B.08.03 Amendment 0005 W912DQ20R40320005.pdf

PDF 392 KB Posted

Attached to
Building 46 Renovations - Construction, Fort Leavenworth, Kansas
Solicitation number
W912DQ20R4032
Issued by

About this file

This document provides details for a federal solicitation seeking construction services. The U.S. Army Corps of Engineers, Kansas City District, will issue a request for proposal set aside for total small businesses to renovate Building 46 at Fort Leavenworth, Kansas. The renovation scope includes administrative spaces, team rooms, restrooms, break rooms, storage, and mechanical/communications rooms to support LEED Silver certification. The NAICS code is 236220 and small businesses must have average annual receipts under $39.5 million to qualify as small. The estimated value is between $5-10 million. Proposals are due by September 9, 2020 at 11:00AM Central. The source selection will follow FAR Part 15 and DFARS Part 215 procedures. Offerors must register at SAM.gov to access solicitation documents including any amendments.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

474179 Building 46 Historic Renovations – Construction, Fort Leavenw orth, Kansas

The purpose of this amendment is to provide specification updates. The follow ing modified draw ings are added by attachment.

B.08.03 Amendment 0005 Section 05 40 00, Cold-Formed Metal Framing

See the Continuation Page for more details. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Sep-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DQ20R4032

X 9B. DATED (SEE ITEM 11)

10-Aug-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Sep-2020

CODE

USACE, KANSAS CITY +

FEDERAL BLDG. CT-M RM 647; 601 E 12TH ST

KANSAS CITY MO 64106-2896

W912DQ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DQ20R4032

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0005

The solicitation is amended as follows:

Deleted text is shown with a strikethrough. Added text is shown with underline.

a. Section 05 40 00, Cold-Formed Metal Framing is added in its entirety and attached.

b. Section 09 29 00, Gypsum Board. Paragraph 1.1, References, is revised to add the following reference as shown below.

ASTM D226/D226M (2017) Standard Specification for Asphalt-Saturated Organic Felt Used in Roofing and

Waterproofing

c. Section 09 29 00, Gypsum Board. Paragraph 1.2, Submittals, is revised as shown below.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Cementitious Backer Units; G, AE

Glass Mat Water-Resistant Gypsum Tile Backing Board; G, AE

Water-Resistant Gypsum Backing Board; G, AE

Glass Mat Covered or Reinforced Gypsum Sheathing; G, AE

Glass Mat Covered or Reinforced Gypsum Sheathing Sealant; G, AE

Accessories; G, AE

Submit for each type of gypsum board and for cementitious backer units.

Gypsum Board

Recycled Content for Gypsum Board; G, AE

VOC Content of Joint Compound; G, AE

SD-07 Certificates

Asbestos Free Materials; G, AE

Certify that gypsum board types, gypsum backing board types, cementitious backer units, and joint treating materials do not contain asbestos.

Indoor Air Quality for Gypsum Board; G, AE

Indoor Air Quality for Non-aerosol Adhesives; G, AE

Indoor Air Quality for Aerosol Adhesives; G, AE

SD-08 Manufacturer's Instructions

Safety Data Sheets

SD-10 Operation and Maintenance Data

Manufacturer Maintenance Instructions

d. Section 09 29 00, Gypsum Board. Paragraph 2.1.5, Glass Mat Covered or Reinforced Gypsum Sheathing, is added as shown below.

2.1.5 Glass Mat Covered or Reinforced Gypsum Sheathing

Exceeds physical properties of ASTM C1396/C1396M and ASTM C1177/C1177M. Provide 5/8 inch, gypsum sheathing. Provide gypsum board of with a noncombustible water-resistant core, with glass mat surfaces embedded to the gypsum core or reinforcing embedded throughout the gypsum core. Warrant gypsum sheathing board for at least twelve months against delamination due to direct weather exposure. Provide continuous, asphalt impregnated, building felt to cover exterior face of sheathing. Seal all joints, seams, and penetrations with compatible sealant.

2.1.5.1 Glass Mat Covered or Reinforced Gypsum Sheathing Sealant

Provide sealant compatible with glass mat covered or reinforced gypsum sheathing, rubber washers for masonry veneer anchors, and other associated cavity wall components such as anchors and through wall flashing. Provide sealants for glass mat covered or reinforced gypsum sheathing board edge seams and veneer anchor penetrations recommended by the glass mat covered or reinforced gypsum sheathing manufacturer and have the following performance requirements:

a. ASTM D412: Tensile Strength, 80 psi

b. ASTM D412: Ultimate Tensile Strength (maximum elongation), 170 psi

c. ASTM D624: Tear Strength, dieB, 27 ppi

d. ASTM D1149: Joint Movement Capability after 14 Days cure, plus or minus 50 percent.

e. Section 09 29 00, Gypsum Board. Paragraph 2.1.12, Asphalt Impregnated Building Felt, is added as shown below.

2.1.12 Asphalt Impregnated Building Felt

Provide a 15 lb asphalt moisture barrier over glass mat covered or reinforced gypsum sheathing. Conforming to ASTM D226/D226M Type 1 (No. 15) for asphalt impregnated building felt.

f. Section 09 29 00, Gypsum Board. Paragraph 3.2.5, Glass Mat Covered or Fiber Reinforced Gypsum Sheating, is added as shown below.

3.2.4 Glass Mat Covered or Fiber Reinforced Gypsum Sheathing

Apply glass mat covered or fiber reinforced gypsum sheathing in accordance to gypsum association publications GA

253. Follow gypsum sheathing manufacturer's requirements of design details for joints and fasteners and be properly installed to protect the substrate from moisture intrusion. Do not leave exposed surfaces of the glass mat covered or fiber reinforced gypsum sheathing beyond the manufacturer's recommendation without a weather barrier cladding. Provide continuous asphalt impregnated building felt over sheathing surface in shingle fashion with edges and ends lapped a minimum of 6 inch. Properly flash the openings. Seal all joints, seams, and penetrations with a compatible silicone sealant.

Proposal due date remains the same: September 9, 2020, at 11:00 a.m. local Kansas City time.

All other terms and conditions remain unchanged and in full force and effect.

(End of Summary of Changes)