This document is a federal contract solicitation amendment (Amendment 0002) for a debris boom design and construction project at Harry S. Truman Dam in Warsaw, Missouri. The U.S. Army Corps of Engineers (USACE) is seeking a contractor to design and construct a debris boom system with specific requirements, including a minimum 24-inch diameter boom, high visibility color, U-shaped alignment for debris deflection, a 20-foot service gate, and a 40-foot removable section. The project's estimated price range is between $1,000,000 and $5,000,000, with Phase 2 proposal submissions due on October 30, 2025. The contract includes three primary contract line items (CLINs): design of the debris boom system, construction of the anchorage system, and installation of the debris boom, with a minimum design service life of 45 years. The solicitation emphasizes environmental safety, durability, and compatibility with the dam's existing infrastructure.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to issue Phase 2 of the solicitation to the Phase 1 offerors w ho w ere selected to continue in Phase 2. See continuation page for additional details regarding this amendment.
The due date for Phase 2 Proposals is October 30, 2025 at 10:00 a.m. local Kansas City time.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Sep-2025
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DQ25R1004
X 9B. DATED (SEE ITEM 11)
17-Apr-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Sep-2025
CODE
USACE, KANSAS CITY +
FEDERAL BLDG, CT-C +
601 E 12TH ST RM 647
KANSAS CITY MO 64106-2896
W912DQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DQ25R1004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0002
1. Those offerors selected for Phase 2 are invited to submit Phase 2 proposals. The due date for Phase 2 proposals is as stated in Box 14 of the SF 30.
2. Offerors are required to acknowledge receipt of this amendment. Failure to acknowledge all amendments may cause the proposal to be rejected.
3. Summary of revisions made by this amendment:
Section 00 10 00 – Solicitation Added due date for Phase 2 proposals Updated contract line item number (CLIN) Schedule Revised wording in “General Description of Scope” Revised wording in “Magnitude of Project”
Section 01 21 00 – Instructions Added Field Office Overhead (FOH) Clause
Section 00 21 16 – Instructions to Proposers Revised wording in “How to Submit Questions” to include new bidder inquiry key Added new Attachment 5 with instructions for submitting Phase 2 proposals Removed FAR provision 52.217-5
Section 00 72 00 – General Conditions Updated Wage Determination information Removed FAR clause 52.217-7
Division 1 Specifications Updated wording in 01 20 00, Price and Payment Procedures Updated wording in 01 33 00, Submittal Procedures Updated wording in 01 33 16.00 10, Design Data (Design After Award)
4. The following items will be uploaded in PIEE as separate attachments:
- Attachment 5 -- Phase 2 Proposal Content & Evaluation
- CLIN Schedule (Fill out and submit as part of Price Volume, per instructions in Attachment 5.)
- FOH Clause (Fill out and submit as part of Price Volume, per instructions in Attachment 5.)
- Clean copy of the revised Division 1 specifications
SECTION 00 01 10 - TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Proposal Content &
Evaluation
Attachment 2 Vendor Info Form Attachment 3 PPQ Form Attachment 4 Exp Form to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Proposal Content &
Evaluation
Attachment 2 Vendor Info Form Attachment 3 PPQ Form Attachment 4 Exp Form Attachment 5 Phase 2 - Proposal
Content and Evaluation
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 29-May-2025 10:00 AM to 30-Oct-2025 10:00 AM.
CLIN 0001
The CLIN extended description has changed from:
To:
Design of site-specific debris boom system in accordance with the request for proposals and accepted final proposal.
Includes all required design tasks and deliverables.
CLIN 0002
Construction of anchorage system for the debris boom. Includes all labor, materials, equipment, and other costs to construct the anchorage system.
CLIN 0003
Installation of the debris boom. Includes all labor, materials, equipment, and other costs to construct / install the debris boom system apart from the anchorage system as described in CLIN 0002.
CLIN 0004
The CLIN description has changed from Extended Warranty on Debris Boom System to [CLIN deleted].
The CLIN extended description has changed from:
The Government's deadline for exercising this option CLIN is no later than 365 days after issuance of notice to proceed on CLIN 0001. Other than the warranty period itself, exercising this option will not extend the contract completion date.
[CLIN deleted] The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
The following Delivery Schedule for CLIN 0004 has been deleted:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
420 dys. ANP 1 USACE, KANSAS CITY +
RACHEL DONATTI
HARRY S TRUMAN PROJECT OFFICE
15968 TRUMAN R
WARSAW MO 65355
816-389-3606 FOB: Destination
966475
The following have been modified:
GENERAL DESCRIPTION OF SCOPE
Note: The description below is preliminary and for information only. Final version to be provided in Phase 2.
General information about the project location (Harry S. Truman Lake and Dam) is provided at the end of this scope for reference.
The purpose of this project is to design and construct a debris boom for Harry S. Truman Dam in Warsaw, MO. The contractor will be responsible for supplying all labor, equipment, supplies, and materials to complete the design and construction of the site-specific debris boom system, to include the required submittals and construction of any necessary anchorage systems.
The contractor will design and construct a debris boom to stop debris, logs, and other floating objects from entering the dam spillway. A non-exhaustive list of desired features/characteristics is as follows:
- Minimum 24-inch diameter boom.
- High visibility color.
- All material must be environmentally safe and appropriate for the location of construction.
- Debris boom alignment should have a U shape to assist in the deflection of debris toward the shore to facilitate debris removal.
- Boom system must include, at a minimum, one 20-foot-wide or larger manual opening service gate. Service gate to provide a minimum of 7 foot draft depth.
- Boom system must include a portion that could be removed or hinged to allow access for larger service equipment such as a spud barge. Removable section, at a minimum, must be 40 feet in width.
- Boom system must include fail-safe linkage to prevent anchor point failure.
- Minimum design service life of 45 years.
- Debris boom should be unsinkable and made of solid material able to maintain buoyancy even when punctured.
- Boom floats should be suitable for use in temperatures ranging from -38 degrees F (-39 degrees C) up to
130 degrees F (54 degrees C).
Design parameters relating to engineered boom calculations and loading are will be provided as part of the complete specifications in Phase 2. Any specifications attached to this Phase 1 solicitation are preliminary and subject to revision. The complete specifications will be provided in Phase 2.
Anchor point sizing, positioning and supply will be the responsibility of the contractor. The need for drilling or diving is not anticipated for anchorage installation. As-built structures can be utilized at the discretion of the debris boom manufacturer and construction contractor. Any pre-existing structures that are used must be certified by a Professional Engineer, registered in the State of Missouri, to meet loading requirements. Any new anchors in any concrete section of the dam must be two times the depth of the anchor away from any monolith joint.
Should drilling be needed, a Drilling and Invasive Activities Program Plan will need to be submitted and approved prior to any subsurface drilling activities. Depending on the activities, it may be approved by the U.S. Army Corps of Engineers (USACE) District Dam Safety Officer or may need to be approved by the Geotechnical, Geology and Materials Community of Practice (GG and M COP) Standing Committee on Drilling and Instrumentation. The contractor should use Ground Penetrating Radar (GPR) to locate existing reinforcing steel prior to any drilling in Dam concrete. Any attachments to the Tainter structures, including vessels/watercraft, are not allowed without prior clearance.
If dive operations are required, the contractor must follow all USACE Engineer Manual 385-1-1 diving requirements, to include submittal and approval by the USACE District Dive Coordinator of all required dive plans, and personnel and equipment certifications prior to the dive team mobilizing to the work site. Only surface-supplied air diving is allowed in the Kansas City District (no SCUBA). If dive operations are conducted, then an approved USACE Dive Inspector must be on site at all times during dive operations.
General Overview of Truman Reservoir and Dam:
Harry S. Truman Dam is a USACE facility located at river mile 175 on the Osage River, about 1-1/2 miles northwest of Warsaw, Missouri. The dam provides flood risk reduction for Warsaw and several communities along the Osage and Missouri Rivers. The project consists of a main earthen embankment, concrete gated spillway, powerhouse, and saddle dikes. The main embankment of Truman Dam is 5,100 ft long composed of 4,100 ft of compacted earth and rockfill and 1,000 ft of concrete structure including the powerhouse, spillway, and non-overflow sections.
Truman Reservoir is the largest flood control reservoir in Missouri, with a storage capacity of more than 5 million acre-feet (an acre-foot = 325,000 gal.). At conservation/multipurpose pool (706 feet NGVD29) the reservoir has a surface area of about 55,600 acres. This surface area can grow to over 200,000 acres at the top of the flood control pool. During periods of flooding, Truman Reservoir, operating in conjunction with other reservoirs, provides flood risk reduction for the lower Osage, Missouri and Mississippi River floodplains.
The Truman Power Plant has six turbine generators and a rated capacity of 160,000 kilowatts. This electrical energy is used to meet peak electrical demands when conventional power plants cannot fulfill the public's demand for electricity. Power plant operators are on duty around the clock to control the flow of water through Truman Dam.
There are also four large Tainter gates located within the spillway next to the powerhouse that are the primary means of flood control releases.
The lake, and more than 100,000 acres of land surrounding it, is managed for fish and wildlife. Over 55,000 acres are licensed to the Missouri Department of Conservation for fish and wildlife management, and approximately 8,800 acres of timber was left standing in the lake to improve fisheries habitat.
MAGNITUDE OF PROJECT
The magnitude of this project (including the base and all options) is represented by the following estimated price range: Between $1,000,000 and $5,000,000.
The following have been deleted:
THIS IS A DRAFT CLIN SCHEDULE
SECTION 00 21 00 - INSTRUCTIONS
FIELD OFFICE OVERHEAD (JUL 2002) (RFP)
NOTICE TO OFFERORS: you must declare below the single accounting practice that you apply to contracts to calculate field office overhead for all change orders, modifications and requests for equitable adjustment. Pursuant to Federal Acquisition Regulations (FAR) Parts 31.105(d)(3) and 31.203(d)(1), an accounting practice that varies from modification to modification is not allowable. Select one of the following:
1. TIME DISTRIBUTION BASE FOR A PER DIEM RATE
If you use this practice, see Special Clause “Field Office Overhead Per Diem Rate” _____
2. DIRECT COST DISTRIBUTION BASE FOR A PERCENTAGE MARKUP
If you use this practice, see Special Clause “Field Office Overhead Percentage Markup” _____
3. OTHER ACCOUNTING PRACTICE THAT IS ALLOWABLE _____
UNDER THE FAR AND THAT USES A SINGLE DISTRIBUTION BASE.
If you choose 3, you must describe the accounting practice in sufficient detail below to allow the contracting officer to determine what accounting practice is being utilized by your company and that it complies with the FAR.
FAILURE TO FULLY COMPLY WITH THE ABOVE REQUIREMENT OR, IF ALTERNATIVE 3 IS
DECLARED AND YOUR DESCRIPTION DOES NOT CLEARLY STATE OR DESCRIBE A CONSISTENT
ACCOUNTING PRACTICE USING A SINGLE DISTRIBUTION BASE, MAY CAUSE YOUR PROPOSAL
TO BE EVALUTED AS UNACCEPTABLE.
(End)
SECTION 00 21 16 - INSTRUCTIONS TO PROPOSERS
HOW TO SUBMIT QUESTIONS
Prospective offerors who wish to submit contracting or technical inquiries and questions concerning this solicitation document must do so via Bidder Inquiry in ProjNet at www.projnet.org/projnet.
To submit and review offer inquiry items, offerors will need to be a current registered user or self-register into the system. To self-register, go to the aforementioned web page and click on Register. Select Agency: USACE, then select Site: Contractor. Complete the required fields and then click the Register button.
If you are registered, enter the Managing Agency: USACE, your email address, and the Bidder Inquiry Key for this solicitation listed below, check the security box, and then click Sign in. From this page, you may view all inquiries or add a new inquiry.
Offerors will receive an acknowledgment of their questions via email, followed by an answer to each of their question(s) after they have been processed by our technical team. ***Please Note: Offerors shall only submit one question per inquiry. All inquiries containing multiple questions shall be rejected.***
The Solicitation Number is: W912DQ25R1004 The Bidder Inquiry Key is: RWTGIN-XYKU4U The Bidder Inquiry Key for Phase 2 is 4X55XU-7ZKG6Y
The Bidder Inquiry System will be unavailable for new inquiries after September 30, 2025 at 4:00 p.m. May 5, 2025 at 10:00 a.m. local Kansas City time in order to ensure adequate time is allotted to form an appropriate response to inquiries and amend the solicitation, if necessary.
Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry. The telephone number for the Call Center is (833) 389-1097 or
(217) 367-3273. Email: staff@projnet.info.
PROPOSAL CONTENT & EVALUATION
(See Attachment 1 to Solicitation -- Revised version issued with Amendment 0001 to Solicitation)
For Phase 2, see Attachment 5 to Solicitation. Attachment 5 is a new attachment with information regarding Phase 2 proposal submission requirements and evaluation.
52.217-5 Evaluation Of Options JUL 1990
SECTION 00 72 00 - GENERAL CONDITIONS
CHANGES TO SPECIFICATIONS
NOTE: Deleted text is shown in red text with a strikethrough. Added text is shown in underlined green text.
SECTION 01 20 00 PRICE AND PAYMENT PROCEDURES
01 20 00 – 1 Deleted text as follows:
1.3.4 OPTION CLIN 0004 Debris Boom Extended Warranty
1.3.4.1 Payment
1.3.4.2 Unit of Measure
01 20 00 – 3
1.3.3 BASE CLIN 0003 Installation of Debris Boom System
1.3.3.1 Payment
Payment will be made for costs associated with the procurement and installment of the commercially purchased portion of the debris boom system.
1.3.3.2 Unit of Measure
Unit of measure: job.
1.3.4 OPTION CLIN 0004 Debris Boom Extended Warranty
1.3.4.1 Payment
Payment will be made for costs associated with providing a warranty.
1.3.4.2 Unit of Measure
Unit of measure: job.
SECTION 01 33 00 SUBMITTAL PROCEDURES
01 33 00 Revisions on pages 2-5 of Submittal Register Form (see revised form in specifications)
SECTION 01 33 16.00 10 – DESIGN DATA (DESIGN AFTER AWARD)
01 33 16.00 10 – 3-4 Revised text as follows:
NATIONAL INSTITUTE OF BUILDING SCIENCES (NIBS)
NBIMS-US (V3) National BIM Standard -United States NCS (V6) United States National CAD Standard
U.S. ARMY CORPS OF ENGINEERS (USACE)
ERDC/ITL TR-19-6 (2019) A/E/C Graphics Standard, Release 2.1
ERDC/ITL TR-19-7 (2019) A/E/C/ CAD Standard - Release 6.1
EM 1110-1-2909 (2012) Engineering and Design -- Geospatial Data and
Systems ER 1110-1-9 (2012) Design Build Contracting ER 1110-2-1150 (1999) Engineering and Design of Civil Works Projects ER 1110-2-1156 (2014) Safety of Dams -Policy and Procedures ER 1165-2-217 (2021) Civil Works Review Policy ERDC/ITL SR-23-1 (2023) A/E/C Graphics Standard, Release 2.2 ERDC/ITL SR-24-3 (2024) A/E/C CAD Standard - Release 6.2
01 33 16.00 10 – 2
3.2.1.3 Interim Design Development Review Waiver
The Government may agree to shorten or waive the formal interim design development review period for design package(s) if an effective, mutually agreeable partnering procedure is established and implemented for regular (e.g., weekly) over-the shoulder review. During the course of the procedure, keep the Government reviewers fully informed of the progress, contents, design intent, design documentation, and other pertinent factors of the design package.
01 33 16.00 10 – 14
3.2.1.3 Interim Design Development Review Waiver The Government may agree to shorten or waive the formal interim design development review period for design package(s) if an effective, mutually agreeable partnering procedure is established and implemented for regular (e.g., weekly) over-the shoulder review. During the course of the procedure, keep the Government reviewers fully informed of the progress, contents, design intent, design documentation, and other pertinent factors of the design package.
01 33 16.00 10 – 15 Revised text as follows:
3.4.2.1 Native CAD Authoring Content
All content produced through CAD authoring software outside of any object/element based BIM or CIM platform must be compliant with ERDC/ITL TR-19-6 and ERDC/ITL TR-19-7 SR -23-1 and ERDC/ITL SR-24-3. Audodesk Civil 3D Bentley MicroStation Seed Files Most recent version at the time of Contract award. The contractor must ensure that all files and data are compatible with the target platform. The term "compatible" means the data can be accessed directly by the target AutoCAD/Civil3D software without conversion, reprocessing, or post processing of data files. Download form the CAD/BIM Technology Center website as part of the A/E/C Work Structure.
3.4.2.2 CAD Extracted From BIM/CIM Authoring Platforms
Provide editable CAD sheet files extracted from the BIM or CIM files. CAD content exported from a BIM or CIM modeling platform must comply with ERDC/ITL TR-19-6SR-23-1 and ERDC/ITL TR-19-7SR-24-3.
01 33 16.00 10 – 19
3.7 INTERIM DESIGN REQUIREMENTS
At least one interim design submittal, review and review conference is required for each design package (except that the Contractor may, upon Government approval, skip the interim design submission and proceed directly to final design of the sitework and utilities package). Additional interim design conferences or over-the-shoulder reviews may be scheduled, as needed, to assure continued Government concurrence with the design work.
Include the interim submittal review periods and conferences in the Section 01 32 16.01 23 PROGRESS CHART (KCD) and indicate in periodic schedule updates what part of the design work is at what percentage of completion.
See also paragraph INTERIM DESIGN DEVELOPMENT REVIEW WAIVER for a waiver to the formal interim design review.
WAGE DETERMINATION
Applicable Davis Bacon Act Wage Determination:
MO20250001
Modification Number: 5 10 Construction Types: Heavy and Highway Published Date: May 16, 2025 September 5, 2025 A hard copy will be provided upon request.
Link provided: https://sam.gov/wage-determination/MO20250001/5 https://sam.gov/wage-determination/MO20250001/10
52.217-7 Option For Increased Quantity-Separately Priced Line Item MAR 1989
(End of Summary of Changes)