This document is an Amendment to Solicitation W912DQ24R1006 for a water injection dredging demonstration project at Tuttle Creek Lake, KS. The amendment makes several changes, including:

  • Updates the supplemental bid schedule by adding supplemental line items for CLIN 0002 and CLIN 0003.
  • Amends the Water Injection Dredge Requirements in Section 3.1.6 to remove the U.S. Coast Guard approval requirement.
  • Amends Attachment C to remove the dollar amount on total percentage planned and add new text in Section A.

The overall solicitation is for construction services for a water injection dredging demonstration project, with an estimated magnitude between $5,000,000 and $10,000,000. The NAICS code is 237990 with a size standard of $37,000,000. The contracting agency is the U.S. Army Corps of Engineers, Kansas City District.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment reflects the follow ing changes to the solicitation:

Update supplemental bid schedule by adding supplemental line items on CLIN 0002 and CLIN 0003.

Water Injection Dredge Requirements in section 3.1.6 on page 35 20 23 - 7 has been amended to remove the US Coast Guard approval requirement in the chart.

Attachment C has been amended to remove the dollar amount on total percentage planned and new text in section a has been added.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Jul-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DQ24R1006

X 9B. DATED (SEE ITEM 11)

07-Jun-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Jul-2024

CODE

USACE, KANSAS CITY +

CONTRACTING DIVISION FEDERAL BLDG CT 601 E 12

KANSAS CITY MO 64106-2896

W912DQ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DQ24R1006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 2

3.1.6 Dredge Plant and Equipment

A water injection dredge (WID) will be used to perform all dredging work under this contract. 30 days prior to dredge assembly, submit WID design and shop drawings complying with the minimum requirements shown below.

Design under the direction of a professional engineer. Affix engineer's stamp on all design data. Prior to the start of active dredging the Contractor shall submit verification that the dredge meets the minimum requirements. Minimum requirements for the dredge are listed in the following tables:

Maintain all dredge plant and associated equipment such as, but not limited to, scows, coamings, and barges to meet the requirements of the work.

-end-

SECTION 00 10 00 - SOLICITATION

The following have been modified:

SUPPLEMENTAL BID SCHEDULE

The contractor shall complete the following Supplemental Bid Schedule in addition to the Bid Schedule. This Supplemental Bid Schedule is not contractually binding. The Government will use this Supplemental Bid Schedule to assist in the evaluation of prices. The individual supplemental bid items should add up to the prices for the Bid Schedule. In the event that the CLIN subtotal in the Supplemental Bid Schedule does not match the CLIN total in the Bid Schedule, the latter shall control and will be the price evaluated by the Government.

CLIN 0001

Spring 2025 Demonstration Est. Qty. Unit Unit Price Subtotal

Site Prep 1 JOB $ $

Crane Rental 1 JOB $ $

Construct WID System 1 JOB $ $

WID System 1 JOB $ $

Barge Rental 1 JOB $ $

Operation 1 JOB $ $

Demobilize WID System 1 JOB $ $

SUBTOTAL $

CLIN 0002 (Option)

Summer 2025 Demonstration Est. Qty. Unit Unit Price Subtotal

Barge Rental 1 JOB $ $

Operation 1 JOB $ $

Storage and Monitoring 1 JOB $ $

CLIN 0003 (Option)

Fall 2025 Demonstration Est. Qty. Unit Unit Price Subtotal

WID System 1 JOB $ $

Barge Rental 1 JOB $ $

Operation 1 JOB $ $

Storage and Monitoring 1 JOB $ $

CLIN 0004 (Option)

Additional 2025 WID Days Est. Qty. Unit Unit Price Subtotal

CLIN 0005 (Option)

2026 WID Est. Qty. Unit Unit Price Subtotal

Crane Rental 1 JOB $ $

Construct WID System 1 JOB $ $

Barge Rental 1 JOB $ $

Demobilize WID System 1 JOB $ $

SUBTOTAL $

CONTRACT TOTAL $

Note: Any work not specifically noted shall be priced with the most closely related CLIN.