Q&A2.pdf
PDF 47 KB Posted
- Attached to
- Railroad Track Maintenance Ft. Wainwright
- Solicitation number
- W912D0-18-R-0025
About this file
Q&A
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q&A3.pdf | ||
| Corrected_Attachment4_J14.xlsx | XLSX spreadsheet | |
| Corrected_Attachment4_J14.xlsx | XLSX spreadsheet | |
| Q&A.pdf | ||
| Attachment4_J14.XLSX | XLSX spreadsheet | |
| Attachment1_PWS.pdf | ||
| Attachment3_Wage_Det.pdf | ||
| CS_RR.pdf | ||
| Attachment2_Bid_sheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question: Is there a pre-bid meeting event scheduled for this contract? If yes, please advise date, time, location and if attendance is mandatory.
Answer: There is no pre-bid meeting or site visit.
Question: Can you advise if there is a bid bond security requirement? If yes, is the bid bond percentage:
5%, 10% or 20%? Is there a specific bid bond form that is required?
Answer: No bond is required.
Questions concerning Attachment 4, J14 spreadsheet.
Road Crossing Surface Materials (wood): Unit of Measure: SF
Road Crossing Surface Materials (Concrete): Unit of Measure: SF
Road Crossing Surface Materials (rubber): Unit of Measure: SF
Culverts: Diameter & Length: 24 inch diameter per LF
Ties: New, treated hardwood
Turnouts-Switch: Do you mean switch point?
ANSWER: No, switch point is listed elsewhere.
Turnout-Point Rail Stops: Please clarify what this item is.
ANSWER: Installed between heel of the switch and tapered section to prevent lateral movement of the point rail.
(OTM) Hold down devices: What type of device? There are many choices.
ANSWER: Delete this requirement
Turnout-Switch Point Rail: Is this referring to a stock rail? If so, are the rails standard bent or Samson?
ANSWER: Stock rail standard bent.
File details come from the government source that posted it.