- Former Sunflower Army Ammunition Plant - Explosive Decontamination and Removal of Outside Sewer Lines
- Solicitation number
- W912DQ-16-R-3007
About this file
Attachment 4
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A.07.24_Amendment_0004.pdf | ||
| A.07.20_Site_Visit_Tour_Route_Map.pdf | ||
| Bid_Schedule.xlsx | XLSX spreadsheet | |
| Supplemental_Bid_Schedule.xlsx | XLSX spreadsheet | |
| A.07.24_Amendment_0003.pdf | ||
| A.07.24_Site_Visit_Sign-in.pdf | ||
| SUXOS_Resume.docx | DOCX document | |
| A.07.24_Amendment_0002.pdf | ||
| Company_Experience.docx | DOCX document | |
| A.07.24_Amendment_0001.pdf | ||
| Attachment_6_-_Schedule_Spec.PDF | ||
| Table_3.pdf | ||
| Attachment_5_-_SOP-DEM-11.pdf | ||
| A.07.23_W912DQ-16-R-3007_20160413.pdf | ||
| Table_5.pdf | ||
| Attachment_1_-_Site_Map.pdf | ||
| Table_1.docx | DOCX document | |
| Attachment_2b_ESS_SFAAP_Final_ver_3.pdf | ||
| Table_2.pdf | ||
| Table_4.pdf | ||
| Attachment_3_-_KDHE_Exception_from_Open_Burning_Prohibition_-_2016.pdf | ||
| Attachment_8_-_WAD_Summary_Page.xlsx | XLSX spreadsheet | |
| Attachment_7_-_RMS_Spec.PDF | ||
| Attachment_2a_Sunflower_AAP_ESS_-_Draft_V1.pdf |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4
SUNFLOWER ARMY AMMUNITION PLANT COST ASSUMPTIONS
IRP Work at MEC Sites at SFAAP_ver 3 - Outside Sewers, TBPs and SAAP-017.xlsx 1 of 35
SITE ID PHASE SITE/PARAMETER UNITS AMOUNT COMMENTS
SAMPLE NUMBERS DO NOT INCLUDE QA
SAAP-008 NORTH ACID AREA - CHROMATE CONCENTRATION POND
ICM LINEAR FEET AROUND EXPLOSIVE FOUNDATIONS FT 386 TEMPORARY BURN PADS
ICM RIND SOIL SAMPLES OF EXPLOSIVE FOUNDATIONS SAMPLE 15 13 + 2 = 15 Samples ICM RIND SOIL STEP OUT SAMPLES SAMPLE 6 15% TMCL exceedances, 2 Samples x 3 ICM ADDITIONAL RIND SOIL STEP OUT SAMPLES SAMPLE 3 5% TMCL exceedances, 1 Sample x 3
ICM 900 SQ FT GRIDS REQUIRING RE-REMEDITION EACH 1 25% of Grids, excavate an additional 1 foot deep to obtain clean soil ICM TOTAL 900 SQ FT GRIDS REQUIRING EXCAVATION EACH 4 Estimated grids requiring excavation
ICM SOIL CONTAMINATION DEPTH FT 2
ICM SOIL CONTAMINATION AREA SQ FT 3,600
ICM CONTAMINATED SOIL VOLUME CY 267
ICM CONFIRMATION SAMPLES SAMPLE 4
RCRA Metals, hexavalent chromium, iron, manganese, SVOC-PAHs, VOCs, SVOCs, nitrate/nitrite, sulfate, ammonia, explosives, NC, NG, TPH-DRO, pH
ICM CONTAMINATED SOIL STOCKPILE CONFIRMATION SAMPLES SAMPLE 1
Required sampling for areas where contaminated soil was stockpiled, after stockpile is removed.
ICM DISPOSAL SAMPLES SAMPLE 1 TCLP (Metals), Corrosivity, Ignitability, Reactivity ICM TEMPORARY BURN PADS - LINEAR FEET OF RIND SOIL FT 386 ACM debris resulting from burning buildings with asbestos in place
ICM RIND BURN DEBRIS/ACM WIDTH FT 8
ICM RIND BURN DEBRIS/ACM AREA SQ FT 3,088
ICM RIND BURN DEBRIS/ACM DEPTH FT 1 5
ICM RIND BURN DEBRIS/ACM VOLUME CY 114
ICM CONFIRMATION SAMPLES SAMPLE 3
ICM BURN DEBRIS/ACM IN BASEMENTS VOLUME CY 290
ICM TOTAL BURN DEBRIS/ACM VOLUME CY 405
ICM ACM CONTAMINATED SOIL STOCKPILE CONFIRMATION SAMPLES SAMPLE 1
after stockpile is removed.
ICM ACM DISPOSAL SAMPLES SAMPLE 1 TCLP (Metals), Corrosivity, Ignitability, Reactivity
ICM TEMPORARY BURN PADS - FR1 SUBFOUNDATION SLAB AREA SQ FT 4,816
ICM INITIAL 900 sq ft GRID SOIL SAMPLES SAMPLE 7 5 + 2 = 7 Samples ICM 900 SQ FT GRIDS REQUIRING REMEDITION EACH 1 15% TMCL exceedances; excavate 1 foot deep ICM 900 SQ FT GRIDS REQUIRING RE-REMEDITION EACH 0 25% of Grids, excavate an additional 1 foot deep to obtain clean soil
ICM TOTAL 900 SQ FT GRIDS REQUIRING EXCAVATION EACH 1
ICM SOIL CONTAMINATION DEPTH FT 1
ICM SOIL CONTAMINATION AREA SQ FT 900
ICM CONTAMINATED SOIL VOLUME CY 33
ICM EXPLOSIVES BLENDED CONTAMINATED SOIL VOLUME CY 9 5% of total square feet of explosive soil blended to <10%
ICM TOTAL CONTAMINATED SOIL VOLUME CY 42
ICM CONFIRMATION SAMPLES (TOTAL) SAMPLE 1
ICM CONTAMINATED SOIL STOCKPILE CONFIRMATION SAMPLES SAMPLE 1
ICM DISPOSAL SAMPLES SAMPLE 1 TCLP (Metals), Corrosivity, Ignitability, Reactivity ICM INITIAL SEWER OUTSIDE FDN TRENCH SAMPLES SAMPLE 8 1 Five-point composite sample every 500 feet
IRP Work at MEC Sites at SFAAP_ver 3 - Outside Sewers, TBPs and SAAP-017.xlsx 2 of 35
SITE ID PHASE SITE/PARAMETER UNITS AMOUNT COMMENTS
ICM LENGTH OF EXPLOSIVE SEWER TRENCH OUTSIDE FOUNDATIONS FT 3,736
ICM WIDTH OF EXPLOSIVE SEWER TRENCH FT 8
ICM SOIL CONTAMINATION LENGTH FT 560 15% of linear feet with TMCL exceedances
ICM SOIL CONTAMINATION DEPTH FT 1
ICM SOIL CONTAMINATION AREA SQ FT 4,483
ICM CONTAMINATED SOIL VOLUME CY 166
ICM SEWER TRENCH REQUIRING RE-REMEDITION LENGTH FT 140
1 foot deep to obtain clean soil
ICM RE-REMEDIATION CONTAMINATED SOIL VOLUME CY 42
ICM EXPLOSIVES BLENDED CONTAMINATED SOIL VOLUME CY 166 15% of total linear feet of explosive soil blended to <10%
ICM TOTAL CONTAMINATED SOIL VOLULME SEWER OUTSIDE FDN CY 374
ICM CONFIRMATION SAMPLES SAMPLE 2
ICM CONTAMINATED SOIL STOCKPILE CONFIRMATION SAMPLES SAMPLE 2
SAAP-008 Total Environmental Samples SAMPLE 59
SAAP-008 Total Contaminated Soil Excavation Volume CY 1087 SAAP-008 Total Contaminated Soil Disposal Weight TON 1631
SAAP-014 ROCKET STATIC TEST AREA
ICM LINEAR FEET AROUND EXPLOSIVE FOUNDATIONS FT 782 TEMPORARY BURN PADS
ICM RIND SOIL SAMPLES OF EXPLOSIVE FOUNDATIONS SAMPLE 28 26 + 2 = 28 Samples ICM RIND SOIL STEP OUT SAMPLES SAMPLE 12 15% TMCL exceedances, 4 Samples x 3 ICM ADDITIONAL RIND SOIL STEP OUT SAMPLES SAMPLE 3 5% TMCL exceedances, 1 Sample x 3
ICM 900 SQ FT GRIDS REQUIRING RE-REMEDITION EACH 1 25% of Grids, excavate an additional 1 foot deep to obtain clean soil ICM TOTAL 900 SQ FT GRIDS REQUIRING EXCAVATION EACH 6 Estimated grids requiring excavation
ICM SOIL CONTAMINATION DEPTH FT 1
ICM SOIL CONTAMINATION AREA SQ FT 5,400
ICM CONTAMINATED SOIL VOLUME CY 200
ICM CONFIRMATION SAMPLES SAMPLE 6
RCRA Metals, hexavalent chromium, iron, manganese, SVOC-PAHs, VOCs, SVOCs, nitrate/nitrite, sulfate, ammonia, explosives, NC NG, TPH-DRO, pH
ICM CONTAMINATED SOIL STOCKPILE CONFIRMATION SAMPLES SAMPLE 0
Required sampling for areas where contaminated soil was stockpiled, after stockpile is removed.
ICM DISPOSAL SAMPLES SAMPLE 1 TCLP (Metals), Corrosivity, Ignitability, Reactivity ICM TEMPORARY BURN PADS - LINEAR FEET OF RIND SOIL FT 782 ACM debris resulting from burning buildings with asbestos in place
ICM RIND BURN DEBRIS/ACM WIDTH FT 8
ICM RIND BURN DEBRIS/ACM AREA SQ FT 6,256
ICM RIND BURN DEBRIS/ACM DEPTH FT 1
ICM RIND BURN DEBRIS/ACM VOLUME CY 232
ICM CONFIRMATION SAMPLES SAMPLE 7
ICM BURN DEBRIS/ACM IN BASEMENTS VOLUME CY 290
ICM TOTAL BURN DEBRIS/ACM VOLUME CY 522
IRP Work at MEC Sites at SFAAP_ver 3 - Outside Sewers, TBPs and SAAP-017.xlsx 3 of 35
SITE ID PHASE SITE/PARAMETER UNITS AMOUNT COMMENTS
ICM ACM DISPOSAL SAMPLES SAMPLE 1 TCLP (Metals), Corrosivity, Ignitability, Reactivity
ICM TEMPORARY BURN PADS - FR1 SUBFOUNDATION SLAB AREA SQ FT 15,213
ICM INITIAL 900 sq ft GRID SOIL SAMPLES SAMPLE 19 17 + 2 = 19 Samples ICM 900 SQ FT GRIDS REQUIRING REMEDITION EACH 3 15% TMCL exceedances; excavate 1 foot deep ICM 900 SQ FT GRIDS REQUIRING RE-REMEDITION EACH 1 25% of Grids, excavate an additional 1 foot deep to obtain clean soil
ICM TOTAL 900 SQ FT GRIDS REQUIRING EXCAVATION EACH 4
ICM SOIL CONTAMINATION DEPTH FT 1
ICM SOIL CONTAMINATION AREA SQ FT 3,190
ICM CONTAMINATED SOIL VOLUME CY 118
ICM EXPLOSIVES BLENDED CONTAMINATED SOIL VOLUME CY 28 5% of total square feet of explosive soil blended to <10%
ICM TOTAL CONTAMINATED SOIL VOLUME CY 146
ICM CONFIRMATION SAMPLES (TOTAL) SAMPLE 4
ICM INITIAL SEWER OUTSIDE FDN TRENCH SAMPLES SAMPLE 1 1 Five-point composite sample every 500 feet
ICM LENGTH OF EXPLOSIVE SEWER TRENCH OUTSIDE FOUNDATIONS FT 229
ICM WIDTH OF EXPLOSIVE SEWER TRENCH FT 8
ICM SOIL CONTAMINATION LENGTH FT 34 15% of linear feet with TMCL exceedances
ICM SOIL CONTAMINATION DEPTH FT 1
ICM SOIL CONTAMINATION AREA SQ FT 275
ICM CONTAMINATED SOIL VOLUME CY 10
ICM SEWER TRENCH REQUIRING RE-REMEDITION LENGTH FT 9
ICM RE-REMEDIATION CONTAMINATED SOIL VOLUME CY 4
ICM EXPLOSIVES BLENDED CONTAMINATED SOIL VOLUME CY 10 15% of total linear feet of explosive soil blended to <10%
ICM TOTAL CONTAMINATED SOIL VOLULME SEWER OUTSIDE FDN CY 24
ICM CONFIRMATION SAMPLES SAMPLE 1
SAAP-014 Total Environmental Samples SAMPLE 88
SAAP-014 Total Contaminated Soil Excavation Volume CY 892 SAAP-014 Total Contaminated Soil Disposal Weight TON 1338
SAAP-017 G LINE AREA DITCHES
ICM LINEAR FEET AROUND EXPLOSIVE FOUNDATIONS FT 18,910 All Explosive Foundations Including TBPs ICM RIND SOIL SAMPLES OF EXPLOSIVE FOUNDATIONS SAMPLE 695 630 + 65 = 695 Samples ICM RIND SOIL STEP OUT SAMPLES SAMPLE 313 15% TMCL exceedances, 104 Samples x 3 ICM ADDITIONAL RIND SOIL STEP OUT SAMPLES SAMPLE 48 5% TMCL exceedances, 16 Samples x 3
ICM 900 SQ FT GRIDS REQUIRING RE-REMEDITION EACH 30 25% of Grids, excavate an additional 2 feet deep to obtain clean soil
ICM TOTAL 900 SQ FT GRIDS REQUIRING EXCAVATION EACH 150
ICM SOIL CONTAMINATION DEPTH FT 2 1,056
ICM SOIL CONTAMINATION AREA SQ FT 135,000
ICM CONTAMINATED SOIL VOLUME CY 10,000
IRP Work at MEC Sites at SFAAP_ver 3 - Outside Sewers, TBPs and SAAP-017.xlsx 4 of 35
SITE ID PHASE SITE/PARAMETER UNITS AMOUNT COMMENTS
ICM LINEAR FEET OF RIND SOIL FT 18,910 ACM debris resulting from burning buildings with asbestos in place
ICM RIND BURN DEBRIS/ACM WIDTH FT 8
ICM RIND BURN DEBRIS/ACM AREA SQ FT 151,280
ICM RIND BURN DEBRIS/ACM DEPTH FT 1
ICM RIND BURN DEBRIS/ACM VOLUME CY 5,603
ICM CONFIRMATION SAMPLES SAMPLE 168
ICM BURN DEBRIS/ACM IN BASEMENTS VOLUME CY 290
ICM TOTAL BURN DEBRIS/ACM VOLUME CY 5,893
ICM ACM CONTAMINATED SOIL STOCKPILE CONFIRMATION SAMPLES SAMPLE 11
Required sampling for areas where contaminated soil was stockpiled, after stockpile is removed.
ICM ACM DISPOSAL SAMPLES SAMPLE 15 TCLP (Metals), Corrosivity, Ignitability, Reactivity ICM FR1 SUBFOUNDATION SLAB AREA SQ FT 173,355 All Explosive Foundations Including TBPs ICM INITIAL 900 sq ft GRID SOIL SAMPLES SAMPLE 263 193 + 70 = 263 Samples ICM 900 SQ FT GRIDS REQUIRING REMEDITION EACH 39 15% TMCL exceedances; excavate 1 foot deep
ICM 900 SQ FT GRIDS REQUIRING RE-REMEDITION EACH 10 25% of Grids, excavate an additional 1 foot deep to obtain clean soil
ICM TOTAL 900 SQ FT GRIDS REQUIRING EXCAVATION EACH 49
ICM SOIL CONTAMINATION DEPTH FT 1
ICM SOIL CONTAMINATION AREA SQ FT 44,317
ICM CONTAMINATED SOIL VOLUME CY 1,641
ICM EXPLOSIVES BLENDED CONTAMINATED SOIL VOLUME CY 321 5% of total square feet of explosive soil blended to <10%
ICM TOTAL CONTAMINATED SOIL VOLUME CY 1,962
ICM CONFIRMATION SAMPLES (TOTAL) SAMPLE 49
ICM CONTAMINATED SOIL STOCKPILE CONFIRMATION SAMPLES SAMPLE 3
Required sampling for areas where contaminated soil was stockpiled, after stockpile is removed.
ICM DISPOSAL SAMPLES SAMPLE 4 TCLP (Metals), Corrosivity, Ignitability, Reactivity ICM INITIAL SEWER INSIDE FDN TRENCH SAMPLES SAMPLE 24 1 Five-point composite sample every foundation containing sewers ICM LENGTH OF EXPLOSIVE SEWER TRENCH INSIDE FOUNDATIONS FT 377 212 horizontal ft + (5' x 33) linear ft (drains, 5' per drain)
ICM WIDTH OF EXPLOSIVE SEWER TRENCH FT 6
ICM SOIL CONTAMINATION LENGTH FT 57 15% of linear feet with TMCL exceedances
ICM SOIL CONTAMINATION DEPTH FT 1
ICM TEMPORARY BURN PADS - SOIL CONTAMINATION AREA SQ FT 339
ICM CONTAMINATED SOIL VOLUME CY 13
ICM SEWER TRENCH REQUIRING RE-REMEDITION LENGTH FT 14
25% of length of contaminated sewer trench, re-excavate an additional 1 foot deep to obtain clean soil
ICM RE-REMEDIATION CONTAMINATED SOIL VOLUME CY 4
ICM EXPLOSIVES BLENDED CONTAMINATED SOIL VOLUME CY 13 15% of total linear feet of explosive soil blended to <10%
ICM TOTAL CONTAMINATED SOIL VOLULME SEWER INSIDE FDN CY 30
ICM CONFIRMATION SAMPLES SAMPLE 4
ICM CONTAMINATED SOIL STOCKPILE CONFIRMATION SAMPLES SAMPLE 1
Required sampling for areas where contaminated soil was stockpiled, after stockpile is removed.
ICM DISPOSAL SAMPLES SAMPLE 7 TCLP (Metals), Corrosivity, Ignitability, Reactivity ICM SEWER IN PESTICIDE FOUNDATIONS LENGTH FT 206 Pesticide containing soil moved to excavate explosive sewers
ICM SEWER IN PESTICIDE FOUNDATIONS WIDTH FT 6
ICM SEWER IN PESTICIDE FOUNDATIONS DEPTH FT 5 All Explosive Foundations Including TBPs
IRP Work at MEC Sites at SFAAP_ver 3 - Outside Sewers, TBPs and SAAP-017.xlsx 5 of 35
SITE ID PHASE SITE/PARAMETER UNITS AMOUNT COMMENTS
ICM SEWER IN PESTICIDE FOUNDATIONS VOLUME CY 229
ICM SEWER IN PESTICIDE FOUNDATIONS DISPOSAL SAMPLES SAMPLE 2
SAAP-017 Total Environmental Samples SAMPLE 1606 SAAP-017 Total Contaminated Soil Excavation Volume CY 18115
SAAP-017 Total Contaminated Soil Disposal Weight TON 27172
SAAP-024 NITROGLYCERINE AND PASTE MIX AREA
ICM LINEAR FEET AROUND EXPLOSIVE FOUNDATIONS FT 1,108 TEMPORARY BURN PADS
ICM RIND SOIL SAMPLES OF EXPLOSIVE FOUNDATIONS SAMPLE 42 37 + 5 = 42 Samples ICM RIND SOIL STEP OUT SAMPLES SAMPLE 18 15% TMCL exceedances, 6 Samples x 3 ICM ADDITIONAL RIND SOIL STEP OUT SAMPLES SAMPLE 3 5% TMCL exceedances, 1 Sample x 3
ICM 900 SQ FT GRIDS REQUIRING RE-REMEDITION EACH 2 25% of Grids, excavate an additional 1 foot deep to obtain clean soil ICM TOTAL 900 SQ FT GRIDS REQUIRING EXCAVATION EACH 9 Estimated grids requiring excavation
ICM SOIL CONTAMINATION DEPTH FT 2
ICM SOIL CONTAMINATION AREA SQ FT 8,100
ICM CONTAMINATED SOIL VOLUME CY 600
ICM CONFIRMATION SAMPLES SAMPLE 9
RCRA Metals, manganese, explosives (including NC, NG and NQ), SVOCs, VOCs, TPH-DRO, TPH-GRO, nitrate/nitrite, ammonia, sulfate, pesticides, pH
ICM CONTAMINATED SOIL STOCKPILE CONFIRMATION SAMPLES SAMPLE 1
Required sampling for areas where contaminated soil was stockpiled, after stockpile is removed.
ICM DISPOSAL SAMPLES SAMPLE 2 TCLP (Metals), Corrosivity, Ignitability, Reactivity ICM TEMPORARY BURN PADS - LINEAR FEET OF RIND SOIL FT 1,108 ACM debris resulting from burning buildings with asbestos in place
ICM RIND BURN DEBRIS/ACM WIDTH FT 8
ICM RIND BURN DEBRIS/ACM AREA SQ FT 8,864
ICM RIND BURN DEBRIS/ACM DEPTH FT 1
ICM RIND BURN DEBRIS/ACM VOLUME CY 328
ICM CONFIRMATION SAMPLES SAMPLE 10
ICM BURN DEBRIS/ACM IN BASEMENTS VOLUME CY 290
ICM TOTAL BURN DEBRIS/ACM VOLUME CY 619
ICM ACM DISPOSAL SAMPLES SAMPLE 2 TCLP (Metals), Corrosivity, Ignitability, Reactivity
ICM TEMPORARY BURN PADS - FR1 SUBFOUNDATION SLAB AREA SQ FT 9,365
ICM INITIAL 900 sq ft GRID SOIL SAMPLES SAMPLE 15 10 + 5 = 15 Samples ICM 900 SQ FT GRIDS REQUIRING REMEDITION EACH 2 15% TMCL exceedances; excavate 1 foot deep ICM 900 SQ FT GRIDS REQUIRING RE-REMEDITION EACH 1 25% of Grids, excavate an additional 1 foot deep to obtain clean soil
ICM TOTAL 900 SQ FT GRIDS REQUIRING EXCAVATION EACH 3
ICM SOIL CONTAMINATION DEPTH FT 1
ICM SOIL CONTAMINATION AREA SQ FT 2,600
ICM CONTAMINATED SOIL VOLUME CY 96
ICM EXPLOSIVES BLENDED CONTAMINATED SOIL VOLUME CY 17 5% of total square feet of explosive soil blended to <10%
ICM TOTAL CONTAMINATED SOIL VOLUME CY 114
IRP Work at MEC Sites at SFAAP_ver 3 - Outside Sewers, TBPs and SAAP-017.xlsx 6 of 35
SITE ID PHASE SITE/PARAMETER UNITS AMOUNT COMMENTS
ICM CONFIRMATION SAMPLES (TOTAL) SAMPLE 3
ICM INITIAL SEWER INSIDE FDN TRENCH SAMPLES SAMPLE 24 1 Five-point composite sample every foundation containing sewers ICM LENGTH OF EXPLOSIVE SEWER TRENCH INSIDE FOUNDATIONS FT 678 433 horizontal ft + (5' x 49) linear ft (drains, 5' per drain)
ICM WIDTH OF EXPLOSIVE SEWER TRENCH FT 6
ICM SOIL CONTAMINATION LENGTH FT 102 15% of linear feet with TMCL exceedances
ICM SOIL CONTAMINATION DEPTH FT 1
ICM TEMPORARY BURN PADS - SOIL CONTAMINATION AREA SQ FT 610
ICM CONTAMINATED SOIL VOLUME CY 23
ICM SEWER TRENCH REQUIRING RE-REMEDITION LENGTH FT 25
ICM RE-REMEDIATION CONTAMINATED SOIL VOLUME CY 7
ICM EXPLOSIVES BLENDED CONTAMINATED SOIL VOLUME CY 23 15% of total linear feet of explosive soil blended to <10%
ICM TOTAL CONTAMINATED SOIL VOLULME SEWER INSIDE FDN CY 53
ICM CONFIRMATION SAMPLES SAMPLE 4
SAAP-024 Total Environmental Samples SAMPLE 137
SAAP-024 Total Contaminated Soil Excavation Volume CY 1385 SAAP-024 Total Contaminated Soil Disposal Weight TON 2078
SAAP-026
SINGLE BASE PROPELLANT AREA, WASTE WATER SETTLING
SUMPS
ICM LINEAR FEET AROUND EXPLOSIVE FOUNDATIONS FT 1,982 TEMPORARY BURN PADS
ICM RIND SOIL SAMPLES OF EXPLOSIVE FOUNDATIONS SAMPLE 72 66 + 6 = 72 Samples ICM RIND SOIL STEP OUT SAMPLES SAMPLE 33 15% TMCL exceedances, 11 Samples x 3 ICM ADDITIONAL RIND SOIL STEP OUT SAMPLES SAMPLE 6 5% TMCL exceedances, 2 Sample x 3
ICM 900 SQ FT GRIDS REQUIRING RE-REMEDITION EACH 3 25% of Grids, excavate an additional 1 foot deep to obtain clean soil ICM TOTAL 900 SQ FT GRIDS REQUIRING EXCAVATION EACH 16 Estimated grids requiring excavation
ICM SOIL CONTAMINATION DEPTH FT 1
ICM SOIL CONTAMINATION AREA SQ FT 14,400
ICM CONTAMINATED SOIL VOLUME CY 533
ICM CONFIRMATION SAMPLES SAMPLE 1 RCRA Metals, Manganese, SVOCs, Explosives, VOCs, Nitrate
ICM CONTAMINATED SOIL STOCKPILE CONFIRMATION SAMPLES SAMPLE 1
Required sampling for areas where contaminated soil was stockpiled, after stockpile is removed.
ICM DISPOSAL SAMPLES SAMPLE 1 TCLP (Metals), Corrosivity, Ignitability, Reactivity ICM TEMPORARY BURN PADS - LINEAR FEET OF RIND SOIL FT 1,982 ACM debris resulting from burning buildings with asbestos in place
ICM RIND BURN DEBRIS/ACM WIDTH FT 8
ICM RIND BURN DEBRIS/ACM AREA SQ FT 15,856
ICM RIND BURN DEBRIS/ACM DEPTH FT 1
ICM RIND BURN DEBRIS/ACM VOLUME CY 587
ICM CONFIRMATION SAMPLES SAMPLE 18
ICM BURN DEBRIS/ACM IN BASEMENTS VOLUME CY 290
IRP Work at MEC Sites at SFAAP_ver 3 - Outside Sewers, TBPs and SAAP-017.xlsx 7 of 35
SITE ID PHASE SITE/PARAMETER UNITS AMOUNT COMMENTS
ICM TOTAL BURN DEBRIS/ACM VOLUME CY 878
ICM ACM CONTAMINATED SOIL STOCKPILE CONFIRMATION SAMPLES SAMPLE 2
ICM TEMPORARY BURN PADS - FR1 SUBFOUNDATION SLAB AREA SQ FT 18,897
ICM INITIAL 900 sq ft GRID SOIL SAMPLES SAMPLE 30 21 + 9 = 30 Samples ICM 900 SQ FT GRIDS REQUIRING REMEDITION EACH 5 15% TMCL exceedances; excavate 1 foot deep ICM 900 SQ FT GRIDS REQUIRING RE-REMEDITION EACH 2 25% of Grids, excavate an additional 1 foot deep to obtain clean soil
ICM TOTAL 900 SQ FT GRIDS REQUIRING EXCAVATION EACH 7
ICM SOIL CONTAMINATION DEPTH FT 1
ICM SOIL CONTAMINATION AREA SQ FT 6,187
ICM CONTAMINATED SOIL VOLUME CY 229
ICM EXPLOSIVES BLENDED CONTAMINATED SOIL VOLUME CY 35 5% of total square feet of explosive soil blended to <10%
ICM TOTAL CONTAMINATED SOIL VOLUME CY 264
ICM CONFIRMATION SAMPLES (TOTAL) SAMPLE 7
ICM INITIAL SEWER INSIDE FDN TRENCH SAMPLES SAMPLE 116 1 Five-point composite sample every foundation containing sewers ICM LENGTH OF EXPLOSIVE SEWER TRENCH INSIDE FOUNDATIONS FT 1,425 1035 horizontal ft + (5' x 78) linear ft (drains, 5' per drain)
ICM WIDTH OF EXPLOSIVE SEWER TRENCH FT 6
ICM SOIL CONTAMINATION LENGTH FT 214 15% of linear feet with TMCL exceedances
ICM SOIL CONTAMINATION DEPTH FT 1
ICM TEMPORARY BURN PADS - SOIL CONTAMINATION AREA SQ FT 1,283
ICM CONTAMINATED SOIL VOLUME CY 48
ICM SEWER TRENCH REQUIRING RE-REMEDITION LENGTH FT 53
ICM RE-REMEDIATION CONTAMINATED SOIL VOLUME CY 13
ICM EXPLOSIVES BLENDED CONTAMINATED SOIL VOLUME CY 48 15% of total linear feet of explosive soil blended to <10%
ICM TOTAL CONTAMINATED SOIL VOLULME SEWER INSIDE FDN CY 109
ICM CONFIRMATION SAMPLES SAMPLE 17
ICM SEWER IN PESTICIDE FOUNDATIONS LENGTH FT 1,035 Pesticide containing soil moved to excavate explosive sewers
ICM SEWER IN PESTICIDE FOUNDATIONS WIDTH FT 6
ICM TEMPORARY BURN PADS - SEWER IN PESTICIDE FOUNDATIONS FT 5
ICM SEWER IN PESTICIDE FOUNDATIONS VOLUME CY 1,150
ICM SEWER IN PESTICIDE FOUNDATIONS DISPOSAL SAMPLES SAMPLE 4
SAAP-026 Total Environmental Samples SAMPLE 314 SAAP-026 Total Contaminated Soil Excavation Volume CY 2934
SAAP-026 Total Contaminated Soil Disposal Weight TON 4401
SAAP-048 NITROGUANIDINE SUPPORT AREA
ICM LINEAR FEET AROUND EXPLOSIVE FOUNDATIONS FT 1,772 TEMPORARY BURN PADS
ICM RIND SOIL SAMPLES OF EXPLOSIVE FOUNDATIONS SAMPLE 64 59 + 5 = 64 Samples ICM RIND SOIL STEP OUT SAMPLES SAMPLE 30 15% TMCL exceedances, 10 Samples x 3
IRP Work at MEC Sites at SFAAP_ver 3 - Outside Sewers, TBPs and SAAP-017.xlsx 8 of 35
SITE ID PHASE SITE/PARAMETER UNITS AMOUNT COMMENTS
ICM ADDITIONAL RIND SOIL STEP OUT SAMPLES SAMPLE 6 5% TMCL exceedances, 2 Sample x 3
ICM 900 SQ FT GRIDS REQUIRING RE-REMEDITION EACH 3 25% of Grids, excavate an additional 1 foot deep to obtain clean soil ICM TOTAL 900 SQ FT GRIDS REQUIRING EXCAVATION EACH 15 Estimated grids requiring excavation
ICM SOIL CONTAMINATION DEPTH FT 1
ICM SOIL CONTAMINATION AREA SQ FT 13,500
ICM CONTAMINATED SOIL VOLUME CY 500
ICM CONFIRMATION SAMPLES SAMPLE 15
RCRA Metals, Manganese, Explosives (including NC, NQ, GN), Nitrate, Sulfate, Ammonia, VOCs
ICM CONTAMINATED SOIL STOCKPILE CONFIRMATION SAMPLES SAMPLE 1
Required sampling for areas where contaminated soil was stockpiled, after stockpile is removed.
ICM DISPOSAL SAMPLES SAMPLE 1 TCLP (Metals), Corrosivity, Ignitability, Reactivity ICM TEMPORARY BURN PADS - LINEAR FEET OF RIND SOIL FT 1,772 ACM debris resulting from burning buildings with asbestos in place
ICM RIND BURN DEBRIS/ACM WIDTH FT 8
ICM RIND BURN DEBRIS/ACM AREA SQ FT 14,176
ICM RIND BURN DEBRIS/ACM DEPTH FT 1
ICM RIND BURN DEBRIS/ACM VOLUME CY 525
ICM CONFIRMATION SAMPLES SAMPLE 16
ICM BURN DEBRIS/ACM IN BASEMENTS VOLUME CY 290
ICM TOTAL BURN DEBRIS/ACM VOLUME CY 815
ICM TEMPORARY BURN PADS - FR1 SUBFOUNDATION SLAB AREA SQ FT 26,461
ICM INITIAL 900 sq ft GRID SOIL SAMPLES SAMPLE 30 29 + 1 = 30 Samples ICM 900 SQ FT GRIDS REQUIRING REMEDITION EACH 5 15% TMCL exceedances; excavate 1 foot deep ICM 900 SQ FT GRIDS REQUIRING RE-REMEDITION EACH 1 25% of Grids, excavate an additional 1 foot deep to obtain clean soil
ICM TOTAL 900 SQ FT GRIDS REQUIRING EXCAVATION EACH 6
ICM SOIL CONTAMINATION DEPTH FT 1
ICM SOIL CONTAMINATION AREA SQ FT 5,130
ICM CONTAMINATED SOIL VOLUME CY 190
ICM EXPLOSIVES BLENDED CONTAMINATED SOIL VOLUME CY 49 5% of total square feet of explosive soil blended to <10%
ICM TOTAL CONTAMINATED SOIL VOLUME CY 239
ICM CONFIRMATION SAMPLES (TOTAL) SAMPLE 6
ICM INITIAL SEWER INSIDE FDN TRENCH SAMPLES SAMPLE 13 1 Five-point composite sample every foundation containing sewers ICM LENGTH OF EXPLOSIVE SEWER TRENCH INSIDE FOUNDATIONS FT 196 171 horizontal ft + (5' x 5) linear ft (drains, 5' per drain)
ICM WIDTH OF EXPLOSIVE SEWER TRENCH FT 6
ICM SOIL CONTAMINATION LENGTH FT 29 15% of linear feet with TMCL exceedances
ICM SOIL CONTAMINATION DEPTH FT 1
ICM TEMPORARY BURN PADS - SOIL CONTAMINATION AREA SQ FT 176
ICM CONTAMINATED SOIL VOLUME CY 7
ICM SEWER TRENCH REQUIRING RE-REMEDITION LENGTH FT 7
ICM RE-REMEDIATION CONTAMINATED SOIL VOLUME CY 3
IRP Work at MEC Sites at SFAAP_ver 3 - Outside Sewers, TBPs and SAAP-017.xlsx 9 of 35
SITE ID PHASE SITE/PARAMETER UNITS AMOUNT COMMENTS
ICM EXPLOSIVES BLENDED CONTAMINATED SOIL VOLUME CY 7 15% of total linear feet of explosive soil blended to <10%
ICM TOTAL CONTAMINATED SOIL VOLULME SEWER INSIDE FDN CY 17
ICM CONFIRMATION SAMPLES SAMPLE 2
ICM SEWER IN PESTICIDE FOUNDATIONS LENGTH FT 171 Pesticide containing soil moved to excavate explosive sewers
ICM SEWER IN PESTICIDE FOUNDATIONS WIDTH FT 6
ICM TEMPORARY BURN PADS - SEWER IN PESTICIDE FOUNDATIONS FT 5
ICM SEWER IN PESTICIDE FOUNDATIONS VOLUME CY 190
ICM SEWER IN PESTICIDE FOUNDATIONS DISPOSAL SAMPLES SAMPLE 1
SAAP-048 Total Environmental Samples SAMPLE 193 SAAP-048 Total Contaminated Soil Excavation Volume CY 1761
SAAP-048 Total Contaminated Soil Disposal Weight TON 2642
SAAP-065 TANK FARM
ICM LINEAR FEET AROUND EXPLOSIVE FOUNDATIONS FT 301 TEMPORARY BURN PADS
ICM RIND SOIL SAMPLES OF EXPLOSIVE FOUNDATIONS SAMPLE 12 10 + 2 = 12 Samples ICM RIND SOIL STEP OUT SAMPLES SAMPLE 6 15% TMCL exceedances, 2 Samples x 3 ICM ADDITIONAL RIND SOIL STEP OUT SAMPLES SAMPLE 3 5% TMCL exceedances, 1 Sample x 3
ICM 900 SQ FT GRIDS REQUIRING RE-REMEDITION EACH 1 25% of Grids, excavate an additional 1 foot deep to obtain clean soil ICM TOTAL 900 SQ FT GRIDS REQUIRING EXCAVATION EACH 4 Estimated grids requiring excavation
ICM SOIL CONTAMINATION DEPTH FT 1
ICM SOIL CONTAMINATION AREA SQ FT 3,600
ICM CONTAMINATED SOIL VOLUME CY 133
ICM CONFIRMATION SAMPLES SAMPLE 4
RCRA Metals, Manganese, 2,4-DNT, NC, SVOCs, VOCs, TPH-DRO, and TPH-GRO
ICM CONTAMINATED SOIL STOCKPILE CONFIRMATION SAMPLES SAMPLE 1
Required sampling for areas where contaminated soil was stockpiled, after stockpile is removed.
ICM DISPOSAL SAMPLES SAMPLE 1 TCLP (Metals), Corrosivity, Ignitability, Reactivity ICM TEMPORARY BURN PADS - LINEAR FEET OF RIND SOIL FT 301 ACM debris resulting from burning buildings with asbestos in place
ICM RIND BURN DEBRIS/ACM WIDTH FT 8
ICM RIND BURN DEBRIS/ACM AREA SQ FT 2,408
ICM RIND BURN DEBRIS/ACM DEPTH FT 1
ICM RIND BURN DEBRIS/ACM VOLUME CY 89
ICM CONFIRMATION SAMPLES SAMPLE 3
ICM BURN DEBRIS/ACM IN BASEMENTS VOLUME CY 290
ICM TOTAL BURN DEBRIS/ACM VOLUME CY 379
ICM TEMPORARY BURN PADS - FR1 SUBFOUNDATION SLAB AREA SQ FT 3,235
ICM INITIAL 900 sq ft GRID SOIL SAMPLES SAMPLE 6 4 + 2 = 6 Samples ICM 900 SQ FT GRIDS REQUIRING REMEDITION EACH 1 15% TMCL exceedances; excavate 1 foot deep
IRP Work at MEC Sites at SFAAP_ver 3 - Outside Sewers, TBPs and SAAP-017.xlsx 10 of 35
SITE ID PHASE SITE/PARAMETER UNITS AMOUNT COMMENTS
ICM 900 SQ FT GRIDS REQUIRING RE-REMEDITION EACH 1 25% of Grids, excavate an additional 1 foot deep to obtain clean soil
ICM TOTAL 900 SQ FT GRIDS REQUIRING EXCAVATION EACH 2
ICM SOIL CONTAMINATION DEPTH FT 1
ICM SOIL CONTAMINATION AREA SQ FT 1,844
ICM CONTAMINATED SOIL VOLUME CY 68
ICM EXPLOSIVES BLENDED CONTAMINATED SOIL VOLUME CY 6 5% of total square feet of explosive soil blended to <10%
ICM TOTAL CONTAMINATED SOIL VOLUME CY 74
ICM CONFIRMATION SAMPLES (TOTAL) SAMPLE 2
ICM INITIAL SEWER INSIDE FDN TRENCH SAMPLES SAMPLE 7 1 Five-point composite sample every foundation containing sewers ICM LENGTH OF EXPLOSIVE SEWER TRENCH INSIDE FOUNDATIONS FT 224 174 horizontal ft + (5' x 10) linear ft (drains, 5' per drain)
ICM WIDTH OF EXPLOSIVE SEWER TRENCH FT 6
ICM SOIL CONTAMINATION LENGTH FT 34 15% of linear feet with TMCL exceedances
ICM SOIL CONTAMINATION DEPTH FT 1
ICM TEMPORARY BURN PADS - SOIL CONTAMINATION AREA SQ FT 202
ICM CONTAMINATED SOIL VOLUME CY 7
ICM SEWER TRENCH REQUIRING RE-REMEDITION LENGTH FT 8
ICM RE-REMEDIATION CONTAMINATED SOIL VOLUME CY 3
ICM EXPLOSIVES BLENDED CONTAMINATED SOIL VOLUME CY 7 15% of total linear feet of explosive soil blended to <10%
ICM TOTAL CONTAMINATED SOIL VOLULME SEWER INSIDE FDN CY 18
ICM CONFIRMATION SAMPLES SAMPLE 1
ICM SEWER IN PESTICIDE FOUNDATIONS LENGTH FT 174 Pesticide containing soil moved to excavate explosive sewers
ICM SEWER IN PESTICIDE FOUNDATIONS WIDTH FT 6
ICM SEWER IN PESTICIDE FOUNDATIONS DEPTH FT 5 TEMPORARY BURN PADS
ICM SEWER IN PESTICIDE FOUNDATIONS VOLUME CY 193
ICM SEWER IN PESTICIDE FOUNDATIONS DISPOSAL SAMPLES SAMPLE 1
SAAP-065 Total Environmental Samples SAMPLE 54 SAAP-065 Total Contaminated Soil Excavation Volume CY 798
SAAP-065 Total Contaminated Soil Disposal Weight TON 1197
SAAP-067 SOUTH ACID AREA
ICM LINEAR FEET AROUND EXPLOSIVE FOUNDATIONS FT 296 TEMPORARY BURN PADS
ICM RIND SOIL SAMPLES OF EXPLOSIVE FOUNDATIONS SAMPLE 13 10 + 3 = 13 Samples ICM RIND SOIL STEP OUT SAMPLES SAMPLE 6 15% TMCL exceedances, 2 Samples x 3 ICM ADDITIONAL RIND SOIL STEP OUT SAMPLES SAMPLE 3 5% TMCL exceedances, 1 Sample x 3
ICM 900 SQ FT GRIDS REQUIRING RE-REMEDITION EACH 1 25% of Grids, excavate an additional 1 foot deep to obtain clean soil ICM TOTAL 900 SQ FT GRIDS REQUIRING EXCAVATION EACH 4 Estimated grids requiring excavation
ICM SOIL CONTAMINATION DEPTH FT 2
ICM SOIL CONTAMINATION AREA SQ FT 3,600
IRP Work at MEC Sites at SFAAP_ver 3 - Outside Sewers, TBPs and SAAP-017.xlsx 11 of 35
SITE ID PHASE SITE/PARAMETER UNITS AMOUNT COMMENTS
ICM CONTAMINATED SOIL VOLUME CY 267
ICM CONFIRMATION SAMPLES SAMPLE 4
RCRA Metals, Hexavalent Chromium, Manganese, Nickel, Vanadium, SVOCs, VOCs, TPH-DRO, TPH-GRO, NG, Nitrate, Sulfate, Ammonia, pH
ICM CONTAMINATED SOIL STOCKPILE CONFIRMATION SAMPLES SAMPLE 1
Required sampling for areas where contaminated soil was stockpiled, after stockpile is removed.
ICM DISPOSAL SAMPLES SAMPLE 1 TCLP (Metals), Corrosivity, Ignitability, Reactivity ICM TEMPORARY BURN PADS - LINEAR FEET OF RIND SOIL FT 296 ACM debris resulting from burning buildings with asbestos in place
ICM RIND BURN DEBRIS/ACM WIDTH FT 8
ICM RIND BURN DEBRIS/ACM AREA SQ FT 2,368
ICM RIND BURN DEBRIS/ACM DEPTH FT 1
ICM RIND BURN DEBRIS/ACM VOLUME CY 88
ICM CONFIRMATION SAMPLES SAMPLE 3
ICM BURN DEBRIS/ACM IN BASEMENTS VOLUME CY 290
ICM TOTAL BURN DEBRIS/ACM VOLUME CY 378
ICM TEMPORARY BURN PADS - FR1 SUBFOUNDATION SLAB AREA SQ FT 6,529
ICM INITIAL 900 sq ft GRID SOIL SAMPLES SAMPLE 10 7 + 3 = 10 Samples ICM 900 SQ FT GRIDS REQUIRING REMEDITION EACH 2 15% TMCL exceedances; excavate 1 foot deep ICM 900 SQ FT GRIDS REQUIRING RE-REMEDITION EACH 1 25% of Grids, excavate an additional 1 foot deep to obtain clean soil
ICM TOTAL 900 SQ FT GRIDS REQUIRING EXCAVATION EACH 3
ICM SOIL CONTAMINATION DEPTH FT 1
ICM SOIL CONTAMINATION AREA SQ FT 2,630
ICM CONTAMINATED SOIL VOLUME CY 97
ICM EXPLOSIVES BLENDED CONTAMINATED SOIL VOLUME CY 12 5% of total square feet of explosive soil blended to <10%
ICM TOTAL CONTAMINATED SOIL VOLUME CY 110
ICM CONFIRMATION SAMPLES (TOTAL) SAMPLE 3
SAAP-067 Total Environmental Samples SAMPLE 47
SAAP-067 Total Contaminated Soil Excavation Volume CY 754 SAAP-067 Total Contaminated Soil Disposal Weight TON 1131
SAAP-116 NC PRODUCTION LINES
ICM LINEAR FEET AROUND EXPLOSIVE FOUNDATIONS FT 3,786 TEMPORARY BURN PADS
ICM RIND SOIL SAMPLES OF EXPLOSIVE FOUNDATIONS SAMPLE 136 126 + 10 = 136 Samples ICM RIND SOIL STEP OUT SAMPLES SAMPLE 60 15% TMCL exceedances, 20 Samples x 3 ICM ADDITIONAL RIND SOIL STEP OUT SAMPLES SAMPLE 9 5% TMCL exceedances, 3 Sample x 3
ICM 900 SQ FT GRIDS REQUIRING RE-REMEDITION EACH 6 25% of Grids, excavate an additional 1 foot deep to obtain clean soil
ICM TOTAL 900 SQ FT GRIDS REQUIRING EXCAVATION EACH 29
ICM SOIL CONTAMINATION DEPTH FT 1
IRP Work at MEC Sites at SFAAP_ver 3 - Outside Sewers, TBPs and SAAP-017.xlsx 12 of 35
SITE ID PHASE SITE/PARAMETER UNITS AMOUNT COMMENTS
ICM SOIL CONTAMINATION AREA SQ FT 26,100
ICM CONTAMINATED SOIL VOLUME CY 967
ICM CONFIRMATION SAMPLES SAMPLE 29 RCRA Metals, SVOCs, Nitrates, NC
ICM CONTAMINATED SOIL STOCKPILE CONFIRMATION SAMPLES SAMPLE 2
Required sampling for areas where contaminated soil was stockpiled, after stockpile is removed.
ICM DISPOSAL SAMPLES SAMPLE 2 TCLP (Metals), Corrosivity, Ignitability, Reactivity ICM TEMPORARY BURN PADS - LINEAR FEET OF RIND SOIL FT 3,786 ACM debris resulting from burning buildings with asbestos in place
ICM RIND BURN DEBRIS/ACM WIDTH FT 8
ICM RIND BURN DEBRIS/ACM AREA SQ FT 30,288
ICM RIND BURN DEBRIS/ACM DEPTH FT 1
ICM RIND BURN DEBRIS/ACM VOLUME CY 1,122
ICM CONFIRMATION SAMPLES SAMPLE 34
ICM BURN DEBRIS/ACM IN BASEMENTS VOLUME CY 290
ICM TOTAL BURN DEBRIS/ACM VOLUME CY 1,412
ICM ACM CONTAMINATED SOIL STOCKPILE CONFIRMATION SAMPLES SAMPLE 3
ICM ACM DISPOSAL SAMPLES SAMPLE 4 TCLP (Metals), Corrosivity, Ignitability, Reactivity
ICM TEMPORARY BURN PADS - FR1 SUBFOUNDATION SLAB AREA SQ FT 149,189
ICM INITIAL 900 sq ft GRID SOIL SAMPLES SAMPLE 173 166 + 7 = 173 Samples ICM 900 SQ FT GRIDS REQUIRING REMEDITION EACH 26 15% TMCL exceedances; excavate 1 foot deep ICM 900 SQ FT GRIDS REQUIRING RE-REMEDITION EACH 6 25% of Grids, excavate an additional 1 foot deep to obtain clean soil
ICM TOTAL 900 SQ FT GRIDS REQUIRING EXCAVATION EACH 32
ICM SOIL CONTAMINATION DEPTH FT 1
ICM SOIL CONTAMINATION AREA SQ FT 29,154
ICM CONTAMINATED SOIL VOLUME CY 1,080
ICM EXPLOSIVES BLENDED CONTAMINATED SOIL VOLUME CY 276 5% of total square feet of explosive soil blended to <10%
ICM TOTAL CONTAMINATED SOIL VOLUME CY 1,356
ICM CONFIRMATION SAMPLES (TOTAL) SAMPLE 32
ICM CONTAMINATED SOIL STOCKPILE CONFIRMATION SAMPLES SAMPLE 2
ICM DISPOSAL SAMPLES SAMPLE 3 TCLP (Metals), Corrosivity, Ignitability, Reactivity ICM INITIAL SEWER INSIDE FDN TRENCH SAMPLES SAMPLE 72 1 Five-point composite sample every foundation containing sewers ICM LENGTH OF EXPLOSIVE SEWER TRENCH INSIDE FOUNDATIONS FT 173 68 horizontal ft + (5' x 21) linear ft (drains, 5' per drain)
ICM WIDTH OF EXPLOSIVE SEWER TRENCH FT 6
ICM SOIL CONTAMINATION LENGTH FT 26 15% of linear feet with TMCL exceedances
ICM SOIL CONTAMINATION DEPTH FT 1
ICM TEMPORARY BURN PADS - SOIL CONTAMINATION AREA SQ FT 156
ICM CONTAMINATED SOIL VOLUME CY 6
ICM SEWER TRENCH REQUIRING RE-REMEDITION LENGTH FT 6
ICM RE-REMEDIATION CONTAMINATED SOIL VOLUME CY 2
ICM EXPLOSIVES BLENDED CONTAMINATED SOIL VOLUME CY 6 15% of total linear feet of explosive soil blended to <10%
ICM TOTAL CONTAMINATED SOIL VOLULME SEWER INSIDE FDN CY 14
ICM CONFIRMATION SAMPLES SAMPLE 11
ICM SEWER IN PESTICIDE FOUNDATIONS LENGTH FT 49 Pesticide containing soil moved to excavate explosive sewers
IRP Work at MEC Sites at SFAAP_ver 3 - Outside Sewers, TBPs and SAAP-017.xlsx 13 of 35
SITE ID PHASE SITE/PARAMETER UNITS AMOUNT COMMENTS
ICM SEWER IN PESTICIDE FOUNDATIONS WIDTH FT 6
ICM SEWER IN PESTICIDE FOUNDATIONS DEPTH FT 5 TEMPORARY BURN PADS
ICM SEWER IN PESTICIDE FOUNDATIONS VOLUME CY 54
ICM SEWER IN PESTICIDE FOUNDATIONS DISPOSAL SAMPLES SAMPLE 1
SAAP-116 Total Environmental Samples SAMPLE 577 SAAP-116 Total Contaminated Soil Excavation Volume CY 3803
SAAP-116 Total Contaminated Soil Disposal Weight TON 5705
SAAP-117 NQ PRODUCTION FACILITIES
ICM LINEAR FEET AROUND EXPLOSIVE FOUNDATIONS FT 2,600 TEMPORARY BURN PADS
ICM RIND SOIL SAMPLES OF EXPLOSIVE FOUNDATIONS SAMPLE 92 87 + 5 = 92 Samples ICM RIND SOIL STEP OUT SAMPLES SAMPLE 42 15% TMCL exceedances, 14 Samples x 3 ICM ADDITIONAL RIND SOIL STEP OUT SAMPLES SAMPLE 6 5% TMCL exceedances, 2 Sample x 3
ICM 900 SQ FT GRIDS REQUIRING RE-REMEDITION EACH 4 25% of Grids, excavate an additional 1 foot deep to obtain clean soil
ICM TOTAL 900 SQ FT GRIDS REQUIRING EXCAVATION EACH 20
ICM SOIL CONTAMINATION DEPTH FT 2
ICM SOIL CONTAMINATION AREA SQ FT 18,000
ICM CONTAMINATED SOIL VOLUME CY 1,333
ICM CONFIRMATION SAMPLES SAMPLE 20
RCRA Metals, Hexavalent Chromium, Cobalt, Iron, Manganese, SVOCs, VOCs, NQ, GN, Ethylene Glycol, PCBs, TPH-DRO, Nitrate, Sulfate, Ammonia, Cyanide, Fluoride, pH
ICM CONTAMINATED SOIL STOCKPILE CONFIRMATION SAMPLES SAMPLE 3
Required sampling for areas where contaminated soil was stockpiled, after stockpile is removed.
ICM DISPOSAL SAMPLES SAMPLE 3 TCLP (Metals), Corrosivity, Ignitability, Reactivity ICM TEMPORARY BURN PADS - LINEAR FEET OF RIND SOIL FT 2,600 ACM debris resulting from burning buildings with asbestos in place
ICM RIND BURN DEBRIS/ACM WIDTH FT 8
ICM RIND BURN DEBRIS/ACM AREA SQ FT 20,800
ICM RIND BURN DEBRIS/ACM DEPTH FT 1
ICM RIND BURN DEBRIS/ACM VOLUME CY 770
ICM CONFIRMATION SAMPLES SAMPLE 23
ICM BURN DEBRIS/ACM IN BASEMENTS VOLUME CY 290
ICM TOTAL BURN DEBRIS/ACM VOLUME CY 1,061
ICM ACM CONTAMINATED SOIL VOLUME (W 25% FLUFF) CY 1,326
ICM ACM DISPOSAL SAMPLES SAMPLE 3 TCLP (Metals), Corrosivity, Ignitability, Reactivity
ICM TEMPORARY BURN PADS - FR1 SUBFOUNDATION SLAB AREA SQ FT 38,277
ICM INITIAL 900 sq ft GRID SOIL SAMPLES SAMPLE 48 43 + 5 = 48 Samples ICM 900 SQ FT GRIDS REQUIRING REMEDITION EACH 8 15% TMCL exceedances; excavate 1 foot deep ICM 900 SQ FT GRIDS REQUIRING RE-REMEDITION EACH 2 25% of Grids, excavate an additional 1 foot deep to obtain clean soil
ICM TOTAL 900 SQ FT GRIDS REQUIRING EXCAVATION EACH 10
ICM SOIL CONTAMINATION DEPTH FT 1 48
ICM SOIL CONTAMINATION AREA SQ FT 9,146
IRP Work at MEC Sites at SFAAP_ver 3 - Outside Sewers, TBPs and SAAP-017.xlsx 14 of 35
SITE ID PHASE SITE/PARAMETER UNITS AMOUNT COMMENTS
ICM CONTAMINATED SOIL VOLUME CY 339
ICM EXPLOSIVES BLENDED CONTAMINATED SOIL VOLUME CY 71 5% of total square feet of explosive soil blended to <10%
ICM TOTAL CONTAMINATED SOIL VOLUME CY 410
ICM CONFIRMATION SAMPLES (TOTAL) SAMPLE 10
ICM CONTAMINATED SOIL STOCKPILE CONFIRMATION SAMPLES SAMPLE 1
Required sampling for areas where contaminated soil was stockpiled, after stockpile is removed.
ICM DISPOSAL SAMPLES SAMPLE 1 TCLP (Metals), Corrosivity, Ignitability, Reactivity ICM INITIAL SEWER INSIDE FDN TRENCH SAMPLES SAMPLE 11 1 Five-point composite sample every foundation containing sewers ICM LENGTH OF EXPLOSIVE SEWER TRENCH INSIDE FOUNDATIONS FT 578 448 horizontal ft + (5' x 26) linear ft (drains, 5' per drain)
ICM WIDTH OF EXPLOSIVE SEWER TRENCH FT 6
ICM SOIL CONTAMINATION LENGTH FT 87 15% of linear feet with TMCL exceedances
ICM SOIL CONTAMINATION DEPTH FT 1
ICM TEMPORARY BURN PADS - SOIL CONTAMINATION AREA SQ FT 520
ICM CONTAMINATED SOIL VOLUME CY 19
ICM SEWER TRENCH REQUIRING RE-REMEDITION LENGTH FT 22
25% of length of contaminated sewer trench, re-excavate an additional 1 foot deep to obtain clean soil
ICM RE-REMEDIATION CONTAMINATED SOIL VOLUME CY 6
ICM EXPLOSIVES BLENDED CONTAMINATED SOIL VOLUME CY 19 15% of total linear feet of explosive soil blended to <10%
ICM TOTAL CONTAMINATED SOIL VOLULME SEWER INSIDE FDN CY 44
ICM CONFIRMATION SAMPLES SAMPLE 2
ICM CONTAMINATED SOIL STOCKPILE CONFIRMATION SAMPLES SAMPLE 1
Required sampling for areas where contaminated soil was stockpiled, after stockpile is removed.
ICM DISPOSAL SAMPLES SAMPLE 1 TCLP (Metals), Corrosivity, Ignitability, Reactivity SAAP-117 Total Environmental Samples SAMPLE 268
SAAP-117 Total Contaminated Soil Excavation Volume CY 2848 SAAP-117 Total Contaminated Soil Disposal Weight TON 4272
3343 SAMPLE Total TBP & Rind Soil Environmental Samples 34377 CY Total TBP & Rind Soil Contamination Excavation Volume 1 QA MULTIPLIER 51566 TON Total TBP & Rind Soil Contaminated Soil Disposal Weight 900 CONFIRMATION SAMPLE CENTERS (SQ FT) - STANDARD
27 CONFIRMATION SAMPLE FOR STOCKPILES CONVERTER
490 SAMPLE Total Outside Sewer Environmental Samples 500 DISPOSAL SAMPLE FREQUENCY (CY)
18668 CY Total Outside Sewer Contamination Excavation Volume 0.15 INITIAL SOIL SAMPLE TMCL EXCEEDANCE FREQUENCY 28002 TON Total Outside Sewer Contaminated Soil Disposal Weight 0.05 SOIL STEPOUT SAMPLE TMCL EXCEEDANCE FREQUENCY
GENERAL ASSUMPTIONS
1) QA SAMPLING CALCULATED BY RACER.
2) CONFIRMATION SAMPLES AT 900 FOOT CENTERS (EXCEPT AS SHOWN).
3) ONE SOIL SAMPLE TAKEN PER NEW WELL, ANALYZED FOR COCs.
4) OFFSITE DISPOSAL OF WASTE ASSUMMED FOR ALL SITES.
5) ANALYSES SHOWN FOR CONFIRMATION SAMPLES APPLY TO ALL OTHER
SAMPLES UNLESS OTHERWISE INDICATED.
6) BACKFILL INCLUDED WITH EXCAVATION, ROCKFILL DELETED FROM ASSEMBLY
7) DISPOSAL SAMPLES ASSUMED AT ONE FOR EVERY 500 CUBIC YARDS.
IRP Work at MEC Sites at SFAAP_ver 3 - Outside Sewers, TBPs and SAAP-017.xlsx 15 of 35
SITE ID PHASE SITE/PARAMETER UNITS AMOUNT COMMENTS
8) CONFIRMATION SAMPLE FREQUENCY FOR FORMER CONTAMINATED SOIL STOCK-
PILE AREAS SET AT TOTAL CUBIC YARDS OF DISPOSED CONTAMINATED SOIL
CONVERTED TO CUBIC FEET (CY/27=CF), THEN DIVIDE BY 20 (HEIGHT OF
SOIL STOCKPILES) TIMES 900 (SQUARE FEET SAMPLING FREQUENCY)
B-LINE OUTSIDE SEWERS
ICM INITIAL SEWER OUTSIDE FDN TRENCH SAMPLES SAMPLE 42 1 Five-point composite sample every 500 feet
ICM LENGTH OF EXPLOSIVE SEWER TRENCH OUTSIDE FOUNDATIONS FT 20,505
ICM WIDTH OF EXPLOSIVE SEWER TRENCH FT 8
ICM SOIL CONTAMINATION LENGTH FT 3,076 15% of linear feet with TMCL exceedances
ICM SOIL CONTAMINATION DEPTH FT 1
ICM SOIL CONTAMINATION AREA SQ FT 24,606
ICM CONTAMINATED SOIL VOLUME CY 911
ICM SEWER TRENCH REQUIRING RE-REMEDITION LENGTH FT 769
25% of length of contaminated sewer trench, re-excavate an additional 1 foot deep to obtain clean soil
ICM RE-REMEDIATION CONTAMINATED SOIL VOLUME CY 229
ICM EXPLOSIVES BLENDED CONTAMINATED SOIL VOLUME CY 911 15% of total linear feet of explosive soil blended to <10%
ICM TOTAL CONTAMINATED SOIL VOLULME SEWER OUTSIDE FDN CY 2,052
ICM CONFIRMATION SAMPLES SAMPLE 6
ICM CONTAMINATED SOIL STOCKPILE CONFIRMATION SAMPLES SAMPLE 3
Required sampling for areas where contaminated soil was stockpiled, after stockpile is removed.
ICM DISPOSAL SAMPLES SAMPLE 5 TCLP (Metals), Corrosivity, Ignitability, Reactivity B-Line O-Sewer Total Environmental Samples SAMPLE 57
B-Line O-Sewer Total Contaminated Soil Excavation Volume CY 2052 B-Line O-Sewer Total Contaminated Soil Disposal Weight TON 3077
C-LINE OUTSIDE SEWERS
ICM INITIAL SEWER OUTSIDE FDN TRENCH SAMPLES SAMPLE 45 1 Five-point composite sample every 500 feet
ICM LENGTH OF EXPLOSIVE SEWER TRENCH OUTSIDE FOUNDATIONS FT 21,926
ICM WIDTH OF EXPLOSIVE SEWER TRENCH FT 8
ICM SOIL CONTAMINATION LENGTH FT 3,289 15% of linear feet with TMCL exceedances
ICM SOIL CONTAMINATION DEPTH FT 1
ICM SOIL CONTAMINATION AREA SQ FT 26,311
ICM CONTAMINATED SOIL VOLUME CY 974
ICM SEWER TRENCH REQUIRING RE-REMEDITION LENGTH FT 822
25% of length of contaminated sewer trench, re-excavate an additional 1 foot deep to obtain clean soil
ICM RE-REMEDIATION CONTAMINATED SOIL VOLUME CY 245
ICM EXPLOSIVES BLENDED CONTAMINATED SOIL VOLUME CY 974 15% of total linear feet of explosive soil blended to <10%
ICM TOTAL CONTAMINATED SOIL VOLULME SEWER OUTSIDE FDN CY 2,194
ICM CONFIRMATION SAMPLES SAMPLE 7
ICM CONTAMINATED SOIL STOCKPILE CONFIRMATION SAMPLES SAMPLE 3
Required sampling for areas where contaminated soil was stockpiled, ICM DISPOSAL SAMPLES SAMPLE 6 TCLP (Metals), Corrosivity, Ignitability, Reactivity
IRP Work at MEC Sites at SFAAP_ver 3 - Outside Sewers, TBPs and SAAP-017.xlsx 16 of 35
SITE ID PHASE SITE/PARAMETER UNITS AMOUNT COMMENTS
C-Line O-Sewer Total Environmental Samples SAMPLE 61
C-Line O-Sewer Total Contaminated Soil Excavation Volume CY 2194 C-Line O-Sewer Total Contaminated Soil Disposal Weight TON 3290
D-LINE OUTSIDE SEWERS
ICM INITIAL SEWER OUTSIDE FDN TRENCH SAMPLES SAMPLE 43 1 Five-point composite sample every 500 feet
ICM LENGTH OF EXPLOSIVE SEWER TRENCH OUTSIDE FOUNDATIONS FT 20,949
ICM WIDTH OF EXPLOSIVE SEWER TRENCH FT 8
ICM SOIL CONTAMINATION LENGTH FT 3,142 15% of linear feet with TMCL exceedances
ICM SOIL CONTAMINATION DEPTH FT 1
ICM SOIL CONTAMINATION AREA SQ FT 25,139
ICM CONTAMINATED SOIL VOLUME CY 931
ICM SEWER TRENCH REQUIRING RE-REMEDITION LENGTH FT 786
25% of length of contaminated sewer trench, re-excavate an additional 1 foot deep to obtain clean soil
ICM RE-REMEDIATION CONTAMINATED SOIL VOLUME CY 234
ICM EXPLOSIVES BLENDED CONTAMINATED SOIL VOLUME CY 931 15% of total linear feet of explosive soil blended to <10%
ICM TOTAL CONTAMINATED SOIL VOLULME SEWER OUTSIDE FDN CY 2,096
ICM CONFIRMATION SAMPLES SAMPLE 6
ICM CONTAMINATED SOIL STOCKPILE CONFIRMATION SAMPLES SAMPLE 3
Required sampling for areas where contaminated soil was stockpiled, after stockpile is removed.
ICM DISPOSAL SAMPLES SAMPLE 5 TCLP (Metals), Corrosivity, Ignitability, Reactivity D-Line O-Sewer Total Environmental Samples SAMPLE 58
D-Line O-Sewer Total Contaminated Soil Excavation Volume CY 2096 D-Line O-Sewer Total Contaminated Soil Disposal Weight TON 3144
E-LINE OUTSIDE SEWERS
ICM INITIAL SEWER OUTSIDE FDN TRENCH SAMPLES SAMPLE 62 1 Five-point composite sample every 500 feet
ICM LENGTH OF EXPLOSIVE SEWER TRENCH OUTSIDE FOUNDATIONS FT 30,258
ICM WIDTH OF EXPLOSIVE SEWER TRENCH FT 8
ICM SOIL CONTAMINATION LENGTH FT 4,539 15% of linear feet with TMCL exceedances
ICM SOIL CONTAMINATION DEPTH FT 1
ICM SOIL CONTAMINATION AREA SQ FT 36,310
ICM CONTAMINATED SOIL VOLUME CY 1,345
ICM SEWER TRENCH REQUIRING RE-REMEDITION LENGTH FT 1,135
25% of length of contaminated sewer trench, re-excavate an additional 1 foot deep to obtain clean soil
ICM RE-REMEDIATION CONTAMINATED SOIL VOLUME CY 337
ICM EXPLOSIVES BLENDED CONTAMINATED SOIL VOLUME CY 1,345 15% of total linear feet of explosive soil blended to <10%
ICM TOTAL CONTAMINATED SOIL VOLULME SEWER OUTSIDE FDN CY 3,027
ICM CONFIRMATION SAMPLES SAMPLE 9
ICM CONTAMINATED SOIL STOCKPILE CONFIRMATION SAMPLES SAMPLE 5
Required sampling for areas where contaminated soil was stockpiled, after stockpile is removed.
ICM DISPOSAL SAMPLES SAMPLE 8 TCLP (Metals), Corrosivity, Ignitability, Reactivity E-Line O-Sewer Total Environmental Samples SAMPLE 83
IRP Work at MEC Sites at SFAAP_ver 3 - Outside Sewers, TBPs and SAAP-017.xlsx 17 of 35
SITE ID PHASE SITE/PARAMETER UNITS AMOUNT COMMENTS
E-Line O-Sewer Total Contaminated Soil Excavation Volume CY 3027
E-Line O-Sewer Total Contaminated Soil Disposal Weight TON 4540
E-LINE OUTSIDE SEWERS
Premix ICM INITIAL SEWER OUTSIDE FDN TRENCH SAMPLES SAMPLE 9 1 Five-point composite sample every 500 feet
ICM LENGTH OF EXPLOSIVE SEWER TRENCH OUTSIDE FOUNDATIONS FT 3,784
ICM WIDTH OF EXPLOSIVE SEWER TRENCH FT 8
ICM SOIL CONTAMINATION LENGTH FT 568 15% of linear feet with TMCL exceedances
ICM SOIL CONTAMINATION DEPTH FT 1
ICM SOIL CONTAMINATION AREA SQ FT 4,541
ICM CONTAMINATED SOIL VOLUME CY 168
ICM SEWER TRENCH REQUIRING RE-REMEDITION LENGTH FT 142
25% of length of contaminated sewer trench, re-excavate an additional 1 foot deep to obtain clean soil
ICM RE-REMEDIATION CONTAMINATED SOIL VOLUME CY 43
ICM EXPLOSIVES BLENDED CONTAMINATED SOIL VOLUME CY 168 15% of total linear feet of explosive soil blended to <10%
ICM TOTAL CONTAMINATED SOIL VOLULME SEWER OUTSIDE FDN CY 379
ICM CONFIRMATION SAMPLES SAMPLE 1
ICM CONTAMINATED SOIL STOCKPILE CONFIRMATION SAMPLES SAMPLE 1
Required sampling for areas where contaminated soil was stockpiled, after stockpile is removed.
ICM DISPOSAL SAMPLES SAMPLE 1 TCLP (Metals), Corrosivity, Ignitability, Reactivity E-Line Premix O-Sewer Total Environmental Samples SAMPLE 11
E-Line Premix O-Sewer Total Cont Soil Excavation Volume CY 379
E-Line Premix O-Sewer Total Contaminated Soil Disposal Weight TON 569
G-LINE OUTSIDE SEWERS
ICM INITIAL SEWER OUTSIDE FDN TRENCH SAMPLES SAMPLE 27 1 Five-point composite sample every 500 feet
ICM LENGTH OF EXPLOSIVE SEWER TRENCH OUTSIDE FOUNDATIONS FT 13,045
ICM WIDTH OF EXPLOSIVE SEWER TRENCH FT 8
ICM SOIL CONTAMINATION LENGTH FT 1,957 15% of linear feet with TMCL exceedances
ICM SOIL CONTAMINATION DEPTH FT 1
ICM SOIL CONTAMINATION AREA SQ FT 15,654
ICM CONTAMINATED SOIL VOLUME CY 580
ICM SEWER TRENCH REQUIRING RE-REMEDITION LENGTH FT 489
25% of length of contaminated sewer trench, re-excavate an additional 1 foot deep to obtain clean soil
ICM RE-REMEDIATION CONTAMINATED SOIL VOLUME CY 146
ICM EXPLOSIVES BLENDED CONTAMINATED SOIL VOLUME CY 580 15% of total linear feet of explosive soil blended to <10%
ICM TOTAL CONTAMINATED SOIL VOLULME SEWER OUTSIDE FDN CY 1,306
ICM CONFIRMATION SAMPLES SAMPLE 4
ICM CONTAMINATED SOIL STOCKPILE CONFIRMATION SAMPLES SAMPLE 2
Required sampling for areas where contaminated soil was stockpiled, after stockpile is removed.
G-Line O-Sewer Total Environmental Samples SAMPLE 36
IRP Work at MEC Sites at SFAAP_ver 3 - Outside Sewers, TBPs and SAAP-017.xlsx 18 of 35
SITE ID PHASE SITE/PARAMETER UNITS AMOUNT COMMENTS
G-Line O-Sewer Total Contaminated Soil Excavation Volume CY 1306
G-Line O-Sewer Total Contaminated Soil Disposal Weight TON 1958
Five OUTSIDE SEWERS Corners ICM INITIAL SEWER OUTSIDE FDN TRENCH SAMPLES SAMPLE 9 1 Five-point composite sample every 500 feet
ICM LENGTH OF EXPLOSIVE SEWER TRENCH OUTSIDE FOUNDATIONS FT 3,949
ICM WIDTH OF EXPLOSIVE SEWER TRENCH FT 8
ICM SOIL CONTAMINATION LENGTH FT 592 15% of linear feet with TMCL exceedances
ICM SOIL CONTAMINATION DEPTH FT 1
ICM SOIL CONTAMINATION AREA SQ FT 4,739
ICM CONTAMINATED SOIL VOLUME CY 176
ICM SEWER TRENCH REQUIRING RE-REMEDITION LENGTH FT 148
25% of length of contaminated sewer trench, re-excavate an additional 1 foot deep to obtain clean soil
ICM RE-REMEDIATION CONTAMINATED SOIL VOLUME CY 45
ICM EXPLOSIVES BLENDED CONTAMINATED SOIL VOLUME CY 176 15% of total linear feet of explosive soil blended to <10%
ICM TOTAL CONTAMINATED SOIL VOLULME SEWER OUTSIDE FDN CY 396
ICM CONFIRMATION SAMPLES SAMPLE 1
ICM CONTAMINATED SOIL STOCKPILE CONFIRMATION SAMPLES SAMPLE 1
Required sampling for areas where contaminated soil was stockpiled, after stockpile is removed.
ICM DISPOSAL SAMPLES SAMPLE 1 TCLP (Metals), Corrosivity, Ignitability, Reactivity Five Corners O-Sewer Total Environmental Samples SAMPLE 12
Five Corners O-Sewer Total Contaminated Soil Excavation Volume CY 396 Five Corners O-Sewer Total Contaminated Soil Disposal Weight TON 594
Finishing OUTSIDE SEWERS Area ICM INITIAL SEWER OUTSIDE FDN TRENCH SAMPLES SAMPLE 85 1 Five-point composite sample every 500 feet
ICM LENGTH OF EXPLOSIVE SEWER TRENCH OUTSIDE FOUNDATIONS FT 41,920
ICM WIDTH OF EXPLOSIVE SEWER TRENCH FT 8
ICM SOIL CONTAMINATION LENGTH FT 6,288 15% of linear feet with TMCL exceedances
ICM SOIL CONTAMINATION DEPTH FT 1
ICM SOIL CONTAMINATION AREA SQ FT 50,304
ICM CONTAMINATED SOIL VOLUME CY 1,863
ICM SEWER TRENCH REQUIRING RE-REMEDITION LENGTH FT 1,572
25% of length of contaminated sewer trench, re-excavate an additional 1 foot deep to obtain clean soil
ICM RE-REMEDIATION CONTAMINATED SOIL VOLUME CY 467
ICM EXPLOSIVES BLENDED CONTAMINATED SOIL VOLUME CY 1,863 15% of total linear feet of explosive soil blended to <10%
ICM TOTAL CONTAMINATED SOIL VOLULME SEWER OUTSIDE FDN CY 4,193
ICM CONFIRMATION SAMPLES SAMPLE 13
ICM CONTAMINATED SOIL STOCKPILE CONFIRMATION SAMPLES SAMPLE 6
Required sampling for areas where contaminated soil was stockpiled, after stockpile is removed.
ICM DISPOSAL SAMPLES SAMPLE 10 TCLP (Metals), Corrosivity, Ignitability, Reactivity Finishing Area O-Sewer Total Environmental Samples SAMPLE 114
IRP Work at MEC Sites at SFAAP_ver 3 - Outside Sewers, TBPs and SAAP-017.xlsx 19 of 35
SITE ID PHASE SITE/PARAMETER UNITS AMOUNT COMMENTS
Finishing Area O-Sewer Total Contam Soil Excavation Volume CY 4193
Finishing Area O-Sewer Total Contaminated Soil Disposal Weight TON 6290
NG OUTSIDE SEWERS
ICM INITIAL SEWER OUTSIDE FDN TRENCH SAMPLES SAMPLE 4 1 Five-point composite sample every 500 feet
ICM LENGTH OF EXPLOSIVE SEWER TRENCH OUTSIDE FOUNDATIONS FT 1,690
ICM WIDTH OF EXPLOSIVE SEWER TRENCH FT 8
ICM SOIL CONTAMINATION LENGTH FT 254 15% of linear feet with TMCL exceedances
ICM SOIL CONTAMINATION DEPTH FT 1
ICM SOIL CONTAMINATION AREA SQ FT 2,028
ICM CONTAMINATED SOIL VOLUME CY 75
ICM SEWER TRENCH REQUIRING RE-REMEDITION LENGTH FT 63
25% of length of contaminated sewer trench, re-excavate an additional 1 foot deep to obtain clean soil
ICM RE-REMEDIATION CONTAMINATED SOIL VOLUME CY 20
ICM EXPLOSIVES BLENDED CONTAMINATED SOIL VOLUME CY 75 15% of total linear feet of explosive soil blended to <10%
ICM TOTAL CONTAMINATED SOIL VOLULME SEWER OUTSIDE FDN CY 170
ICM CONFIRMATION SAMPLES SAMPLE 1
ICM CONTAMINATED SOIL STOCKPILE CONFIRMATION SAMPLES SAMPLE 1
Required sampling for areas where contaminated soil was stockpiled, after stockpile is removed.
ICM DISPOSAL SAMPLES SAMPLE 1 TCLP (Metals), Corrosivity, Ignitability, Reactivity NG O-Sewer Total Environmental Samples SAMPLE 8
NG O-Sewer Total Contaminated Soil Excavation Volume CY 170 NG O-Sewer Total Contaminated Soil Disposal Weight TON 255
NQ OUTSIDE SEWERS
ICM INITIAL SEWER OUTSIDE FDN TRENCH SAMPLES SAMPLE 5 1 Five-point composite sample every 500 feet
ICM LENGTH OF EXPLOSIVE SEWER TRENCH OUTSIDE FOUNDATIONS FT 1,780
ICM WIDTH OF EXPLOSIVE SEWER TRENCH FT 8
ICM SOIL CONTAMINATION LENGTH FT 267 15% of linear feet with TMCL exceedances
ICM SOIL CONTAMINATION DEPTH FT 1
ICM SOIL CONTAMINATION AREA SQ FT 2,136
ICM CONTAMINATED SOIL VOLUME CY 79
ICM SEWER TRENCH REQUIRING RE-REMEDITION LENGTH FT 67
25% of length of contaminated sewer trench, re-excavate an additional 1 foot deep to obtain clean soil
ICM RE-REMEDIATION CONTAMINATED SOIL VOLUME CY 21
ICM EXPLOSIVES BLENDED CONTAMINATED SOIL VOLUME CY 79 15% of total linear feet of explosive soil blended to <10%
ICM TOTAL CONTAMINATED SOIL VOLULME SEWER OUTSIDE FDN CY 179
ICM CONFIRMATION SAMPLES SAMPLE 1
ICM CONTAMINATED SOIL STOCKPILE CONFIRMATION SAMPLES SAMPLE 1
Required sampling for areas where contaminated soil was stockpiled, after stockpile is removed.
NQ O-Sewer Total Environmental Samples SAMPLE 8
IRP Work at MEC Sites at SFAAP_ver 3 - Outside Sewers, TBPs and SAAP-017.xlsx 20 of 35
SITE ID PHASE SITE/PARAMETER UNITS AMOUNT COMMENTS
NQ O-Sewer Total Contaminated Soil Excavation Volume CY 179
NQ O-Sewer Total Contaminated…