Synopsis Attachment B - Past Performance Questionaire (Form PPQ-0).docx
DOCX document 21 KB Posted
- Attached to
- Civil Works Multi-Discipline Architect/Engineer (A/E) Multiple Award Task Order Contract (MATOC) Federal contract opportunity
- Solicitation number
- W912DR26RA011
About this file
This is a Past Performance Questionnaire template (Form PPQ-0) used by the U.S. Army Corps of Engineers (USACE) to evaluate contractor performance on relevant past projects. The form is designed to be completed jointly by the contractor and the client/contracting officer to provide comprehensive performance assessments.
The questionnaire captures contractor information including firm name, CAGE code, DUNS number, and contact details, along with contract specifics such as contract number, type (Firm Fixed Price, Cost Reimbursement, or other), location, award date, and completion dates. Clients evaluate contractor performance across seven major categories: Quality (technical data preparation, quality standards, problem resolution, and quality assurance); Schedule/Timeliness (delivery compliance and resource utilization); Customer Satisfaction (end-user satisfaction, cooperation, and responsiveness); Management/Personnel/Labor (on-site management, workforce retention, government property control, personnel expertise, small business utilization, and change management); Cost/Financial Management (ability to meet agreed prices, cost reduction innovations, invoice accuracy, accounting system adequacy, and financial stability); Safety/Security (safety compliance and security requirements); and General performance factors (emergency response, contractual compliance, and overall ratings). Ratings use a five-point scale: Exceptional (E), Very Good (VG), Satisfactory (S), Marginal (M), Unsatisfactory (U), or Not Applicable (N). The form includes fields for narrative remarks addressing strengths, weaknesses, and deficiencies to support performance risk evaluation. USACE requests that clients submit completed questionnaires directly to offerors for inclusion in proposals.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B.01._Amendment 0002_AE Synopsis and Request for SF 330s_26RA011_04FEB2026.pdf | ||
| Synopsis Attachment A_Scope of AE Services_26RA011_30MAY2025.pdf | ||
| Synopsis Attachment C - Official Responses to Requests for Information.pdf | ||
| B.01._AE Synopsis_Amendment 0001_26RA011_29JAN2026.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT A: PAST PERFORMANCE QUESTIONNAIRE
USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)
CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
| 1. Contractor Information | |
| Firm Name: | CAGE Code: |
| Address: | DUNs Number: |
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Explain) Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: |_| Firm Fixed Price |_| Cost Reimbursement |_| Other (Please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work |_| High |_| Med |_| Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE
RATING DEFINITION NOTE
| (E) Exceptional |
| Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective. |
| An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified. |
| (VG) Very Good |
| Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective. |
| A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified. |
| (S) Satisfactory |
| Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. |
| A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DoD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract. |
| (M) Marginal |
| Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented. |
| A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner. |
| (U) Unsatisfactory |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective. |
| An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating. |
| (N) Not Applicable |
| No information or did not apply to your contract |
| Rating will be neither positive nor negative. |
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY:
| a) Quality of technical data/report preparation efforts |
| E VG S M U N |
| b) Ability to meet quality standards specified for technical performance |
| E VG S M U N |
| c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance |
| E VG S M U N |
| d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance) |
| E VG S M U N |
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
| a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below) |
| E VG S M U N |
| b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract |
| E VG S M U N |
3. CUSTOMER SATISFACTION:
| a) To what extent were the end users satisfied with the project? |
| E VG S M U N |
| b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication) |
| E VG S M U N |
| c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer? |
| E VG S M U N |
| d) Overall customer satisfaction |
| E VG S M U N |
4. MANAGEMENT/ PERSONNEL/LABOR
| a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force? |
| E VG S M U N |
| b) Ability to hire, apply, and retain a qualified workforce to this effort |
| E VG S M U N |
| c) Government Property Control |
| E VG S M U N |
| d) Knowledge/expertise demonstrated by contractor personnel |
| E VG S M U N |
| e) Utilization of Small Business concerns |
| E VG S M U N |
| f) Ability to simultaneously manage multiple projects with multiple disciplines |
| E VG S M U N |
| g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes |
| E VG S M U N |
| h) Effectiveness of overall management (including ability to effectively lead, manage and control the program) |
| E VG S M U N |
5. COST/FINANCIAL MANAGEMENT
| a) Ability to meet the terms and conditions within the contractually agreed price(s)? |
| E VG S M U N |
| b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client |
| E VG S M U N |
| c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns) |
| E VG S M U N |
| d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section. |
| Yes No |
| e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below. |
| Yes No |
| f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below. |
| Yes No |
6. SAFETY/SECURITY
| a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.) |
| E VG S M U N |
| b) Contractor complied with all security requirements for the project and personnel security requirements. |
| E VG S M U N |
7. GENERAL
| a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues). |
| E VG S M U N |
| b) Compliance with contractual terms/provisions (explain if specific issues) |
| E VG S M U N |
| c) Would you hire or work with this firm again? (If no, please explain below) |
| Yes No |
| d) In summary, provide an overall rating for the work performed by this contractor. |
| E VG S M U N |
Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary