This document provides responses to contractor questions on a solicitation for the construction of an F-16 flight simulator facility at Joint Base Andrews in Maryland. Key details include: the roles of superintendent, quality control manager, and safety officer must be separate individuals; a revised price schedule with the cost for utility work will be included in Amendment 0002; all questions must be submitted by February 10th and the site will be locked thereafter with responses in a formal amendment; the minimum self-performance requirement is 15%; the justification and approval requires all listed products and services to be provided as specified; and the contractor must provide pathways for telecommunications while the government furnishes and installs equipment.
View the file
Other files for this federal contract opportunity
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT TITLE: F-16 FLIGHT SIMULATOR FACILITY at JOINT BASE ANDREWS, MARYLAND
The purpose of this amendment is to:
1. Provide updated response to RFI with Inquiry ID 9592744
2. Delete FAR Clause 52.236-1 "Performance of Work by the Contractor (APR 1984)"
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Mar-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DR22B0004
X 9B. DATED (SEE ITEM 11)
24-Jan-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Mar-2022
CODE
USACE, BALTIMORE
2 HOPKINS PLAZA
BALTIMORE MD 21201
W912DR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DR22B0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 72 00 - GENERAL CONDITIONS
The following have been deleted:
52.236-1 Performance of Work by the Contractor APR 1984
(End of Summary of Changes)
Information for this report is procurement sensitive.
9592744 Contracting 01 42 00
Comment Classification: UNCLASSIFIED (U)
1. Please clarify full-time supervisory personnel requirements with regards to the Superintendent, QC Manager, and Site Safety and Health Officer. How many individuals are required to fulfill these roles? Can multiple roles be performed by one person; or are three separate, full-time individuals required?
2. Reference Bid Schedule: Item 0003 is "Payment to ASUS (Terrapin Services Inc.) for Utility work." To ensure all contractors receive the same proposal for the same scope of work, we request that the government obtain and provide the amount to carry for this line item.
3. RFIs are to be submitted via ProjNet Bid Inquiry. Will this site be locked after the February 10th due date and a formal Amendment issued that answers all RFIs?
4. Please consider holding an additional site visit.
5. Project requires the contractor to self-perform at least twenty (20) percent of the total amount of work to be performed under the contract. Please consider revising this to fifteen (15) percent.
6. Please explain the purpose of the Justification & Approval For Other Than Full And Open Competition attached to the end of the solicitation. Must all of the products and services listed be utilized for this project, regardless of cost?
7. Please clarify which telecommunication systems are to be installed by the government and which by the contractor. Does the contractor provide any equipment or cabling, or just conduit, back boxes, trays, racks, etc.?
(Attachment: RFI-01.pdf) On: Feb 08 2022.
Government Response. . 1. These roles must be conducted by separate people.
2. A revised Price Schedule will be included via Amendment and will provide this line item cost.
3. Yes. All RFI's must be received NLT 2/10/22.
4. There will not be an additional site visit.
5. ?
6. Yes, the J&A items specifically listed in the Solicitation must be provided exactly as noted without substitution. Please note that other items appearing in the CD's are intended to be basis-of-design references, and KTR may submit equals for approval.
7. The MILCON Contract (this project) scope is to provide power & conduit (including back boxes, trays, racks, etc.) for building telecommunications systems. The cabling will be provided by the GC in the project but that amount will be paid for out of a different pot of money than the MILCON Contract.
The Government will then install all telecom devices during and perhaps some after the construction period. On: Feb 24 2022
Government Response. The text below appends or clarifies ALL previous replies.
1. These roles must be conducted by separate people.
2. See Amendment 0002 for revised Price Schedule.
3. Yes. All RFIs must be received NLT 2/10/22.
4. There will not be an additional site visit.
5. FAR clause 52.236-1 "Performance of Work by the Contractor (APR 1984)" has been deleted by amendment.
6. Yes, the J&A items specifically listed in the Solicitation must be provided exactly as noted without substitution.
7. Contractor to provide pathways (cable trays, power, conduit, etc.). Government will furnish and install the equipment. On: