B.08.03 514C301.pdf

PDF 163 KB Posted

Attached to
Mid Chesapeake Bay Barren Island Restoration Project
Solicitation number
W912DR22B0006
Issued by

About this file

This document includes technical drawings and specifications for stone structures required for the Mid Chesapeake Bay Barren Island Restoration Project. The project involves modifications to existing stone sills and construction of new breakwaters. The drawings depict typical cross sections for the stone sill modifications and breakwaters, specifying layer depths and materials such as armor stone, quarry run, geotextile fabric, and core stone. Sill modifications will take place between stations 125+20 to 138+19, 221+20 to 228+90, 231+10 to 232+90, 254+00 to 255+94, 300+00 to 323+50, and 402+50 to 409+67. New breakwaters will be constructed between stations 500+00 to 513+06, 601+00 to 614+00, and 701+00 to 713+00. All elevations are in NAVD88 vertical datum. The solicitation number for this opportunity is W912DR22B0006 and it was issued by the Department of the Army Corps of Engineers Baltimore District.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

-10

-20

-10

-20

070 60 50 40 30 20 10 10 20 30 40 50 60 70

NORTHEAST SILL

FROM STA. 125+20 TO 138+19

*ARMOR STONE IN 2 LAYERS ALONG CREST AND SIDE SLOPES, SINGLE LAYER ALONG TOE

EXISTING GROUND EL. VARIES

7.50'

7.50'

5.00'

1.5

ARMOR STONE*, W50 = 2600-lb

2.50' 1.50'

1.00'

QUARRY RUN**

#10 STONE**

GEOTEXTILE, EXTEND

5 FT MIN. BEYOND

#10 STONE

TOP EL. +6'

MHW EL. 0.16'

MLW EL. -1.06'

CENTERLINE

GEOTEXTILE,

EXTEND 5 FT

MIN. BEYOND

#10 STONE

*QUARRY RUN THICKNESS, WHERE NOT CALLED OUT, VARIES WITH ELEVATION OF

EXISTING SILL.

-10

-20

-10

-20

070 60 50 40 30 20 10 10 20 30 40 50 60 70

EXISTING SILL GAP/SOUTHWEST/SOUTHEAST SILL

EXISTING GROUND EL. VARIES

*ARMOR STONE IN 2 LAYERS ALONG CREST AND SIDE SLOPES, SINGLE LAYER ALONG TOE

FROM STA. 221+20 TO 228+90, 231+10 TO 232+90, 254+00 TO 255+94, STA. 300+00 TO 323+50, AND STA.

402+50 TO 409+67

9.00'

9.00'

1.50'

1.00'

3.00'5.00'

1.5

ARMOR STONE*, W50 = 4300-lb

6.00'

QUARRY RUN CREST** #10

STONE**

MHW EL. 0.16'

MLW EL. -1.06'

TOP EL. +6'

GEOTEXTILE, EXTEND

5 FT MIN. BEYOND

#10 STONE CENTERLINE

GEOTEXTILE,

EXTEND 5 FT

MIN. BEYOND

#10 STONE

QUARRY RUN TOE

**QUARRY RUN THICKNESS, WHERE NOT CALLED OUT, VARIES WITH ELEVATION OF

EXISTING SILL.

1.5

MODIFICATION OF EXISTING SILL

-10

-20

-10

-20

070 60 50 40 30 20 10 10 20 30 40 50 60 70

*ARMOR STONE IN 2 LAYERS ALONG CREST AND SIDE SLOPES, SINGLE LAYER ALONG TOE

TOP EL. +6'

9.00'

9.00'

1.50'

1.00'

3.00' 5.00'

1.5

ARMOR STONE*, W50 = 4300-lb

6.00'

MLW EL. -1.06'

GEOTEXTILE, EXTEND

5 FT MIN. BEYOND

#10 STONE

ESTIMATED EXTENT

OF BURIED STRUCTURE

QUARRY RUN CREST**

#10

STONE**

COVER EXISTING TOE

OF SILL WITH GEOTEXTILE

MHW EL. 0.16'

FROM STA. 200+00 TO 218+07, 219+00 TO 221+20, 228+90 TO 231+10, 232+90 TO

234+13.5, AND 234+88 TO 254+00

CENTERLINE

EXISTING GROUND EL. VARIES

QUARRY RUN TOE

**QUARRY RUN THICKNESS, WHERE NOT CALLED OUT, VARIES WITH ELEVATION OF

EXISTING SILL.

1.5

LANDSIDE (EAST) BAYSIDE (WEST)

-10

-20

-10

-20

070 60 50 40 30 20 10 10 20 30 40 50 60 70

TOP EL. 8.5'

BREAKWATER

GEOTEXTILE, EXTEND

5 FT MIN. BEYOND

#10 STONE

FROM STA. 500+00 TO 513+06 , 601+00 TO 614+00, AND 701+00 TO 713

MHW EL. 0.16'

MLW EL. -1.06'

*ARMOR STONE IN 2 LAYERS ALONG CREST AND SIDE SLOPES, SINGLE LAYER ALONG TOE

1.5

9.50'

9.50'

6.40'

1.50'

1.00'

3.20'

5.00'

EXISTING GROUND EL. VARIES

ARMOR STONE*, W50 = 5400-lb

QUARRY RUN**

#10

STONE**

CORE STONE

CENTERLINE

GEOTEXTILE,

EXTEND 5 FT

MIN. BEYOND

#10 STONE

CORE STONE CREST

**QUARRY RUN THICKNESS, WHERE NOT CALLED OUT, VARIES WITH ELEVATION OF

EXISTING SILL.

1.5

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N

AM

E:

D W

N B

Y:

C

KD

B

Y:

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

D

2 3

C

4 5

A

B

M

AR

K

AP

PR

D

AT

E:

PL

AT

E N

U M

BE

R

SI

ZE

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

PL

O

T D

AT

E:

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

C O

N

TR

AC

T

N O

SHEET

IDENTIFICATION

D

AT

E

AP

PR

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

BA

LT

IM

O

R E

D

IS

TR

IC

T

BA

LT

IM

O R

E, M

AR

YL

AN

D

M

ID

-C H

ES

AP

EA

KE

B

AY

IS

LA

N D

EC

O

SY

ST

EM

R

ES

TO

R

AT

IO

N

P R

O

JE

C T

BA

R

R

EN

IS

LA

N D

R

ES

TO

R

AT

IO

N

M

AY

AN

SI

D

BALTIMORE DISTRICT

PH

AS

E I S

TO

N

E

ST

R U

C

TU

R

ES

C301

TY

PI

C

AL

S

EC

TI

O

N S

4C

1.

D W

G

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

Feet 0 10 20

NOTES: 1. ALL ELEVATIONS SHOWN ARE IN VERTICAL DATUM NAVD88.

2. W50 = NOMINAL MEAN SIZE OF THE ARMOR STONE.

3. REFER TO DIV 31 05 19 FOR GEOTEXTILE SPECIFICATIONS

Sheets and Views
C301

File details come from the government source that posted it. Updated .