Amendment_0002___FOH_Clause.pdf
PDF 185 KB Posted
- Attached to
- Design and Construction of Debris Boom for Harry S. Truman Lake and Dam (Warsaw, Missouri)
- Solicitation number
- W912DQ25R1004
About this file
This document is a section of a Request for Proposals (RFP) containing instructions for field office overhead accounting practices. The document requires offerors to declare a single accounting practice for calculating field office overhead for all change orders, modifications, and requests for equitable adjustment, in compliance with Federal Acquisition Regulation (FAR) Parts 31.05(d)(3) and 31.203(d)(1).
Offerors must choose one of three accounting practice options: 1) Time Distribution Base for Per Diem Rate, 2) Direct Cost Distribution Base for a Percentage Markup, or 3) Another Allowable Accounting Practice using a Single Distribution Base. The document warns that failure to fully comply with the requirements or provide a clear and consistent accounting practice description may result in the proposal being evaluated as unacceptable. The document is page 12 of a 63-page document, identified by the contract number W912DQ25R1004.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .