This document contains a sources sought notice and draft bid schedule for a federal contract opportunity to provide decommissioning and disposal services for the SM-1 Reactor Facility located at Fort Belvoir, Virginia. The U.S. Army Corps of Engineers, Baltimore District is seeking capability statements from contractors with experience in nuclear reactor decommissioning and disposal, hazardous and radioactive waste services, engineering design, construction, demolition, and environmental remediation. Responses are due by May 1, 2018 to be considered for a future solicitation for a five-year, cost-reimbursable contract to conduct planning, engineering, construction, demolition, and support activities for the deactivated SM-1 Nuclear Power Plant. Services will include radiological and hazardous materials handling, environmental permitting and compliance, engineering design, construction management, and facility security. Offerors should demonstrate experience with similar nuclear decommissioning projects valued over $10 million, compliance with EM 385-1-1 and other regulations, and accounting systems for cost-reimbursement contracts. A draft bid schedule for the contract includes line items for project management, site preparation, mobilization, and reporting with firm-fixed prices, as well as engineering, construction, and remediation tasks with cost-plus-incentive-fee pricing.
SM-1 DRAFT Bid Schedule
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SM-1 DRAFT Bid Schedule
Base Tasks Contract Type Price
3.2 PROJECT MANAGEMENT AND SUPPORT SERVICES
3.2.1- 3.2.6 PROJECT MANAGEMENT, WORK PLANS, TRAVEL AND PER DIEM FFP -$
3.3 SITE PREPARATION FFP -$
3.4 MOBILIZATION FFP -$
3.7 DEMOBILIZATION FFP -$
3.8 REPORTING FFP -$
Option Tasks Contract Type Target Cost Target Fee** Min Fee** Max Fee** Price*
3.5 BUILDING 372 DISPOSITION -$
3.5.1 ASBESTOS ABATEMENT CPIF -$
3.5.2 RESTRICTED AREA M&E REMOVAL & DECONTAMINATION CPIF -$
3.5.3 UNRESTRICTED AREA + HP MOD ROOM REMOVAL & DECON CPIF
3.5.4 VESSEL CONTAINMENT (VC) M&E REMOVAL & DISPOSAL CPIF -$
3.5.5 UNRESTRICTED + HP MOD DEMOLITION CPIF -$
3.5.6 RESTRICTED AREA DEMOLITION CPIF -$
3.5.7 VESSEL CONTAINMENT (VC) DEMOLITION CPIF -$
3.5.8 SOIL REMEDIATION (UPPER SITE) CPIF -$
3.5.9 UPPER SITE RESTORATION CPIF -$
3.6 OTHER STRUCTURE DEMOLITION -$
3.6.1 ENGINEERING (DEMO) CPIF -$
3.6.2 BUILDING 350/399 (LIFT STATION) DEMOLITION CPIF -$
3.6.3 INTAKE PIER DEMOLITION CPIF -$
3.6.4 BUILDING 349 (WAREHOUSE) DEMOLITION CPIF -$
3.6.5 LOWER SITE REMEDIATION CPIF -$
Total Proposed Price (All FFP Tasks and CPIF Tasks) -$
* Price = (((Target Cost)(1+Target Fee))+((0.9 *Target Cost)(1+Max Fee))+((1.1*Target Cost)(1+Min Fee)))/3
** Please insert one percentage fee rate