A.07.23_W912DQ-16-R-3007_20160413.pdf
PDF 555 KB Posted
- Attached to
- Former Sunflower Army Ammunition Plant - Explosive Decontamination and Removal of Outside Sewer Lines
- Solicitation number
- W912DQ-16-R-3007
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A.07.24_Amendment_0004.pdf | ||
| A.07.20_Site_Visit_Tour_Route_Map.pdf | ||
| Bid_Schedule.xlsx | XLSX spreadsheet | |
| Supplemental_Bid_Schedule.xlsx | XLSX spreadsheet | |
| A.07.24_Amendment_0003.pdf | ||
| A.07.24_Site_Visit_Sign-in.pdf | ||
| SUXOS_Resume.docx | DOCX document | |
| A.07.24_Amendment_0002.pdf | ||
| Company_Experience.docx | DOCX document | |
| A.07.24_Amendment_0001.pdf | ||
| Attachment_6_-_Schedule_Spec.PDF | ||
| Table_3.pdf | ||
| Attachment_5_-_SOP-DEM-11.pdf | ||
| Table_5.pdf | ||
| Attachment_1_-_Site_Map.pdf | ||
| Table_1.docx | DOCX document | |
| Attachment_2b_ESS_SFAAP_Final_ver_3.pdf | ||
| Table_2.pdf | ||
| Attachment_4.pdf | ||
| Table_4.pdf | ||
| Attachment_3_-_KDHE_Exception_from_Open_Burning_Prohibition_-_2016.pdf | ||
| Attachment_8_-_WAD_Summary_Page.xlsx | XLSX spreadsheet | |
| Attachment_7_-_RMS_Spec.PDF | ||
| Attachment_2a_Sunflower_AAP_ESS_-_Draft_V1.pdf |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Reference Section 01 10 00
WILLIAM J HILL 816-389-3827
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
13-Apr-2016
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________1825 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES X NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________4 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________13 May 2016 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______365 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USACE, KANSAS CITY +
FEDERAL BLDG CT-H 601 E 12TH ST RM 647
KANSAS CITY MO 64106-2896
W912DQ
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
816-389-2030FAX:TEL: 816-389-3812 TEL: FAX:
W912DQ-16-R-3007 124
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912DQ-16-R-3007
Section 00 11 00 - Solicitation/Contract Form
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job General Requirements - Years 1 and 2
CPFF
This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the general requirements for years 1 and 2, as required in the associated Statement of Work.
FOB: Destination
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
0002 1 Job OPTION General Requirements - Year 3
CPFF
This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the general requirements for year 3, as required in the
0003 1 Job OPTION General Requirements - Year 4
CPFF
This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the general requirements for year 4, as required in the
0004 1 Job OPTION General Requirements - Year 5
CPFF
This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the general requirements for year 5, as required in the
0005 1 Job Contractor Manpower Reporting
CPFF
This line item is used for the pricing of the collection and reporting of Contractor Manpower Reporting data as described in the Statement of Work.
This CLIN is to include all CMRA for the duration of this Contract. If the contractor does not separately price this item, it shall enter zero (0).
0006 1 Job OPTION Line B and C
CPFF
This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Outside Sewer Lines excavation, removal, explosive decontamination, and Reporting for B Line and C Line. The period of performance is 2 years from the date the option is exercised.
0007 1 Job D Line, E Line, and E Line Premix
CPFF
This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Outside Sewer Lines excavation, removal, explosive decon, and Reporting for D Line, E Line, and E Line Premix, as required by the
0008 1 Job OPTION G Line
CPFF
This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Outside Sewer Lines excavation, removal, explosive decontamination, and Reporting for G Line, as required by the associated Statement of Work. The period of performance is 2 years from the date the option is exercised.
0009 1 Job OPTION 5 Corners Paste Mix & NG
CPFF
This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Outside Sewer Lines excavation, removal, explosive decontamination, and Reporting for the 5 Corners Paste Mix and NG, as required by the associated Statement of Work. The period of performance is 2 years from the date the option is exercised.
0010 1 Job OPTION Solvent Propellant Finishing
CPFF
This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Outside Sewer Lines excavation, removal, explosive decontamination, and Reporting for the Solvent Propellant Finishing, as required by the associated Statement of Work. The period of performance is 2 years from the date the option is exercised.
0011 1 Job
OPTION NQ
CPFF
This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Outside Sewer Lines excavation, removal, explosive decontamination, and Reporting for NQ, as required by the associated Statement of Work. The period of performance is 2 years from the date the option is exercised.
0012 1 Job OPTION North Acid
CPFF
This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Outside Sewer Lines excavation, removal, explosive decontamination, and Reporting for North Acid, as required by the associated Statement of Work. The period of performance is 2 years from the date the
0013 1 Job OPTION South Acid
CPFF
This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Outside Sewer Lines excavation, removal, explosive decontamination, and Reporting for South Acid, as required by the associated Statement of Work. The period of performance is 2 years from the date the
0014 1 Job OPTION Rocket Static Area
CPFF
This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Outside Sewer Lines excavation, removal, explosive decontamination, and Reporting for the Rocket Static Area (Proving Grounds), as required by the associated Statement of Work. The period of performance is 2
0015 1 Job OPTION Solvent Tank Farm
CPFF
This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Outside Sewer Lines excavation, removal, explosive decontamination, and Reporting for the Solvent Tank Farm, as required by the associated Statement of Work. The period of performance is 2 years from the date the option is exercised.
0016 1 Job
OPTION AOC 16
CPFF
This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Removal of Temp Burn Pad Foundations and Inside Sewers, Removal of Environmental Soils, Transportation and Offsite Disposal of Contaminated Soil, and Environmental Sampling and Analysis at AOC 16, as required by the associated Statement of Work. The period of performance is 2
0017 1 Job
OPTION SAAP 48
CPFF
This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Removal of Temp Burn Pad Foundations and Inside Sewers, Removal of Environmental Soils, Transportation and Offsite Disposal of Contaminated Soil, and Environmental Sampling and Analysis at SAAP 48, as required by the associated Statement of Work. The period of performance is 2
0018 1 Job OPTION SAAP 26 (Eastern Half)
CPFF
This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Removal of Temp Burn Pad Foundations and associated Inside Sewers, Removal of Environmental Soils, Transportation and Offsite Disposal of Contaminated Soil, and Environmental Sampling and Analysis at SAAP 26 (Eastern Half), as required by the associated Statement of Work.
SAAP 26 Eastern Half is defined by the lines in Table 1. The period of
0019 1 Job
OPTION SAAP 67
CPFF
This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Removal of Temp Burn Pad Foundations and Inside Sewers, Removal of Environmental Soils, Transportation and Offsite Disposal of Contaminated Soil, and Environmental Sampling and Analysis at SAAP 67, as required by the associated Statement of Work. The period of performance is 2
0020 1 Job
OPTION AOC 17
CPFF
This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Removal of Temp Burn Pad Foundations and Inside Sewers, Removal of Environmental Soils, Transportation and Offsite Disposal of Contaminated Soil, and Environmental Sampling and Analysis at AOC 17, as required by the associated Statement of Work. The period of performance is 2
0021 1 Job
OPTION SAAP 14
CPFF
This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Removal of Temp Burn Pad Foundations and Inside Sewers, Removal of Environmental Soils, Transportation and Offsite Disposal of Contaminated Soil, and Environmental Sampling and Analysis at SAAP 14, as required by the associated Statement of Work. The period of performance is 2
0022 1 Job
OPTION SAAP 24
CPFF
This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Removal of Temp Burn Pad Foundations and Inside Sewers, Removal of Environmental Soils, Transportation and Offsite Disposal of Contaminated Soil, and Environmental Sampling and Analysis at SAAP 24, as required by the associated Statement of Work. The period of performance is 2
0023 1 Job
OPTION SAAP 8
CPFF
This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Removal of Temp Burn Pad Foundations and Inside Sewers, Removal of Environmental Soils, Transportation and Offsite Disposal of Contaminated Soil, and Environmental Sampling and Analysis at SAAP 8, as required by the associated Statement of Work. The period of performance is 2
0024 1 Job OPTION SAAP 65 Tank Farm
CPFF
This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Removal of Temp Burn Pad Foundations and Inside Sewers, Removal of Environmental Soils, Transportation and Offsite Disposal of Contaminated Soil, and Environmental Sampling and Analysis at SAAP 65 Tank Farm, as required by the associated Statement of Work. The period of
0025 1 Job
OPTION SAAP 17
CPFF
This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Removal of Temp Burn Pad Foundations and Inside Sewers, Removal of Environmental Soils, Transportation and Offsite Disposal of Contaminated Soil, and Environmental Sampling and Analysis at SAAP 17, as required by the associated Statement of Work. The period of performance is 2
0026 1 Job Year 1 & 2 - Outside Sewers Addtl Work
CPFF
This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Outside Sewers Environmental Soils Excavation, Transportation and Offsite Disposal of Contaminated Soil, and Environmental Sampling and Analysis, and for years 1 and 2, as required by the associated Statement of Work.
0027 1 Job OPTION Year 3 - Outside Sewers Addtl Work
CPFF
This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Outside Sewers Environmental Soils Excavation, Transportation and Offsite Disposal of Contaminated Soil, and Environmental Sampling and Analysis, and for year 3, as required by the associated Statement of Work.
0028 1 Job OPTION Year 4 - Outside Sewers Addtl Work
CPFF
This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Outside Sewers Environmental Soils Excavation, Transportation and Offsite Disposal of Contaminated Soil, and Environmental Sampling and Analysis, and for year 4, as required by the associated Statement
0029 1 Job OPTION Year 5 - Outside Sewers Addtl Work
CPFF
This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Outside Sewers Environmental Soils Excavation, Transportation and Offsite Disposal of Contaminated Soil, and Environmental Sampling and Analysis, and for year 5, as required by the associated Statement
SUPPLEMENTAL BID SCHEDULE
WAD
WAD Title Base/Option Price CLIN
1 General Requirements
Year One and Two Base $ 0001
Year Three Option $ 0002
Year Four Option $ 0003
Year Five Option $ 0004
Contractor Manpower Reporting
Base $ 0005
WAD 1 Total $
WAD Title Base/Option Price CLIN
2 Outside Sewer Lines
B Line Option $ 0006
C Line Option $ 0006
D Line Base $ 0007
E Line Base $ 0007
E Line Premix Base $ 0007
G Line Option $ 0008
5 Corners Paste Mix Option $ 0009
NG Option $ 0009
Solvent Propellant Finishing Option $ 0010
NQ Option $ 0011
North Acid Option $ 0012
South Acid Option $ 0013
Rocket Static Test Area Option $ 0014
Solvent Tank Farm Option $ 0015
WAD 2 Total $
WAD Title Base/Option Price CLIN
3 Removal of Temp Burn Pad Foundations and Inside Sewers
AOC 16 Option $ 0016
SAAP‐48 Option $ 0017
SAAP‐26 (Eastern Half) Option $ 0018
SAAP‐67 Option $ 0019
AOC‐17 Option $ 0020
SAAP‐14 Option $ 0021
SAAP‐24 Option $ 0022
SAAP‐8 Option $ 0023
SAAP‐65 Option $ 0024
SAAP‐17 Option $ 0025
WAD 3 Total $
WAD Title Base/Option Price CLIN
4 Removal of Temp Burn Pad or Outside Sewers Environmental Soils
SAAP‐26 (Eastern Half) Option $ 0018
SAAP‐67 Option $ 0019
AOC‐17 Option $ 0020
SAAP‐14 Option $ 0021
SAAP‐24 Option $ 0022
SAAP‐8 Option $ 0023
SAAP‐65 Option $ 0024
SAAP‐17 Option $ 0025
Year 1 & 2 Outside Sewers Env Soil Excavation
Base $ 0026
Year 3 Outside Sewers Env Soil Excavation
Option $ 0027
Year 4 Outside Sewers Env Soil Excavation
Option $ 0028
Year 5 Outside Sewers Env Soil Excavation
Option $ 0029
WAD 4 Total $
WAD Title Base/Option Price CLIN
5 Transportation and Offsite Disposal of Contaminated Soil
WAD 4 Total
AOC 16 Option $ 0016
SAAP‐48 Option $ 0017
SAAP‐26 (Eastern Half) Option $ 0018
SAAP‐67 Option $ 0019
AOC‐17 Option $ 0020
SAAP‐14 Option $ 0021
SAAP‐24 Option $ 0022
SAAP‐8 Option $ 0023
SAAP‐65 Option $ 0024
SAAP‐17 Option $ 0025
Year 1 & 2 Outside Sewer Trench Soils
Base $ 0026
Year 3 Outside Sewer Trench Soils
Option $ 0027
Year 4 Outside Sewer Trench Soils
Option $ 0028
Year 5 Outside Sewer Trench Soils
Option $ 0029
WAD 5 Total $
WAD Title Base/Option Price CLIN
6 Environmental Sampling and Analysis
SAAP‐26 (Eastern Half) Option $ 0018
SAAP‐67 Option $ 0019
AOC‐17 Option $ 0020
SAAP‐14 Option $ 0021
SAAP‐24 Option $ 0022
SAAP‐8 Option $ 0023
SAAP‐65 Option $ 0024
SAAP‐17 Option $ 0025
Year 1 & 2 Sewer Trenches Base $ 0026
Year 3 Sewer Trenches Option $ 0027
Year 4 Sewer Trenches Option $ 0028
Year 5 Sewer Trenches Option $ 0029
WAD 6 Total $
WAD Title Base/Option Price CLIN
7 Reporting
AOC 16 Base $ 0007
SAAP‐48 Option $ 0006
SAAP‐26 (Western Half) Option $ 0010
SAAP‐26 (Eastern Half) Base $ 0007
SAAP‐67 Option $ 0013
AOC‐17 Option $ 0011
SAAP‐14 Option $ 0014
SAAP‐24 Option $ 0009
SAAP‐8 Option $ 0012
SAAP‐65 Option $ 0015
SAAP‐17 Option $ 0008
WAD 7 Total $
Base Total $
Options Total $
Base Plus All Options Total $
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Exhibit 1 Table 1 1 15-MAR-2016 Exhibit 2 Table 2 3 15-MAR-2016 Exhibit 3 Table 3 5 15-MAR-2016 Exhibit 4 Table 4 1 15-MAR-2016 Exhibit 5 Table 5 1 15-MAR-2016 Attachment 1 Site Map 5 22-MAR-2016 Attachment 2a Draft Revised ESS 01-APR-2016 Attachment 2b ESS 59 06-FEB-2012 Attachment 3 KDHE Exemption from
Open Burning
2 25-MAR-2016
Attachment 4 Sewer Line Details 51 15-MAR-2016 Attachment 5 SOP - DEM 7 15-FEB-2007 Attachment 6 Schedule Spec 6 15-MAR-2016 Attachment 7 RMS Spec 6 15-MAR-2016 Attachment 8 WAD Summary Page 1 21-MAR-2016
Section 00 21 00 - Instructions, Conditions and Notices to Offeror
PROPOSAL SUBMISSION
1.0 GENERAL PROPOSAL INFORMATION
The proposal should be practical, legible, clear and coherent. Offerors are discouraged from providing information not required by the Solicitation.
2.0 GENERAL PROPOSAL SUBMISSION INSTRUCTIONS
All offerors shall be required to submit a proposal with the minimum content as specified herein. Proposals without the minimum content may be rejected. Proposals will be received until the date and time indicated on Standard Form 1442 at the following address:
U.S. Army Engineer District, Kansas City Federal Building Room 647 ATTN: CECT-NWK-H/Josh Hill 601 East 12th Street Kansas City, Missouri 64106-2896
3.0 PROPOSAL FORMAT AND SUBMITTAL REQUIREMENTS
1. In order to be considered for award of a contract for the requirements of this solicitation, the offeror must submit a proposal with its offer. Failure to submit a complete proposal may result in the entire offer being rejected.
The proposals shall be submitted in Volumes as follows. Submit the proposal in tabbed, three-ring binders identified by the Solicitation Number, project title, name, address, and telephone number of the offeror.
Arrange tabs as follows:
Volume 1, Technical Proposal:
FACTOR 1 Company Experience FACTOR 2 Past Performance
Volume 2: Cost Proposal
FACTOR 3 Cost Proposal
2. Proposal Characteristics
a) Each Volume shall contain a table of contents and all pages of each factor shall be sequentially numbered. All text must be legible and easily read. Submit the SF 1442, completed and signed by a person authorized by the offeror, in Volume 2. Offerors shall limit Volume 1, Technical Proposal, Factor 1, Company Experience, to a maximum of 5 pages, utilizing the form provided below.
Pages in excess of 5 will not be evaluated. Factor 2 – Past Performance will not be counted towards this page limitation.
b) Volumes shall be submitted in both hard copy and electronic copy in the following quantities:
Volume 1 – Technical Proposal - Original & 4 copies. Electronic copies shall be submitted in PDF format.
Volume 2 – Cost Proposal - Original & 1 copy. Electronic copies shall be submitted in Excel and PDF format.
Electronic copies should be equivalent to the printed original copy and be searchable or Optical Character Recognition (OCR) formatted. OCR is a common method of digitizing printed texts so that they can be electronically searched, stored more compactly, displayed on-line, and used in machine processes such as machine translation, text-to-speech, key data extraction and text mining.
c) Each Volume of the proposal shall be identified by the Solicitation Number (W912DQ-16-R-3007), project title (Former Sunflower Army Ammunition Plant – Explosive Decontamination and Removal of Outside Sewer Lines, DeSoto, Kansas), name, address, and telephone number of the offeror, and the following on the volume in bold letters:
VOLUME 1: TECHNICAL PROPOSAL
VOLUME 2: COST PROPOSAL
d) The Technical proposal shall not refer the reviewer to information contained in the Cost proposal.
e) Additional Information to be provided in Volume 1.
Tab 1 - For joint ventures, the information required by paragraph "Joint Ventures" (if applicable).
Tab 2 - Subcontractor letters of commitment as required by paragraph “Subcontractors” (if applicable).
Tab 3 - All offerors shall complete the resume template provided below for the proposed Senior UXO Supervisor.
f) Additional Information to be provided in Volume 2.
Tab 1 - Adequate Accounting System, the information required by paragraph 12 below.
Tab 2 - Earned Value Management System, the information required by paragraph
12 below.
Tab 3 - Pro Forma Requirements. The following information should be submitted with Volume 2 and labled “Pro Forma Requirements”. This information consists of the following:
i. Offeror will submit a cover letter containing:
a. Solicitation number
b. Name, address, email, and telephone and fax numbers of the offeror
c. Names, title, email, and telephone and fax numbers of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this RFP.
d. Name, title and signature of the person authorized to sign the proposal
e. A statement specifying agreement with all terms, conditions and provisions included in the Solicitation
f. CAGE Codes for the offeror, and all teaming partners who participated in the Factor 1 – Company Experience projects.
ii. The Offer (the SF1442) duly executed with an original signature by an official authorized to bind the company. Include the offeror’s DUNS number in block 14.
iii. Acknowledgement of all amendments to the Solicitation in accordance with the instructions on the Standard Form 30 (amendment form).
iv. The completed Section 00 45 00 of the RFP (Representations and Certifications), Printed Entity Record from System for Award Management
(SAM).
v. Financial statement and bank letter that verify that sufficient funds will be available to finance the work
4.0 INQUIRIES/QUESTIONS
Technical inquiries and questions relating to this solicitation shall be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org). To submit and review inquiry items, prospective offerors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective offeror who submits a comment /question will receive an acknowledgement of their comment/question via email. Another email to the same address will notify the prospective offeror once the reply is available for viewing.
***Please Note: Offerors shall only submit one question per inquiry. All inquiries containing multiple questions shall be rejected.
The Solicitation Number is: W912DQ-16-R-3007 The Bidder Inquiry Key is: YVVH7Q-4U5T44
Instructions for first-time ProjNet Bid Inquiry Access:
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. Select agency USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Instructions for future ProjNet Bid Inquiry Access:
1. For future access to ProjNet, you will not be provided any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. Select agency USACE.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Click Continue. A page will then open asking you to enter the answer to your Secret Question.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
The Bidder Inquiry System will be unavailable for new inquiries at 4:00 pm, local Kansas City time on May 03, 2016 in order to ensure adequate time is allotted to form an appropriate response to inquiries and amend the solicitation if necessary.
Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The ProjNet call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago) or by appointment for OCONUS. The telephone number for the Call Center is 1-800-428-HELP. Email to staff@rcesupport.com.
5.0 JOINT VENTURES
Joint Ventures shall submit the following additional documentation regarding their business entities:
1) A certified copy of their Joint Venture agreement.
2) A detailed statement outlining the following in terms of percentages, where appropriate.
a. The relationship of the joint venture parties in terms of business ownership, capital contribution, and profit distribution or loss sharing.
b. The management approach of the joint venture in terms of who will conduct, direct, supervise and control the project and have custody and control of the assets of the Joint Venture and perform the duties necessary to complete the work.
c. The structure of the joint venture and decision-making responsibilities of the Joint Venture parties in terms of who will control the manner and method of performance of the work.
d. The bonding responsibilities of the Joint Venture parties.
e. Identification of the key personnel having authority to legally bind the Joint Venture to subcontracts and state who will provide or contract for the labor and materials for the Joint Venture.
f. Identification of party maintaining the Joint Venture bank accounts for the payment of all expenses and the deposits of all receipts, keep the books and records, and pay applicable taxes for the Joint Venture.
g. Identification of party furnishing the facilities, such as office supplies and telephone service.
h. Identification of party having overall control of the Joint Venture.
Other sections of the proposal shall identify, where appropriate, whether key personnel are employees of the individual Joint Venture parties and identify the party, or hired as employees of the Joint Venture.
The Joint Venture parties’ experience and/or past experience will be included as the experience and/or past experience of the Joint Venture.
6.0 SUBCONTRACTORS
If an offeror wishes to receive credit for the experience or past performance of a subcontractor, the offeror must submit a letter of commitment to use the proposed subcontractor on the project, signed both by the subcontractor and the offeror. The commitment letter must be submitted even if the subcontractor is in some way affiliated with the offeror (for example, the subcontractor is a subsidiary of a joint venture partner, or a subsidiary of a firm to which the joint venture partner is also a subsidiary). Include the subcontractor letters of commitment in Volume 1, Factor 1, Company Experience. Subcontractor letters of commitment will not be counted towards the page limit for that Factor.
SAMPLE LETTER OF COMMITMENT to USE SUBCONTRACTOR
[COMPANY LETTERHEAD]
TO: Contracting Officer, Kansas City District, United States Army Corps of Engineers
SUBJECT: Letter of Commitment for Proposed Contract for [insert project name]
Dear Sir or Madam:
[Insert name of offeror] and [insert name of subcontractor] hereby make the unequivocal commitment that, in the event that the company receives award of the Contract for [insert project name], [insert name of subcontractor] will perform the following work required by the Contract.
[Insert list of tasks to be performed by the subcontractor]
Sincerely, [Authorized Official]
[Legal Name of Offeror]
Date: __________
[Subcontractor]
[Legal Name of Subcontractor]
Date: ______
7.0 BASIS FOR AWARD
The Government reserves the right to enter into discussions. In the event that discussions are not necessary then the Government intends to award without discussions, to the responsible offeror whose proposal conforms to the solicitation and is determined to be the Best Value to the Government, utilizing the tradeoff process.
The technical factors, when combined are significantly more important than the Cost Factor. All technical factors are listed in descending order of importance, with Factor 1 – Company Experience being the most important.
Offerors are cautioned that the award may not necessarily be made to the offeror providing the lowest priced proposal.
8.0 SOURCE SELECTION PROCESS
All proposals received in response to this solicitation will be evaluated in accordance with informal source selection procedures. The principal objective of this process is to select a responsible offeror who submits the offer that is the Best Value to the Government, utilizing the tradeoff process. The process is designed to ensure the impartial, equitable, and comprehensive evaluation of all proposals received in response to this solicitation.
(a) Source Selection Organization
The source selection organization is established as a separate organization and management chain of command whose only purpose is to accomplish the objective above. The organization consists of a Source Selection Authority (SSA) and a Source Selection Evaluation Board (SSEB). The SSEB is comprised of separate Technical Evaluation and Price Evaluation teams. The organization is designed to ensure active ongoing involvement of appropriate contracting, technical, logistics, legal, price analysis, small business, and other functional staff management expertise.
(b) Source Selection Procedure
The source selection procedures will begin with an initial review of proposals and continue with a technical and price evaluation conducted by the SSEB. The SSEB shall evaluate the proposals based solely on the evaluation criteria identified above. The proposals received in response to this solicitation will be evaluated individually to select the most advantageous proposal. The Government reserves the right to consider and evaluate information regarding past performance from sources outside the proposal. The results of the SSEB evaluations will be presented to the SSA, who will make the final source selection decision or determine whether it is appropriate to engage in clarifications or communications prior to the establishment of a competitive range, or to establish a competitive range and conduct discussions with those offerors that are included in the competitive range. All communications leading to establishment of the competitive range will be conducted in accordance with FAR Part 15.306(b).
If a competitive range is established, discussions will be conducted with offerors who are included in the competitive range. After conclusion of discussions and receipt of final revised proposals (if applicable), the SSEB will complete the evaluation and establish the final technical ratings and present them to the SSA.
The SSA will then review the proposals and make the final source selection decision.
The Government is not responsible for information overlooked during the evaluation which is not located in the appropriate proposal section.
To ensure the evaluation credit is appropriately received for proposal material submitted, do not incorporate by reference documents not contained in the proposal.
9.0 DEBRIEFING OFFERORS
Offerors may request a debriefing in accordance with FAR 15.505 Pre-award Debriefing of Offerors, and FAR
15.506 Post-award Debriefing of offerors.
10.0 FACTORS TO BE EVALUATED
1. VOLUME 1 – TECHNICAL
Factor Location Description Relative Importance FACTOR 1 Vol. 1 Company Experience Most Important Technical Factor
FACTOR 2 Vol. 1 Past Performance Least Important Technical Factor
3. VOLUME 2 – COST
Factor Location Description Relative Importance FACTOR 3 Vol. 2 Cost (Standard Form 1442 and
Proposal Bid Schedules)
Technical Factors, when combined, are significantly more important than cost
VOLUME 1, FACTOR 1 – Company Experience.
Submission Requirements
The offeror shall submit a project portfolio of up to five (5) relevant projects to be evaluated for this factor. If more than five projects are submitted, only the first five projects will be evaluated. A project is defined as work performed at one site, or at a single installation. An Indefinite Delivery Contract (IDC) is not a project. The projects should describe the specific work, identify whether it was performed as the prime, or subcontractor. The projects should demonstrate experience with similar contaminants, materials and construction techniques necessary to complete the requirements included under this solicitation. Cost and schedule control methods employed during the projects should also be described. A project will be considered relevant only if it is similar in size, scope, and complexity to the work described in this solicitation. These projects must have been completed in the eight (8) year period preceding the date of this solicitation or started within the past eight (8) year period and be at least 50% complete at the time of this solicitation.
Projects included in the portfolio shall demonstrate the breadth and depth of the offeror’s experience as it relates to the work described in this solicitation.
The offeror shall use the form provided below in providing this information.
If the offeror is a Joint Venture combining two or more companies, state whether each project was performed by the same Joint Venture. Each member of a Joint Venture shall demonstrate experience commensurate with its proposed role on this project.
The Government may contact and interview project references. Reference information will not be revealed to other parties
Company Experience (Up to 5 projects)
SFAAP Outside Sewer and Foundation Removal – Similar Experience to SOW Project Name: Client: USACE USEPA Other Offeror: Prime SubContractor
If other than Prime Offeror, name of Team Subcontractor or Contractor:
Site Location (City/State):
Client Name/Company: Client Phone:
Start Date: mm/yyyy Completion Date: : mm/yyyy % of Project Compete: Project Cost:
Contract Type: Cost Reimbursable Firm Fixed Other – Describe:
Contaminant(s):
Media: : Soil Groundwater
Active Industrial Area: YES NO Dewatering & Water Treatment: YES NO Excavation Support: YES NO
Project Description
VOLUME 1, FACTOR 2 - Past Performance.
For each of the projects submitted under Factor 1, the offeror shall provide a Past Performance Questionnaire (Form PPQ) included in the solicitation to a representative of the owner that can provide the owner’s opinion of the offeror’s past performance for the project. Completed PPQ forms should be submitted with your proposal. The PPQ does not have to be sent directly from the client. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). Ensure correct phone numbers and email addresses are provided for the client point of contact. Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Josh Hill via email at william.j.hill@@usace.army.mil prior to proposal closing date. The offeror is responsible for ensuring that the completed questionnaires are submitted by the closing date. If you have questions regarding the attached questionnaire, or require assistance, please contact the Contract Specialist at (816) 389-3827.
For each of the projects submitted under Factor 1, to ensure the agency has all relevant past performance information, the offeror also should submit copies of Federal/DoD/Navy/Army performance reviews that are likely already in the agency’s databases or likely within the agency’s arm’s reach, i.e., Contractor’s copy of CCASS or CPARS evaluations. To improve accuracy of database searches, the offeror will also provide the CAGE Codes for the prime contractor and all teaming partners, i.e. key subcontractors, Joint Venture Partners, whose experience is being relied upon for Factor 1.
Offerors should organize all Past Performance Information based on the Factor 1 Projects, which normally have project titles and are numbered 1-5, so that reviewers can match the owner’s opinion with the corresponding Factor 1 Project. There is no page limit for this factor.
The Government will evaluate the responses from the customers from which Past Performance Questionnaires have been received. The Government may contact and interview the owner’s representative on the PPQ, and reserves the right to interview other individuals acting for the owner’s representative, if the owner’s representative is not available. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the offeror.
In addition to the above, the Government may review any other sources of information for evaluating past performance. Past performance information may be obtained from any other sources available to the Government, to include, but not limited to, the Past Performance Information Retrieval System (PPIRS), Construction Contractor Appraisal Support System (CCASS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; interviews with Program Managers, Contracting Officers, and Fee Determining Officials; and the Defense Contract Management Agency.
At no time during this process, nor during the debriefing, nor after award, will the names of the individuals providing reference information about an offeror’s past performance be revealed to the offerors or to any other party. If discussions are held, offerors may be afforded the opportunity to respond to adverse comments made by references in accordance with guidelines identified in FAR Part 15.3. In this case, comments will be extracted and provided to the offeror. Copies of the questionnaires will not be furnished to the offeror and will remain confidential.
SAMPLE TRANSMITTAL LETTER
AND
PAST PERFORMANCE QUESTIONAIRE
Date_______________ To: _________________________________
We have listed your firm as a reference for work we have performed for you as listed below. Our firm has submitted a proposal under a project advertised by the U.S. Army Corps of Engineers, Kansas City District. In accordance with Federal Acquisition Regulations (FAR), an evaluation of our firm’s past performance will be completed by the Corps of Engineers. Your candid response to the attached questionnaire will assist the evaluation team in this process.
We understand that you have a busy schedule and your participation in this evaluation is greatly appreciated. Please complete the enclosed questionnaire as thoroughly as possible. Space is provided for comments.
Please respond in time for us to include the questionnaire with our proposal, which is due on _____________. Only one response from each office is required. If at all possible, we suggest that you individually answer this questionnaire and then coordinate your responses with that of _________________, to forge a consensus on one overall response from your organization. Please return completed questionnaires to the following:
If you would prefer to respond directly to USACE, your completed questionnaire may be sent to the following address:
U.S. Army Engineer District, Kansas City ATTN: CECT-NWK-M/Josh Hill Federal Building Room 647
601 East 12 th
Street Kansas City, Missouri 64106-2896
The questionnaires can also be e-mailed to william.j.hill@usace.army.mil.
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)
CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information Firm Name: CAGE Code:
Address: DUNs Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE
AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE
COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE
THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE
HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR.
HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT
THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT
TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating.
Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract.
There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS YOUR EVALUATION OF THE
CONTRACTOR’S PERFORMANCE.
1. QUALITY:
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards specified for technical performance E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance
E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
E VG S M U N
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract
E VG S M U N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;
responsiveness to administrative reports, businesslike and communication)
E VG S M U N
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
E VG S M U N
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/ PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?
E VG S M U N
b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines
E VG S M U N
g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes
E VG S M U N
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
E VG S M U N
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agreed price(s)?
E VG S M U N
b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
E VG S M U N
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
E VG S M U N
d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
Yes No
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
Yes No
f) Have there been any indications that the contractor has had any…
This is the start of the file's text. The full file is on GovTribe.