#3- Questions/Answers

1) Based on the response to Question No. 4 in Amendment 2 Q&A, will the contractor be allowed to set up laydown facilities and place equipment on the spillway structure downstream of the gates?

There is a concrete slab downstream of the spillway, but there is not any way to get from the concrete slab up to the catwalk where the work would be located without using personnel lifts and/or ladders. There are gravel parking areas at each end of the spillway bridge at highway level and there are gravel access roads from the downstream mid spillway level on both ends of the spillway structure. Access to the catwalk is through the galleries at each end of the spillway that require stairway travel from any of the 4 locations. All 4 locations can be used for laydown and staging.