Clay Pipe and PCCP)
(1) Reinforced Concrete Pipe, Vitrified Clay Pipe & Prestressed Concrete Cylinder Pipe (Open Cut)
• American Concrete Pipe Association design manual shall be used for design with:
(a) Marston load theory used for earth load
- 11 -
(b) Bedding (Load Factor) - Lf = 1.9
(c) Factor of safety - FS = 1.25 for RCP FS = 1.50 for VCP
(d) Railroad impact as per Section 4.1.3.b. of this specification.
(2) Reinforced Concrete Pipe (Jacked)
• American Concrete Pipe Association design manual shall be used for design with:
(a) Marston load theory used for earth load
(b) Bedding (Load Factor) - Lf = 3.0
(c) Factor of safety = 1.25
(d) Railroad impact as per Section 4.1.3.b. of this specification.
4.3 Casing Pipe
4.3.1 General Requirements
a. Casing pipe shall be so constructed as to prevent leakage of any substance from the casing throughout its length, except at ends of casing where ends are left open, or through vent pipes when ends of casing are sealed. Casing shall be installed so as to prevent the formation of a waterway under the railroad, and with an even bearing throughout its length, and shall slope to one end (except for longitudinal occupancy).
b. The casing pipe and joints shall be of steel and of leakproof construction when the pipeline is carrying liquid flammable products or highly volatile substances under pressure.
c. The inside diameter of the casing pipe shall be such as to allow the carrier pipe to be removed subsequently without disturbing the casing or the roadbed. For steel pipe casings, the inside diameter of the casing pipe shall be at least 2 inches (51 mm) greater than the largest outside diameter of the carrier pipe joints or couplings, for carrier pipe less than 6 inches (152 mm) in diameter; and at least 4 inches (102 mm) greater for carrier pipe 6 inches (152 mm) and over in diameter.
d. For flexible casing pipe, a maximum vertical deflection of the casing pipe of 3 percent of its diameter, plus ½ inch (13 mm) clearance shall be provided so that no loads from the roadbed, track, traffic or casing pipe itself are transmitted to the carrier pipe. When insulators are used on the carrier pipe, the inside diameter of the flexible casing pipe shall be at least 2 inches (51
mm) greater than the outside diameter of the carrier pipe for pipe less than 8 inches (203 mm) in diameter; at least 3¼ inches (83 mm) greater for pipe 8 inches to 16 inches (203 mm to 406 mm), inclusive, in diameter and at least 4½ inches (114 mm) greater for pipe 18 inches (457 mm) and over in diameter.
e. In no event shall the casing pipe diameter be larger than is necessary to permit the insertion of the carrier pipe.
f. Casing pipe under railroad tracks and across Conrail's right-of-way shall extend the greater of the following distances, measured at right angle to centerline of track:
(1) Across the entire width of the Conrail right-of-way.
(2) 3 feet (0.9 m) beyond ditch line.
(3) 2 feet (0.6 m) beyond toe of slope.
(4) A minimum distance of 25 feet (7.6 m) from each side of centerline of outside track when casing is sealed at both ends.
- 12 -
(5) A minimum distance of 45 feet (13.7 m) from centerline of outside track when casing is open at both ends.
(6) Beyond the theoretical railroad embankment line. This line begins at a point, on existing grade, 10 feet (3 m) horizontally from centerline track and extends downward on a 1½ (H) to 1 (V) slope. (See Plate III).
g. If additional tracks are constructed in the future, the casing shall be extended correspondingly at the Owner's expense.
4.3.2 Steel Pipe
a. Steel pipe may be installed by open cut, boring or jacking.
b. Steel pipe shall have a specified minimum yield strength, SMYS, of at least 35,000 psi (241 MPa). The ASTM or API specification and grade for the pipe are to be shown on the Pipe Data Sheet (Plate I).
c. Joints between the sections of pipe shall be fully welded around the complete circumference of the pipe.
d. Steel casing pipe, with a minimum cover of 5½ ft. (1.7 m), shall have a minimum wall thickness as shown in Table 2, unless computations indicate that a thicker wall is required.
Table 2
Pipe Diameter Coated or Cathodically Protected
Uncoated and Unprotected
Nominal Pipe Size Nominal Wall Thickness Nominal Wall Thickness inches (mm) inches (mm) inches (mm) 10 and under (254 & under) 0.188 (4.78) 0.188 (4.78) 12 & 14 (305 & 356) 0.188 (4.78) 0.250 (6.35) 16 (406) 0.219 (5.54) 0.281 (7.14) 18 (457) 0.250 (6.35) 0.312 (7.92) 20 & 22 (508 & 559) 0.281 (7.14) 0.344 (8.74) 24 (610) 0.312 (7.92) 0.375 (9.53) 26 (660) 0.344 (8.74) 0.406 (10.31) 28 (711) 0.375 (9.53) 0.438 (11.07) 30 (762) 0.406 (10.31) 0.469 (11.91) 32 (813) 0.438 (11.07) 0.500 (12.70) 34 & 36 (864 & 914) 0.469 (11.91) 0.532 (13.49) 38 (965) 0.500 (12.70) 0.562 (14.27) 40 (1016) 0.531 (13.49) 0.594 (15.09) 42 (1067) 0.562 (14.27) 0.625 (15.88) 44 & 46 (1118 & 1168) 0.594 (15.09) 0.657 (16.66) 48 (1219) 0.625 (15.88) 0.688 (17.48) 50 (1270) 0.656 (16.66) 0.719 (18.26) 52 (1321) 0.688 (17.48) 0.750 (19.05) 54 (1372) 0.719 (18.26) 0.781 (19.84) 56 & 58 (1422 &1473) 0.750 (19.05) 0.812 (20.62) 60 (1524) 0.781 (19.84) 0.844 (21.44) 62 (1575) 0.812 (20.62) 0.875 (22.23) 64 (1626) 0.844 (21.44) 0.906 (23.01) 66 & 68 (1676 & 1727) 0.875 (22.23) 0.938 (23.83) 70 (1778) 0.906 (23.01) 0.969 (24.61)
- 13 -
72 (1829) 0.938 (23.83) 1.000 (25.40)
e. Coated steel pipe that is bored or jacked into place shall conform to the wall thickness requirements for uncoated steel pipe since the coating may be damaged during installation.
f. Smooth wall steel pipes with a nominal diameter over 72 inches (1829 mm) will not be permitted.
4.3.3 Ductile Iron Pipe
a. Ductile iron pipe may be used only when placed by the open cut method. Jacking or boring through the railroad embankment is not permitted due to the bell and spigot joints.
b. Ductile iron pipe shall conform to the requirements of ANSI A21.51/AWWA C-151.
Class 56 pipe shall be used unless computations, in accordance with Sections 4.1 and 4.2, are provided.
c. Table 3 is based on the design assumptions given in Section 4.2. b. (2) with a minimum cover of 5½ ft. (1.7 m). This table is provided for information only.
Table 3
Pipe diameter Thickness Class Pressure Class Wall thickness Class Wall thickness Class
in. (mm) in. (mm) in. (mm) 3 (89) 0.25 (6.35) 51 0.25 (6.35) 350 4 (114) 0.26 (6.60) 51 0.25 (6.35) 350 6 (168) 0.25 (6.35) 50 0.25 (6.35) 350 8 (219) 0.27 (6.86) 50 ---- ---- ----
10 (273) 0.32 (8.13) 51 ---- ---- ---- 12 (324) 0.34 (8.64) 51 ---- ---- ---- 14 (356) 0.39 (9.91) 52 ---- ---- ---- 16 (406) 0.40 (10.2) 52 ---- ---- ---- 18 (457) 0.44 (11.2) 53 ---- ---- ---- 20 (508) 0.45 (11.4) 53 ---- ---- ---- 24 (610) 0.53 (13.5) 55 ---- ---- ---- 30 (762) 0.63 (16.0) 56 ---- ---- ---- 36 (914) 0.73 (18.5) 56 ---- ---- ---- 42 (1067) 0.83 (21.1) 56 ---- ---- ---- 48 (1219) 0.93 (23.6) 56 ---- ---- ---- 54 (1372) 1.05 (26.7) 56 ---- ---- ----
d. The pipe shall have mechanical or push on type joints.
4.3.4 Corrugated Steel Pipe and Corrugated Structural Steel Plate Pipe
a. Corrugated steel pipe and corrugated structural steel plate pipe may be used for a casing only when placed by the open cut method. Jacking or boring through the railroad embankment is not permitted.
b. Corrugated steel pipe and corrugated structural steel plate pipe may be used for a casing provided the pressure in the carrier pipe is less than 100 psi (689 kPa).
- 14 -
c. Pipe shall be bituminous coated and shall conform to the current American Railway Engineering Association Specifications Chapter 1, Part 4.
d. Corrugated steel pipe shall have a minimum sheet thickness as shown in Table 4.
Corrugated structural steel plate pipe shall have a minimum plate thickness of 8 gage, 0.168
in. (4.27 mm). If computations indicate that a greater thickness is required, the thicker sheet or plate shall be used.
TABLE 4
Pipe Diameter Sheet Thickness inches (mm) Gage inches (mm) 12 to 30 (305 to 762) 14 0.079 (2.01) 36 (914) 12 0.109 (2.77) 42 to 54 (1067 to 1372) 10 0.138 (3.51) 60 to 120 (1524 to 3048) 8 0.168 (4.27)
4.3.5 Steel Tunnel Liner Plates
a. Liner plates shall be installed by the tunneling method as detailed in Section 5.1.5 of this specification.
b. Tunnel liner plates shall be galvanized and bituminous coated and shall conform to current AREA Specification Chapter 1, Part 4, Section 4.16. If the tunnel liner plates are used only to maintain a tunneled opening until the carrier pipe is installed, and the annular space between the carrier pipe and the tunnel liner is completely filled with cement grout within a reasonably short time after completion of the tunnel, then the tunnel liner plates need not be galvanized and coated.
c. Tunnel liner plates are to be a minimum of 12 gage and shall be fabricated from structural quality, hot-rolled, carbon-steel sheets or plates conforming to ASTM Specification A 569.
d. The following liner plate information must be shown on the Pipe Data Sheet (Plate I):
(1) Number of flanges (2 or 4)
(2) Width of plate
(3) Type of plate (smooth or corrugated)
4.3.6 Reinforced Concrete Pipe
a. Reinforced concrete pipe shall be installed by the open cut or jacking method.
b. Reinforced concrete pipe shall conform to ASTM Specification C 76. Class V pipe, Wall B or C shall be used unless computations, in accordance with Section 4.2, are provided.
c. Reinforced concrete pipe may be used for a casing provided the pressure in the carrier pipe is less than 100 psi (689 kPa).
d. Pipe placed by open cut shall be installed in accordance with AREA Chapter 8, Part 10, Section 10.4 except that backfill and compaction shall be in accordance with Section 5.1.2 of this specification.
- 15 -
e. Pipe jacked into place shall have tongue and groove joints and shall be installed in accordance with Section 5.1.4 of this specification.
f. Joints between sections of the RCP shall be sealed with a gasket conforming with ASTM C 443 or approved equal.
4.3.7 Concrete Encasement
a. At locations where the installation is by open cut and a casing pipe is required, but can not be installed due to elbows or other obstructions, concrete encasement may be used when approved by Conrail.
b. The concrete encasement must provide a minimum cover of 6 inches of concrete (152
mm) around the pipe. A 6 x 6 - W 2.9 x W 2.9 (152 x 152 MW 18.7 x MW 18.7) welded wire fabric shall be placed in the concrete on all sides.
4.4 Carrier Pipe
4.4.1 General Requirements
a. The pipe shall be laid with sufficient slack so that it is not in tension.
b. Steel pipe shall not be used to convey sewage, storm water or other liquids which could cause corrosion.
c. Carrier pipes located on Conrail's right-of-way or under tracks which Conrail operates, shall be manufactured in accordance with the following specifications:
(1) Steel Pipe - The ASTM or API specification and grade for the pipe is to be shown on the Pipe Data Sheet. The specified minimum yield strength is to be at least 35,000 psi (241 MPa). For flammable substances see Sections 4.4.2 and 4.4.3 for additional requirements.
(2) Ductile Iron Pipe - ANSI A21.51/AWWA C151
(3) Corrugated Metal Pipe - AREA Chapter 1, Part 4
(4) Reinforced Concrete Pipe - ASTM C 76
(5) Vitrified Clay Pipe - ASTM C 700
(6) Prestressed Concrete Cylinder Pipe - AWWA C301 Reinforced Concrete Cylinder Pipe - AWWA C300
(7) Others - As approved by Conrail.
d. Carrier pipes installed within a casing pipe shall be designed for the internal pressure to which it will be subjected.
e. Gravity flow carrier pipes, installed without a casing pipe, shall meet the requirements, of the particular pipe material, as given in Section 4.3 of this specification.
f. Design computations, stamped by a P.E., must be submitted for all uncased pressure pipelines installed on Conrail's right-of-way. The pipe must be designed for the internal and external loads (see Section 4.1) to which it may be subjected. The design assumptions given in Section 4.2 shall apply.
- 16 -
- 17 -
4.4.2 Pipelines Carrying Flammable Substances
a. Pipelines carrying oil, liquefied petroleum gas and other flammable products shall be of steel and conform to the requirements of the current ANSI B 31.4 Liquid Transportation Systems for Hydrocarbons, Liquid Petroleum Gas, Anhydrous Ammonia, and Alcohols, and other applicable ANSI codes, except that the maximum allowable stresses for design of steel pipe shall not exceed the following percentages of the specified minimum yield strength (multiplied by the longitudinal joint factor) of the pipe as defined in the above codes:
(1) The following percentages apply to hoop stress in steel pipe within a casing under railroad tracks, across railroad right-of-way and longitudinally on railroad right-of-way:
(a) Seventy-two percent on oil pipelines.
(b) Fifty percent for pipelines carrying condensate, natural gasoline, natural gas liquids, liquefied petroleum gas, and other liquid petroleum products.
(c) Sixty percent for installations on gas pipelines.
(2) The following percentages apply to hoop stress in steel pipe laid longitudinally on railroad right-of-way without a casing:
(a) Sixty percent for oil pipelines.
(b) Forty percent for pipelines carrying condensate, natural gasoline, natural gas liquids, liquefied petroleum gas, and other liquid petroleum products.
(c) For gas pipelines see Section 4.4.3.b.
b. Computations, based on the above requirements and stamped by a P.E., shall be submitted with the application for occupancy.
4.4.3 Uncased Pipelines Carrying Gas
a. Pipelines carrying flammable and nonflammable gas products shall be steel and shall conform to the requirements of the current ANSI B 31.8 Gas Transmission and Distribution Piping Systems, and other applicable ANSI codes.
b. The minimum wall thickness for uncased carrier pipe shall be in accordance with the values provided in AREA, Chapter 1, Part 5, Section 5.2, Tables 5.2.3 (a through j).
c. A durable coating, which will resist abrasion (fusion bonded epoxy or other suitable material), shall be used to protect the uncased pipeline when the boring method of installation is used.
d. If Conrail determines there is the potential for damage to the uncased pipeline (foreign material in the subgrade, third party damage, etc.), special protection of the pipeline will be required. Special protection may include the use of concrete jacketed carrier pipe, a protection slab over the pipeline, increased depth of bury or other means.
4.5 Casing Pipe End Seals
a. Casings for carrier pipes of flammable and hazardous substances shall be suitably sealed to the outside of the carrier pipe. Details of the end seals shall be shown on the plans.
- 18 -
b. Casings for carrier pipes of non-flammable substances shall have both ends of the casing blocked up in such a way as to prevent the entrance of foreign material, but allowing leakage to pass in the event of a carrier break.
c. The ends of a casing pipe may be left open when the ends are at or above ground surface and above high water level, provided drainage is afforded in such a manner that leakage will be conducted away from railroad tracks and structures.
4.6 Vents
a. Sealed casings for flammable substances shall be properly vented. Vent pipes shall be of sufficient diameter, but in no case less than two inches (51 mm) in diameter, and shall be attached near each end of the casing and project through the ground surface at right-of-way lines or not less than 45 feet (13.7 m), measured at right angles from centerline of nearest track.
b. Vent pipes shall extend not less than 4 feet (1.2 m) above the ground surface. Top of vent pipe shall have a down-turned elbow, properly screened, or a relief valve. Vents in locations subject to high water shall be extended above the maximum elevation of high water and shall be supported and protected in a manner approved by Conrail.
c. Vent pipes shall be at least 4 feet (1.2 m), vertically, from aerial electric wires or greater if required by National Electrical Safety Code (ANSI C2).
d. When the pipeline is in a public highway, street-type vents shall be installed.
4.7 Signs
a. All pipelines (except those in streets where it would not be practical to do so) shall be prominently marked at right-of-way lines (on both sides of track for crossings) by durable, weatherproof signs located over the centerline of the pipe. Signs shall show the following:
(1) Name and address of owner
(2) Contents of pipe
(3) Pressure in pipe
(4) Pipe depth below grade at point of a sign
(5) Emergency telephone number in event of pipe rupture
b. For pipelines running longitudinally on Conrail property, signs shall be placed over the pipe (or offset and appropriately marked) at all changes in direction of the pipeline. Such signs should also be located so that when standing at one sign the next adjacent marker in either direction is visible. In no event shall they be placed more than 500 feet (152.4 m) apart unless otherwise specified by Conrail.
c. The Owner must maintain all signs on Conrail's right-of-way as long as the occupational agreement is in effect.
4.8 Warning Tape
a. All pressure pipelines installed by the trench method, without a casing, shall have a warning tape placed directly above the pipeline, 2 feet (0.6 m) below the ground surface.
- 19 -
4.9 Shut-off Valves
a. Accessible emergency shut-off valves shall be installed within effective distances each side of the railroad at locations selected by Conrail where hazard to life and property must be guarded against. No additional valves will be required where pipelines are provided with automatic control stations and within distances approved by Conrail,
4.10 Cathodic Protection
a. Cathodic protection shall be applied to all pipelines carrying flammable substances on Conrail's right-of-way.
b. For crossings and at other locations where the pipeline must be placed within a casing, the casing is to have cathodic protection or the wall thickness is to be increased to the requirements of Section 4.3.2 Table 2.
c. Uncased gas carrier pipes must be coated and cathodically protected to industry standards and test sites, for monitoring the pipeline, provided within 50 feet (15.2 m) of the crossing.
d. Where casing and/or carrier pipes are cathodically protected by other than anodes, Conrail shall be notified and a suitable test made to ensure that other railroad structures and facilities are adequately protected from the cathodic current in accordance with the recommendation of current Reports of Correlating Committee on Cathodic Protection, published by the National Association of Corrosion Engineers.
e. Where sacrificial anodes are used the locations shall be marked with durable signs.
4.11 Manholes
a. Manholes shall not be located on Conrail property where possible. At locations where this is not practical, including longitudinal occupancies, manholes shall be precast concrete sections conforming to ASTM Designation C 478, "Specification for Precast Concrete Manhole Sections".
b. The top of manholes located on Conrail property shall be flush with top of ground.
c. The distance from centerline of adjacent track to centerline of proposed manhole shall be shown on the plans.
4.12 Box Culverts
a. Reinforced concrete box culverts shall conform to the requirements of AREA Chapter 8, Parts 13 and 16.
4.13 Drainage
a. Occupancies shall be designed, and their construction shall be accomplished, so that adequate and uninterrupted drainage of Conrail's right-of-way is maintained.
b. All pipes, ditches and other structures carrying surface drainage on Conrail property and/or under Conrail track(s) shall be designed to carry the run-off from a one hundred
(100) year storm. Computations indicating this design, prepared by a Professional Engineer, and suitable topographic plans, outlining the total drainage area, shall be submitted for Conrail's approval.
- 20 -
c. If the drainage is to discharge into an existing drainage channel on Conrail's right-of-way and/or through a drainage structure under Conrail’s track(s), the computations must include the hydraulic analysis of any existing ditch and/or structure.
d. When calculating the capacity of existing or proposed drainage structures, under Conrail’s track(s), the headwater at the structure shall not be greater than one (1).
e. Pipe(s) used to carry surface drainage on Conrail’s right-of-way shall have a minimum diameter of 18 inches (457 mm).
f. Detention ponds must not be placed on any part of Conrail's right-of-way. Also, the railroad embankment must not be used as any part of a detention pond structure.
g. Formal approval of the proposed design, by the appropriate governmental agency having jurisdiction, shall be submitted with the drainage computations.
4.14 Pipelines on Bridges
a. Pipelines of any type shall not be installed on any bridge carrying Conrail tracks.
b. New overhead pipe bridges shall not be constructed over Conrail's right-of-way where underground installation of the pipeline is possible. Where the Applicant can show that no practicable alternative is available, this type of structure will be permitted provided the following conditions are met:
(1) The vertical clearance, distance from top of rail to bottom of structure, is shown and is a minimum of 23 feet (7.01 m), measured at a point 6 feet (1.83 m) horizontally from centerline track.
(2) The support bents for the overhead structure are located off of Conrail's right-of-way or a minimum clear distance of 18 feet (5.5 m) from centerline track, whichever distance is greater.
(3) Support bents within 25 feet (7.6 m) of centerline track have pier protection in accordance with AREA, Chapter 8, Part 2, Section 2.1.5.
(4) Complete structural plans and design computations for the structure and foundations, stamped by a Professional Engineer, are submitted with the application.
(5) A fence (with barbed wire) or other measures are provided which will prevent access to the bridge by unauthorized personnel or vandals.
c. Pipelines carrying flammable substances or non-flammable substances, which by their nature might cause damage if escaping on or near railroad facilities or personnel, shall not be installed on bridges over Conrail tracks. In special cases when it can be demonstrated to Conrail's satisfaction that such an installation is necessary and that no practicable alternative is available, Conrail may permit the installation and only by special design approved by him.
d. When permitted, pipelines on bridges over Conrail tracks shall be so located as to minimize the possibility of damage from vehicles, railroad equipment, vandalism and other external causes. They shall be encased in a casing pipe as directed by Conrail (See Plate
VII).
- 21 -
5.0 CONSTRUCTION REQUIREMENTS
5.1 Method of Installation
5.1.1 General Requirements
a. Bored, jacked or tunneled installations shall have a bore hole essentially the same as the outside diameter of the pipe plus the thickness of the protective coating.
b. The use of water or other liquids to facilitate casing emplacement and spoil removal is prohibited.
c. If during installation an obstruction is encountered which prevents installation of the pipe in accordance with this specification, the pipe shall be abandoned in place and immediately filled with grout. A new installation procedure and revised plans must be submitted to, and approved by, Conrail before work can resume.
5.1.2 Open Cut
a. The Owner must request open cut approval when making application for occupancy.
b. Installations beneath the track by open trench methods will be permitted only with the approval of the General Manager Transportation & Customer Service of the Division involved.
c. Installations by open cut will not be permitted under mainline tracks, tracks carrying heavy tonnage or tracks carrying passenger trains. Also, open cut shall not be used within the limits of a highway/railroad grade crossing or its approaches, 25 feet (7.6 m) either side of traveled way, where possible.
d. Rigid pipe (RCP, VCP and PCCP) must be placed in a Class B bedding or better.
e. At locations where open cut is permitted, the trench is to be backfilled with crushed stone with a top size of the aggregate to be a maximum of 2 inches (51 mm) and to have no more than 5% passing the number 200 sieve. The gradation of the material is to be such that a dense stable mass is produced.
f. The backfill material shall be placed in loose 6 inch (152 mm) lifts and compacted to at least 95% of its maximum density with a moisture content that is no more than 1% greater than or 2% less than the optimum moisture as determined in accordance with current ASTM Designation D - 1557 (Modified Proctor). When the backfill material is within 3 feet (9.1 m) of the subgrade elevation (the interface of the ballast and the subsoil) a compaction of at least 98% will be required.