This amendment to a solicitation provides revised drawings for a federal construction contract opportunity. The U.S. Army Corps of Engineers, Kansas City District, is seeking a single Design-Bid-Build, Firm Fixed Price contract for renovations to Building 46 at Fort Leavenworth, Kansas. The scope of work includes furnishing all labor, materials, and equipment to complete renovations to the two-story historic building, originally constructed in 1882, to convert it into modern administrative space while maintaining its historic character. Renovations will provide private and open offices, team rooms, restrooms, break rooms, storage, and mechanical and communications spaces. The solicitation will be issued as a request for proposal set aside for total small businesses. The NAICS code is 236220 and size standard is $39.5 million in average annual receipts. The estimated value is between $5-10 million. The amendment provides revised architectural drawings and specifies a September 9, 2020 proposal due date.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

474179 Building 46 Historic Renovations – Construction, Fort Leavenw orth, Kansas

The purpose of this amendment is to provide modified draw ings. The follow ing modified draw ings are added by attachment.

B.08.03 Amendment 0004 B46 Arch-AE101- Rev1-2020-09-01 B.08.03 Amendment 0004 B46 Arch-AE401- Rev1-2020-09-02 B.08.03 Amendment 0004 B46 Arch-AE504- Rev1-2020-09-02

See the Continuation Page for more details. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Sep-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DQ20R4032

X 9B. DATED (SEE ITEM 11)

10-Aug-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Sep-2020

CODE

USACE, KANSAS CITY +

FEDERAL BLDG. CT-M RM 647; 601 E 12TH ST

KANSAS CITY MO 64106-2896

W912DQ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DQ20R4032

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0004

The solicitation is amended as follows:

Deleted text is shown with a strikethrough. Added text is shown with underline.

1. Specification Changes

N/A

2. Revised Building 46 Drawings

a. Drawing AE401. Modified to provide additional detailing of Basement access enclosure. Revised drawing attached.

b. Drawing AE504. Modified to provide additional detailing of Basement access enclosure. Revised drawing attached.

c. Drawing AE101. Revised keynote 10 to clarify curb location. Revised drawing attached.

3. Offerors are required to acknowledge receipt of this amendment on the Bidding Form in the space provided.

Failure to acknowledge all amendments may cause rejection of the bid.

4. Proposal due date remains the same: September 9, 2020, at 11:00 a.m. local Kansas City time.

5. All other terms and conditions remain unchanged and in full force and effect.

(End of Summary of Changes)