Questions and Answers #2

1) Where can you get fill for the project?

About 8/10’s of a mile from the site. Please take a look at the “Rathbun UST Fill Location Map” that is provided.

2) Do you want the electrical disconnected and saved? And where?

Yes, leave the electrical lines to the dispensers. Disconnect the electrical at the dispensers, not the building.

3) Will the contractor be responsible for any breakage to the asphalt around the job site?

No, this will not be an issue. The asphalt is already deteriorating.

4) Will the concrete blocks around the job site be removed?

Yes.

5) Will the contractor have access through the gate?

Yes.

6) What is the thickness of the concrete slab that needs to be removed?

The slab is estimated to be six (6) inches thick.

7) Do you have someplace you would like the concrete rubble from the slab to go?

Yes, disposal will be in our storage area approximately .7 mile from the site. Please take a look at the “Rathbun UST Fill Location Map” that is provided.

8) Do you plan on applying for the UST Loan and Grant Program?

No.