About this file

Amendment 0009 Retry

View the file

Other files

File Type Posted
Amendment 0014.pdf PDF
W912DS-08-B-0005 Amendment 13.pdf PDF
W912DS-08-B-0005 Amendment 12.pdf PDF
Signed Amendment 11.pdf PDF
W912DS-08-B-0005 Amendment 0010.pdf PDF
08-B-0005 Amendment 9.pdf PDF
W912DS-08-B-0005 amendment 7.pdf PDF
W912DS-08-B-0005 Amendment 0006.pdf PDF
Amendment 5.pdf PDF
08-B-0005 AMENDMENT 4.pdf PDF
W912DS-08-B-0005 Amendment 3.pdf PDF
W912DS-08-B-0005 Amendment 2.pdf PDF
W912DS-08-B-0005-0001.pdf PDF
Green Brook Segment R2 Plans.pdf PDF
W912DS-08-B-0005.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W16ROE80946030

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1. The purpose of this amendment is to EXTEND THE BID OPENING DATE FROM THUR.MAY 31 JUL 2008 2 PM EST TO WED 6 AUG 2008 2 PM EST. NOTE: AMENDMENT 0008 WAS ISSUED IN ERROR and w ill not be incorporated into the contract. Amend 0009 hereby replaces Amend 0008.

2. Include Revised Plans (Appendix A), 3. Include Revised Specifications (Appendix B),

4. Include Supplmental Information Concerning Contaminated Soil (Appendix C), and

5. Include answ ers to contractor questions. FOR INFORMATIONAL PURPOSES ONLY.

6. Include Revised "Bid Schedule," "Price Schedule Notes," and "TOTAL" Section

NOTE 2: Offerors must acknow ledge the receipt of this amendment by the date specified in the bid (or as amended) by one of the follow ing methods: in the space provided in 1442, by separate letter, by telegram, or by signing block 15 of the SF 30s. FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN THE REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID OR

LATE WITHDRAWL OF BID (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 12

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Jul-2008

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-08-B-0005

X 9B. DATED (SEE ITEM 11)

15-May-2008

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Jul-2008

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-08-B-0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT #9

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lump Sum

R2 LEVEE - WEST END FFP BASE BID

FFP

BASE BID -All work to complete construction of Segment R2 (i.e. levee, drainage structures, etc) located within Station 33+00 and Station 52+00 of the easement areas in accordance with the drawings and specifications, but not including Item No 0002 - Item No 0011 on this bid schedule.

FOB: Destination

MILSTRIP: W16ROE80946030

PURCHASE REQUEST NUMBER: W16ROE80946030

NET AMT

0002 1 Lump Sum OPTION R2 Levee/floodwall/pumpstation -East End

FFP

OPTION 1 - OPTION 1 - All work to complete construction of Segment R2 (i.e.

levee, pump station, swale, drainage structures, floodwall, etc) located within Station 52+00 to Station 78+92.77 of the easement areas in accordance with the drawings and specifications, but not including Item No 0001 and Item No 0003 – Item No 0011 on this bid schedule.

FOB: Destination

0003 1 Lump Sum OPTION PSE&G - Electric Power Line Relocation

FFP

OPTION 2 - Conduct temporary and permanent relocation of utilities in work area.

Cost and schedule to be determined during the construction phase in coordination with the utility company. (See Spec Section 00800 Paragraph 38 for details) Offerors shall include this Amount in the bid price. This amount shall not be changed ($20,000.00).

FOB: Destination

0004 1 Lump Sum OPTION Grass Maintenance

FFP

OPTION 3 - Work to include grass cutting and grass maintenance of all the easement areas in accordance with the drawings and specifications for 1 year.

Contractor should assume 4 grass cuts are required.

FOB: Destination

0005 1 Lump Sum OPTION Levee/Railroad Tie off

FFP

OPTION 4 -All Work to include closing the gap from the western end of the Segment R2 levee to the NJ Transit Railroad embankment by use of geotube, anchor tube and levee fill. This Bid Item does not include the work in Bid Item 0011 of this bid schedule.

FOB: Destination

0006 1 Lump Sum OPTION Utility Payments

FFP

OPTION 5 - Cost to include payment for utility costs related to pumping station facility for duration of 1 year. Offerors shall include this Amount in the bid price.

This amount shall not be changed. ($6,000.00) FOB: Destination

0007 1 Lump Sum OPTION Commercial General/Public Liability

FFP

OPTION 6 - Commercial General/Public Liability FFP Insurance, not less than $5,000,000.00 (See Paragraph 36 of Spec Section 00800 for details.)

FOB: Destination

0008 14,720 Cubic

Yard

OPTION Soil Disposal for Base Award

FFP

OPTION 7 - All work to remove non-hazardous contaminated soil from within the project limits of the Base Award of this contract including excavation, temporary storage, hauling off site, and disposal at a waste landfill capable of accepting such materials and soils along with all labor, equipment and materials and incidentals necessary to dispose of the materials and soils in compliance with all Federal, State, and local rules and regulations.

FOB: Destination

0009 28,141 Cubic

Yard

OPTION Soil Disposal for Bid Item # 2

FFP

OPTION 8 - All work to remove non-hazardous contaminated soil from within the project limits of Bid Item # 2 of this contract including excavation, temporary storage, hauling off site, and disposal at a waste landfill capable of accepting such materials and soils along with all labor, equipment and materials and incidentals necessary to dispose of the materials and soils in compliance with all Federal, 0010 Lump Sum OPTION Soil Disposal for Bid Item # 5

FFP

OPTION 9 - All work to remove non-hazardous contaminated soil from within the project limits of Bid Item # 5 of this contract including excavation, temporary storage, hauling off site, and disposal at a waste landfill capable of accepting such materials and soils along with all labor, equipment and materials and incidentals necessary to dispose of the materials and soils in compliance with all Federal, CCASS / CPARS

FFP

The Federal Acquisition Regulation (FAR) requires collection of Past performance Information (PPI) on AE contracts and IDIQs at the task order. The system collects and manages past performance data. Effective 1 Apr 2007 ACASS is now a module of DoD’s CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (CPARS). Architect-Engineer PPI data shall be entered in the Architect-Engineer Contract Administration Support System (ACASS) module via CPARS. Both the contractor and government personnel are responsible for inputting PPI data. Performance evaluations prepared in ACASS are transmitted to the Past Performance Information Retrieval System (PPIRS). For specific details and guidance in use of the system, contractor is directed to https://www.nwp.usace.army.mil/ct/I/home.asp. This links the contractor to the Portland District Contractor Appraisal Information Center (CAIC). CAIC is the primary center to assist both the contractor and government personnel in using the system.

FOB: Destination

TOTAL BASE LINE ITEM 0001 $__________________

TOTAL OPTION #1 CLIN 0002 $__________________

TOTAL OPTION #2 CLINS 0003 $__20,000.00________

TOTAL OPTION #3 CLINS 0004 $__________________

TOTAL OPTION #4 CLINS 0005 $__________________

TOTAL OPTION #5 CLINS 0006 $___ 6,000.00_______

TOTAL OPTION #6 CLINS 0007 $__________________

TOTAL OPTION # 7 CLIN 0008 $__________________

TOTAL OPTION # 8 CLIN 0009 $__________________

TOTAL OPTION # 9 CLIN 0010 $__________________

TOTAL LINE ITEM 0011 $_______NSP_______

TOTAL BASE PLUS OPTIONS 0001 - 0011 $__________________

NOTES FOR PRICE SCHEDULE:

1. The low bidder for purposes of award will be the conforming responsible bidder offering the lowest amount for the Total Base Bid Plus Optional Items.

2. The minimum construction award will be the amount bid for the Total Base Bid.

3. Any bid which is materially unbalanced as to the price for the Base Bid Item and Optional Items may be rejected. An unbalanced bid is one, which is based on price significantly less than cost for some work and prices are significantly overstated for other work.

4. Bidders are required to bid on both the Base Bid Item and the Optional Items or their bid will be rejected.

5. Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions or attachments made by the bidders he thereto may render the bid non-responsive and be cause for its rejection.

6. Item No. 001 Base Bid shall be completed within 360 calendar days from receipt of Notice to Proceed.

The Optional Bid Items, if awarded, would be awarded as follows:

7. Item No. 002 Bid Option #1 R2 levee/floodwall/pump station – East End, to be awarded within 360 calendar days from NTP and shall be completed within 720 calendar days from NTP.

8. Item No. 003 Bid Option #2 Permanent relocation PSE&G - Electric Power Line, to be awarded within 300 calendar days from NTP and shall be completed within 720 calendar days from NTP.

9. Item No. 004 Bid Option #3 Grass Maintenance, to be awarded within 360 calendar days from NTP and shall be completed within 720 calendar days from NTP.

10. Item No. 005 Bid Option #4 Levee/Railroad tie off, to be awarded within 360 calendar days from NTP and shall be completed within 720 calendar days from NTP.

11. Item No. 006 Bid Option #5 Utility Payments, to be awarded within 360 calendar days from NTP and shall be completed within 720 calendar days from NTP.

12. Item No. 007 Bid Option #6 Commercial General/Public Liability, to be awarded within 90 calendar days from NTP and shall be completed within 720 calendar days from NTP.

13. Item No. 008 Bid Option #7 Soil Disposal for Base Award, to be awarded at the same time as the base award and shall be completed within 720 calendar days from NTP.

14. Item No. 009 Bid Option #8 Soil Disposal for Bid Item # 2, to be awarded at the same time as Option # 1 and shall be completed within 720 calendar days from NTP.

15. Item No. 010 Bid Option #9 Soil Disposal for Bid Item # 5, to be awarded at the same time as Option # 4 and shall be completed within 720 calendar days from NTP.

AMENDMENT NO. 9:

Bid Opening: The Bid Opening date/time has changed from July 31, 2008 at 2:00 PM to Aug 6, 2008 at 2:00 PM. Please submit all remaining questions to the government by close of business on Thursday, 31 July 2008.

1. Plans (Revised Sheets in Appendix A):

Plan sheet CG-201 has been revised to display the limits of Option # 4.

Plan sheet G-101 has been revised to display the limits of Option # 4.

Plan sheet S-001, Steel Construction Notes, Note 2 – References to roller gate are deleted. (Narrative change)

2. Specifications (See Appendix B):

Replace current spec section: 01 35 29.00 18 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS with new spec section 01 35 29 SAFETY AND OCCUPATIONAL HEALTH

REQUIREMENTS.

Replace current spec section 01 35 45.0010 CHEMICAL DATA QUALITY CONTROL with new spec section 01 35 45.00 10 CHEMICAL DATA QUALITY CONTROL.

Spec Section 01 57 20.00 10 ENVIRONMENTAL PROTECTION added.

Spec Section 02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL added.

Spec Section 02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS added.

Delete the following paragraph from Spec Section 05 48 10.00 18 (previously incorporated by amendment) (This is a narrative change):

3.2.19 Manufacturer's Guarantees

The Manufacturer shall guarantee trouble-free operation for period of (10) years. If the Owner and his engineer are not completely satisfied with the performance of the products, the Manufacturer shall remedy the problem at no cost or refund the purchase cost upon return of the equipment. When installed and operated as recommended by the manufacturer.

Spec Section 35 31 19, Section 2.2.2 – Tables 1, 2 and 3 are deleted (Narrative change)

3. Supplemental information to contractors concerning contaminated soil (See Appendix C)

4. Responses to Contractor Questions:

Q1) At what depths are there environmental concerns?

A1) All material excavated for purposes of construction of project elements should be handled, tested and disposed of in accordance with the specifications of this contract and in particular the new specification sections supplied in this amendment.

Q2) Are there contaminated materials that need to be removed? If so what type of contaminated material is it?

A2) The information supplied in this amendment by the EPA indicates levels of Arsenic and Chromium in the soils within the working limits of this project.

Q3) What PPE level is required?

A3) Please refer to EM 385-1-1 Safety and Health Requirements for all PPE requirements for work in this contract.

Q4) In reference to monthly billings - Please provide the retainage percentages that may be applicable.

A4) The retainage percentage is always 10%.

Q5) On the main table of contents, Page MTOC-3 lists Technical Provision Section 32 16 13 CONCRETE SIDEWALK AND CURBS. This section is not included in the specifications. Could you please clarify.

A5) Spec Section 32 16 13 is not required for this construction contract. Please disregard it from the table of contents.

Q6) 44 46 00 paragraph 2.32 The pump shall be started manually…is this correct?

A6) Yes.

Q7) What is rip-rap thickness @ pump station inlet channel?

A7) The swale and side slopes are lined with 1' riprap

Q8) What is rip-rap thickness @ pump station outlet structure?

A8) The swale and side slopes are lined with 1' riprap

Q9) Refer to Specification Section 35 31 19, Section 2.2.2; please identify the areas that receive a 54” layer of Table 1 Rip Rap. Please identify the areas that receive a 36” layer of Table 2 Rip Rap. Please identify the areas that receive a 36” layer of the second Table 2 Rip Rap. Please identify the areas that receive an 18” layer of Table 3 Rip Rap. Please identify the areas that receive a 12” layer of Table 4 Rip Rap.

A9) Riprap Thickness of 1' is to be used for all areas with riprap. All tables in paragraph 2.2.2 of spec section 35 31 19 should be disregarded except Table 4.

Q10) Refer to S-001 Steel Construction Notes, Note 2, 1st sentence. Does this sentence apply only to structural steel (i.e. roof trusses) in the Generator Building? Please identify the “Roller Gate” referred to in the third sentence.

A10) This sentence applies to structural steel, including roof trusses. Please disregard the roller gate reference as there is no roller gate in this contract.

Q11) E-501 (Pg. 75) calls out “Vaisala Model 555FG”. Unfortunately this is an obsolete unit that we can’t manufacturer anymore due major components being unavailable. We do have a potential substitute unit called the Vaisala MAWS50 but this will need to be discussed.

A11) The latest suitable Vaisala model shall be provided by the contractor for this project. Prior to purchase the contractor shall supply a cut sheet for approval by the contracting officer’s representative.

Q12) Drawing Sheet 2 shows the levee tie-off to be bid option #2. Please clarify.

A12) Plan sheet G-101 has been revised to display that the levee tie-off is actually Bid Option # 4.

Q13) What type of reinforcement steel is required for the drainage structures and floodwalls, black, epoxy or galvanized?

A13) Galvanized

Q14) Why was the following requirement, “The Manufacturer shall guarantee trouble-free operation for period of (10) years. If the Owner and his engineer are not completely satisfied with the performance of the products, the Manufacturer shall remedy the problem at no cost or refund the purchase cost upon return of the equipment.” deleted from Reinforced Plastic Flap Valves?

A14) The requirement was deleted to allow for the purchase of the valve for a larger number of suppliers and manufacturers who may otherwise not meet the guarantee requirement.

Q15) Why is the guarantee only applied to Sluice Gates?

A15) The requirement for the guarantee has been deleted from the Sluice Gate spec in this amendment.

Q16) Why is it not applied to Slide Gates, which operate in a companion chamber to the 48X48 Sluice Gate?

A16) The requirement for the guarantee has been deleted from the Sluice Gate spec in this amendment.

Q17) Why is such a requirement imposed on process equipment?

A17) The requirement for the guarantee has been deleted from the Sluice Gate spec in this amendment.

Appendix A

CG-201

P

R O

F I L

E

S

T A

R

T

O

S

T A

0 30 30 60FT

SCALE: 1"=30’

15 0 10 10 20FT

SCALE: 1"=10’

Vertical:

Horizontal:

BASIC CONTRACT

BASIC CONTRACT

BID OPTION #4

1 2 3

G e o tu b e a n d a n c h o r t u b e s h o w n

S ta ti o n l im it s r e v is e d

B id

O p ti o n a d d e d a n d B a s ic

C o n tr a c t d e f in e d

BASIC CONTRACT BID OPTION #1

F il e n a m e

S fi le ro o m

\c i

P lo t d a te

-J

U L

-2

:0

P lo t b y e e n d n a s

.0

:1

.0

S c a le

D e s c ri p ti o n

D a te

S y m b o l

A p p r.

f i l e r o o m c i v i l g r e e n c i v i l S e g m e n t

R l m r

C G

J u n e d g n e e n d n a s

S u b m i t t e d b y

J U

L

P l o t

D a t e

U

.S

A R

M Y

E N

G

IN

E E

R D

IS

T

R

IC

C

O R

P S

O F

E N

G I N

E E

N

W

Y O

R K

N

E W

Y O

K

D s ig n e d b y w n b k d b u b m it te d b a te iz e

R e v ra w in g f il e n o w in g c o d v ie w e d b

8 7 6 5 4 3 2 0

A

B

C

D

E

Sheet reference number:

F

G

H

A

B

C

D

G

H

8 7 6 5 4 3 2 01910

B O

U N

D B

R O

O K

N

E W

J E

R S

E Y

X X

X

X X

X G

R E

E N

B R

O O

K S

U B

-B A

S

IN

O F

T H

E R

A R

IT

A

N R

IV

E

X-000

H E

I T

N

O

V I D

Sheet of 86

G R

E E

N B

R O

O K

F L

O O

D D

A M

A G

E R

E D

U C

T

IO

N P

R O

J E

C T

J u n e

31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00

41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00

51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00 61+00

P V

I

.6

E le v

.5

P V

I

.0

E le v

.3

P V

I

.2

E le v

.2

P V

I

.7

E le v

.2

P V

I

.7

E le v

.7

P V

I

.6

E le v

.3

P V

I

.5

E le v

.1

P V

I

.0

E le v

.9

P V

I

.7

E le v

.6

P

V I

.6

E le v

.8

P V

I

.4

E le v

.8

P V

I

.4

E le v

.3

Approximate Existing Ground

Line along center line of levee

Approximate Existing Ground

Line along center line of levee

Approximate Existing Ground

Line along center line of levee

Bottom of Inspection Trench

Bottom of Inspection Trench

Bottom of Inspection Trench

Invert of drainage ditch along protected side of levee

Invert of drainage ditch along protected side of levee

Invert of drainage ditch along protected side of levee

Drainage Structure No. 14

18" O RCP

Drainage Structure No. 15

36" O RCP

72" O RCP

under levee access road

Access road

Access Road along unprotected side of levee

31+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00

41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00

51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00 61+00

P V

I

.6

E le v

.5

P V

I

.0

E le v

.3

P V

I

.2

E le v

.2

P V

I

.7

E le v

.2

P V

I

.7

E le v

.7

P V

I

.6

E le v

.3

P V

I

.5

E le v

.1

P V

I

.0

E le v

.9

P V

I

.7

E le v

.6

P

V I

.6

E le v

.8

P V

I

.4

E le v

.8

P V

I

.4

E le v

.3

Approximate Existing Ground

Line along center line of levee

Approximate Existing Ground

Line along center line of levee

Approximate Existing Ground

Line along center line of levee

Bottom of Inspection Trench

Bottom of Inspection Trench

Bottom of Inspection Trench

Invert of drainage ditch along protected side of levee

Invert of drainage ditch along protected side of levee

Invert of drainage ditch along protected side of levee

Drainage Structure No. 14

18" O RCP

Drainage Structure No. 15

36" O RCP

72" O RCP

under levee access road

Access road

Access Road along unprotected side of levee

32+00

Geotube

Anchor Tube

P V

I

.4

P V

I

.3

E le v

.2

E le v

.7

Scour Geotextile

Wrap around geotube and levee

P V

I

.1

E le v

.7

E

E

N 628000

N 629000

N 630000

N 631000

N 630000

PLAN

H A

R D

Y A

V E

L A

M O

N T

E A

V E

R O

M N

E Y

A V

E

F I S

H E

R A

V E

V O

S S

E L

E R

A V

E

V A

N K

U E

R N

A V

E

N O

R T

H A

V E

E

0 E 2034000

VICINITY PLAN

02500 2500 5000

SCALE IN FEET

30 0 6030

SCALE IN MILES

LOCATION PLAN

Sheet C -101

Sheet C-102

Sheet C -103

Sheet C-104

Sheet C-105

S E

G M

E N

T R

G E

N E

R A

L P

L A

N

N 629000

N 628000

G-101

A V

E

R A

R

IT

A N

R

IV

E R

SOMERSET COUNTY

I 2

I-287 N.B.

I-287 S.B.

R T

E

E

.B

RTE 22 W

.B.

PL

U

C K

E M

IN

BRIDGEW

ATER TW

P.

G R

E E

N B

R O

O K

AMBROSE

BROOK

B R

O O

K

M

ID

D

LE

525 22

BROOK

V

O

SSELLER

BOROUGH OF

SOUTH BOUND

BROOK

BOROUGH OF BOUND BROOK

Long Is land Sound

Cape

Cod

Bay

Block I S ound

Nantucket Sound

Montauk

Point

Long Is land

N E W Y O R K

MASSACHUSETTS

CONNECTICUT

P E

N N

S Y

L V

A N

IA

D E

L A

W A

R E

R H

O D

E I

S L

NEW

JERSEY

H u d s n

D e la w e a r

R i v e r

1.

2.

3.

4.

5.

6.

7.

GENERAL NOTES:

Topographic Mapping was compiled by Aerial Methods from photographs dated 3-28-86 and field survey from 1991 with additional field survey and edits in 1996, 1997 and 2004. See Topographic Survey Sheets 1 through 7.

The grid system is referenced to New Jersey Plane Coordinate

System (NAD 1927).

The vertical Datum is referenced to the National Geodetic

Vertical Datum (NGVD of 1929).

Existing utilities shall be protected by the contractor during construction.

All cross sections are shown looking toward increasing stations unless otherwise indicated.

All exposed concrete corners shall be chamfered one inch unless otherwise noted.

Clear within work limits, except as noted. Clearing will be kept to a minimum within private yards.

SCALE: 1’’= 150’-0"

0 150’150’ 50’

100’

THIS PROJECT

S ta

.9

LEVEE

(BASIC CONTRACT

Sta. 33+20.00 to 52+00.00)

GEOTUBE SANDBAG

(BID OPTION #4

STA. 32+26.19 to 33+20.60)

LEVEE

(BID OPTION #4)

STA. 32+26.19 to 33+20.60)

PUMP STATION

(BID OPTION #1

STA. 52+00.00 to 78+94.97)

FLOODWALL

(BID OPTION #1

STA. 52+00.00 to 78+94.97)

LEVEE

(BID OPTION #1

STA. 52+00.00 to 78+94.97)

U p d a te d l e v e e a n d a li g n m e n t, a n d f ix e d s lo p e a r r o w s

M is s in g d r a in a g e s tr u c tu r e a d d e d

2 3

B a s ic

C o n tr a c t, O p ti o n a n d O p ti o n d e f in e d

F il e n a m e

S fi le ro o m

\c i

P lo t d a te

-J

U L

-2

:0

P lo t b y e e n d n a s

.0

:1

.0

S c a le

D e s c ri p ti o n

D a te

S y m b o l

A p p r.

f i l e r o o m c i v i l g r e e n c i v i l S e g m e n t R l m

R g g p s c a l e

J u n e d g n e e n d n a s

S u b m i t t e d b y

J U

L

P l o t

D a t

U

.S

A R

M Y

E N

G

IN

E E

R D

IS

T

R

IC

R

P S

O F

E N

G I N

E E

N

W

Y O

R K

N

E W

Y O

K s ig n e d b w n b k d b u b m it te d b a te iz e

R e v w in g f il e n w in g c o d v ie w e d b

8 7 6 5 4 3 2 0

B

C

D

E

Sheet reference number:

F

G

H

A

B

C

D

G

H

8 7 6 5 4 3 2 01910

B O

U N

D B

R O

O K

N

E W

J E

R S

E Y

X X

X

X X

X G

R E

E N

B R

O O

K S

U B

-B A

S

IN

O F

T H

E R

A R

IT

A

N R

IV

E

X-000

H E

T

N

O

V I D

Sheet of 86

R

E E

N B

R O

O K

F L

O O

D D

A M

A G

E R

E D

U C

T

IO

N P

R O

J E

C T

J u n e

El 4 1.1

El 4 1.1

El 4 0.4

Pumps

S ta

.0

S ta

.5

S ta

.7

S ta

.0

S ta

.2

S ta

.8

S ta

.6

S ta

.9

S ta

.8

El. 1 9.57

El. 1 9.42

72" O RCP

S ta

.4

31+28

32+00

33+

34+

35+

0 49+00 5

0 6

0 6

Sta

5+04.7

S ta

.0

S ta

.5

S ta

.7

S ta

.0

S ta

.2

S ta

.8

S ta

.6

S ta

.9

S ta

.8

S ta

.3

S ta

.4

2+

S ta

.5

S ta

.4

ALUMINIUM BARRIER

CONCRETE

ALUMINIUM BARRIER

CONC.

WING WALL

G U

A R D

R A

IL

H E

A D

W A

L L

C O

N C

. P I E

R

C O

N C

. P

IE

R

C O

N C

. P

IE

R

C O

N C

WING WALL

CONC.

WINGWALL

WINGWALLCONC.

WING WALLCONC.

C O

N C

. P

IE

R

M E

T A

L S

H E

D

C O

N C

. P

IE

R

D

IR

T T

R A

IL

WOOD

PIER

.2

.4

26.0

25.2

.6

26.0

.8

.0

.0

24.2

.5

.5

.9

22.8

.2

AG POOL

PATIO

CONC. WALK

G R

A V

E L

G R

A V

E L

CONC.

UP#

60552BB

WV

LP

C O

N C

C O

N C

C O

N C

18"

18"

23"

14"

30"

SHED

CONC. WALK

13"

27"

20"

28"

34"

20"

7"

18"

8"

12"

8"

3 @ 12" & 10"

STEPS

WOOD

DECK

CONC.

SLAB

GRASS

GRASS

W O

O D

F E

N C

E

CONC. RET. WALL

PATIO

CLF ON

CONC.

RET. WALL

CLF ON

CONC. BASE

CONC.

C O

N C

G R

A V

E L

6"

8"

8" C L

F

16"

WOOD

FENCE

2 @ 10" 1 @ 8"

2 STY.

FR.

CONC.

BLOCK

STORAGE

BLDG.

2 STY.

FR.

2 STY.

FR.

2 STY.

FR.

2 STY.

FR.

2 STY.

FR.

2 STY.

FR.

2 1/2 STY.

FR.

2 1/2 STY.

FR.

23"

GRASS

BB

CLF

PLAYGROUND

GV

WOODEN

PORCH

C O

N C

A S

P H

A L

T

GRASS

CONC.

BLOCK

WALL

CONC.

BLOCK

WALL

GRASS

WOOD

RW

12"

16"

30"

5"

UP#

1528BB

G R

A S

S

A S

P H

A L

T

A S

P H

A L

T

CONC.

WV

WVGV

UP#

61201

C O

N C

S

T Y

. F R

S T

O R

A G

E

4"

2 STY. FR.

GARAGE

C O

N C

5"

ASPHALT

C O

N C

5"

W O

O D

F E

N C

E

W O

O D

F E

N C

E

G R

A S

S

G R

A V

E L

G R

A V

E L

G R

A V

E L

12" CLAY

RIM

40.07

IN

V 23.32

INV 23.37

7"

G R

A V

E L

SHED

2 STY.

FR.

2 STY.

FR.

2 STY.

FR.

2 STY.

FR.

C L

F

C O

N C

CONC.

GRASS

GRASS

WOOD

PORCH

WOOD

STEPS

WOOD

RW

CLFUP#

61200BB

UP#

1529BB

GRASS

DIRT ROAD

DIRT ROAD

DIR

T R

OAD

2 STY.

FR.

2 STY.

FR.

2 STY.

FR.

2 STY.

FR.

2 STY.

FR.

2 STY.

BRICK

2 STY.

BRICK

2 STY.

FR.

2 1/2 STY.

FR.

S

T Y

. F R

G A

R A

G E

21"

15"

5"

8"

13"

25"

12"

13"

6"

1 STY. FR.

GARAGE

1 STY. FR.

GARAGE 14"

25"

13"

50"

13"

12"

1 STY. FR.

GARAGE

13"

26"

GRASS

20"

15"

12"

4"

5"

14"

15"

30"

13"

13"

6"

24"

9"

14"

GRASS

GRASS

GRASS

G R

A S

S

G R

A S

S

G R

A S

S

GRASS

CONC.

BLOCK

RWASPHALT

BRICK

STEPS

A S

P H

A L

LP

A V

E L

G R

A V

E L

WOOD

STEPS

CONC.

WOOD

PORCH

C O

N C

UP#

61199

CONC.

POST

WV

A S

P H

A L

T

CONC. WALK

BRICK

STEPS

C O

N C

CONC.

RWCONC.

BLOCK RW

FP

CONC.

WALK

CLF

12" CLAY

INV 23.70

INV 23.7512" CLAY

RIM

38.65

C O

N C

. C U

R B

C O

N C

. C U

R B

A S

P H

A L

T

G R

A V

E L

CONC.

CONC.

CONC.

BLOCK

RW

WV

UP#

61198

CONC.

WALK

GRAVEL

CONC.

GRAVEL

GV

GV

WV

WV

G R

A V

E L

UP#

61197BB

C O

N C

. W A

L K

CONC. WALK

L O

G S

L O

G S

D

IR

T D

R

IV

E

SHED

G R

A S

S D

R

IV

E

GV

C O

N C

. W A

L K

CONC.

RW

RET. WALL

C O

N C

W. M

AIN STREET

WOOD

RET. WALL

27.75

30.07

28.00

28.86

28.02CONC.

ST

E

PS

28.52

27.76

28.37

27.87

27.69 27.65

27.30 27.10

GARDEN

2’ WIRE

MESH FENCE

WOOD

POSTS

B A

S K

E T

B A

L L

POST

W

I R

E M

E S

H F

E N

C E

CONC.

BLK.

SHED

CONC.

O H

OH

27.26

27.57 27.53

27.28

3’ WIRE

MESH

FENCE

27.16 26.81

2’ WIRE

MESH FENCE

GARDEN

5’ CLF

33.77 33.97

28.3526.96

G R

A V

E L

D

IR

T

D R

IV

E

.3

33.9

33.07

36.81

.0

7 31.78

36.34

6’

CLF

36.75 36.09

38.02

.4

SH

ED

35.36

35.58

36.08

35.15

PLANTING

PLANTING

AREA

AREA

31.93

26.09

25.73

31.65

WOOD

RW

’ C

L F

C

L F

SHED

.0

1 3 .1

30.03

.6

33.42

33.04

UP#

PS1323BB

4’ C

LF

’ C

L F

’ C

L F

G R

A S

S

C

L F

.3

30.28

30.45 27.45

28.44

22.95

23.15

CONC.

BLK

RW

23.93

3’ CLF

3’ CLF

21.79

23.90

.4

23.46

33.89

33.78

30.4

’ W

O O

D F

E N

C E

WOOD

POST

METAL

POST

4"G4"g

4"G

4"G (ABAN.)

4"G

4"G (ABAN.)

"G

A

B A

N

4"G

4"G

"G

A

B A

N

.1

25.7

.0

25.2

.0

.4

.8

TRAIL

GRASS

21"

UP#

TRANSMISSION

TOWER

9"

UP#

TRANSM

IS

SIO

N

TOWER

9"

9"

UP#

ABANDONED R

.R

UP#

TRAV 13

TRAV 14

N79^26’46"E 466.98

N 66^23’2

1"E

32.6

N72^34’1 2"E 5

39.3

OH

OH

OH

.7

23.7

23.8

.2

.4

.6

34.5

.3

.4

35.2

34.5

633.2

31.8

.7

921.2

.0

19.7

22.0

.6

19.0

.1

.2

20.6

20.8

22.3

.3

.7

33.0

33.4 1 36.4

.4

PILE

20"

25"

13"

5"

6"

15"

14"

16"

20"

D

I

A

D

18"

30"

9"

8"

10"

ABANDONED R.R.

RARIT

AN R

IV

ER

TRAIL

ABAND.RR

TREES

TREES

TREES

PILE

12"

15"

10"

7"

8"

10"

12"

12"

10"

10"

10"

9"

10"

22"

48"

DIR

T ROAD

12"

15"

14"

12"

STONE

ABUTMENT

STONE

ABUTMENT

STONE

ABUTMENT

STONE

ABUTMENT

STEEL

STRUCTURE

ABAND.RR

UNPAVED DRIVE

T R

IL

STEEL

STRUCTURE

STONE

ABUTMENT

STONE

ABUTMENT

STONE

ABUTMENT

STONE

ABUTMENT

CONC. PLATFORM

ASPHALT

ASPHALT

A S

P H

A L

T

CONC.

GROUND

METAL

POSTS

METAL

POSTS

MONIT.

WELL

MONIT.

WELL

M O

N

IT

W E

L L

GROUND

STEEL STRUCTURE

INV 23.44

12" MET

RIM

27.74

SOUTH B

OUND B

ROOK B

ORO

TRAV 15

TRA

V

N72^34’12"E 539.36

N 64^49’0

0"E

42.0

N66^38’5 4"E

55.6

BOUND B

ROOK B

ORO

31.93

31.62

23.6

23.3

32.27

32.27

34.5

.3

.4

35.2

34.5

STRUCTURE

STRUCTURE

S H

E D

W O

O D

S H

E D

W O

O D

GRAVEL

693 694

RR BOX

RR BOX

RR BOX

A60801BB

UP#

864BB

UP#

867BB

GW#

TRANSMISSION

TOWER

UP#

PS1445

UP#

PS869BB

TEL.

(AT&T)

MARKER

RR SIGNAL

RR SIGNAL

UP#

PS1444

UP#

870BB

RR BOX

TRANSMISSIO

N

TOWER

UP#

UP#

UP# 33

UP#

PS872BB

TEL.

(AT&T)

MARKER

C L

F

C

L F

6’ CLF

’ C

L F

6’ CLF

C

L F

6’ C

LF

X

X X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

RR BOX

RR BOX

RR BOX

A60801BB

UP#

864BB

UP#

867BB

GW#

TRANSMISSION

TOWER

UP#

PS1445

UP#

PS869BB

TEL.

(AT&T)

MARKER

RR SIGNAL

RR SIGNAL

UP#

PS1444

UP#

870BB

RR BOX

TRANSMISSIO

N

TOWER

UP#

UP#

UP# 33

UP#

PS872BB

TEL.

(AT&T)

MARKER

INV 23.44

12" MET

RIM

27.74

30"

CMP

IN

V

19.72

INV

19.4

19.72

34.63 34.6435.57

35.69

36.67 36.72

36.07 35.84

.7

34.53 34.22

34.51

33.96

33.49

RARITAN RIVER

O

LD

R R G

RA

C L

A Y

DIR

T R

OAD

35"

14" 36"

METAL

STORAGE

ASPHALT

GROUND

10"

TRAIL

20"

5"

8"

GRAVEL

GRAVEL

GRAVEL

.3

35.13

INV

20.85

.9

34.85

34.38

34.48

24.91

32.60

32.98

30"

CMP

20.65

BOUND BROOK BORO

SOUTH BOUND BROOK BORO

TRAV 17

TRAV 18

N 66^38’5

4"E

55.6

N74^14’43"E 503.58

N73^58’19"E 549.77

MONIT.

RR BOX

ELEC. BOX

RR

RR SIG

NAL

RR SIGNAL

UP#

PS875BB

UP#

PS877BB

TRANSMISSION

TOWER

ELEC. BOX

RR

UP#

PS874BB

UP#

PS873BB

6 ’

CLF

RR BOX

UP#

1557BB

C L

A Y

ELEC. BOX

RR

TEL.

(AT&T)

MARKER

RR SIG

NAL

RR SIGNAL

RR SIGNAL

UP#

PS875BB

UP#

PS877BB

TRANSMISSION

TOWER

ELEC. BOX

RR

MONIT.

WELL

UP#

PS874BB

UP#

PS873BB

INV

20.85

20.65

20.8

INV. 20.37

36" R

C P N

O T F

O U

N D

R

IM

.1

IN

V

.4

ABAND.RR

UNPAVED DRIVE

UNPAVED DRIVE

ASPHALT

RR

SIGNAL

36.4

33.5

33.1

.7

232.1

31.2

.2

.9

.6

WV

WV

CONC.

CONC.

BLOCK

RET. WALL

O N

E

R E

T . W

A

O N

E

R E

T . W

A L

L

CONC.

BLOCK

RET. WALL

WV

ASPHALT

ATHLETIC

COURT

WV

METER

METAL

POST

METAL

POST

CONC.

BLOCK

WALL

CONC.

BLOCK

WALL

CONC.

BLOCK

BBQ

METAL

POST

GV

WOOD

METAL

BOX

UNPAVED DRIVE

24.51

24.12

25.81

21.95

BENCH

RARITAN RIVER

PILE

TRAIL

TRAIL

TRANSMISSION

TOWER

DIRT ROAD

BRUSH

9"

11"

30"

DOUBLE

11"10"

25"

8"

10"

36"

DOUBLE

11"

8"

10"

10" 6"

20"

DIRT ROAD

UP#

PS884BB

TOP OF

WALL 24.45

C

L A

Y

INV

18.05

17"

8"

5"

4"

8" 9"

10"

10"

12"

DIRT ROAD

PILE PILE

PILE

4"

15"

CONC. RW

METAL

BARRIER

CLF

C L

F

C L

F

PILE

PILE

DIRT ROAD

DIRT ROAD

DIRT ROAD

DIRT ROAD

SHED

TRANSMISSION

TOWER

DIRT ROAD

1 STY.

CONC BLK.

BOUND BROOK BORO

SOUTH BOUND BROOK BORO

N73^58’19"E 549.77

TRAV 19

N88^58’42"E 506.66

TRAV 20

N84^07’55"E 518.86

IN

V

. 2 4.9

INV. 20.25

IN

V. 2

5.75

12"

INV. 18.87I

N

V .2

INV. 19.47

INV. 26.04

I N

V

IN

V. 1

8.87

MH RIM 28.97

RIM 29.21 RIM 29.12

RIM 29.96

MH

INV. 24.56 8"

INV. 20.86 12"

IN

V. 20.86

RIM 30.11

RIM 29.81

INV. 26.55

I N

V . 2

.5

IN

V

. 2 .6

INV. 26.63

INV. 26.89

RIM 30.01

RIM 31.25

RIM 29.63

RIM 29.85

W

10"W

10"W

10"W

10"W

10"W

10"W

10"W

10"W

10"W

I N

V

RIM 33.64

I N

V

IN

V

. 2 .7

RIM 30.27

IN

V. 2

2.47

INV. 27.19RIM 30.96MH

W

W

W

W

W

10"W

10"W

10"W

10"W

6"W

6"W

6"W

6"W

R A

IL

GUID

E

S

A N

SAN. MH SAN MH

SAN MH

SAN MH

SAN MH

SAN MH

SAN MH

SAN MH

SAN MH

SAN MH

S

A N

12" SAN

8" SAN

S

A N

12" SAN

8" SAN

12" S

AN

S

A N

12" ACP SAN

12" SAN

SAN MH RIM 31.16

S

A N

S

A N

SIGNAL

Appendix B

SECTION 01 35 29

SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

ANSI A10.32 Personal Fall Protection - Safety Requirements for Construction and Demolition Operations

ANSI Z359.1 (1992; R 1999) Safety Requirements for Personal Fall Arrest Systems, Subsystems and Components

ANSI/ASSE A10.34 (2001) Protection of the Public on or Adjacent to Construction Sites

ASME INTERNATIONAL (ASME)

ASME B30.22 (2005) Articulating Boom Cranes

ASME B30.3 (2004) Construction Tower Cranes

ASME B30.5 (2007) Mobile and Locomotive Cranes

ASME B30.8 (2004) Floating Cranes and Floating Derricks

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 10 (2008) Portable Fire Extinguishers

NFPA 241 (2004) Safeguarding Construction,Alteration, and Demolition Operations

NFPA 51B (2003) Fire Prevention During Welding, Cutting, and Other Hot Work

NFPA 70 (2007) National Electrical Code

NFPA 70E (2004) Electrical Safety in the Workplace

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2003) Safety -- Safety and Health Requirements

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910 Occupational Safety and Health Standards

29 CFR 1910.146 Permit-required Confined Spaces

29 CFR 1915 Confined and Enclosed Spaces and Other Dangerous Atmospheres in Shipyard Employment

29 CFR 1919 Gear Certification

29 CFR 1926 Safety and Health Regulations for Construction

29 CFR 1926.500 Fall Protection

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

Government acceptance is required for submittals with a "G, D" designation.

SD-01 Preconstruction Submittals

Accident Prevention Plan (APP); G, RO

Activity Hazard Analysis (AHA); G, RO, DO

Crane Critical Lift Plan; G, RO, DO

Proof of qualification for Crane Operators; G, RO

SD-06 Test Reports

Reports

Submit reports as their incidence occurs, in accordance with the requirements of the paragraph entitled, "Reports."

Accident Reports

Monthly Exposure Reports

Crane Reports

Regulatory Citations and Violations

SD-07 Certificates

Contractor Safety Self-Evaluation Checklist; G, RO

Third Party Certification of Barge-Mounted Mobile Cranes, if used

Certificate of Compliance (Crane)

Submit one copy of each permit/certificate attached to each Daily Quality Control Report.

Machinery & Mechanized Equipment Certification Form

1.3 DEFINITIONS

a. Competent Person for Fall Protection. A person who is capable of identifying hazardous or dangerous conditions in the personal fall arrest system or any component thereof, as well as their application and use with related equipment, and has the authority to take prompt corrective measures to eliminate the hazards of falling.

b. High Visibility Accident. Any mishap which may generate publicity and/or high visibility.

c. Medical Treatment. Treatment administered by a physician or by registered professional personnel under the standing orders of a physician. Medical treatment does not include first aid treatment even through provided by a physician or registered personnel.

d. Operating Envelope. The area surrounding any crane. Inside this "envelope" is the crane, the operator, riggers and crane walkers, rigging gear between the hook and the load, the load and the crane's supporting structure (ground, rail, etc.).

e. Qualified Person for Fall Protection. A person with a recognized degree or professional certificate, and with extensive knowledge, training and experience in the field of fall protection; who is capable of performing design, analysis, and evaluation of fall protection systems and equipment.

f. Recordable Injuries or Illnesses. Any work-related injury or illness that results in:

(1) Death, regardless of the time between the injury and death, or the length of the illness;

(2) Days away from work (any time lost after day of injury/illness onset);

(3) Restricted work;

(4) Transfer to another job;

(5) Medical treatment beyond first aid;

(6) Loss of consciousness; or

(7) A significant injury or illness diagnosed by a physician or other licensed health care professional, even if it did not result in (1) through (6) above.

g. "USACE" property and equipment specified in USACE EM 385-1-1 should be interpreted as Government property and equipment.

h. Weight Handling Equipment (WHE) Accident. A WHE accident occurs when any one or more of the six elements in the operating envelope fails to perform correctly during operation, including operation during maintenance or testing resulting in personnel injury or death; material or equipment damage; dropped load; derailment; two-blocking; overload;

and/or collision, including unplanned contact between the load, crane, and/or other objects. A dropped load, derailment, two-blocking, overload and collision are considered accidents even though no material damage or injury occurs. A component failure (e.g., motor burnout, gear tooth failure, bearing failure) is not considered an accident solely due to material or equipment damage unless the component failure results in damage to other components (e.g., dropped boom, dropped load, roll over, etc.).

1.4 CONTRACTOR SAFETY SELF-EVALUATION CHECKLIST

Contracting Officer will provide a "Contractor Safety Self-Evaluation checklist" to the Contractor at the pre-construction conference. The checklist will be completed monthly by the Contractor and submitted with each request for payment voucher. An acceptable score of 90 or greater is required. Failure to submit the completed safety self-evaluation checklist or achieve a score of at least 90, will result in a retention of up to 10 percent of the voucher.

1.5 REGULATORY REQUIREMENTS

In addition to the detailed requirements included in the provisions of this contract, work performed shall comply with USACE EM 385-1-1, and the following federal, state, and local, laws, ordinances, criteria, rules and regulations. Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting work.

Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements shall apply.

1.6 SITE QUALIFICATIONS, DUTIES AND MEETINGS

1.6.1 Personnel Qualifications

1.6.1.1 Site Safety and Health Officer (SSHO)

Site Safety and Health Officer (SSHO) shall be provided at the work site at all times to perform safety and occupational health management, surveillance, inspections, and safety enforcement for the Contractor. The Contractor Quality Control (QC) person can be the SSHO on this project. The SSHO shall meet the following requirements:

Level 3:

A minimum of 5 years safety work on similar projects.

30-hour OSHA construction safety class or equivalent within the last 5 years.

An average of at least 24 hours of formal safety training each year for the past 5 years.

Competent person training as needed.

1.6.1.2 Crane Operators

Crane operators shall meet the requirements in USACE EM 385-1-1, Section 16 and Appendix G. In addition, for mobile cranes with Original Equipment Manufacturer (OEM) rated capacitates of 50,000 pounds or greater, crane operators shall be designated as qualified by a source that qualifies crane operators (i.e., union, a government agency, or and organization that tests and qualifies crane operators). Proof of current qualification shall be provided.

1.6.2 Personnel Duties

1.6.2.1 Site Safety and Health Officer (SSHO)/Superintendent

a. Conduct daily safety and health inspections and maintain a written log which includes area/operation inspected, date of inspection, identified hazards, recommended corrective actions, estimated and actual dates of corrections. Safety inspection logs shall be attached to the Contractors' daily quality control report.

b. Conduct mishap investigations and complete required reports.

Maintain the OSHA Form 300 and Daily Production reports for prime and sub-contractors.

c. Maintain applicable safety reference material on the job site.

d. Attend the pre-construction conference, pre-work meetings including preparatory inspection meeting, and periodic in-progress meetings.

e. Implement and enforce accepted APPS and AHAs.

f. Maintain a safety and health deficiency tracking system that monitors outstanding deficiencies until resolution. A list of unresolved safety and health deficiencies shall be posted on the safety bulletin board.

g. Ensure sub-contractor compliance with safety and health requirements.

Failure to perform the above duties will result in dismissal of the SSHO and a project work stoppage. The project work stoppage will remain in effect pending approval of a suitable replacement. The costs of the project work stoppage and selection of a suitable replacement shall be 100 percent contractor costs and the Government shall not permit any reimbursement.

1.6.3 Meetings

1.6.3.1 Preconstruction Conference Items Related to APP

a. Contractor representatives who have a responsibility or significant role in accident prevention on the project shall attend the preconstruction conference. This includes the project superintendent, site safety and health officer, quality control supervisor, or any other assigned safety and health professionals who participated in the development of the APP (including the Activity Hazard Analyses (AHAs) and special plans, program and procedures associated with it).

b. The Contractor shall discuss the details of the submitted APP to include incorporated plans, programs, procedures and a listing of anticipated AHAs that will be developed and implemented during the performance of the contract. This list of proposed AHAs will be reviewed at the conference and an agreement will be reached between the Contractor and the Contracting Officer's representative as to which phases will require an analysis. In addition, a schedule for the preparation, submittal, review, and acceptance of AHAs shall be established to preclude project delays.

c. Deficiencies in the submitted APP will be brought to the attention of the Contractor at the preconstruction conference, and the Contractor shall revise the plan to correct deficiencies and re-submit it for acceptance. Work shall not begin until there is an accepted APP.

1.6.3.2 Safety Meetings

Safety meetings shall be conducted and documented as required by EM 385-1-1.

Minutes showing contract title, signatures of attendees and a list of topics discussed shall be attached to the Contractors' daily quality control report.

1.7 ACCIDENT PREVENTION PLAN (APP)

The Contractor shall use a qualified person to prepare the written site-specific APP. Prepare the APP in accordance with the format and requirements of USACE EM 385-1-1 and as supplemented herein. Cover all paragraph and subparagraph elements in USACE EM 385-1-1, Appendix A, "Minimum Basic Outline for Accident Prevention Plan". Specific requirements for some of the APP elements are described below. The APP shall be job-specific and shall address any unusual or unique aspects of the project or activity for which it is written. The APP shall interface with the Contractor's overall safety and health program. Any portions of the Contractor's overall safety and health program referenced in the APP shall be included in the applicable APP element and made site-specific. The Government considers the Prime Contractor to be the "controlling authority" for all work site safety and health of the subcontractors. Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract and the penalties for noncompliance, coordinating the work to prevent one craft from interfering with or creating hazardous working conditions for other crafts, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out. The APP shall be signed by the person and firm (senior person) preparing the APP, the Contractor, the on-site superintendent and the designated site safety and health officer.

Submit the APP to the Contracting Officer 15 calendar days prior to the date of the preconstruction conference for acceptance. Work cannot proceed without an accepted APP.

Once accepted by the Contracting Officer, the APP and attachments will be enforced as part of the contract. Disregarding the provisions of this contract or the accepted APP will be cause for stopping of work, at the discretion of the Contracting Officer, until the matter has been rectified.

Once work begins, changes to the accepted APP shall be made with the knowledge and concurrence of the Contracting Officer, project superintendent, SSHO and quality control manager. Should any hazard become evident, stop work in the area, secure the area, and develop a plan to remove the hazard. Notify the Contracting Officer within 24 hours of discovery. Eliminate/remove the hazard. In the interim, all necessary action shall be taken to restore and maintain safe working conditions in order to safeguard onsite personnel, visitors, the public (as defined by ANSI/ASSE A10.34,) and the environment.

Copies of the accepted plan will be maintained at the resident engineer's office and at the job site. The APP shall be continuously reviewed and amended, as necessary, throughout the life of the contract. Unusual or high-hazard activities not identified in the original APP shall be incorporated in the plan as they are discovered.

1.7.1 EM 385-1-1 Contents

In addition to the requirements outlines in Appendix A of USACE EM 385-1-1, the following is required:

a. Names and qualifications (resumes including education, training, experience and certifications) of all site safety and health personnel designated to perform work on this project to include the designated site safety and health officer and other competent and qualified personnel. The duties of each position shall be specified.

b. Qualifications of competent and of qualified persons. As a minimum, competent persons shall be designated and qualifications submitted for each of the following major areas: excavation;

scaffolding; fall protection; hazardous energy; confined space; health hazard recognition, evaluation and control of chemical, physical and biological agents; personal protective equipment and clothing to include selection, use and maintenance.

c. Confined Space Entry Plan. (NOT USED)

d. Crane Critical Lift Plan. Prepare and sign weight handling critical lift plans for lifts over 75 percent of the capacity of the crane or hoist (or lifts over 50 percent of the capacity of a barge mounted mobile crane's hoists) at any radius of lift; lifts involving more than one crane or hoist; lifts of personnel; and lifts involving non-routine rigging or operation, sensitive equipment, or unusual safety risks.

The plan shall be submitted 15 calendar days prior to on-site work and include the requirements of USACE EM 385-1-1, paragraph 16.C.18. and the following:

(1) For lifts of personnel, the plan shall demonstrate compliance with the requirements of 29 CFR 1926.550(g).

(2) For barge mounted mobile cranes, barge stability calculations identifying barge list and trim based on anticipated loading; and load charts based on calculated list and trim. The amount of list and trim shall be within the crane manufacturer's requirements.

e. Fall Protection and Prevention (FP&P) Plan. The plan shall be site specific and address all fall hazards in the work place and during different phases of construction and demolition. It shall address how to protect and prevent workers from falling to lower levels when they are exposed to fall hazards above 1.8 m (6 feet). A qualified person for fall protection shall prepare and sign the plan. The plan shall include fall protection and prevention systems, equipment and methods employed for every phase of work, responsibilities, assisted rescue, self-rescue and evacuation procedures, training requirements, and monitoring methods. Fall Protection and Prevention Plan shall be revised reflecting any changes during the course of construction due to changes in personnel, equipment, systems or work habits. The accepted Fall Protection and Prevention Plan shall be kept and maintained at the job site for the duration of the project. The Fall Protection and Prevention Plan shall be included in the Accident Prevention Plan (APP).

f. Occupant Protection Plan. (NOT USED)

g. Lead Compliance Plan. The safety and health aspects of lead work.

h. Asbestos Hazard Abatement Plan. (NOT USED)

i. Site Safety and Health Plan. The safety and health aspects prepared in accordance with this Section.

j. PCB Plan. (NOT USED)

k. Site Demolition Plan. The safety and health aspects prepared in accordance with Section 02 41 00 DEMOLITION and referenced sources.

l. Excavation Plan. The safety and health aspects prepared in accordance with Section 31 00 00 EARTHWORK.

1.8 ACTIVITY HAZARD ANALYSIS (AHA)

The Activity Hazard Analysis (AHA) format shall be in accordance with USACE EM 385-1-1. Submit the AHA for review at least 15 calendar days prior to the start of each phase. Format subsequent AHAs as amendments to the APP.

The analysis should be used during daily inspections to ensure the implementation and effectiveness of the activity's safety and health controls.

The AHA list will be reviewed periodically (at least monthly) at the Contractor supervisory safety meeting and updated as necessary when procedures, scheduling, or hazards change.

The activity hazard analyses shall be developed using the project schedule as the basis for the activities performed. Any activities listed on the project schedule will require an AHA. The AHAs will be developed by the contractor, supplier or subcontractor and provided to the prime contractor for submittal to the Contracting Officer.

1.9 DISPLAY OF SAFETY INFORMATION

Within 1 calendar day after commencement of work, erect a safety bulletin board at the job site. The safety bulletin board shall include information and be maintained as required by EM 385-1-1, section 01.A.06.

1.10 SITE SAFETY REFERENCE MATERIALS

Maintain safety-related references applicable to the project, including those listed in the article "References." Maintain applicable equipment manufacturer's manuals.

1.11 EMERGENCY MEDICAL TREATMENT

Contractors will arrange for their own emergency medical treatment.

Government has no responsibility to provide emergency medical treatment.

1.12 REPORTS

1.12.1 Accident Reports

a. For recordable injuries and illnesses, and property damage accidents resulting in at least $2,000 in damages, the Prime Contractor shall conduct an accident investigation to establish the root cause(s) of the accident, complete the USACE Accident Report Form 3394 and provide the report to the Contracting Officer within 3 calendar day(s) of the accident. The Contracting Officer will provide copies of any required or special forms.

b. For any weight handling equipment accident (including rigging gear accidents) the Prime Contractor shall conduct an accident investigation to establish the root cause(s) of the accident, complete the WHE Accident Report (Crane and Rigging Gear) form and provide the report to the Contracting Officer within 15 calendar days of the accident.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .