B.01.01_Zone_M_Solicitation_Package.pdf

PDF 891 KB Posted

Attached to
Kansas City District Seasonal Park Custodian
Solicitation number
W912DQ19R1007
Issued by

About this file

See Matrix in Solicitation

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM NO SUPPLIES/SERVICE

S

QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Season

BASE

Park Custodian – Base Period

FFP

The Contractor shall furnish Park Custodial services for Ruark Bluff East Park, Mutton Creek Access and Mutton Creek Group Camp, at Stockton Lake as defined in the Performance Work Statement (PWS). Performance of services for this contract shall be from 16 April 2019 through 30 September 2019.

FOB: Destination

BASE YEAR TOTAL

ITEM NO SUPPLIES/SERVICE

0002 1 Season

OPTION

Park Custodian – Option Period 1

FFP

The Contractor shall furnish Park Custodial services for Ruark Bluff East Park, Mutton Creek Access and Mutton Creek Group Camp, at Stockton Lake as defined in the Performance Work Statement (PWS). Performance of services for this contract shall be from 16 April 2020 through 30 September 2020.

OPTION 1 TOTAL

ITEM NO

SUPPLIES/SERVICE

1 Season

OPTION

Park Custodian – Option Period 2

FFP

The Contractor shall furnish Park Custodial services for Ruark Bluff East Park, Mutton Creek Access and Mutton Creek Group Camp, at Stockton Lake as defined in the Performance Work Statement (PWS). Performance of services for this contract shall be from 16 April 2021 through 30 September 2021.

OPTION 2 TOTAL

PERFORMANCE WORK STATEMENT

RUARK BLUFF EAST, MUTTON CREEK GROUP CAMP AND ACCESS CUSTODIAN

STOCKTON LAKE PROJECT OFFICE

1. General: This is a non-personnel services contract to provide Park Custodial services for Ruark Bluff East Park, Mutton Creek Access and Mutton Creek Group Camp,, from 16 April through 30 September at the Stockton Lake Project. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1. Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform services as defined in this Performance Work Statement except for those items specified as government furnished property and services. The Contractor shall perform to the standards in this contract.

1.2. Background: Stockton Lake is a flood control reservoir located on the Sac River in southwest Missouri, tucked into the foothills of the scenic Ozark Mountain range. The lake spans three county boundaries: Cedar, Dade, and Polk. It is approximately 50 miles northwest of the metropolitan area of Springfield, Missouri, and approximately 130 miles south of Kansas City, MO.

A map of Stockton Lake can be found on the Internet at:

http://www.nwk.usace.army.mil/st/. Stockton Lake provides flood protection for downstream areas and is part of a network of Corps of Engineer Lakes that help control flooding in the Missouri and Mississippi River basins. Stockton Lake encompasses approximately 25,000 acres of surface water. Federal land surrounding Stockton Lake totals 36,047 acres, of which 16,572 acres are leased to the Missouri Department of Conservation (MDC) for management.

Land management practices used by the Corps of Engineers and MDC are engineered to preserve their natural value, providing benefits to the nation in areas of flood damage reduction, recreation, fish and wildlife management, hydroelectric power, and water quality improvement. Eight parks around the lake are managed and maintained by the Corps of Engineers. These parks include roads, utility systems, campsites, beaches, boat ramps, picnic grounds, and playground areas. In addition to Corps-managed areas, the Corps also maintains active lease agreements with the Missouri Department of Natural Resources and private entities. The lessees provide a full range of marina services, restaurants, and camping to the public. Additional services contracted to the private sector include mowing, refuse collection, facility cleaning, and park attendant. The Corps manages the contracts and conducts inspections to insure that the services are provided for visitors to the lake.

1.3. Flood Control. This is a flood control project. Occasional retention of floodwaters may inundate portions of the public use areas, other areas, or access roads thereto being serviced by this purchase order. In the event that inundation materially affects the scope of work, Contractors may be requested to submit a pricing proposal covering the unserviceable or affected portion of his work in order that an equitable adjustment to contract price can be negotiated and an adjustment made in accordance with the appropriate contract clause [Changes, FAR 52.212-4(c)]. Payment for services not performed as a result of conditions stated above shall be initially withheld until execution of an equitable adjustment is made by contract modification

1.4. Period of Performance: The period of performance shall be for one (1) Base

Year of 12 months and two (2) 12-month option years. Actual services shall be performed from 16 April through 30 September each year during the periods listed below. The Period of Performance reads as follows:

Base Year – 16 April 2019 through 30 September 2019 Option Year 1 – 16 April 2020 through 30 September 2020 Option Year 2 – 16 April 2021 through 30 September 2021

1.5. General Information

1.5.1. Quality Control: The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. The Contractor shall submit a copy of their quality control plan to the COR for approval prior to the start of work. See Attachment 9 Quality Control Plan Template/Example.

1.5.2. Quality Assurance: The government shall evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.5.3. Security Requirements: Contractor performing work under this contract must comply with the requirements of the Antiterrorism/Operations Security Requirements (AT/OPSEC). See Attachment 3 of this PWS.

1.5.3.1. Physical Security: The Contractor shall be responsible for safeguarding all government equipment, information and property provided for Contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

1.5.3.2. Key Control: The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.

1.5.3.2.1. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

1.5.3.2.2. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.

1.5.3.2.3. Lock Combinations: The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s Quality Control Plan.

1.5.4. Required Insurance: Contractors shall obtain and maintain insurance in accordance with the requirements of FAR 28.307-2 Liability. Reference paragraphs a, b, and c.

1.5.5. Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the contracting officer will apprise the Contractor of how the government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.5.6. Pre-Season Orientation and Training: Prior to beginning performance of this Contract, Contractors are responsible for ensuring that all Contractor employees and personnel are familiar with the requirements of this Contract and are properly trained in the use of reservation system, computer use, use of credit card machines for acceptance of fees and custodial requirements and duties. Failure of the Contractor to properly train employees and personnel, resulting in unsatisfactory performance of this Contract, will be grounds for termination of the Contract. To ensure that all potential Contractors have an adequate opportunity to compete for award, Contractors and their employees and personnel may attend training prior to the start of services. Such training is provided free of charge by the Government and Contractor attendance shall be free of charge to the Government. Normally this is accomplished over a two-day period during the five (5) days prior to start of services. Training may be provided either at the Administrative compound or on location at the park booth. The Contracting Officer or his authorized representative will coordinate the training location and time period. Training will address the use of computers and the associated program, the use of credit card machines for acceptance of fees, and other details related to the services to be provided.

1.5.7. Documents and Correspondence: After award, all documents and related correspondence shall be routed to the Contracting Officer; or through the Contracting Officer’s Representative (COR) at the Project Office to the Contracting Officer. Day to day contact and telephone communication with Government personnel shall normally provide adequate information exchange. The Government reserves the right to schedule meetings at the Project Office as necessary to insure strict compliance with the terms of this contract. Such meetings shall be scheduled, to the extent possible, at mutually convenient times. However, upon notice, the Contractor shall attend meetings regarding matters affecting this contract, and the time spent in such meetings shall be at no additional charge to the Government.

1.5.8. Key Personnel: The Contractor shall provide a contract manager who shall be responsible for the performance of the work. This person may be the Contractor themselves or someone that they choose to designate. The name of this person and an alternate who shall act for the Contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 0730 and 4:00, Monday thru Friday accept Federal holidays or when the government facility is closed for administrative reasons.

1.5.9. Contractor Conduct: All individuals involved in operations shall not be under the influence of drugs or alcoholic beverages. The Contractor shall, at all times, be responsible for the conduct and discipline of his/her employees. Contractor personnel shall present a neat appearance and shall conduct themselves in a proper manner at all times during the performance of this contract. All individuals involved in services shall be dressed neatly and fully to include shoes, pants, shirt with sleeves that shall be closed or buttoned. Contractors shall wear clothes that are suitable for meeting the public while performing fee duties. Clothes such as overalls, old work clothes, short-shorts or “cut-offs” shall not be worn while performing fee duties. Personal Protective Equipment shall fully comply with the current edition of EM-385-1-1 at the time of award. Since a significant portion of the work shall be performed in the presence of the public, the conduct of all employees is critical and shall be closely monitored.

1.5.10. Removal of Contractors Employees: The Contracting Officer may require the Contractor to immediately remove from the work site any employee who endangers persons or property, or whose physical or mental condition would impair the employee's ability to satisfactorily perform the required work. Notification to the Contractor will be verbal and in writing if time and circumstances permit. Otherwise, notification shall be verbal or by telephone, and shall be in writing as soon as possible. No such removal, however, shall reduce the Contractor’s obligation to perform all work required under this contract, and immediate replacement shall be made as required. This requirement shall not be the basis of any claim for compensation or damages against the Government.

1.5.11. Title 36 Rules and Regulations: Contractor and Contractor Personnel shall comply with Title 36 Rules and Regulations for the entire period of performance of this contract.

1.5.12. Safety Requirements: All services shall be performed in accordance with applicable safety requirements set forth in Corps of Engineers Manual EM- 385-1-1, “Safety and Health Requirements Manual” and supplements thereto. The EM-385-1-1 is hereby incorporated by reference, and the Contractor is required to perform this contract in accordance with the standards set forth therein. Any equipment or materials not in conformity with this manual shall be removed from Government property immediately.

The Contractor shall be expected to take a vital interest in safety, hazard, and to educate their employees to work and plan their work safely.

1.5.12.1. Man Hours Reporting: The Contractor shall report the number of hours worked on government property monthly during the period of performance of services under this contract. These hours shall be recorded on the Contractors monthly invoice and submitted to the Stockton Project Office.

1.5.13. Payment: Payment will not be made for services not performed.

Contractors shall provide the Project Office with an invoice at the end of each month, requesting payment for that month’s services. Payment shall be made via Electronic Funds Transfer (EFT) into the Contractor’s banking account on file as registered with SAM. In accordance with the Prompt Payment Act, payment will be made approximately 30 days after the last day of services received for the billing period, or 30 days from receipt of the invoice, whichever is later.

1.5.14. Final Payment: Final payment will not be paid to the Contractor until all funds, permits, and Government property are reconciled and facilities are inspected for cleanliness by Corps personnel. Any shortage of funds may be deducted from the Contractor's final payment. Proper handling of and accounting for funds is a condition of performance of this contract. The Contractor is responsible for user fee permits, collected monies, keys, property, and equipment issued by the Government. The Contractor shall be held liable for any loss, including any equipment issued by the Government that is lost or damaged due to negligence.

1.5.15. Lost and Found: All articles found by Contractor personnel (or if the public turns it in to the Contractor) whom a reasonably prudent person would assign monetary, personal, or other value (including possible contraband items) shall be turned in to the COR. The Contractor shall obtain receipts for articles turned in to the COR.

1.5.16. Other Contracts. The Government may undertake or award other contracts for additional work, and the Contractor shall fully cooperate with such other Contractors and Government employees. All work must be carefully planned and fitted so as not to interfere with such other work. The Contractor shall not commit or permit any act that shall interfere with the performance of work by other Contractors or Government staff

1.5.17. Volunteers. Volunteers may be utilized in the parks. Volunteers receive and follow instructions from a Government representative, not from Contractors. Contractors should not consider any volunteer as his/her employee. Volunteers may staff the fee booth outside of a Contractor’s normal scheduled hours, or may perform other duties as instructed by Government representative.

1.6. Environmental Controls

1.6.1. Park Custodian List of Cleaning Products. Contractors shall use standard commercial cleaning products generally available in the local marketplace and shall use those products only in accordance with their labeled instructions and uses.

1.6.2. Compliance with Laws and Regulations: Contractors shall be knowledgeable of, and shall comply with, all applicable Federal, State, and Local laws, environmental requirements, and instructions. Contractors shall ensure policies and procedures are established that protect the health and safety of employees and the community to minimize or eliminate the risk of environmental pollution.

1.6.3. Hazardous Materials: Contractors are responsible for advising his/her employees of all Environmental and Hazardous Materials Handling, and is also required to provide to the COR the Material Safety Data Sheets (MSDS) for all materials used by the Contractor in accordance with Federal and State laws and/or regulations.

1.6.4. Notification of Environmental Spills: If the Contractor or employee(s) of the Contractor spills or releases any substance into the environment, the Contractor shall immediately report the incident to the Stockton Lake Project Office. The Contractor shall be liable for containment and environmental cleanup of the spill or release of such substance.

1.7. Contractor Arrival. If the Contractor opts to reside on-site, the Contractor shall move onto the designated site a minimum of five (5) but not more than seven

(7) days prior to the start of services. Electrical services will be provided upon arrival, if arrival takes place during normal business hours. Water and sewer services may be postponed upon arrival or discontinued near departure if cold weather conditions warrant. All costs for moving onto and from the site shall be borne by the Contractor. Contractors residing on-site shall do so including nights during the period of services, and shall remove the trailer and all personal property from the site not later than seven (7) days after the end of the service period.

1.8. Campsite. Contractors opting to reside onsite shall maintain the area where the trailer (RV unit) is parked in a clean and sanitary condition at all times. No dog pens, horse corrals, poultry cages, or similar facilities for pets or raising of animals shall be allowed. Government-furnished storage buildings are to be used for storage of supplies only – not as pens or cages for pets. Contractor pets shall fall under the same restrictions of Title 36 that apply to our visitors.

Visitors to the park should have open access to the Contractor’s site without the possibility of incidental contact with pets. Small vegetable or flower gardens are permitted where designated upon approval from the Contracting Officer or his representative. Decorations may be allowed or disallowed at the discretion of the Government. Excessive decoration of campsites is discouraged. Contractors shall perform watering in and around the Contractor’s trailer site. The Contractor shall not use any chemicals (for example, Roundup, Weed-B-Gone, etc.) to control weeds.

1.9. Security of Personal Property: Security of Contractor’s living quarters and all personal property shall remain the Contractor’s responsibility throughout the contract period. The Government accepts no responsibility for, nor will it be liable for, damage or theft occurring to the Contractor’s property. In addition to automobile liability insurance required in Section III.B, the Contractor is responsible for obtaining and paying for any other insurance desired, including but not limited to, general liability, comprehensive property, etc.

1.10. Cooperation with Others: Contractors shall cooperate with other Park

Attendants, Park Volunteers, Corps of Engineers employees, Government Contractors, lessees, and law enforcement personnel. Contractors shall allow Corps employees to utilize Government-furnished communication equipment for official business. Contractors shall not direct the work performance of another Contractor.

1.11. Pets: Any pets allowed shall be confined or restrained in a manner that shall prevent physical contact with visitors that may come to the Contractors’ living area or quarters for assistance. All pets shall be kept on a leash 6 feet in length or under physical restraint at all times. Pets shall not be allowed in or near the gatehouse (NO EXCEPTIONS). Contractors shall be liable for any damage to government facilities, and/or damage to park visitors’ property or person caused by their pets. Contractors are responsible for daily cleanup of their pet’s waste and disposing of the same in an approved sanitary manner.

Pets shall be kept clean, free of foul odors, and have all vaccinations as required by state laws in effect at the park’s location. The Contracting Officer’s

Representative may require the removal of any animal deemed a nuisance or a danger, or causes physical damage to Government property.

1.12. Work Schedule: Contractors shall perform all specified duties during the period of performance according to the schedule included in Attachment 6 of this PWS.

The Contractor must work federal holidays even if they fall on a normally scheduled day off. An alternate day off will be approved by the Contracting Officer or their designated representative. The Contractor shall also be required to perform duties on September 30th even if it falls on the Contractors normally scheduled day off.

1.13. Visitor Assistance: The primary role of the Contractor is to courteously assist visitors, and their secondary role is to tactfully and respectfully inform customers of the rules and regulations. Contractors cannot enforce Title 36 regulations. The Contractor shall not argue with, threaten, harass or badger visitors or attempt to detain or apprehend violators or conduct searches of people or personal property. Contractors shall perform their duties with professionalism befitting a public servant and the Corps of Engineers.

Contractors shall not use profanity in dealing with the public, project personnel, or other Contractors. Within the context of Corps policies and regulations, Contractors shall provide for the needs of our visiting public and act as public relations representatives for the Corps of Engineers.

1.13.1. Contractors shall become familiar with Title 36, CFR, Chapter III, Part 327, “Rules and Regulations Governing Public Use of Corps of Engineers Water Resource Projects”, campground and/or park rules, policies and requirements. Promptly report to any Park Ranger all accidents, violations of law, disturbances, and situations that could affect the health and safety of visitors. Serious or life-threatening incidents and emergencies shall immediately be reported to project personnel and/or local law enforcement. Other situations and incidents shall be reported to Park Rangers as instructed. Contractors shall not attempt to direct, manipulate, undermine, oppose or “second-guess” decisions made by Rangers or other Corps employees.

1.13.2. Contractors shall greet customers in a friendly manner as they arrive at the park. Contractors shall assist visitors as necessary in locating facilities, sites, park features, other project locations, and local attractions in a helpful and professional manner.

1.13.3. Contractors may be required to open and close campground and day-use area gates as required by the PWS. They may also assist Park Rangers with management and control of picnic pavilions and multi-use courts, including turning power on or off, raising or lowering flags, and posting reservations for both pavilions and individual campsites. Contractors may be required to maintain a logbook of park activities, including, but not limited to: accidents, incidents, emergencies, complaints, traffic counter readings, and problems. Records shall be turned into project management personnel as instructed.

1.13.4. Contractors shall not discriminate against persons on the basis of race, color, religion, sex, national origin, age, or disabilities.

1.13.5. Contractors shall not carry or display firearms, pepper spray, mace, clubs, or any item or piece of equipment that may be construed as a weapon. This policy shall be followed despite any “conceal and carry” permit the Contractor may possess. Contractors shall not display any type of emergency lights or emergency/law enforcement decals on vehicles used during the performance of this contract.

1.13.6. Contractors shall remove any signs from their vehicles stating “Park

Attendant” or similar type signs when not actually working under the contract (i.e. when off duty, Contractor shall remove signs prior to leaving the park).

1.14. Questions and Answers: Prospective bidders should contact Caleb Young at the Stockton Project Office at 417-276-3113, for any questions pertaining to that PWS. Potential Contractors are urged to inspect the areas they are interested in before they submit a quote in order to become familiar with the size and scope of the area and the required duties.

PART 2

DEFINITIONS AND ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. Definitions:

2.1.1. Clean: As used generally, free of all foreign matter, dirt, debris, film, spots, streaks, or other impurities. As used for acceptance of work means gleaming; free from dirt, contamination, or impurities; unsoiled, unstained, neat and tidy, free of dirt, foreign material, residue, mold, mildew, algae, trash, and excess water, sanitizers and cleaners.

2.1.2. Contractor. A supplier or vendor having a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.3. Contracting Officer. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.4. Contracting Officers Representative. An employee of the U.S.

Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.5. Debris: Articles or parts thereof such as dead insects, paper, gum, paper clips, candy, lint, litter, strings, cigarette butts, leaves, sand, excrement, etc.

2.1.6. Defective Service. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.7. Dirt: Particles of sand, soil, grit, or pebbles; mud, dust, fuzz, tar, liquid stains, vomit, ashes, etc.

2.1.8. Disinfect: To cleanse in order to destroy any harmful microorganisms, fungus, algae, and mold, by application of an approved chemical agent.

2.1.9. Deliverable. Anything that can be physically delivered but may include non-physical things such as meeting minutes.

2.1.10. Foreign Matter: Any articles, or parts thereof, not belonging to the place found, including but not limited to; spider webs, cobwebs, wasp nests, bird nests, etc.

2.1.11. Fully-Clothed: Wearing a sleeved shirt (T-shirts are acceptable), trousers, and shoes. Clothing shall be clean and neat in appearance and shall not be ripped, torn, or excessively faded. Clothing shall also contain logos or badges that clearly identify the wearer as a Contractor employee. These requirements shall not be construed to replace or eliminate the necessity for the wearing of appropriate protective clothing or devices as may be required in performance of duties.

2.1.12. Glass: Exposed glass surfaces (Lucite, plastic, transparent materials, mirrors) that are not windows.

2.1.13. Neat/Clean: Orderly, tidy, free from dirt and debris.

2.1.14. Key Personnel. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.15. Park Facilities. Include but are not limited to: parking lots/areas, boat ramps, courtesy docks, shower/restrooms, vault toilets, trailer sanitary dump stations, fee booth, campsites, picnic shelters, picnic areas, beaches, park attendant sites, and alongside roadways extending 20 feet outward from each shoulder.

2.1.16. Physical Security. Actions that prevent the loss or damage of

Government property.

2.1.17. Quality Assurance. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.18. Quality Assurance Surveillance Plan. An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.

2.1.19. Quality Control. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.20. Sanitary: Clean and free of bacteria that may endanger health; hygienic.

2.1.21. SubContractor. One that enters into a contract with a prime Contractor.

The Government does not have privity of contract with the subContractor.

2.1.22. Trash: Any abandoned articles, or parts thereof, such as paper, gum, used cups, empty cans and bottles, food scraps, litter, strings, cigarette butts, leaves, or similar waste items, as well as dirt, debris, and foreign matter collected during cleaning, and unwanted residues and ashes.

2.1.23. Windows: The glass surfaces which are an integral part of the outer wall of a building.

2.1.24. Work Day. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.25. Work Week. Is defined as Monday through Friday, unless specified otherwise.

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES

3.1. Government Property/Check Out - Contractors shall be required to sign for accountable Government property and equipment at the beginning of the contract period. Contractors shall be responsible for maintaining the property and return Government property at the end of the contract period unless other arrangements have been made.

3.2. Storage Shed. The Government will provide a storage facility for Contractors to store and maintain supplies/materials, equipment, etc. for use in the performance of the contract. Contractors shall provide upkeep and minor maintenance to facility assigned to the Contractor at Contractor’s sole expense. Before any modification of the facility is performed by the Contractor at his/her expense, the Contractor must give the Contracting Officer documentation describing, in detail, the modification requested. No alterations to the facility shall be made without specific written permission from the Contracting Officer.

3.3. Campsite. An improved site for a self-contained trailer or motor home with 50

Amp electric service, water, sewage hookups and refuse collection (from nearby dumpster) will be provided at no charge to the Contractor. Some utilities may be impacted by weather and not readily available prior to opening of parks. Occupancy of this site is limited to Contractor’s camping unit and personal vehicles only. The campsite pad, turnout and associated facilities shall not be modified for convenience of the Contractor without prior approval from the COR.

3.4. Keys – The Contractor will be furnished a set of keys to those buildings and areas where access is necessary to perform the work described herein or determined to be necessary by the COR. No duplicates of the keys may be obtained in any manner by the Contractor. Security of the keys shall be the responsibility of the Contractor. The failure of the Contractor to provide adequate key security will result in a deduction from payment due the Contractor in the amount required to replace lost or damaged key and a deduction for replacement of any locks, lock tumblers, or lock sets for any affected locks at the rate charged by a commercial locksmith.

3.5. Identification - Identification tags, vests and ball caps, if applicable, will be provided by the Government.

3.6. Government Property Clearance. Government personnel will be available the day AFTER the last date of services to check out Contractors and to receive Government-furnished property from them. All Government-furnished equipment and items must be returned to the Government prior to Contractor departure.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES

4.1. General: The Contractor shall furnish all items required to perform work under this contract that are not listed under Section 3 of this PWS.

4.2. Materials/Supplies and Equipment: The following list of example items

Contractors shall provide for this contract This list may not be all inclusive:

Toilet Paper (single ply) Trash Bags Working vehicle including all fuel and maintenance thereof

Water Hoses

Brooms Dust Pan Mops Buckets Brushes Rakes Squeegee Sponges Rags Stainless Steel Cleaner Pressure Washer (If needed) Shovels Bleach Insect Spray Cleaners Disinfectants Water Tank for pressure washer for cleaning remote toilets (If needed)

High pressure hose for pressure washer (If needed)

The Contractor may store all supplies and equipment in the Government-furnished storage site or at such other off-site location of Contractor's choosing:

no supplies or equipment shall be distributed throughout the facilities.

EXCEPTION: the Contractor may choose to place additional rolls of toilet paper in the restrooms.

4.3. Vehicle(s): Transportation vehicle(s) for use in performing the requirements of this contract must be street legal, properly licensed, and the Contractor shall furnish proof of required insurance in the form of a copy of the insurance policy, or a binder issued by the insurer. Proof of proper insurance for each vehicle shall be delivered to the Contracting Officer or his designated representative at the Pre-Work meeting. The Contractor (all personnel) shall maintain a valid state driver’s license. A photocopy of licenses will be taken at the Pre-Work meeting. No all-terrain vehicles (ATVs) or golf carts shall be allowed.

4.4. Trailer/Motor Home. The Contractor shall furnish a presentable factory-built, “self-contained” recreational vehicle (RV) of the travel trailer or motor home type to serve as temporary living quarters for entire contract period. Maximum size of the trailer or motor home shall be determined by physical limitations of the furnished park attendant pad. The trailer or motor home shall be parked at the designated campsite for the area. All hoses cables and fittings necessary to connect the RV to any desired utilities (existing utilities shall not be modified by the project or Contractor to accommodate Contractor’s equipment). Pickup shell-type campers, pop-up tent trailers, tents, mini-travel trailers, mobile homes, or other RV’s which do not meet size requirements or the “self-contained” classification as determined by inspection of the COR shall not be acceptable. Some projects may not require cleaning attendants to stay on site.

4.5. Telephone: The Contractor shall provide a telephone or cellular phone number to the Contracting Officer or his representative at the Pre-Work meeting where Contractor or Contractor's designated representative can be reached at any time while contract performance is underway. If Contractor is unable to receive a call during contract performance, Contractor shall return the call within 30 minutes after telephone service is available. Alternatively, Contractor may provide handheld radios to the Contracting Officer or his representative if the handheld radio is capable of meeting these same requirements.

4.6. Mail. Mail service shall be at the discretion of the Contractor. If service is desired, it is the responsibility of the Contractor to contact the local Post Office to determine if rural delivery is available. If the Contractor elects to have service, the Contractor shall provide a mailbox and if necessary a post, and installation of the post, in accordance with U.S. Postal Service requirements.

The Contractor shall provide the Project Office with the local mailing address, once established.

PART 5

SPECIFIC TASKS

5. Basic Services: The following requirements in the paragraphs listed below labeled 5._ are applicable to all schedules of the contract. The Contractor shall provide services as per the specifications, drawings, and exhibits in the PWS. Service standards consist of the following. A major defect in this requirement shall be failure to perform satisfactorily in (1) one or more critical elements, or (2) two or more non-critical elements in each park.

5.1. General Duties

5.1.1. Work Schedule: (Critical Element) Contractor shall perform work as described in provided work schedule in Attachment 6 of the PWS.

5.1.2. Safety Regulations: (Non-Critical Element) Contractor shall adhere to all safety regulations described in E.M. 385-1-1. Contractor shall comply with all Federal, state, and local laws.

5.1.3. Paperwork: (Critical Element) All required paperwork shall be properly submitted and accurate. Spot audits will be performed throughout the contract.

5.2. Park Custodial Duties

5.2.1. Park Custodian Duties (General Information). Custodial duties listed herein are directly related to pub l ic health and sanitation; therefore, it is essential that all facilities and areas be services as specified herein. In the event that an area or facility is missed, or is not properly cleaned, the Contractor shall re- perform services immediately upon receipt of notice from the Contracting Officer or his representative. Failure to correct noted deficiencies may result in withholding of payment for services not performed. Ensure that services are performed in a manner that shall maintain a satisfactory facility condition and present a clean, neat appearance. All cleaning procedures and treatments shall be accomplished in accordance with the manufacturer’s directions and/or listed specifications and industry standards applicable to the Professional Cleaning and Restoration Industry. Cleanings shall be performed at the frequencies shown in the attached schedule.

5.2.2. Daily Major Cleanups. The Park Custodian Contractor shall perform major cleanups daily in accordance with the attached schedule. Daily Major Cleanups shall include the following tasks:

5.2.2.1. Shower Houses/Restrooms - (Critical Element) The Contractor shall clean all toilets, showers, well houses and change houses, inside and outside; including windows, fixtures, walls, partitions, ceilings, doors, eaves, louvers, vents, screens, shower curtains and floors to provide "clean, sanitary and odor free" facilities. The Contractor shall also maintain deodorant cakes in all urinals to control odor. Standing water shall be removed from floors after each cleaning. Toilet tissue shall be distributed at each toilet when it is cleaned and/or checked to provide an adequate supply at all times. Marks of vandalism and graffiti shall be removed without damaging the paint surface. Shower stalls, interior walls, floors and petitions shall be kept clean and sanitary. In association with cleaning duties, the Contractor shall remove all obstructions from drains, fixtures, including toilets, urinals, and valves that are easily removable using a plunger or plumber' snake.

5.2.2.2. Trailer Dump Station - (Critical Element) The Contractor shall clean daily all slabs, flush bowls, intakes, hydrants, hoses, wheel stops and other appurtenances at trailer dump stations to provide "clean and sanitary" facilities. Fish cleaning stations (if applicable) shall be included with this task.

5.2.2.3. Group Picnic Shelters - (Critical Element) The Contractor shall clean, after each use and/or once a day, the following; floor slab, table seats and tops, fireplace, light fixtures, eaves, ceilings and columns to provide "clean" facilities.

5.2.2.4. Table Canopies - (Critical Element) The Contractor shall clean weekly, or as needed, the ceilings, eaves, columns, and walls to provide "clean and sanitary" facilities.

5.2.2.5. Vault Toilets - (Critical Element) The Contractor shall use odor control chemicals to reduce or eliminate odors in vault toilets.

Chemicals for this must be approved by the Contracting Officer’s Representative and must be septic system compatible. Material safety data sheets are required and copies must be furnished to the Contracting Officer’s Representative.

5.2.2.6. Fire Rings and Grills -(Critical Element) The Contractor shall clean all fire rings and grills of ashes, including cigarette butts and assorted refuse after each use or once per week if the campsite is not occupied during the previous week. Remove all foil or food left on the grill surface. Ashes shall be disposed of in an area approved by the Contracting Officer’s Representative. At no time shall it be acceptable for ashes or coals to be placed in park dumpsters. All rock fire rings, including ashes and associated debris shall be removed from camping and day use areas. Fire rings and grills shall be left in the down position after cleaning.

5.2.2.7. Campsites - (Critical Element) All unoccupied campsites including unoccupied volunteer sites, shall be checked daily to assure campsites, fire rings/grills, grounds and tables are clean. The Contractor shall rake campsite screening to assure rocks, sticks are picked up, and holes are filled in. The Contractor shall be responsible for site cleanup in emergency situations such as when a site is left in an unusable condition due to trash left on the site. In such cases, the Contractor shall notify a ranger prior to cleaning the site so the ranger can make proper documentation.

5.2.2.8. Drinking Fountains - (Non-Critical Element) The Contractor shall clean daily all surfaces of drinking fountains and adjacent slabs to provide "clean and sanitary" facilities.

5.2.2.9. Sidewalks - (Non-Critical Element) All sidewalks and steps shall be cleaned daily, and area policed to remove all debris and refuse.

5.2.2.10. Swim Beach and Day Use Sites - (Critical Element) The Contractor shall remove daily all refuse and debris from swim beach and day use picnic table sites (including beaches).

5.2.2.11. Park Signs - (Non-Critical Element) The Contractor shall remove all foreign matter from the park signs.

5.2.2.12. Refuse -(Critical Element) Contractor shall empty all waste containers, replace liners and deposit all refuse in centralized dumpsters provided by the Government (if applicable). Contractor shall monitor all dumpsters to insure maximum utilization (if applicable). Contractor shall police area around refuse containers, waste baskets and dumpsters (if applicable).

5.2.2.13. Leaves - (Non-Critical Element) The Contractor shall rake and remove leaves and other debris from the campsite living areas and within 3 feet of park structures and facilities. These leaves may be deposited in the woods out of the mowing limits.

5.2.2.14. Sand and Graveled Areas - (Non-Critical Element) The Contractor shall clean debris from sand volleyball pits, playgrounds, beaches, and horseshoe pits.

5.2.2.15. Policing - (Critical Element) The Contractor shall police all developed park areas and remove litter/trash from area and deposit in approved receptacles.

5.2.2.16. Hazards - (Critical Element) Report all safety hazards and repairs as directed by the Contracting Officer’s Representative.

5.2.3. Emergency Cleanups: (Critical Element) The Contractor shall perform emergency cleanups in their areas as needed during the contract period.

Emergency cleanups shall be for unforeseen issues involving sanitary conditions for health safety that occur between Major and Minor cleanups.

Contractors shall not be required to perform Emergency Cleanups on their normally scheduled days off. Emergency cleanups shall be performed at no additional cost to the government.

5.2.4. Daily Minor Cleanups: The Park Custodian Contractor shall perform Daily

Minor Cleanups i n accordance with the schedule in Attachment 6. Minor Cleanups shall include the same tasks as for Major Cleanups, however the Contractor need only perform the applicable steps listed under Major Cleanups to ensure items are clean (spot cleaning).

5.2.5. List of Facilities. Contractors shall perform services for the areas/facilities shown for the respective park areas listed in Attachment 5. A site visit is strongly recommended prior to bidding. See Instructions/Notice to Bidders.

The number of facilities and size of areas are estimates only. It is the responsibility of the Contractor to determine exact quantities and conditions affecting performance of this work. Total number of grills and fire rings, total number of flush or vault toilet buildings, and total number of campsites and tables, is subject to a variation of +/- 10 each at no change in contract amount.

PART 6

APPLICABLE PUBLICATIONS

6. Applicable Publications (Current Editions): The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.

6.1. Safety and Health Requirements Manual, EM 385-1-1 (latest edition)

6.2. Occupational Safety and Health Act (OSHA) www.osha.gov

6.3. Title 36 – Rules and Regulations

PART 7

ATTACHMENT/TECHNICAL EXHIBIT LISTING

7. Attachment/Technical Exhibit List:

7.1. Attachment 1 – Performance Requirements Summary

7.2. Attachment 2 – Deliverables Schedule

7.3. Attachment 3 – AT/OPSEC Requirements

7.4. Attachment 4 – Corps Watch Information Paper

7.5. Attachment 5 – Facility List

7.6. Attachment 6 – Work Schedule/Park Tour and Custodial Schedule

7.7. Attachment 7 – Estimated Historical Consumption Information

7.8. Attachment 7 – Maps/Approximate Mileage Chart

7.9. Attachment 8 – Quality Control Plan Example

ATTACHMENT 1

Performance Requirements Summary The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

TASK

DESCRIPTION

PERFORMANCE

INDICATOR

REQUIRED

PERFORMANCE

MEASURE

SURVEILLANCE

METHOD

RESULT OF

UNACCEPTABLE

PERFORMANCE

Proportion of required service of total contract price

5.1.1. Work

Schedule.

Cleanings are being performed as scheduled

Cleaning are performed in accordance with the schedule in the

PWS.

Planned Inspection/ Customer Complaints

Deduction in pay for hours or days not opened.

10%

5.1.2. Safety

Regulations.

Discrepancy’s in safety procedures.

Safety practices IAW

EM 385-1-1.

Unscheduled Monitoring of safety regs/ Customer Complaints

Repeat offenses may result in termination of contract.

10%

5.1.3 Paperwork.

All required paperwork shall be properly submitted.

Paperwork shall not be accepted by

COE

representative until corrections are made.

Planned Inspection/ Audits / observation.

Repeat offenses may result in termination of contract.

5%

5.2.2. Major

Cleanups.

Cleanings are being performed

IAW PWS

specifications.

Clean in IAW

PWS

Planned Inspection/ Customer Complaints

Deduction in pay for failure to clean.

Repeat offenses may result in termination of contract.

25%

5.2.3 Emergency Cleanups

Emergency cleanups are performed when required.

Emergency Cleanups are completed IAW

PWS

specifications

100% Inspection

Deduction in pay for failure to clean.

Repeat offenses may result in termination of contract.

25%

5.2.4. Minor

Cleanups

Cleanings are being performed

IAW PWS

specifications.

Clean IAW

PWS

Planned Inspection/ Customer Complaints

Deduction in pay for failure to clean.

Repeat offenses may result in termination of contract.

25%

ATTACHMEN…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.