PA03 Outlet Packet SOLICITATION 23Q1008.pdf

PDF 9 MB Posted

Attached to
Park Attendants, Mass Solicitation W912DQ23Q1008, Kansas Lake Projects, USACE. Six planned awards
Solicitation number
W912DQ23Q1008
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VENDOR INFORMATION SHEET

FY 23 Mass Solicitation / Kansas Park Attendants

W912DQ23Q1008

PA-03 Outlet

OFFEROR’S NAME: _______________________________________________

OFFEROR’S ADDRESS: _______________________________________________

OFFEROR’S PHONE #: _______________________________________________

OFFEROR’S EMAIL: _______________________________________________

OFFEROR’S SAM UEI: _______________________________________________

OFFEROR’S CAGE: _______________________________________________

OFFEROR’S SIGNATURE:______________________________________________

BID SCHEDULE

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Season Year Base

Outlet Park Attendant Services – 2023 Base Period

FFP

The Government's payment for Outlet Park Attendant Services shall constitute full compensation to the Contractor for furnishing all labor, equipment, and materials;

and performing all operations required to complete the work in conformity with Performance Work Statement (PWS) located in section C.

FOB: Destination

PSC CD: M1PA

NET AMT BASE Year Only ____________________

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Season Year

OPTION

Outlet Park Attendant Services – 2024 Option Period 1

FFP

The Government's payment for Outlet Park Attendant Services shall constitute full compensation to the Contractor for furnishing all labor, equipment, and materials;

and performing all operations required to complete the work in conformity with Performance Work Statement (PWS) located in section C.

FOB: Destination

PSC CD: M1PA

NET AMT OPTION Year 1 Only __________________

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0003 1 Season Year

OPTION

Outlet Park Attendant Services – 2025 Option Period 2

FFP

The Government's payment for Outlet Park Attendant Services shall constitute full compensation to the Contractor for furnishing all labor, equipment, and materials;

and performing all operations required to complete the work in conformity with Performance Work Statement (PWS) located in section C.

FOB: Destination

PSC CD: M1PA

NET AMT OPTION Year 2 Only __________________

TOTAL AMOUNT ALL OPTIONS ____________________

RELATED EXPERIENCE FORM:

This form must be completed by all offerors in order to receive consideration for award. If additional space is needed, this form may be duplicated as necessary, no more than three submissions. Information describing the offeror’s complete contracting background and experience shall be provided. The contractor’s information should only describe experience that directly pertains to the type of work set forth in this in Section C of this solicitation. Include details of any training which would enable you to better perform the work outlined in the specifications. Reference information should include the names and current telephone numbers of all agencies/firms listed.

Experience

Contract Work/Type:

Agency/Firm for Whom the Work Was Performed:

Contact Person at the Site: Telephone:

Month/Year Work Began: Month/Year Work Ended:

Description of Duties/Work: (Please provide details)

Form PPQ-0 (9/30/11)

NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information

Firm Name: CAGE Code:

Address: DUNs Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain)

Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information

Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine

How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information

Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK

TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE HIGHLY

ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE

SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT

RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit.

The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an

Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the

Contractor successfully performed a significant event that was a benefit to the

Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the

Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards specified for technical performance E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance

E VG S M U N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

E VG S M U N

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract

E VG S M U N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff

(including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication)

E VG S M U N

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

E VG S M U N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?

E VG S M U N

b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes

E VG S M U N

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

E VG S M U N

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?

E VG S M U N

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

E VG S M U N

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

E VG S M U N

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

Yes No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

Yes No

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.

Yes No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?

(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

E VG S M U N

b) Contractor complied with all security requirements for the project and personnel security requirements.

E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations

(including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

E VG S M U N

b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N

c) Would you hire or work with this firm again? (If no, please explain below) Yes No

d) In summary, provide an overall rating for the work performed by this contractor.

E VG S M U N

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

Section C – Descriptions and Specifications

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT

OUTLET PARK ATTENDANT SERVICES

MELVERN LAKE PROJECT OFFICE

1. General: This is a non-personnel services contract to provide Park Attendant Services at Outlet Park, Melvern Lake Project. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1. Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform services as defined in this Performance Work Statement, except for those items specified as government furnished property and services. The Contractor shall perform to the standards in this contract.

1.2. Background: Melvern Lake is a flood control reservoir located in East Central Kansas. With the presence of an upstream drainage system consisting of 349 square miles of prairie ecosystem, composed of primarily warm-season grasses intermixed with agriculture and hardwood forest, it provides for better than average water quality and clarity. The lake is located approximately 43 miles South of Topeka, 90 miles Southwest of the Kansas City, 35 miles Northeast of Emporia. A map of Melvern Lake can be found on the Internet at: http://www.nwk.usace.army.mil/me/. Melvern Lake provides water for a Rural Water District, flood protection for downstream areas and is part of a network of Corps of Engineer Lakes that help control flooding in the Missouri and Mississippi River basins. Melvern Lake encompasses approximately 6900 acres of surface water, has a storage capacity of 363,000 acre-feet (an acre-foot = 325,000 gallons). Federal lands surrounding Melvern Lake total 23,362 acres of which 11,353 acres are leased to the Kansas Department of Wildlife and Parks (KDWP) for land management.

Land management practices used by the Corps of Engineers and KDWP are engineered to preserve their natural value, providing benefits to the nation in areas of flood damage reduction, recreation, fish and wildlife management and water quality improvements. Four parks around the lake are managed and maintained by the Corps of Engineers, these parks include roads, utility systems, campsites, group camps, swimming areas, boat ramps, picnic grounds, playground areas, day use areas, nature trails, shelter houses. In addition to Corps-managed areas, the Corps also maintains active lease agreements with KDWP and Private entities. The Lease's provide a full range of marina services, camping, swimming areas, nature trails, horse trails, boat ramps, boat rentals, fishing and hunting areas for the public. Additional services contracted to the private sector include mowing, refuse collection, facility cleaning, park attendant services and Law Enforcement. The Corps manages the contracts and conducts inspections to ensure that the services are provided for visitors to the lake.

1.3. Flood Control. This is a flood control project. Occasional retention of floodwaters may inundate portions of the public use areas, other areas, or access roads thereto being serviced by this purchase order. If inundation materially affects the scope of work, Contractors may be requested to submit a pricing proposal covering the unserviceable or affected portion of his work in order that an equitable adjustment to contract price can be negotiated and an adjustment made in accordance with the appropriate contract clause [Changes, FAR 52.212-4(c)]. Payment for services not performed because of conditions stated above shall be initially withheld until execution of an equitable adjustment is made by contract modification.

1.4. Period of Performance: The period of performance shall be for One (1) Base Year of 12 months, One

(1) Option year of 12 months and One (1) Option year of 13 months. Actual services shall be performed from 01 April through 31 October each year during the periods listed below. The Period of Performance reads as follows:

Base Year – 01 November 2023 through 31 October 2024 Option Year 1 – 01 November 2024 through 31 October 2025

Option Year 2 – 01 November 2025 through 31 October 2026

1.5. General Information

1.5.1. Quality Control: The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s quality control program is how he/she assures themselves that their work complies with the requirement of the contract. The Contractor shall submit a copy of their quality control plan to the COR for approval prior to the start of work. See (Attachment 8) Quality Control Plan Template/Example.

1.5.2. Quality Assurance: The government shall evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.5.3. Security Requirements: Contractor performing work under this contract must comply with the requirements of the Antiterrorism/Operations Security Requirements (AT/OPSEC).

See Attachment 3 of this PWS.

1.5.3.1. Physical Security: The Contractor shall be responsible for safeguarding all government equipment, information and property provided for Contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

1.5.3.2. Key Control: The Contractor shall establish and implement methods of making sure all keys, gates, door and safe codes issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. All references to keys include key-pad codes. No keys issued to the Contractor by the Government shall be duplicated.

The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key-pad codes to the Contracting Officer.

1.5.3.2.1. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor.

In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

1.5.3.2.2. The Contractor shall prohibit the use of Government issued keys/key-pad codes by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.

1.5.3.2.3. Gate Codes-Door Codes: The Contractor shall establish and implement methods of ensuring that all gate/door codes are not revealed to unauthorized persons. The Contractor shall ensure that lock codes are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s Quality Control Plan.

1.5.4. Required Insurance: Contractors shall obtain and maintain insurance in accordance with the requirements of FAR 28.307-2 Liability. Reference paragraphs a, b, and c.

1.5.5. Bonding: All Contractors must provide, at the Pre-Work meeting, a surety bond. Bonds must be in the form of firm commitments, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such a s postal money order, certified check, cashier’s check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Bonds must be approved by the Corps of Engineers in the amount of $5,000.00 before services may begin. Failure to provide the bond at this time may result in termination of the contract and award being made to another bidder. The surety bond may be obtained from the Contractor’s local insurance agent. The U.S. Army Corps of Engineers, Kansas City District, shall be named as the recipient.

1.5.6. Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the contracting officer will apprise the Contractor of how the government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.5.7. Pre-Season Orientation and Training: Prior to beginning performance of this Contract, Contractors are responsible for ensuring that all Contractor employees and personnel are familiar with the requirements of this Contract and are properly trained in the use of reservation system, computer use, use of credit card machines for acceptance of fees and custodial requirements and duties. Failure of the Contractor to properly train employees and personnel, resulting in unsatisfactory performance of this Contract, will be grounds for termination of the Contract. To ensure that all potential Contractors have an adequate opportunity to compete for award, Contractors and their employees and personnel may attend training prior to the start of services. Such training is provided free of charge by the Government and Contractor attendance shall be free of charge to the Government.

Normally this is accomplished over a two-day period during the five (5) days prior to start of services. Training may be provided either at the Administrative compound or on location at the park booth. The Contracting Officer or his authorized representative will coordinate the location and time of training. Training will address the use of computers and the associated programs, the use of credit card machines for acceptance of fees, and other details related to the services to be provided.

1.5.8. Documents and Correspondence: After award, all documents and related correspondence shall be routed to the Contracting Officer; or through the Contracting Officer’s Representative (COR) at the Project Office to the Contracting Officer. Day to day contact and telephone communication with Government personnel shall normally provide adequate information exchange. The Government reserves the right to schedule meetings at the Project Office as necessary to ensure strict compliance with the terms of this contract. Such meetings shall be scheduled, to the extent possible, at mutually convenient times. However, upon notice, the

Contractor shall attend meetings regarding matters affecting this contract, and the time spent in such meetings shall be at no additional charge to the Government.

1.5.9. Key Personnel: The Contractor shall provide a contract manager who shall be responsible for the performance of the work. This person may be the Contractor themselves or someone that they choose to designate. The name of this person and an alternate who shall act for the Contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 0730 and 4:00, The contract manager or alternate shall be available between 0730 and 4:00, every scheduled day of the week, except Federal holidays or when the government facility is closed for administrative reasons.

1.5.10. Contractor Conduct: All individuals involved in operations shall not be under the influence of drugs or alcoholic beverages. The Contractor shall, always, be responsible for the conduct and discipline of his/her employees. Contractor personnel shall present a neat appearance and shall always conduct themselves in a proper manner during the performance of this contract. All individuals involved in services shall be dressed neatly and fully to include, shoes, pants or shorts (not athletic shorts), shirts with sleeves that shall be closed or buttoned. Attendants will wear clothes that are suitable for meeting the public while performing fee duties. Clothes such as old work clothes, short-shorts or “cut-offs” shall not be worn while performing fee duties. Personal Protective Equipment shall fully comply with the current edition of EM-385-1-1 at the time of award. Since a significant portion of the work shall be performed in the presence of the public, the conduct of all employees is critical and shall be closely monitored.

1.5.11. Removal of Contractors Employees: The Contracting Officer may require the Contractor to immediately remove from the work site any employee who endangers persons or property, or whose physical or mental condition would impair the employee's ability to satisfactorily perform the required work. Notification to the Contractor will be verbal and in writing if time and circumstances permit. Otherwise, notification shall be verbal or by telephone, and shall be in writing as soon as possible. No such removal, however, shall reduce the Contractor’s obligation to perform all work required under this contract, immediate replacement shall be made as required.

This requirement shall not be the basis of any claim for compensation or damages against the Government.

1.5.12. Title 36 Rules and Regulations: Contractor and Contractor Personnel shall comply with

Title 36 Rules and Regulations for the entire period of performance of this contract.

1.5.13. Safety Requirements: All services shall be performed in accordance with applicable safety requirements set forth in Corps of Engineers Manual EM-385-1-1, “Safety and Health Requirements Manual” and supplements thereto. The EM-385-1-1 is hereby incorporated by reference, and the Contractor is required to perform this contract in accordance with the standards set forth therein. Any equipment or materials not in conformity with this manual shall be removed from Government property immediately. The Contractor shall be expected to take a vital interest in safety, hazard, and to educate their employees to work and plan their work safely.

1.5.13.1. Labor Hours Reporting: The Contractor shall report the number of hours worked on government property monthly during the period of performance of services under this contract. These hours shall be recorded on the Contractors monthly invoice and submitted to the Melvern Project Office.

1.5.14. Payment: Payment will not be made for services not performed. Contractors shall provide the Project Office with an invoice at the end of each month, requesting payment for that month’s services. Payment shall be made via Electronic Funds Transfer (EFT) into the Contractor’s banking account on file as registered with SAM. In accordance with the

Prompt Payment Act, payment will be made approximately 30 days after the last day of services received for the billing period, or 30 days from receipt of the invoice, whichever is later.

1.5.15. Final Payment: Final payment will not be paid to the Contractor until all funds, permits, and Government property are reconciled, and facilities are inspected for cleanliness by Corps personnel. Any shortage of funds may be deducted from the Contractor's final payment. Proper handling of and accounting for funds is a condition of performance of this contract. The Contractor is responsible for user fee permits, collected monies, keys, property, and equipment issued by the Government. The Contractor shall be held liable for any loss, including any equipment issued by the Government that is lost or damaged due to negligence.

1.5.16. Lost and Found: All articles found by Contractor personnel (or if the public turns it in to the Contractor) whom a reasonably prudent person would assign monetary, personal, or other value (including possible contraband items) shall be turned in to the COR. The Contractor shall obtain receipts for articles turned in to the COR.

1.5.17. Other Contracts. The Government may undertake or award other contracts for additional work, and the Contractor shall fully cooperate with such other Contractors and Government employees. All work must be carefully planned and fitted so as not to interfere with such other work. The Contractor shall not commit or permit any act that will interfere with the performance of work by other Contractors or Government staff.

1.5.18. Volunteers. Volunteers may be utilized in the parks. Volunteers receive and follow instructions from a Government Representative, not from Contractors. Contractors should not consider any volunteer as his/her employee. Volunteers may staff the fee booth outside of a Contractor’s normal scheduled hours or may perform other duties as instructed by a Government Representative.

1.6. Environmental Controls

1.6.1. Park Attendants Cleaning Products. Contractors shall use standard commercial cleaning products generally available in the local marketplace and shall use those products only in accordance with their labeled instructions and uses.

1.6.2. Compliance with Laws and Regulations: Contractors shall be knowledgeable of, and shall comply with, all applicable Federal, State, and Local laws, environmental requirements, and instructions. Contractors shall ensure policies and procedures are established that protect the health and safety of employees and the community to minimize or eliminate the risk of environmental pollution.

1.7. Contractor Arrival. The Contractor will be required to reside on-site, the Contractor shall move onto the designated site a minimum of five (5) but not more than seven (7) days prior to the start of services.

Electrical services will be provided upon arrival if arrival takes place during normal business hours.

Water and sewer services may be postponed upon arrival or discontinued near departure if cold weather conditions warrant. All costs for moving onto and from the site shall be borne by the Contractor.

Contractors residing on-site shall do so including nights, during the period of services and shall remove the trailer and all personal property from the site no later than seven (7) days after the end of the service period.

1.8. Campsite. Contractors shall maintain the area where the trailer (RV unit) is always parked in a clean and sanitary condition. No dog pens, horse corrals, poultry cages, or similar facilities for pets or raising of animals will be allowed. Government-furnished storage buildings are to be used for storage of supplies only – not as pens or cages for pets. Contractor pets shall fall under the same restrictions of Title 36 that apply to our visitors. Visitors to the park should have open access to the Contractor’s site without the possibility of incidental contact with pets. Small vegetable or flower gardens are permitted where designated upon approval from the Contracting Officer or his representative. Decorations may be allowed or disallowed at the discretion of the Government. Excessive decoration of campsites is discouraged. Contractors shall perform watering in and around the Contractor’s trailer site. The Contractor shall not use any chemicals (for example, Roundup, Weed-B-Gone, etc.) to control weeds.

1.9. Security of Personal Property: Security of Park Attendant’s living quarters and all personal property shall remain the Attendant’s responsibility throughout the contract period. The Government accepts no responsibility for, nor will it be liable for, damage or theft occurring to the Attendant’s property. In addition to automobile liability insurance required in Section III.B, the Contractor is responsible for obtaining and paying for any other insurance desired, including but not limited to, general liability, comprehensive property, etc.

1.10. Cooperation with Others: Contractor shall cooperate with other Park Attendants, Park Volunteers, Corps of Engineers employees, Government Contractors, lessees, and Law Enforcement personnel. Contractor shall allow Corps employees to utilize Government-furnished communication equipment for official business. Contractor shall not direct the work performance of another Contractor.

1.11. Fee Booth. Contractors shall maintain the entrance fee booth in a neat, clean condition. The Contractor may plant flowers or create rock arrangements in designated curbed area of the fee booth, to the extent it does not create a safety hazard, and nothing obstructs signs on the entrance booth.

1.12. Pets: Any pets allowed shall be confined or restrained in a manner that shall prevent physical contact with visitors that may come to the Contractor’ living area or quarters for assistance. All pets shall be always kept on a leash 6 feet in length or under physical restraint. Pets shall not be allowed in or near the gatehouse (NO EXCEPTIONS) Unless registered as a Service Animal. Contractor shall be liable for any damage to government facilities, and/or damage to park visitors’ property or person caused by their pets. Contractors are responsible for daily cleanup of their pet’s waste and disposing of the same in an approved sanitary manner. Pets shall be kept clean, free of foul odors, and have all vaccinations as required by state laws in effect at the park’s location. The Contracting Officer’s Representative may require the removal of any animal deemed a nuisance or a danger or causes physical damage to Government property.

1.13. Work Schedule: Contractors shall perform all specified duties during the period of performance according to the schedule included in Attachment 6 of this PWS. The Contractor must work federal holidays even if they fall on a normally scheduled day off. An alternate day off will be approved by the Contracting Officer or their designated representative. The Contractor shall also be required to perform duties on October 31 even if it falls on the Contractors normally scheduled day off.

1.14. Visitor Assistance: The primary role of the Contractor is to courteously assist visitors, and their secondary role is to inform customers of the rules and regulations tactfully and respectfully. Contractors cannot enforce Title 36 regulations. The Contractor shall not argue with, threaten, harass, or badger visitors or attempt to detain or apprehend violators or conduct searches of people or personal property.

Contractors shall perform their duties with professionalism befitting a public servant and the Corps of Engineers. Contractors shall not use profanity in dealing with the public, project personnel, or other Contractors. Within the context of Corps policies and regulations, Contractors shall provide for the needs of our visiting public and act as public relations representatives for the Corps of Engineers.

1.14.1. Contractors shall become familiar with Title 36, CFR, Chapter III, Part 327, “Rules and

Regulations Governing Public Use of Corps of Engineers Water Resource Projects”, campground and/or park rules, policies, and requirements. Promptly report to any Park Ranger all accidents, violations of law, disturbances, and situations that could affect the health and safety of visitors. Serious or life-threatening incidents and emergencies shall be immediately reported to Park Rangers, project personnel and/or local law enforcement.

Minor situations and incidents shall be reported to Park Rangers as instructed. Contractors shall not attempt to direct, manipulate, undermine, oppose, or “second-guess” decisions made by Rangers or other Corps employees.

1.14.2. Contractors shall greet customers in a friendly manner as they arrive at the park. Contractors shall assist visitors as necessary in locating facilities, sites, park features, other project locations, and local attractions in a helpful and professional manner.

1.14.3. Contractors may be required to open and close campground and day-use area gates as required by the SPS. They may also assist Park Rangers with management and control of picnic pavilions and multi-use courts, including turning power on or off, raising or lowering flags, and posting reservations for both pavilions and individual campsites. Contractor may be required to maintain a logbook of park activities, including, but not limited to accidents, incidents, emergencies, complaints, traffic counter readings, and problems. Records shall be turned into project management personnel as instructed.

1.14.4. Contractors shall not discriminate against persons based on race, color, religion, sex, national origin, age, or disabilities.

1.14.5. Contractors shall not carry or display firearms, pepper spray, mace, clubs, or any item or piece of equipment that may be construed as a weapon. This policy shall be followed despite any “conceal and carry” permit the Contractor may possess. Contractors shall not display any type of emergency lights or emergency/law enforcement decals on vehicles used during the performance of this contract.

1.14.6. Contractor shall remove any signs from their vehicles stating “Park Attendant” or similar type signs when not actually working under the contract (IE. when off duty, Contractor shall remove signs prior to leaving the park).

1.15. Questions and Answers: Prospective bidders should contact Danny Homer or Julie Radcliffe at the

Melvern Project Office at 785-549-3318, for any questions pertaining to the PWS. Potential Contractors are urged to inspect the areas they are interested in before they submit a quote, to become familiar with the size and scope of the area and the required duties.

PART 2

DEFINITIONS AND ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. Definitions:

2.1.1. Clean: As used generally, free of all foreign matter, dirt, debris, film, spots, streaks, or other impurities. As used for acceptance of work means gleaming; free from dirt, contamination, or impurities; unsoiled, unstained, neat, and tidy, foreign material, residue, mold, trash, sanitizers or cleaners.

2.1.2. Contractor. A supplier or vendor having a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.3. Contracting Officer (KO) - A person with authority to enter, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note:

The only individual who can legally bind the government.

2.1.4. Contracting Officers Representative (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor if that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.5. Debris: Articles or parts thereof such as dead insects, paper, gum, paper clips, candy, lint, litter, strings, cigarette butts, leaves, sand, excrement, etc.

2.1.6. Defective Service. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.7. Dirt: Particles of sand, soil, grit, or pebbles; mud, dust, fuzz, tar, liquid stains, vomit, ashes, etc.

2.1.8. Disinfect: To cleanse to destroy any harmful microorganisms, fungus, algae, and mold, by application of an approved chemical agent.

2.1.9. Deliverable. Anything that can be physically delivered but may include non-physical things such as meeting minutes.

2.1.10. Foreign Matter: Any articles, or parts thereof, not belonging to the place found, including but not limited to; spider webs, cobwebs, wasp nests, bird nests, etc.

2.1.11. Fully Clothed: Wearing a sleeved shirt (T-shirts are acceptable), trousers, and shoes.

Clothing shall be clean and neat in appearance and shall not be ripped, torn, or excessively faded. Government issued name tags that clearly identify the wearer as a Contractor employee shall be worn during performance of duties under this contract. These requirements shall not be construed to replace or eliminate the necessity for the wearing of appropriate protective clothing or devices as may be required in performance of duties.

2.1.12. Neat/Clean: Orderly, tidy, free from dirt and debris.

2.1.13. Key Personnel. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.14. Park Facilities. Include but are not limited to: Parking lots/areas, boat ramps, courtesy docks, shower/restrooms, vault toilets, trailer sanitary dump stations, fee booth, campsites, picnic shelters, picnic areas, playgrounds, beaches, trails, park attendant sites, and alongside roadways.

2.1.15. Physical Security. Actions that prevent the loss or damage of Government property.

2.1.16. Quality Assurance. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.17. Quality Assurance Surveillance Plan. An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.

2.1.18. Quality Control. All necessary measures taken by the Contractor to assure that the quality of the end product or service shall meet contract requirements.

2.1.19. Sanitary: Clean and free of bacteria that may endanger health; hygienic.

2.1.20. Subcontractor. One that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.

2.1.21. Trash: Any abandoned articles, or parts thereof, such as paper, gum, used cups, empty cans and bottles, food scraps, litter, strings, cigarette butts, leaves, or similar waste items, as well as dirt, debris, and foreign matter collected during cleaning, and unwanted residues and ashes.

2.1.22. Windows: The glass surfaces which are an integral part of the outer wall of a building.

2.1.23. Workday. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.24. Work Week. Is defined as Sunday through Saturday, unless specified otherwise

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES

3.1. Government Property/Check Out - Contractors shall be required to sign for accountable Government property and equipment at the beginning of the contract period. Contractors shall be responsible for maintaining the property and return Government property at the end of the contract period unless other arrangements have been made.

3.2. Storage Shed. The Government will provide a storage facility for Contractors to store and maintain supplies/materials, equipment, etc. for use in the performance of the contract. Contractors shall provide upkeep and minor maintenance to facility assigned to the Contractor at Contractor’s sole expense.

Government locks will be provided. If Contractor supplied locks are used, combinations or keys must be given to the COR for Government personnel to access at any time. Before any modification of the facility is performed by the Contractor at his/her expense, the Contractor must give the Contracting Officer documentation describing, in detail, the modification requested. No alterations to the facility shall be made without specific written permission from the Contracting Officer. All Contractor property must be removed permanently at the end of the contract.

3.3. Campsite. An improved site for a self-contained trailer or motor home with 50 Amp electric service, water, sewage hookups and refuse collection (from nearby dumpster) will be provided at no charge to the Contractor. Some utilities may be impacted by weather and not readily available prior to opening of parks. Occupancy of this site is limited to the Contractors camping unit and personal vehicles only. The campsite, turnout and associated facilities shall not be modified for convenience of the Contractor without prior approval from the COR.

3.4. Fee Booth/Gatehouse: A booth or gatehouse workstation will be provided and may be shared between two or more Contractors on alternate work schedules.

3.5. Equipment: All equipment shall always remain secured in the fee booth and shall be used for USACE business purposes only.

3.5.1. Computer

3.5.2. Monitor

3.5.3. Printer

3.5.4. Receipt Printer

3.5.5. Credit Card Machine

3.5.6. Telephone for fee booth

3.5.7. Radio base station

3.5.8. Keys

3.5.9. Annual Access permits, America the Beautiful passes.

3.5.10. Safe

3.6. Materials and Supplies: Materials and supplies will be issued to the Contractor initially and on an as needed basis thereafter. All materials and supplies remaining at the end of the season shall be returned to the Melvern Lake Project Office.

3.6.1. Receipt Paper

3.6.2. Printer Paper

3.6.3. Maps and Informational Brochures

3.6.4. Various forms and logs

3.6.4 Name tags

3.6.5 Permit books

3.6.7 Necessary office supplies

3.6.8 Waste basket

3.6.9 Trash bags for booth waste basket

3.6.10 Light bulbs

3.6.11 Insect spray

3.7. Keys – The Contractor will be furnished a set of keys to those buildings and areas where access is necessary to perform the work described herein or determined to be necessary by the COR. No duplicates of the keys may be obtained in any manner by the Contractor. Security of the keys shall be the responsibility of the Contractor. The failure of the Contractor to provide adequate key security will result in a deduction from payment due the Contractor in the amount required to replace lost or damaged keys and a deduction for replacement of any locks, lock tumblers, or lock sets for any affected locks at the rate charged by a commercial locksmith.

3.8. Identification - Identification tags, and magnetic vehicle Park Attendant signs, will be provided by the Government, for use while in the park performing duties outlined in the PWS.

3.9. Government Property Clearance. Government personnel will be available the day AFTER the last date of services to check out Contractors and to receive Government-furnished property from them. All Government-furnished equipment and items must be returned to the Government prior to Contractor departure.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES

4.1. General: The Contractor shall furnish all items required to perform work under this contract that are not listed under Section 3 of this PWS.

4.2. Materials/Supplies and Equipment: The following list of example items Contractors shall provide for this contract This list may not be all inclusive:

4.3.

Working vehicle - including all fuel, maintenance and insurance thereof

Cleaning supplies and Disinfectants

Water Hoses Trash Bags for personal use Brooms Dustpan Brushes Small vacuum Buckets

The Contractor may store all supplies and equipment in the Government-furnished storage site or at other locations of the COR's choosing.

4.4. Vehicle(s): Transportation vehicle(s) for use in performing the requirements of this contract must be street legal, properly licensed, and the Contractor shall furnish proof of required insurance in the form of a copy of the insurance policy, or a binder issued by the insurer. Proof of proper insurance for each vehicle shall be delivered to the Contracting Officer or his designated representative at the Pre-Work meeting. The Contractor (all personnel) shall maintain a valid state driver’s license. A photocopy of licenses will be taken at the Pre-Work meeting.

4.5. Trailer/Motor Home. The Contractor shall furnish a presentable factory-built, “self-contained” recreational vehicle (RV) of the travel trailer or motor home type to serve as temporary living quarters for entire contract period. Maximum size of the trailer or motor home shall be determined by physical limitations of the furnished park attendant pad. The trailer or motor home shall be parked at the designated park attendant campsite for the area.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .