W16ROE80946030
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to EXTEND THE BID OPENING DATE FROM WED., 27 AUGUST 2008 2 PM EST TO THURSDAY, 4 SEPTEMBER 2008, 2 PM EST, and
2. Include a Revised Bid Schedule, and 3. Include Revised Plans (Appendix A), and
4. Include Revised Specs (Appendix B), and 5. Include answ ers to contractor questions. FOR INFORMATIONAL PURPOSES ONLY.
6. Replace Wage Rates General Decision Number NJ 20080003, dated 8 August 2008 w ith Wage Rates General Decision Number NJ 20080003, dated 22 August 2008.
NOTE: Offerors must acknow ledge the receipt of this amendment by the date specified in the bid (or as amended) by one of the follow ing methods: in the space provided by 1442, by separate letter, by telgram, or by signing block 15 of the SF 30s. FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN THE REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID OR
LATE WITHDRAWL OF BID. (FAR 14.304)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 58
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Aug-2008
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-08-B-0005
X 9B. DATED (SEE ITEM 11)
15-May-2008
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Aug-2008
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS-08-B-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT #13
AMENDMENT NO. 13: TO PLANS & SPECIFICATIONS FOR GREEN BROOK SUB
BASIN OF THE RARITAN RIVER GREEN BROOK FLOOD DAMAGE REDUCTION
PROJECT SEGMENT R2 LEVEE, FLOODWALL & PUMP STATION, BOROUGH OF
BOUNDBROOK NEW JERSEY
Revised Bid Schedule
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
R2 LEVEE - WEST END FFP BASE BID
FFP
BASE BID -All work to complete construction of Segment R2 (i.e. levee, drainage structures, etc) located within Station 33+20.60 to Station 52+00 of the easement areas in accordance with the drawings and specifications, but not including Item No 0001AA, 0001AB, 0002 - Item No 0012 on this bid schedule.
FOB: Destination
MILSTRIP: W16ROE80946030
PURCHASE REQUEST NUMBER: W16ROE80946030
NET AMT
0001AA 11,730 Cubic
Yard
Soil Disposal for Base Award
FFP
BASE BID 2 - All work to remove non-hazardous contaminated soil from within the project limits of the Base Award of this contract including excavation, temporary storage, hauling off site, and disposal at a waste landfill capable of accepting such materials and soils along with all labor, equipment and materials and incidentals necessary to dispose of the materials and soils in compliance with all Federal, State, and local rules and regulations.
FOB: Destination
0001AB 59 Each Soil Testing for Bid Item 1AA
FFP
BASE BID 3 - Testing to determine contamination levels of excavated soils in Bid Item 1AA
0002 1 Lump Sum OPTION R2 Levee/floodwall/pumpstation -East End
FFP
OPTION 1 - All work to complete construction of Segment R2 (i.e. levee, pump station, swale, drainage structures, floodwall, etc) located within Station 52+00 to Station 78+94.97 of the easement areas in accordance with the drawings and specifications, but not including Item No 0001AA, 0001AB, 0001 and Item No 0003 - Item No 0012 on this bid schedule.
FOB: Destination
0003 1 Lump Sum $47,000.00 OPTION PSE&G - Electric Power Line Relocation
FFP
and Pad Mounted Transformer. OPTION 2 - Cost to conduct temporary and permanent relocation of utilities in work area and supply and install concrete pad and transformer. Cost and schedule to be determined during the construction phase in coordination with the utility company. (See Spec Section 00800 Paragraph 38 for details) Offerors shall include this Amount in the bid price. This amount shall not be changed ($47,000.00).
FOB: Destination
NET AMT $47,000.00
0004 1 Lump Sum OPTION Grass Maintenance
FFP
OPTION 3 - Work to include grass cutting and grass maintenance of all the easement areas in accordance with the drawings and specifications for 1 year.
Contractor should assume 4 grass cuts are required.
FOB: Destination
0005 1 Lump Sum OPTION Levee/Railroad Tie off
FFP
OPTION 4 -All Work to include closing the gap from the western end of the Segment R2 levee to the NJ Transit Railroad embankment, located within Station 32+26.19 to Station 33+20.60 of the easement areas, by use of geotube, anchor tube and levee fill. This Bid Item does not include the work in Bid Item 0001AA, 0001AB, 0001-0004, 0006-0012 of this bid schedule.
FOB: Destination
0006 1 Lump Sum $6,000.00 OPTION Utility Payments
FFP
OPTION 5 - Cost to include payment for utility costs related to pumping station facility for duration of 1 year. Offerors shall include this Amount in the bid price.
This amount shall not be changed. ($6,000.00) FOB: Destination
NET AMT $6,000.00
0007 1 Lump Sum OPTION Required Insurances
FFP
OPTION 6 - All required insurances necessary to work in coordination with all involved agencies and organizations with no less than the specified minimum amounts. (See Paragraph 36 of Spec Section 00800 for details on all required insurances and minimum amounts.)
FOB: Destination
0008 24,800 Cubic
OPTION Soil Disposal for Bid Item # 2
OPTION 7 - All work to remove non-hazardous contaminated soil from within the project limits of Bid Item # 2 of this contract including excavation, temporary storage, hauling off site, and disposal at a waste landfill capable of accepting such materials and soils along with all labor, equipment and materials and incidentals necessary to dispose of the materials and soils in compliance with all Federal, State, and local rules and regulations.
0009 124 Each OPTION Soil Testing for Bid Item 8
FFP
OPTION 8 - Testing to determine contamination levels of excavated soils in Bid Item 8.
0010 203 Cubic
OPTION Soil Disposal for Bid Item # 5
OPTION 9 - All work to remove non-hazardous contaminated soil from within the project limits of Bid Item # 5 of this contract including excavation, temporary storage, hauling off site, and disposal at a waste landfill capable of accepting such materials and soils along with all labor, equipment and materials and incidentals necessary to dispose of the materials and soils in compliance with all Federal, State, and local rules and regulations.
0011 2 Each OPTION Soil Testing for Bid Item 10
FFP
OPTION 10 – Testing to determine contamination levels of excavated soils in Bid Item 10.
0012 NSP
CCASS / CPARS
FFP
The Federal Acquisition Regulation (FAR) requires collection of Past performance Information (PPI) on AE contracts and IDIQs at the task order. The system collects and manages past performance data. Effective 1 Apr 2007 ACASS is now a module of DoD’s CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (CPARS). Architect-Engineer PPI data shall be entered in the Architect-Engineer Contract Administration Support System (ACASS) module via CPARS. Both the contractor and government personnel are responsible for inputting PPI data. Performance evaluations prepared in ACASS are transmitted to the Past Performance Information Retrieval System (PPIRS). For specific details and guidance in use of the system, contractor is directed to https://www.nwp.usace.army.mil/ct/I/home.asp. This links the contractor to the Portland District Contractor Appraisal Information Center (CAIC). CAIC is the primary center to assist both the contractor and government personnel in using the system.
FOB: Destination
NET AMT NSP
TOTAL
TOTAL BASE LINE ITEM 0001 $__________________
TOTAL BASE LINE ITEM 0001AA $__________________
TOTAL BASE LINE ITEM 0001AB $__________________
TOTAL OPTION #1 CLIN 0002 $__________________
TOTAL OPTION #2 CLINS 0003 $__47,000.00________
TOTAL OPTION #3 CLINS 0004 $__________________
TOTAL OPTION #4 CLINS 0005 $__________________
TOTAL OPTION #5 CLINS 0006 $___ 6,000.00_______
TOTAL OPTION #6 CLINS 0007 $__________________
TOTAL OPTION # 7 CLIN 0008 $__________________
TOTAL OPTION # 8 CLIN 0009 $__________________
TOTAL OPTION # 9 CLIN 0010 $__________________
TOTAL OPTION # 10 CLIN 0011 $__________________
TOTAL LINE ITEM 0012 $_______NSP_______
TOTAL BASE PLUS OPTIONS 0001 - 0012 $__________________
NOTES FOR PRICE SCHEDULE:
1. The low bidder for purposes of award will be the conforming responsible bidder offering the lowest amount for the Total Base Bid Plus Optional Items.
2. The minimum construction award will be the amount bid for the Total Base Bid.
3. Any bid which is materially unbalanced as to the price for the Base Bid Item and Optional Items may be rejected. An unbalanced bid is one, which is based on price significantly less than cost for some work and prices are significantly overstated for other work.
4. Bidders are required to bid on both the Base Bid Item and the Optional Items or their bid will be rejected. The Government is not obligated to award the Optional items.
5. Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions or attachments made by the bidders he thereto may render the bid non-responsive and be cause for its rejection.
Exercise of CLIN Item (Within calendar days from issuance of NTP)
Completion of CLIN Item period (Within calendar days from issuance of NTP)
Bid Item 1 Base Bid 1 0 720 Bid Item 1AA Base Bid 2 0 720 Bid Item 1AB Base Bid 3 0 720 Bid Item 2 Option 1 360 720 Bid Item 3 Option 2 300 720 Bid Item 4 Option 3 360 720 Bid Item 5 Option 4 360 720 Bid Item 6 Option 5 360 720 Bid Item 7 Option 6 90 720 Bid Item 8 Option 7 360 720 Bid Item 9 Option 8 360 720 Bid Item 10 Option 9 360 720 Bid Item 11 Option 10 360 720
TO BIDDERS
Bid Opening: The Bid Opening date/time has changed from August 27, 2008 at 2:00 PM to September 4, 2008 at 2:00 PM.
1. Plans (See Appendix A):
The following plan sheets have been revised:
CG-101, C-301, C-505, C-512, C-513
2. Specifications:
Spec Section 04 20 00 Masonry replaced (See Appendix B) Revised: SECTION 05 48 10.00 18, Paragraph 3.2.17 Stem Cover has been revised:
3.2.17 Stem Protector
Each unit shall be provided with a stem protector, which contains a view window. Galvanized steel is to be used for the stem protector. The stem shall be vandal proof. The view window shall be clear and UV protected to avoid deterioration from sunlight.
Replace paragraph 3.6.5 Waste Water from spec section 01 57 20.00 10, previously revised in Amendment #12, with revised version below:
3.6.5 Waste Water
a. Waste water from construction activities shall not be allowed to enter water ways or to be discharged prior to being tested and treated to remove pollutants. Monitoring of water areas affected by construction shall be the Contractor's responsibility. The Contractor will employ maximum Best Management Practices to limit, minimize and eliminate contamination down the hydrologic gradient. The Contractor is responsible for all costs to clean-up off-site waterways which are contaminated as a result of their activities. The Contractor shall handle all waste water in accordance with all Federal, State, Regional and Local laws and regulations.
b. Waste waters directly derived from construction activities shall not be allowed to enter clean water areas directly. Waste waters shall be collected and placed in retention areas where suspended material can be settled out or the water evaporates or is absorbed into the ground to separate pollutants from the water. Analysis shall be performed and results reviewed and approved before water in retention areas is discharged. Retention areas shall be dug within the limits of the project and are to be backfilled when no longer in use.
c. For discharge of ground water, the Contractor shall obtain a State or Federal permit specific for pumping and discharging ground water prior to surface discharging or shall land apply on the project site. Encountered ground water shall be handled in the same manner as waste water described in sub-paragraph B of this spec paragraph. Land application shall be in accordance with all Federal, State, Regional, and/or Local laws and regulations for pumping and land applying ground water. For discharge of ground water to surface waters a NJPDES – Discharge to Surface Water (NJPDES - DSW) permit is required. For discharge of ground waters to a retention area there is no requirement to obtain a NJPDES - Discharge to Ground Water (NJPDES - DGW) permit provided that each construction project segment is less than 30 days, and does not exceed 100,000 gallons per day.
d. Water generated from the flushing of lines shall be land applied in accordance with all Federal, State, and local laws and regulations for land application.
Please submit any remaining questions on this project by Thursday, 28 August 2008, 2 pm.
3. Responses to Contractor Questions (For Information Purposes Only):
Q1) In terms of removal of contaminated groundwater it is nearly impossible to quantify the volume expected to be removed. It is not only necessary to quantify the amount that is expected to be disposed from de-con but also the volume of water from dewatering from excavation. As an example “USACE” provided a “CY’ quantity for disposal. The reason for that is to maintain an even and comparable bidding field between all of the contractors. In an effort to keep the bids balanced – it would be necessary to provide a bid “Quantity”, an allowance or some value that all contractors can bid evenly.
A1) Agreed, it is nearly impossible to quantify the amount of water that will need to be pumped out of the excavated areas in terms of “quantity” and “CY”. For the purposes of the Invitation for Bid, the government specification calls for the water not to be removed but to have the water discharged it back into the ground within project limits. For clarification, please visit paragraph
3.6.5 entitled, “Waste Water” from spec section 01 57 20.00 10. It has been revised again in this amendment to outline the procedures for dealing with contaminated water, which is to discharge it back into the ground within the project limits.
Q2) Further clarification to Question #6 of Amendment #12: “May 8’ diameter precast manholes as detailed on Sheet C-509 be substituted for cast-in-place junction chambers? If not, please identify the locations where 8’ diameter precast manholes are to be used.”
A2) No. Junction chambers are to be built as shown in the plans and can not be substituted for cast-in-place junction chambers. The detail for the 8’ manhole on plan sheet C-509 is a typical detail for the face of the junction chamber. To help identify the locations of where the 8’ diameter precast manholes are to be used, plan views of certain junction chambers can be found on plan sheet C-512, which show what angles to construct.
Q3) Can round manholes be substituted in place of the CIP junction chambers.
A3) No. Round manholes can not be substituted in place of the CIP junction chambers. Junction chambers are to be built as shown in the plans. As explained in the previous response, the plans show the dimensions of the junction chambers.
Q4) The plan sheet referred to in response to question #20 of amendment #12 is incorrect.
A4) Correction to Answer #20 of Amendment #12: The correct revised plan sheet is C-505. The dimensions are correct as shown on the revised plan sheet.
Q5) Amendment 12 requires the Contractor to obtain the necessary permits to discharge any water resulting from the construction operations into surface waters. To the best of our knowledge, these permits which must be secured from the New Jersey Department of Environmental Protection must be obtained from the owner. This is also a lengthy process, time wise and will affect the contractor’s ability to perform the work under the contract within the time allowed. The issuance of this permit, as well as the alternate scheme of storing this water using on-site detention is subject to what contaminants, and the levels thereof, as indicated in the information contained in Amendment 9, may be present in the soils and groundwater within and adjacent to the work area.
A5) Reference is made to specification section 01 57 20.00 10 Environmental Protection, paragraph 3.6.5 Waste water, found in Amendment #13, which states, “For discharge of ground waters to a retention area there is no requirement to obtain a NJPDES - Discharge to Ground Water (NJPDES - DGW) permit provided that each construction project segment is less than 30 days, and does not exceed 100,000 gallons per day.” If the construction methodology chosen by the contractor requires a NJPDES Permit, then the contractor is responsible for obtaining said permit and completing the project within the contract duration.
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 27-Aug-2008 02:00 PM to 04-Sep-2008 02:00 PM.
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
WAGE RATES
General Decision Number: NJ080003 08/22/2008 NJ3
Superseded General Decision Number: NJ20070003 State: New Jersey JG 22 Aug 08
Construction Types: Building, Heavy and Highway
Counties: Bergen, Essex, Hudson, Hunterdon, Middlesex, Morris, Passaic, Somerset, Sussex, Union and Warren Counties in New Jersey.
Does not include building construction in Hunterdon and Somerset Counties
BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories) (does not include building construction in Hunterdon or Somerset Counties)
HEAVY AND HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date 0 02/08/2008 1 02/15/2008 2 02/29/2008 3 03/21/2008 4 04/11/2008 5 04/18/2008 6 04/25/2008 7 05/09/2008 8 05/16/2008 9 05/23/2008 10 05/30/2008 11 06/06/2008 12 06/20/2008 13 07/04/2008 14 07/11/2008 15 07/18/2008 16 08/01/2008 17 08/08/2008 18 08/22/2008
ASBE0032-001 09/01/2005
BERGEN, ESSEX AND HUDSON COUNTIES; HUNTERDON COUNTY (Borough of Califon; Township of Tewksbury); MIDDLESEX COUNTY (Boroughs of Carteret and Dunellen; Township of Edison; Boroughs of Highland Park, Metuchen and Middlesex; City of New Brunswick; Township of Old Bridge; City of Perth Amboy; Township of Piscataway;
Borough of Sayreville; City of South Amboy; Boroughs of South
Plainfield and South River; Township of Woodbridge); MORRIS AND PASSAIC COUNTIES: SOMERSET COUNTY (Boroughs of Bernardsville and Bound Brook; Township of Bridgewater; Borough of Far Hills;
Township of Green Brook; Boroughs of North Plainfield, Peapack-Gladstone, Raritan, Somerville, South Bound Brook and Watchung; Township of Warren); SUSSEX AND UNION COUNTIES;
WARREN COUNTY (Townships of Allamuchy, Blairstown and Frelinghuysen; Town of Hackettstown; Townships of Hope, Independence, Knowlton, Liberty and Mansfield):
Rates Fringes
Insulator/asbestos worker (includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement).........$ 41.01 19.30
ASBE0032-004 09/01/2004
BERGEN, ESSEX AND HUDSON COUNTIES; HUNTERDON COUNTY (Borough of Califon; Township of Tewksbury); MIDDLESEX COUNTY (Boroughs of Carteret and Dunellen; Township of Edison; Boroughs of Highland Park, Metuchen and Middlesex; City of New Brunswick; Township of Old Bridge; City of Perth Amboy; Township of Piscataway;
Borough of Sayreville; City of South Amboy; Boroughs of South Plainfield and South River; Township of Woodbridge); MORRIS AND PASSAIC COUNTIES: SOMERSET COUNTY (Boroughs of Bernardsville and Bound Brook; Township of Bridgewater; Borough of Far Hills;
Township of Green Brook; Boroughs of North Plainfield, Peapack-Gladstone, Raritan, Somerville, South Bound Brook and Watchung; Township of Warren); SUSSEX AND UNION COUNTIES;
WARREN COUNTY (Townships of Allamuchy, Blairstown and Frelinghuysen; Town of Hackettstown; Townships of Hope, Independence, Knowlton, Liberty and Mansfield):
Rates Fringes
Hazardous material handler/asbestos removal worker...........................$ 21.75 5.00
ASBE0089-001 07/01/2008
HUNTERDON COUNTY (does not include the Borough of Califon;
Township of Tewksbury); MIDDLESEX COUNTY (does not include the Boroughs of Carteret and Dunellen; Township of Edison; Boroughs of Highland Park, Metuchen and Middlesex; City of New Brunswick; Township of Old Bridge; City of Perth Amboy;
Township of Piscataway; Borough of Sayreville; City of South Amboy; Boroughs of South Plainfield and South River; Township of Woodbridge); SOMERSET COUNTY (Townships of Branchburg, Franklin, Hillsborough and Montgomery); WARREN COUNTY (Townships of Franklin, Greenwich, Harmony, Lopatcong, Oxford, Pohatcong, Washington and White):
Asbestos worker/insulator (includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement).........$ 38.02 24.98
PAID HOLIDAYS:
The last day prior to the Christmas and New Year's Day observed holiday: 4 hrs. pay.
BOIL0028-001 08/01/2006
Rates Fringes
Boilermaker....................$ 36.77 44% + 9.08
BRNJ0002-005 05/01/2008
BERGEN, ESSEX AND HUDSON COUNTIES; HUNTERDON COUNTY (north and west of a line drawn from Clover Hill, through Reaville, through Flemington, through High Bridge, through Califon, through Fairmont, to Pottersville); MIDDLESEX COUNTY (Borough of Dunellen; Township of Edison (Town of Oak Tree only);
Township of Piscataway (Town of New Market only); Borough of South Plainfield); MORRIS AND PASSAIC COUNTIES; SOMERSET COUNTY (north of a line drawn from the point where the Lamington River leaves the boundary line between Hunterdon and Somerset Counties; then, continuing along the Lamington River to where it becomes the North Branch of the Raritan River; then, continuing along the North Branch of the Raritan River to where it becomes Chambers Brook; then, continuing along Chambers Brook until it becomes the boundary line between the Townships of Bernards and Bridgewater; then, continuing along the boundary line between the Townships of Bernards and Bridgewater, until that boundary line intersects with Route 78;
then, continuing along Route 78 until Route 78 intersects with
Route 525; then, continuing along Route 525 until Route 525 intersects with the boundary line between the Townships of Bridgewater and Warren; then, continuing along the boundary line between the Townships of Bridgewater and Warren until that boundary line intersects with Route 22; then, following Route 22 until Route 22 intersects with Sebrings Mills Rd. (also known as King George Rd.); then, continuing south on Sebrings Mills Rd. until it goes over Green Brook, which is the Middlesex County line); SUSSEX, UNION AND WARREN COUNTIES:
Bricklayer.....................$ 35.50 19.72
Work 100 degrees F. and over:
to be paid at the rate of double time.
Work on high stacks:
22% per hour additional.
BRNJ0002-006 05/01/2008
HUNTERDON COUNTY (south and east of a line drawn from Clover Hill, through Reaville, through Flemington, through High Bridge, through Califon, through Fairmont, to Pottersville);
MIDDLESEX COUNTY (does not include the Borough of Dunellen;
Township of Edison (Town of Oak Tree); Township of Piscataway (Town of New Market); Borough of South Plainfield); SOMERSET COUNTY (south of a line drawn from the point where the Lamington River leaves the boundary line between Hunterdon and Somerset Counties; then, continuing along the Lamington River to where it becomes the North Branch of the Raritan River;
then, continuing along the North Branch of the Raritan River to where it becomes Chambers Brook; then, continuing along Chambers Brook until it becomes the boundary line between the Townships of Bernards and Bridgewater; then, continuing along the boundary line between the Townships of Bernards and Bridgewater, until that boundary line intersects with Route 78;
then, continuing along Route 78 until Route 78 intersects with Route 525; then, continuing along Route 525 until Route 525 intersects with the boundary line between the Townships of Bridgewater and Warren; then, continuing along the boundary line between the Townships of Bridgewater and Warren until that boundary line intersects with Route 22; then, continuing along Route 22 until Route 22 intersects with Sebrings Mills Rd.
(also known as King George Rd.); then, continuing south along Sebrings Mills Rd. until it goes over Green Brook, which is the Middlesex County line):
Bricklayer.....................$ 35.50 19.72
Work 100 degrees F. and over:
to be paid at the rate of double time.
Work on high stacks:
22% per hour additional.
BRNJ0002-008 05/01/2008
BERGEN, ESSEX AND HUDSON COUNTIES; HUNTERDON COUNTY (north and west of a line drawn from Clover Hill, through Reaville, through Flemington, through High Bridge, through Califon, through Fairmont, to Pottersville); MIDDLESEX COUNTY (Borough of Dunellen; Township of Edison (Town of Oak Tree only);
Township of Piscataway (Town of New Market only); Borough of South Plainfield); MORRIS AND PASSAIC COUNTIES; SOMERSET COUNTY (north of a line drawn from the point where the Lamington River leaves the boundary line between Hunterdon and Somerset Counties; then, continuing along the Lamington River to where it becomes the North Branch of the Raritan River; then, continuing along the North Branch of the Raritan River to where it becomes Chambers Brook; then, continuing along Chambers Brook until it becomes the boundary line between the Townships of Bernards and Bridgewater; then, continuing along the boundary line between the Townships of Bernards and Bridgewater, until that boundary line intersects with Route 78;
then, continuing along Route 78 until Route 78 intersects with Route 525; then, continuing along Route 525 until Route 525 intersects with the boundary line between the Townships of Bridgewater and Warren; then, continuing along the boundary line between the Townships of Bridgewater and Warren until that boundary line intersects with Route 22; then, continuing along Route 22 until Route 22 intersects with Sebrings Mills Rd.
(also known as King George Rd.); then, continuing south on
Middlesex County line); SUSSEX, UNION AND WARREN COUNTIES:
Cement mason and plasterer......$ 35.50 19.72
Cement mason and plasterer:
Work on high stacks: 22% per hour additional.
Cement mason only:
Epoxy, acid and latex work: $.50 per hour additional.
BRNJ0002-009 05/01/2008
HUNTERDON COUNTY (south and east of a line drawn from Clover Hill, through Reaville, through Flemington, through High Bridge, through Califon, through Fairmont, to Pottersville);
MIDDLESEX COUNTY (does not include the Borough of Dunellen;
Township of Edison (Town of Oak Tree); Township of Piscataway (Town of New Market); Borough of South Plainfield); SOMERSET COUNTY (south of a line drawn from the point where the Lamington River leaves the boundary line between Hunterdon and
Somerset Counties; then, continuing along the Lamington River to where it becomes the North Branch of the Raritan River;
then, continuing along the North Branch of the Raritan River to where it becomes Chambers Brook; then, continuing along Chambers Brook until it becomes the boundary line between the Townships of Bernards and Bridgewater; then, continuing along the boundary line between the Townships of Bernards and Bridgewater, until that boundary line intersects with Route 78;
then, continuing along Route 78 until Route 78 intersects with Route 525; then, continuing along Route 525 until Route 525 intersects with the boundary line between the Townships of Bridgewater and Warren; then, continuing along the boundary line between the Townships of Bridgewater and Warren until that boundary line intersects with Route 22; then, continuing along Route 22 until Route 22 intersects with Sebrings Mills Rd.
(also known as King George Rd.); then, continuing south along
Middlesex County line):
Cement mason and plasterer......$ 35.50 19.72
Cement mason and plasterer:
Work on high stacks: 22% per hour additional.
Cement mason only:
Epoxy, acid and latex work: $.50 per hour additional.
BRNJ0007-003 07/01/2008
Rates Fringes
Marble setter...................$ 49.63 23.40
BRNJ0007-004 07/01/2008
Rates Fringes
Marble finisher................$ 40.75 23.23
BRNJ0007-005 07/01/2005
Rates Fringes
Terrazzo finisher..............$ 38.37 23.25 Terrazzo setter................$ 39.68 23.25
BRNJ0007-009 12/01/2005
BERGEN, ESSEX, HUDSON AND HUNTERDON COUNTIES; MIDDLESEX COUNTY
(north of Route 33); MORRIS, PASSAIC, SOMERSET, SUSSEX, UNION
AND WARREN COUNTIES:
Tile finisher..................$ 33.40 17.15 Tile setter....................$ 40.17 21.08
Tile finisher:
Work grouting all epoxy: $10.00 additional per day.
BRNJ0007-010 12/01/2007
MIDDLESEX COUNTY (south of Route 33):
Rates Fringes
Tile finisher..................$ 33.51 16.36 Tile setter....................$ 37.08 19.23
Tile finisher:
Work grouting all epoxy: $10.00 additional per day.
CARP0006-008 06/01/2006
Rates Fringes
Carpenter, drywall hanger......$ 35.72 46%
Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.
CARP0029-003 05/01/2006
Rates Fringes
Soft floor layer...............$ 33.76 42.25% + .04
CARP0715-001 05/01/2006
Rates Fringes
Millwright.....................$ 36.55 46% + .04
Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.
* CARP1456-001 05/01/2008
Divers:
Diver tender................$ 35.03 32.90 Diver.......................$ 45.24 32.90
Work on land pile driving, floating marine construction and the construction of wharves, while handling and working with creosote and creosote-impregnated products: $.25 per hour additional.
Work on hazardous/toxic/contaminated waste removal, on a hazardous/toxic/contaminated waste site, where the worker comes into contact with hazardous/toxic/contaminated waste material, and when A, B or C personal protective equipment is required and used for respiratory, skin or eye protection: 20% per hour additional.
* CARP1456-002 05/01/2008
Rates Fringes
Dockbuilder and piledriver operator Concrete form work..........$ 37.00 27.02 All other work..............$ 37.00 32.90
Work on land pile driving, floating marine construction and the construction of wharves, while handling and working with creosote and creosote-impregnated products: $.25 per hour additional.
Work on hazardous/toxic/contaminated waste removal, on a hazardous/toxic/contaminated waste site, where the worker comes into contact with hazardous/toxic/contaminated waste material, and when A, B or C personal protective equipment is required and used for respiratory, skin or eye protection: 20% per hour additional.
ELEC0102-001 06/02/2008
HUNTERDON COUNTY (Townships of Alexandria and Bethlehem;
Boroughs of Bloomsbury and Califon; Town of Clinton; Township of Clinton; Township of Delaware (west of a line following County Route 523 from the Delaware River north to the Raritan Township line); Township of East Amwell (east of State Hwy.
31); Township of Franklin; Boroughs of Frenchtown, Glen Gardner, Hampton and High Bridge; Townships of Holland and Kingwood; Borough of Lebanon; Township of Lebanon; Borough of Milford; Township of Raritan (east of State Hwy. 31 and north of County Route 523); Townships of Readington, Tewksbury and Union); MORRIS AND PASSAIC COUNTIES; SOMERSET COUNTY (does not include the Township of Franklin east of a line following Cedar Grove Lane from the Raritan River, in a southwesterly direction, to the Millstone Branch of the Pennsylvania Railroad; then, west along the railroad to the Delaware and Raritan Canal; then, south along the canal to the Middlesex County line; does not include the Township of Montgomery west and south of a line following U.S. Hwy. 206 (formerly State Hwy. 31) north from the Mercer County line to Harlingen Rd.;
then, west along Harlingen Rd. and the Dutchtown-Zion road to the Hillsborough township line); SUSSEX, UNION AND WARREN
COUNTIES:
Line construction:
High-tension pipe-type cable installation:
Cable splicer..............$ 50.15 50.75% Ground person..............$ 26.496 51% Groundman..................$ 27.36 50.75% Line technician;
equipment operator; x-ray technician; equipment repair person; equipment service person; hole-digging equipment operator; truck with winch or pole and steel hand; truck without winch..$ 44.16 51% Line technician-welder.....$ 47.87 50.75% Lineman; equipment operator; x-ray technician; equipment repair person; equipment service person; hole-digging equipment operator; truck with winch or pole and steel hand; truck without winch..$ 45.59 50.75% All other work:
Cable splicer..............$ 50.15 50.75% Ground person..............$ 26.496 51% Groundman..................$ 27.36 50.75% Line technician;
equipment operator.........$ 44.16 51% Line technician-welder.....$ 47.87 50.75% Lineman; equipment operator...................$ 45.59 50.75%
Work with, or the removal of, asbestos materials: 114% times the journeyman rate.
ELEC0102-002 06/02/2008
HUNTERDON COUNTY (Townships of Alexandria and Bethlehem;
Boroughs of Bloomsbury and Califon; Town of Clinton; Township of Clinton; Township of Delaware (west of a line following County Route 523 from the Delaware River north to the Raritan Township line); Township of East Amwell (east of State Hwy.
31); Township of Franklin; Boroughs of Frenchtown, Glen Gardner, Hampton and High Bridge; Townships of Holland and
Kingwood; Borough of Lebanon; Township of Lebanon; Borough of Milford; Township of Raritan (east of State Hwy. 31 and north of County Route 523); Townships of Readington, Tewksbury and Union); MORRIS AND PASSAIC COUNTIES; SOMERSET COUNTY (does not include the Township of Franklin east of a line following Cedar Grove Lane from the Raritan River, in a southwesterly direction, to the Millstone Branch of the Pennsylvania Railroad; then, west along the railroad to the Delaware and Raritan Canal; then, south along the canal to the Middlesex County line; does not include the Township of Montgomery west and south of a line following U.S. Hwy. 206 (formerly State Hwy. 31) north from the Mercer County line to Harlingen Rd.;
then, west along Harlingen Rd. and the Dutchtown-Zion road to
Electricians:
All other work:
Cable splicer..............$ 50.07 51% Electrician................$ 45.52 51%
Work forty ft. or more above the ground or protective rigging (does not apply to pole work, or to use of a manlift or high reach-type lift): 10% per hour additional.
Work with, or the removal of, asbestos materials: 114% times the journeyman rate.
ELEC0102-020 06/02/2008
HUNTERDON COUNTY (Townships of Alexandria and Bethlehem;
Boroughs of Bloomsbury and Califon; Town of Clinton; Township of Clinton; Township of Delaware (west of a line following County Route 523 from the Delaware River north to the Raritan Township line); Township of East Amwell (east of State Hwy.
31); Township of Franklin; Boroughs of Frenchtown, Glen Gardner, Hampton and High Bridge); Townships of Holland and Kingwood; Borough of Lebanon; Township of Lebanon; Borough of Milford; Township of Raritan (east of State Hwy. 31 and north of County Route 523); Townships of Readington, Tewksbury and Union); MORRIS AND PASSAIC COUNTIES; SOMERSET COUNTY (does not include the Township of Franklin east of a line following Cedar Grove Lane from the Raritan River, in a southwesterly direction, to the Millstone Branch of the Pennsylvania Railroad; then, west along the railroad to the Delaware and Raritan Canal; then, south along the canal to the Middlesex County line; does not include the Township of Montgomery west and south of a line following U.S. Hwy. 206 (formerly State Hwy. 31) north from the Mercer County line to Harlingen Rd.;
then, west along Harlingen Rd. and the Dutchtown-Zion road to
Work on gas stations; free-standing fast-food restaurants and convenience stores;
commercial work involving a free-standing building not exceeding 13,000 sq.
ft..........................$ 26.28 40%
ELEC0164-002 06/02/2008
BERGEN, ESSEX AND HUDSON COUNTIES:
Rates Fringes
Electricians:
All other work:
Cable splicer..............$ 51.87 54% Electrician on radio tower work.................$ 55.54 54% Electrician................$ 45.90 54%
Work on line voltage of 440 or 480 volts: 10% per hour additional.
Work from trusses, scaffolds, frames, ladders and poles, 40
ft. or more above the ground or floor (does not include work from a manlift): 20% per hour additional.
Work on radio towers, transmission towers and smokestacks:
21% per hour additional.
ELEC0164-009 06/01/2008
BERGEN, ESSEX AND HUDSON COUNTIES:
Rates Fringes
Electricians:
Work on gas stations; free-standing fast-food restaurants and convenience stores;
commercial work involving a free-standing building not exceeding 13,000 sq.
ft..........................$ 28.07 28% + 1.00
ELEC0164-010 06/02/2008
BERGEN, ESSEX AND HUDSON COUNTIES:
Cable splicer...............$ 51.87 54% Groundman (includes empty conduit installations on roadways)...................$ 30.75 54% Layout Man..................$ 50.03 54% Lineman; lineman-welder; x-ray technician; equipment repairman; equipment serviceman..................$ 45.90 54%
Work on live wires of 440 or 480 volts: 10% per hour additional.
Work on radio towers, transmission towers and smokestacks:
21% per hour additional.
ELEC0269-010 10/01/2006
HUNTERDON COUNTY (Township of Delaware (east of a line following County Route 523 from the Delaware River north to the Raritan Township line); Township of East Amwell (west of State Hwy. 31); Borough of Flemington; City of Lambertville; Township of Raritan (west of State Hwy. 31 and south of County Route 523); Borough of Stockton; Township of West Amwell); SOMERSET COUNTY (Township of Montgomery (west and south of a line following U.S. Hwy. 206 (formerly State Hwy. 31) north from the Mercer County line to Harlingen Rd.; then, west along Harlingen Rd. and the Dutchtown-Zion road to the Hillsborough township line):
Electrician....................$ 44.48 51.3% + .25
ELEC0269-013 10/01/2006
HUNTERDON COUNTY (Township of Delaware (east of a line following County Route 523 from the Delaware River north to the Raritan Township line); Township of East Amwell (west of State Hwy. 31); Borough of Flemington; City of Lambertville; Township of Raritan (west of State Hwy. 31 and south of County Route 523); Borough of Stockton; Township of West Amwell); SOMERSET COUNTY (Township of Montgomery (west and south of a line following U.S. Hwy. 206 (formerly State Hwy. 31) north from the Mercer County line to Harlingen Rd.; then, west along Harlingen Rd. and the Dutchtown-Zion road to the Hillsborough township line):
Continuous pipe-type underground oil-filled transmission conduit installations:
Ground person; truck with winch operator.............$ 35.58 47.3% Line technician; cable splicer; heavy equipment operator...................$ 44.48 47.3% All other work:
Ground person; truck with winch operator.............$ 35.58 47.3% Line technician; cable splicer; heavy equipment operator...................$ 44.48 47.3%
ELEC0456-001 06/01/2006
MIDDLESEX COUNTY; SOMERSET COUNTY (Township of Franklin (east of a line following Cedar Grove Lane from the Raritan River, in a southwesterly direction, to the Millstone Branch of the Pennsylvania Railroad; then, west along the railroad to the Delaware and Raritan Canal; then, south along the canal to the Middlesex County line)):
Cable splicer...............$ 50.57 49% Electrician.................$ 44.75 49%
Work on line voltage of 440 volts and over: 10% per hour additional.
Work from trusses, scaffolds and ladders 40 ft. or more from the ground or floor; or under air pressure; or over conveyors or moving equipment or machinery: 10% per hour additional.
ELEC0456-002 06/01/2006
MIDDLESEX COUNTY; SOMERSET COUNTY (Township of Franklin (east of a line following Cedar Grove Lane from the Raritan River, in a southwesterly direction, to the Millstone Branch of the Pennsylvania Railroad; then, west along the railroad to the elaware and Raritan Canal; then, south along the canal to the Middlesex County line)):
Continuous pipe-type underground oil-filled transmission conduit installations:
Cable splicer; crane operator...................$ 48.85 54.75% Ground person (when installing conduit on public roadways)...........$ 25.94 54.75% Ground person; winch operator...................$ 42.44 54.75% Line technician; x-ray technician; equipment repair person; equipment serviceperson; electrical installation worker; hole-digging equipment operator; truck operator with winch or pole; truck operator without winch.....$ 43.23 54.75% All other work:
Cable splicer; crane operator...................$ 48.85 54.75% Ground person (when installing conduit on public roadways)...........$ 25.94 54.75% Ground person; winch operator...................$ 42.44 54.75% Line technician............$ 43.23 54.75%
ELEV0001-001 03/17/2008
BERGEN, ESSEX, HUDSON, MIDDLESEX, MORRIS, PASSAIC, SOMERSET,
SUSSEX AND UNION COUNTIES:
Rates Fringes Elevator mechanic Work on the addition, replacement, refurbishing or relocation of control, drive, generating equipment, hoistway or pit equipment, including work involving a structural rise in the elevator shafts in an existing building and other elevator work in the machine room, hoistway or pit; Also, changes in design and appearance of basic escalator equipment...$ 38.46 21.565 All other work..............$ 48.19 21.715
PAID HOLIDAYS:
New Year's Day, President's Day, Good Friday, Memorial Day, Fourth of July, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day, and Christmas Day.
PAID VACATION:
A worker who has worked less than 5 years: 4% of his or her hourly rate for all hours worked.
A worker who has worked 5 to 10 years: 6% of his or her hourly rate for all hours worked.
A worker who has worked 15 or more years: 8% of his or her hourly rate for all hours worked.
ELEV0084-005 01/01/2007
HUNTERDON AND WARREN COUNTIES:
Rates Fringes
Elevator mechanic..............$ 36.295 14.885
PAID HOLIDAYS:
New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day, and Christmas Day.
VACATION PAY CREDIT:
A worker with 6 months but less than 5 years of service receives two weeks vacation; a worker with 5 years or more of service receives three weeks vacation.
ENGI0825-003 07/01/2008
Rates Fringes
Power equipment operators:
Tank erection:
GROUP 1....................$ 41.61 21.00
GROUP 2....................$ 40.67 21.00
GROUP 3....................$ 41.15 21.00
GROUP 4....................$ 38.58 21.00
GROUP 5....................$ 36.12 21.00
GROUP 6....................$ 34.87 21.00
GROUP 7....................$ 33.37 21.00
Hazardous waste removal work:
Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: 20% per hour additional.
New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day;
provided 1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday.
DEFINITION OF GROUPS:
GROUP 1:
Operating engineer - on all equipment, including cranes and derricks with boom including jib, 140 ft. or more above the ground
GROUP 2:
Operating engineer - on all equipment, including cranes and derricks with boom including jib, less than 140 ft. above the ground
GROUP 3:
Helicopter pilot
GROUP 4:
Air compressor, welding machine and generator (gas, diesel, or electrical-driven equipment and sources of power from a permanent plant (steam, compressed air, hydraulic or other power), for the operation of any machine or automatic tool used in the erection, alteration, repair and dismantling of tanks and any and all "dual-purpose" trucks used on the construction job site)
GROUP 5:
Concrete cleaning/decontamination machine operator, decontamination and remediation work only; directional boring machine; heavy equipment robotic operator/technician, decontamination and remediation work only; master environmental maintenance technician, decontamination and remediation work only; ultra high-pressure waterjet cutting tool system operator/maintenance technician, decontamination and remediation work only; vacuum blasting machine operator/maintenance technician, decontamination and remediation work only
GROUP 6:
Off-road back dump
GROUP 7:
Oiler
ENGI0825-004 07/01/2008
Power equipment operators:
Steel erection:
GROUP 1....................$ 41.79 21.00
GROUP 2....................$ 40.88 21.00
GROUP 3....................$ 42.65 21.00
GROUP 4....................$ 38.59 21.00
GROUP 5....................$ 35.93 21.00
GROUP 6....................$ 34.40 21.00
GROUP 7....................$ 32.64 21.00
Hazardous waste removal work:
Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is
Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day;
provided 1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2)
Cranes (all cranes, land or floating with boom including jib, 140 ft. and over, above ground); derricks (all derricks, land, floating or Chicago boom type with boom including jib, 140 ft. and over, above ground)
GROUP 2:
Cranes (all cranes, land or floating with boom including jib, less than 140 ft. above ground); derricks (all derricks, land, floating or Chicago boom type with boom including jib, less than 140 ft. above ground)
GROUP 3:
Helicopter pilot
GROUP 4:
"A" frame; cherry picker (10 ton and under); hoist (all types of hoist, including steam, gas, diesel, electric, air, hydraulic, single and double drum, concrete, brick shaft caisson, or any other similar type of hoisting machine, portable or stationary, except Chicago boom type);
jack (screw, air, hydraulic power-operated unit or console type (not hand jack or pile load test type); side boom;
straddle carrier
GROUP 5:
Aerial platform used as a hoist; compressor, two or three in battery; directional boring machine; elevator or house car; concrete cleaning/decontamination machine operator, decontamination and remediation work only; conveyor and tugger hoist; firefighter; forklift; generator, two or three in battery; heavy equipment robotic operator/technician, decontamination and remediation work only; maintenance, utility person; master environmental…