Corrected formula for end total. Use this spreadsheet instead. We will correct the old form if it is submitted to fix the error.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q&A3.pdf | ||
| Corrected_Attachment4_J14.xlsx | XLSX spreadsheet | |
| Q&A2.pdf | ||
| Q&A.pdf | ||
| Attachment4_J14.XLSX | XLSX spreadsheet | |
| Attachment1_PWS.pdf | ||
| Attachment3_Wage_Det.pdf | ||
| CS_RR.pdf | ||
| Attachment2_Bid_sheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year
| CLIN | Para. Number | Rail Track Maintenance | UM | |||||||
| INSPECT RAILROAD TRACK AND ADJUST AND LUBE ALL SWITCHES | Est Units | Unit Price | Total | |||||||
| 0001 | 5.1.1/5.1.2 | Inspect Railroad Trackage and adjust and lube all the switches | Monthly | 12 | $ - 0 | $ - 0 | BASE | 51201a | 51201b | 51201c |
| TOTAL INSPECT AND ADJUST AND LUBE ALL SWITCHES- COSTS | 12 | $0.00 |
| SNOW AND VEGETATION REMOVAL | Est Units | Unit Price | Total | |||||||
| 0002 | 5.1.3 | Snow Rmoval, Switches | Task | 36 | $ - 0 | $ - 0 | BASE | 51202a | 51202b | 51202c |
| 0002 | 5.1.3 | Vegetation Removal, Switches | Task | 12 | $ - 0 | $ - 0 | BASE | 51203a | 51203b | 51203c |
| 0002 | 5.1.3.2 | Snow Removal, All Railway at A Track (CH&PP) | Task | 6 | $ - 0 | $ - 0 | BASE | 51204a | 51204b | 51204c |
| 0002 | 5.1.3.2 | Snow Removal, All Railway at E Track | Task | 3 | $ - 0 | $ - 0 | BASE | 51205a | 51205b | 51205c |
| 0002 | 5.1.3 | Vegetation Removal, All Railway | Task | 2 | $ - 0 | $ - 0 | BASE | 51206a | 51206b | 51206c |
| TOTAL SNOW AND VEGETATION REMOVAL - COSTS | 59 | $0.00 |
| MAINTENANCE REPAIR REPLACE | Est Units | Unit Price | Total | |||||||
| 0003 | 5.1.4 | Ballast (Replacement) Per Cubic Yard | Task | 120 | $ - 0 | $ - 0 | BASE | 51101a | 51101b | 51101c |
| 0003 | 5.1.4 | Ballast (Regulator) Per Lineal Foot | Task | 1000 | $ - 0 | $ - 0 | ||||
| 0003 | 5.1.4 | Rail Crossings | Task | 2 | $ - 0 | $ - 0 | BASE | 51102a | 51102b | 51102c |
| 0003 | 5.1.4 | Road Crossing Surface Materials(wood) | Task | 4 | $ - 0 | $ - 0 | BASE | 51104a | 51104b | 51104c |
| 0003 | 5.1.4 | Road Crossing Surface Materials(Concrete) | Task | 1 | $ - 0 | $ - 0 | BASE | 51105a | 51105b | 51105c |
| 0003 | 5.1.4 | Road Crossing Surface Materials(rubber) | Task | 1 | $ - 0 | $ - 0 | BASE | 51106a | 51106b | 51106c |
| 0003 | 5.1.4 | Culverts | Task | 1 | $ - 0 | $ - 0 | BASE | 51107a | 51107b | 51107c |
| 0003 | 5.1.4 | Ties | Task | 50 | $ - 0 | $ - 0 | BASE | 51108a | 51108b | 51108c |
| 0003 | 5.1.4 | Joint Bars | Task | 8 | $ - 0 | $ - 0 | BASE | 51109a | 51109b | 51109c |
| 0003 | 5.1.4 | Rails (includes bonded and grounded rails) | Task | 4 | $ - 0 | $ - 0 | BASE | 51110a | 51110b | 51110c |
| 0003 | 5.1.4 | Mud Rails | Task | 1 | $ - 0 | $ - 0 | BASE | 51111a | 51111b | 51111c |
| 0003 | 5.1.4 | Grade crossing warning signs and signals | Task | 1 | $ - 0 | $ - 0 | BASE | 51112a | 51112b | 51112c |
| 0003 | 5.1.4 | Portable Derails | Task | 2 | $ - 0 | $ - 0 | BASE | 51113a | 51113b | 51113c |
| 0003 | 5.1.4 | Bumper stops | Task | 2 | $ - 0 | $ - 0 | BASE | 51114a | 51114b | 51114c |
| 0003 | 5.1.4 | Wheel stops | Task | 2 | $ - 0 | $ - 0 | BASE | 51115a | 51115b | 51115c |
| 0003 | 5.1.4 | Turnouts-Switch | Task | 1 | $ - 0 | $ - 0 | BASE | 51117a | 51117b | 51117c |
| 0003 | 5.1.4 | Turnouts-Frogs | Task | 1 | $ - 0 | $ - 0 | BASE | 51118a | 51118b | 51118c |
| 0003 | 5.1.4 | Turnouts-Guardrail | Task | 1 | $ - 0 | $ - 0 | BASE | 51119a | 51119b | 51119c |
| 0003 | 5.1.4 | Turnouts-Switch Stands including targets | Task | 1 | $ - 0 | $ - 0 | BASE | 51120a | 51120b | 51120c |
| 0003 | 5.1.4 | Turnouts-Connecting Rods | Task | 1 | $ - 0 | $ - 0 | BASE | 51121a | 51121b | 51121c |
| 0003 | 5.1.4 | Turnout-Switch Point Rail | Task | 1 | $ - 0 | $ - 0 | BASE | 51122a | 51122b | 51122c |
| 0003 | 5.1.4 | Turnout-Switch Rods | Task | 1 | $ - 0 | $ - 0 | BASE | 51123a | 51123b | 51123c |
| 0003 | 5.1.4 | Turnout-Switch Clips | Task | 1 | $ - 0 | $ - 0 | BASE | 51124a | 51124b | 51124c |
| 0003 | 5.1.4 | Turnout-Switch Heels | Task | 1 | $ - 0 | $ - 0 | BASE | 51125a | 51125b | 51125c |
| 0003 | 5.1.4 | Turnout-Rail Braces | Task | 1 | $ - 0 | $ - 0 | BASE | 51126a | 51126b | 51126c |
| 0003 | 5.1.4 | Turnout-Point Rail Stops | Task | 1 | $ - 0 | $ - 0 | BASE | 51127a | 51127b | 51127c |
| 0003 | 5.1.4 | (OTM) Tie Plates | Task | 1 | $ - 0 | $ - 0 | BASE | 51128a | 51128b | 51128c |
| 0003 | 5.1.4 | (OTM) Spikes | Task | 1 | $ - 0 | $ - 0 | BASE | 51129a | 51129b | 51129c |
| 0003 | 5.1.4 | (OTM) Hold down devices | Task | 1 | $ - 0 | $ - 0 | BASE | 51130a | 51130b | 51130c |
| 0003 | 5.1.4 | (OTM) Bolts, nuts, washers | Task | 1 | $ - 0 | $ - 0 | BASE | 51131a | 51131b | 51131c |
| 0003 | 5.1.4 | (OTM) Rail Anchors | Task | 1 | $ - 0 | $ - 0 | BASE | 51142a | 51142b | 51142c |
| 0003 | 5.1.4 | (OTM) Gage Rods | Task | 1 | $ - 0 | $ - 0 | BASE | 51132a | 51132b | 51132c |
| TOTAL MAINTENANCE REPAIR AND REPLACE COSTS | 1216 | $0.00 |
| EMERGENCY CALL OUT FOR TRACK MAINTENANCE | Est Units | Unit Price | Total | ||||||
| 0004 | After hours emergency calls for track maintenance, repairs and replacement | Task | 1 | $ - 0 | $ - 0 | BASE | 51201a | 51201b | 51201c |
| TOTAL EMERGENCY CALL OUT FOR TRACK MAINTENANCE - COSTS | 1 | $0.00 |
| CONTRACT MANPOWER REPORTING | Est Units | Unit Price | Total | |||||||
| 0005 | 5.2 | Contract Manpower Reporting | Each | 1 | $ - 0 | $ - 0 | BASE | 51201a | 51201b | 51201c |
| TOTAL CONTRACT MANPOWER REPORTING - COSTS | 1 | $0.00 |
TOTAL COST OF THE CONTRACT $0.00
&G BASE YEAR Volume IV: Cost/Price Proposal Sol. No. W912D0-18-R-0002 | 1 June 2018
BASE YEAR
Sol. No. W912D0-18-R-0025 | &KFF000028 February 2019&K000000
Use or disclosure of data contained on this sheet is subject to the restriction on the cover page of this proposal. &P
OPT1
| CLIN | Para. Number | Rail Track Maintenance | UM | |||||||
| INSPECT RAILROAD TRACK AND ADJUST AND LUBE ALL SWITCHES | Est Units | Unit Price | Total | |||||||
| 1001 | 5.1.1/5.1.2 | Inspect Railroad Trackage and adjust and lube all the switches | Monthly | 12 | $ - 0 | $ - 0 | BASE | 51201a | 51201b | 51201c |
| TOTAL INSPECT AND ADJUST AND LUBE ALL SWITCHES- COSTS | 12 | $0.00 |
| SNOW AND VEGETATION REMOVAL | Est Units | Unit Price | Total | |||||||
| 1002 | 5.1.3 | Snow Rmoval, Switches | Task | 36 | $ - 0 | $ - 0 | BASE | 51202a | 51202b | 51202c |
| 1002 | 5.1.3 | Vegetation Removal, Switches | Task | 12 | $ - 0 | $ - 0 | BASE | 51203a | 51203b | 51203c |
| 1002 | 5.1.3.2 | Snow Removal, All Railway at A Track (CH&PP) | Task | 6 | $ - 0 | $ - 0 | BASE | 51204a | 51204b | 51204c |
| 1002 | 5.1.3.2 | Snow Removal, All Railway at E Track | Task | 3 | $ - 0 | $ - 0 | BASE | 51205a | 51205b | 51205c |
| 1002 | 5.1.3 | Vegetation Removal, All Railway | Task | 2 | $ - 0 | $ - 0 | BASE | 51206a | 51206b | 51206c |
| TOTAL SNOW AND VEGETATION REMOVAL - COSTS | 59 | $0.00 |
| MAINTENANCE REPAIR REPLACE | Est Units | Unit Price | Total | |||||||
| 1003 | 5.1.4 | Ballast (Replacement) Per Cubic Yard | Task | 120 | $ - 0 | $ - 0 | BASE | 51101a | 51101b | 51101c |
| 1003 | 5.1.4 | Ballast (Regulator) Per Lineal Foot | Task | 1000 | $ - 0 | $ - 0 | BASE | 51102a | 51102b | 51102c |
| 1003 | 5.1.4 | Road Crossing Surface Materials(wood) | Task | 2 | $ - 0 | $ - 0 | BASE | 51104a | 51104b | 51104c |
| 1003 | 5.1.4 | Road Crossing Surface Materials(Concrete) | Task | 4 | $ - 0 | $ - 0 | BASE | 51105a | 51105b | 51105c |
| 1003 | 5.1.4 | Road Crossing Surface Materials(rubber) | Task | 1 | $ - 0 | $ - 0 | BASE | 51106a | 51106b | 51106c |
| 1003 | 5.1.4 | Culverts | Task | 1 | $ - 0 | $ - 0 | BASE | 51107a | 51107b | 51107c |
| 1003 | 5.1.4 | Ties | Task | 1 | $ - 0 | $ - 0 | BASE | 51108a | 51108b | 51108c |
| 1003 | 5.1.4 | Joint Bars | Task | 50 | $ - 0 | $ - 0 | BASE | 51109a | 51109b | 51109c |
| 1003 | 5.1.4 | Rails (includes bonded and grounded rails) | Task | 8 | $ - 0 | $ - 0 | BASE | 51110a | 51110b | 51110c |
| 1003 | 5.1.4 | Mud Rails | Task | 4 | $ - 0 | $ - 0 | BASE | 51111a | 51111b | 51111c |
| 1003 | 5.1.4 | Grade crossing warning signs and signals | Task | 1 | $ - 0 | $ - 0 | BASE | 51112a | 51112b | 51112c |
| 1003 | 5.1.4 | Derails(part that attaches to the rail) | Task | 1 | $ - 0 | $ - 0 | BASE | 51113a | 51113b | 51113c |
| 1003 | 5.1.4 | Bumper stops | Task | 2 | $ - 0 | $ - 0 | BASE | 51114a | 51114b | 51114c |
| 1003 | 5.1.4 | Wheel stops | Task | 2 | $ - 0 | $ - 0 | BASE | 51115a | 51115b | 51115c |
| 1003 | 5.1.4 | Turnouts-Switch | Task | 2 | $ - 0 | $ - 0 | BASE | 51117a | 51117b | 51117c |
| 1003 | 5.1.4 | Turnouts-Grogs | Task | 1 | $ - 0 | $ - 0 | BASE | 51118a | 51118b | 51118c |
| 1003 | 5.1.4 | Turnouts-Guardrail | Task | 1 | $ - 0 | $ - 0 | BASE | 51119a | 51119b | 51119c |
| 1003 | 5.1.4 | Turnouts-Switch Stands including targets | Task | 1 | $ - 0 | $ - 0 | BASE | 51120a | 51120b | 51120c |
| 1003 | 5.1.4 | Turnouts-Connecting Rods | Task | 1 | $ - 0 | $ - 0 | BASE | 51121a | 51121b | 51121c |
| 1003 | 5.1.4 | Turnout-Switch Point Rail | Task | 1 | $ - 0 | $ - 0 | BASE | 51122a | 51122b | 51122c |
| 1003 | 5.1.4 | Turnout-Switch Rods | Task | 1 | $ - 0 | $ - 0 | BASE | 51123a | 51123b | 51123c |
| 1003 | 5.1.4 | Turnout-Switch Clips | Task | 1 | $ - 0 | $ - 0 | BASE | 51124a | 51124b | 51124c |
| 1003 | 5.1.4 | Turnout-Switch Heels | Task | 1 | $ - 0 | $ - 0 | BASE | 51125a | 51125b | 51125c |
| 1003 | 5.1.4 | Turnout-Rail Braces | Task | 1 | $ - 0 | $ - 0 | BASE | 51126a | 51126b | 51126c |
| 1003 | 5.1.4 | Turnout-Point Rail Stops | Task | 1 | $ - 0 | $ - 0 | BASE | 51127a | 51127b | 51127c |
| 1003 | 5.1.4 | (OTM) Tie Plates | Task | 1 | $ - 0 | $ - 0 | BASE | 51128a | 51128b | 51128c |
| 1003 | 5.1.4 | (OTM) Spikes | Task | 1 | $ - 0 | $ - 0 | BASE | 51129a | 51129b | 51129c |
| 1003 | 5.1.4 | (OTM) Hold down devices | Task | 1 | $ - 0 | $ - 0 | BASE | 51130a | 51130b | 51130c |
| 1003 | 5.1.4 | (OTM) Bolts, nuts, washers | Task | 1 | $ - 0 | $ - 0 | BASE | 51131a | 51131b | 51131c |
| 1003 | 5.1.4 | (OTM) Rail Anchors | Task | 1 | $ - 0 | $ - 0 | BASE | 51142a | 51142b | 51142c |
| 1003 | 5.1.4 | (OTM) Gage Rods | Task | 1 | $ - 0 | $ - 0 | BASE | 51132a | 51132b | 51132c |
| TOTAL MAINTENANCE REPAIR AND REPLACE COSTS | 1 | $0.00 |
| EMERGENCY CALL OUT FOR TRACK MAINTENANCE | Est Units | Unit Price | Total | ||||||
| 1004 | After hours emergency calls for track maintenance, repairs and replacement | Task | 1 | $ - 0 | $ - 0 | BASE | 51201a | 51201b | 51201c |
| TOTAL EMERGENCY CALL OUT FOR TRACK MAINTENANCE - COSTS | 1 | $0.00 |
| CONTRACT MANPOWER REPORTING | Est Units | Unit Price | Total | |||||||
| 1005 | 5.2 | Contract Manpower Reporting | Each | 1 | $ - 0 | $ - 0 | BASE | 51201a | 51201b | 51201c |
| TOTAL CONTRACT MANPOWER REPORTING - COSTS | 1 | $0.00 |
TOTAL COST OF THE CONTRACT $0.00
&G OPTION YEAR 1 Volume IV: Cost/Price Proposal
OPTION YEAR 1
Use or disclosure of data contained on this sheet is subject to the restriction on the cover page of this proposal. &P
&P
OPT2
| CLIN | Para. Number | Rail Track Maintenance | UM | |||||||
| INSPECT RAILROAD TRACK AND ADJUST AND LUBE ALL SWITCHES | Est Units | Unit Price | Total | |||||||
| 2001 | 5.1.1/5.1.2 | Inspect Railroad Trackage and adjust and lube all the switches | Monthly | 12 | $ - 0 | $ - 0 | BASE | 51201a | 51201b | 51201c |
| TOTAL INSPECT AND ADJUST AND LUBE ALL SWITCHES- COSTS | 12 | $0.00 |
| SNOW AND VEGETATION REMOVAL | Est Units | Unit Price | Total | |||||||
| 2002 | 5.1.3 | Snow Rmoval, Switches | Task | 36 | $ - 0 | $ - 0 | BASE | 51202a | 51202b | 51202c |
| 2002 | 5.1.3 | Vegetation Removal, Switches | Task | 12 | $ - 0 | $ - 0 | BASE | 51203a | 51203b | 51203c |
| 2002 | 5.1.3.2 | Snow Removal, All Railway at A Track (CH&PP) | Task | 6 | $ - 0 | $ - 0 | BASE | 51204a | 51204b | 51204c |
| 2002 | 5.1.3.2 | Snow Removal, All Railway at E Track | Task | 3 | $ - 0 | $ - 0 | BASE | 51205a | 51205b | 51205c |
| 2002 | 5.1.3 | Vegetation Removal, All Railway | Task | 2 | $ - 0 | $ - 0 | BASE | 51206a | 51206b | 51206c |
| TOTAL SNOW AND VEGETATION REMOVAL - COSTS | 59 | $0.00 |
| MAINTENANCE REPAIR REPLACE | Est Units | Unit Price | Total | |||||||
| 2003 | 5.1.4 | Ballast (Replacement) Per Cubic Yard | Task | 120 | $ - 0 | $ - 0 | BASE | 51101a | 51101b | 51101c |
| 2003 | 5.1.4 | Ballast (Regulator) Per Lineal Foot | Task | 1000 | $ - 0 | $ - 0 | BASE | 51102a | 51102b | 51102c |
| 2003 | 5.1.4 | Road Crossing Surface Materials(wood) | Task | 2 | $ - 0 | $ - 0 | BASE | 51104a | 51104b | 51104c |
| 2003 | 5.1.4 | Road Crossing Surface Materials(Concrete) | Task | 4 | $ - 0 | $ - 0 | BASE | 51105a | 51105b | 51105c |
| 2003 | 5.1.4 | Road Crossing Surface Materials(rubber) | Task | 1 | $ - 0 | $ - 0 | BASE | 51106a | 51106b | 51106c |
| 2003 | 5.1.4 | Culverts | Task | 1 | $ - 0 | $ - 0 | BASE | 51107a | 51107b | 51107c |
| 2003 | 5.1.4 | Ties | Task | 1 | $ - 0 | $ - 0 | BASE | 51108a | 51108b | 51108c |
| 2003 | 5.1.4 | Joint Bars | Task | 50 | $ - 0 | $ - 0 | BASE | 51109a | 51109b | 51109c |
| 2003 | 5.1.4 | Rails (includes bonded and grounded rails) | Task | 8 | $ - 0 | $ - 0 | BASE | 51110a | 51110b | 51110c |
| 2003 | 5.1.4 | Mud Rails | Task | 4 | $ - 0 | $ - 0 | BASE | 51111a | 51111b | 51111c |
| 2003 | 5.1.4 | Grade crossing warning signs and signals | Task | 1 | $ - 0 | $ - 0 | BASE | 51112a | 51112b | 51112c |
| 2003 | 5.1.4 | Derails(part that attaches to the rail) | Task | 1 | $ - 0 | $ - 0 | BASE | 51113a | 51113b | 51113c |
| 2003 | 5.1.4 | Bumper stops | Task | 2 | $ - 0 | $ - 0 | BASE | 51114a | 51114b | 51114c |
| 2003 | 5.1.4 | Wheel stops | Task | 2 | $ - 0 | $ - 0 | BASE | 51115a | 51115b | 51115c |
| 2003 | 5.1.4 | Turnouts-Switch | Task | 2 | $ - 0 | $ - 0 | BASE | 51117a | 51117b | 51117c |
| 2003 | 5.1.4 | Turnouts-Grogs | Task | 1 | $ - 0 | $ - 0 | BASE | 51118a | 51118b | 51118c |
| 2003 | 5.1.4 | Turnouts-Guardrail | Task | 1 | $ - 0 | $ - 0 | BASE | 51119a | 51119b | 51119c |
| 2003 | 5.1.4 | Turnouts-Switch Stands including targets | Task | 1 | $ - 0 | $ - 0 | BASE | 51120a | 51120b | 51120c |
| 2003 | 5.1.4 | Turnouts-Connecting Rods | Task | 1 | $ - 0 | $ - 0 | BASE | 51121a | 51121b | 51121c |
| 2003 | 5.1.4 | Turnout-Switch Point Rail | Task | 1 | $ - 0 | $ - 0 | BASE | 51122a | 51122b | 51122c |
| 2003 | 5.1.4 | Turnout-Switch Rods | Task | 1 | $ - 0 | $ - 0 | BASE | 51123a | 51123b | 51123c |
| 2003 | 5.1.4 | Turnout-Switch Clips | Task | 1 | $ - 0 | $ - 0 | BASE | 51124a | 51124b | 51124c |
| 2003 | 5.1.4 | Turnout-Switch Heels | Task | 1 | $ - 0 | $ - 0 | BASE | 51125a | 51125b | 51125c |
| 2003 | 5.1.4 | Turnout-Rail Braces | Task | 1 | $ - 0 | $ - 0 | BASE | 51126a | 51126b | 51126c |
| 2003 | 5.1.4 | Turnout-Point Rail Stops | Task | 1 | $ - 0 | $ - 0 | BASE | 51127a | 51127b | 51127c |
| 2003 | 5.1.4 | (OTM) Tie Plates | Task | 1 | $ - 0 | $ - 0 | BASE | 51128a | 51128b | 51128c |
| 2003 | 5.1.4 | (OTM) Spikes | Task | 1 | $ - 0 | $ - 0 | BASE | 51129a | 51129b | 51129c |
| 2003 | 5.1.4 | (OTM) Hold down devices | Task | 1 | $ - 0 | $ - 0 | BASE | 51130a | 51130b | 51130c |
| 2003 | 5.1.4 | (OTM) Bolts, nuts, washers | Task | 1 | $ - 0 | $ - 0 | BASE | 51131a | 51131b | 51131c |
| 2003 | 5.1.4 | (OTM) Rail Anchors | Task | 1 | $ - 0 | $ - 0 | BASE | 51142a | 51142b | 51142c |
| 2003 | 5.1.4 | (OTM) Gage Rods | Task | 1 | $ - 0 | $ - 0 | BASE | 51132a | 51132b | 51132c |
| TOTAL MAINTENANCE REPAIR AND REPLACE COSTS | 1 | $0.00 |
| EMERGENCY CALL OUT FOR TRACK MAINTENANCE | Est Units | Unit Price | Total | ||||||
| 2004 | After hours emergency calls for track maintenance, repairs and replacement | Task | 1 | $ - 0 | $ - 0 | BASE | 51201a | 51201b | 51201c |
| TOTAL EMERGENCY CALL OUT FOR TRACK MAINTENANCE - COSTS | 1 | $0.00 |
| CONTRACT MANPOWER REPORTING | Est Units | Unit Price | Total | |||||||
| 2005 | 5.2 | Contract Manpower Reporting | Each | 1 | $ - 0 | $ - 0 | BASE | 51201a | 51201b | 51201c |
| TOTAL CONTRACT MANPOWER REPORTING - COSTS | 1 | $0.00 |
TOTAL COST OF THE CONTRACT $0.00
&G OPTION YEAR 2 Volume IV: Cost/Price Proposal
OPTION YEAR 2
Use or disclosure of data contained on this sheet is subject to the restriction on the cover page of this proposal. &P
OPT3
| CLIN | Para. Number | Rail Track Maintenance | UM | |||||||
| INSPECT RAILROAD TRACK AND ADJUST AND LUBE ALL SWITCHES | Est Units | Unit Price | Total | |||||||
| 3001 | 5.1.1/5.1.2 | Inspect Railroad Trackage and adjust and lube all the switches | Monthly | 12 | $ - 0 | $ - 0 | BASE | 51201a | 51201b | 51201c |
| TOTAL INSPECT AND ADJUST AND LUBE ALL SWITCHES- COSTS | 12 | $0.00 |
| SNOW AND VEGETATION REMOVAL | Est Units | Unit Price | Total | |||||||
| 3002 | 5.1.3 | Snow Rmoval, Switches | Task | 36 | $ - 0 | $ - 0 | BASE | 51202a | 51202b | 51202c |
| 3002 | 5.1.3 | Vegetation Removal, Switches | Task | 12 | $ - 0 | $ - 0 | BASE | 51203a | 51203b | 51203c |
| 3002 | 5.1.3.2 | Snow Removal, All Railway at A Track (CH&PP) | Task | 6 | $ - 0 | $ - 0 | BASE | 51204a | 51204b | 51204c |
| 3002 | 5.1.3.2 | Snow Removal, All Railway at E Track | Task | 3 | $ - 0 | $ - 0 | BASE | 51205a | 51205b | 51205c |
| 3002 | 5.1.3 | Vegetation Removal, All Railway | Task | 2 | $ - 0 | $ - 0 | BASE | 51206a | 51206b | 51206c |
| TOTAL SNOW AND VEGETATION REMOVAL - COSTS | 59 | $0.00 |
| MAINTENANCE REPAIR REPLACE | Est Units | Unit Price | Total | |||||||
| 3003 | 5.1.4 | Ballast (Replacement) Per Cubic Yard | Task | 120 | $ - 0 | $ - 0 | BASE | 51101a | 51101b | 51101c |
| 3003 | 5.1.4 | Ballast (Regulator) Per Lineal Foot | Task | 1000 | $ - 0 | $ - 0 | BASE | 51102a | 51102b | 51102c |
| 3003 | 5.1.4 | Road Crossing Surface Materials(wood) | Task | 2 | $ - 0 | $ - 0 | BASE | 51104a | 51104b | 51104c |
| 3003 | 5.1.4 | Road Crossing Surface Materials(Concrete) | Task | 4 | $ - 0 | $ - 0 | BASE | 51105a | 51105b | 51105c |
| 3003 | 5.1.4 | Road Crossing Surface Materials(rubber) | Task | 1 | $ - 0 | $ - 0 | BASE | 51106a | 51106b | 51106c |
| 3003 | 5.1.4 | Culverts | Task | 1 | $ - 0 | $ - 0 | BASE | 51107a | 51107b | 51107c |
| 3003 | 5.1.4 | Ties | Task | 1 | $ - 0 | $ - 0 | BASE | 51108a | 51108b | 51108c |
| 3003 | 5.1.4 | Joint Bars | Task | 50 | $ - 0 | $ - 0 | BASE | 51109a | 51109b | 51109c |
| 3003 | 5.1.4 | Rails (includes bonded and grounded rails) | Task | 8 | $ - 0 | $ - 0 | BASE | 51110a | 51110b | 51110c |
| 3003 | 5.1.4 | Mud Rails | Task | 4 | $ - 0 | $ - 0 | BASE | 51111a | 51111b | 51111c |
| 3003 | 5.1.4 | Grade crossing warning signs and signals | Task | 1 | $ - 0 | $ - 0 | BASE | 51112a | 51112b | 51112c |
| 3003 | 5.1.4 | Derails(part that attaches to the rail) | Task | 1 | $ - 0 | $ - 0 | BASE | 51113a | 51113b | 51113c |
| 3003 | 5.1.4 | Bumper stops | Task | 2 | $ - 0 | $ - 0 | BASE | 51114a | 51114b | 51114c |
| 3003 | 5.1.4 | Wheel stops | Task | 2 | $ - 0 | $ - 0 | BASE | 51115a | 51115b | 51115c |
| 3003 | 5.1.4 | Turnouts-Switch | Task | 2 | $ - 0 | $ - 0 | BASE | 51117a | 51117b | 51117c |
| 3003 | 5.1.4 | Turnouts-Grogs | Task | 1 | $ - 0 | $ - 0 | BASE | 51118a | 51118b | 51118c |
| 3003 | 5.1.4 | Turnouts-Guardrail | Task | 1 | $ - 0 | $ - 0 | BASE | 51119a | 51119b | 51119c |
| 3003 | 5.1.4 | Turnouts-Switch Stands including targets | Task | 1 | $ - 0 | $ - 0 | BASE | 51120a | 51120b | 51120c |
| 3003 | 5.1.4 | Turnouts-Connecting Rods | Task | 1 | $ - 0 | $ - 0 | BASE | 51121a | 51121b | 51121c |
| 3003 | 5.1.4 | Turnout-Switch Point Rail | Task | 1 | $ - 0 | $ - 0 | BASE | 51122a | 51122b | 51122c |
| 3003 | 5.1.4 | Turnout-Switch Rods | Task | 1 | $ - 0 | $ - 0 | BASE | 51123a | 51123b | 51123c |
| 3003 | 5.1.4 | Turnout-Switch Clips | Task | 1 | $ - 0 | $ - 0 | BASE | 51124a | 51124b | 51124c |
| 3003 | 5.1.4 | Turnout-Switch Heels | Task | 1 | $ - 0 | $ - 0 | BASE | 51125a | 51125b | 51125c |
| 3003 | 5.1.4 | Turnout-Rail Braces | Task | 1 | $ - 0 | $ - 0 | BASE | 51126a | 51126b | 51126c |
| 3003 | 5.1.4 | Turnout-Point Rail Stops | Task | 1 | $ - 0 | $ - 0 | BASE | 51127a | 51127b | 51127c |
| 3003 | 5.1.4 | (OTM) Tie Plates | Task | 1 | $ - 0 | $ - 0 | BASE | 51128a | 51128b | 51128c |
| 3003 | 5.1.4 | (OTM) Spikes | Task | 1 | $ - 0 | $ - 0 | BASE | 51129a | 51129b | 51129c |
| 3003 | 5.1.4 | (OTM) Hold down devices | Task | 1 | $ - 0 | $ - 0 | BASE | 51130a | 51130b | 51130c |
| 3003 | 5.1.4 | (OTM) Bolts, nuts, washers | Task | 1 | $ - 0 | $ - 0 | BASE | 51131a | 51131b | 51131c |
| 3003 | 5.1.4 | (OTM) Rail Anchors | Task | 1 | $ - 0 | $ - 0 | BASE | 51142a | 51142b | 51142c |
| 3003 | 5.1.4 | (OTM) Gage Rods | Task | 1 | $ - 0 | $ - 0 | BASE | 51132a | 51132b | 51132c |
| TOTAL MAINTENANCE REPAIR AND REPLACE COSTS | 1 | $0.00 |
| EMERGENCY CALL OUT FOR TRACK MAINTENANCE | Est Units | Unit Price | Total | ||||||
| 3004 | After hours emergency calls for track maintenance, repairs and replacement | Task | 1 | $ - 0 | $ - 0 | BASE | 51201a | 51201b | 51201c |
| TOTAL EMERGENCY CALL OUT FOR TRACK MAINTENANCE - COSTS | 1 | $0.00 |
| CONTRACT MANPOWER REPORTING | Est Units | Unit Price | Total | |||||||
| 3005 | 5.2 | Contract Manpower Reporting | Each | 1 | $ - 0 | $ - 0 | BASE | 51201a | 51201b | 51201c |
| TOTAL CONTRACT MANPOWER REPORTING - COSTS | 1 | $0.00 |
TOTAL COST OF THE CONTRACT $0.00
&G OPTION YEAR 3 Volume IV: Cost/Price Proposal
OPTION YEAR 3
Use or disclosure of data contained on this sheet is subject to the restriction on the cover page of this proposal. &P
OPT4
| CLIN | Para. Number | Rail Track Maintenance | UM | |||||||
| INSPECT RAILROAD TRACK AND ADJUST AND LUBE ALL SWITCHES | Est Units | Unit Price | Total | |||||||
| 4001 | 5.1.1/5.1.2 | Inspect Railroad Trackage and adjust and lube all the switches | Monthly | 12 | $ - 0 | $ - 0 | BASE | 51201a | 51201b | 51201c |
| TOTAL INSPECT AND ADJUST AND LUBE ALL SWITCHES- COSTS | 12 | $0.00 |
| SNOW AND VEGETATION REMOVAL | Est Units | Unit Price | Total | |||||||
| 4002 | 5.1.3 | Snow Rmoval, Switches | Task | 36 | $ - 0 | $ - 0 | BASE | 51202a | 51202b | 51202c |
| 4002 | 5.1.3 | Vegetation Removal, Switches | Task | 12 | $ - 0 | $ - 0 | BASE | 51203a | 51203b | 51203c |
| 4002 | 5.1.3.2 | Snow Removal, All Railway at A Track (CH&PP) | Task | 6 | $ - 0 | $ - 0 | BASE | 51204a | 51204b | 51204c |
| 4002 | 5.1.3.2 | Snow Removal, All Railway at E Track | Task | 3 | $ - 0 | $ - 0 | BASE | 51205a | 51205b | 51205c |
| 4002 | 5.1.3 | Vegetation Removal, All Railway | Task | 2 | $ - 0 | $ - 0 | BASE | 51206a | 51206b | 51206c |
| TOTAL SNOW AND VEGETATION REMOVAL - COSTS | 59 | $0.00 |
| MAINTENANCE REPAIR REPLACE | Est Units | Unit Price | Total | |||||||
| 4003 | 5.1.4 | Ballast (Replacement) Per Cubic Yard | Task | 120 | $ - 0 | $ - 0 | BASE | 51101a | 51101b | 51101c |
| 4003 | 5.1.4 | Ballast (Regulator) Per Lineal Foot | Task | 1000 | $ - 0 | $ - 0 | BASE | 51102a | 51102b | 51102c |
| 4003 | 5.1.4 | Road Crossing Surface Materials(wood) | Task | 2 | $ - 0 | $ - 0 | BASE | 51104a | 51104b | 51104c |
| 4003 | 5.1.4 | Road Crossing Surface Materials(Concrete) | Task | 4 | $ - 0 | $ - 0 | BASE | 51105a | 51105b | 51105c |
| 4003 | 5.1.4 | Road Crossing Surface Materials(rubber) | Task | 1 | $ - 0 | $ - 0 | BASE | 51106a | 51106b | 51106c |
| 4003 | 5.1.4 | Culverts | Task | 1 | $ - 0 | $ - 0 | BASE | 51107a | 51107b | 51107c |
| 4003 | 5.1.4 | Ties | Task | 1 | $ - 0 | $ - 0 | BASE | 51108a | 51108b | 51108c |
| 4003 | 5.1.4 | Joint Bars | Task | 50 | $ - 0 | $ - 0 | BASE | 51109a | 51109b | 51109c |
| 4003 | 5.1.4 | Rails (includes bonded and grounded rails) | Task | 8 | $ - 0 | $ - 0 | BASE | 51110a | 51110b | 51110c |
| 4003 | 5.1.4 | Mud Rails | Task | 4 | $ - 0 | $ - 0 | BASE | 51111a | 51111b | 51111c |
| 4003 | 5.1.4 | Grade crossing warning signs and signals | Task | 1 | $ - 0 | $ - 0 | BASE | 51112a | 51112b | 51112c |
| 4003 | 5.1.4 | Derails(part that attaches to the rail) | Task | 1 | $ - 0 | $ - 0 | BASE | 51113a | 51113b | 51113c |
| 4003 | 5.1.4 | Bumper stops | Task | 2 | $ - 0 | $ - 0 | BASE | 51114a | 51114b | 51114c |
| 4003 | 5.1.4 | Wheel stops | Task | 2 | $ - 0 | $ - 0 | BASE | 51115a | 51115b | 51115c |
| 4003 | 5.1.4 | Turnouts-Switch | Task | 2 | $ - 0 | $ - 0 | BASE | 51117a | 51117b | 51117c |
| 4003 | 5.1.4 | Turnouts-Grogs | Task | 1 | $ - 0 | $ - 0 | BASE | 51118a | 51118b | 51118c |
| 4003 | 5.1.4 | Turnouts-Guardrail | Task | 1 | $ - 0 | $ - 0 | BASE | 51119a | 51119b | 51119c |
| 4003 | 5.1.4 | Turnouts-Switch Stands including targets | Task | 1 | $ - 0 | $ - 0 | BASE | 51120a | 51120b | 51120c |
| 4003 | 5.1.4 | Turnouts-Connecting Rods | Task | 1 | $ - 0 | $ - 0 | BASE | 51121a | 51121b | 51121c |
| 4003 | 5.1.4 | Turnout-Switch Point Rail | Task | 1 | $ - 0 | $ - 0 | BASE | 51122a | 51122b | 51122c |
| 4003 | 5.1.4 | Turnout-Switch Rods | Task | 1 | $ - 0 | $ - 0 | BASE | 51123a | 51123b | 51123c |
| 4003 | 5.1.4 | Turnout-Switch Clips | Task | 1 | $ - 0 | $ - 0 | BASE | 51124a | 51124b | 51124c |
| 4003 | 5.1.4 | Turnout-Switch Heels | Task | 1 | $ - 0 | $ - 0 | BASE | 51125a | 51125b | 51125c |
| 4003 | 5.1.4 | Turnout-Rail Braces | Task | 1 | $ - 0 | $ - 0 | BASE | 51126a | 51126b | 51126c |
| 4003 | 5.1.4 | Turnout-Point Rail Stops | Task | 1 | $ - 0 | $ - 0 | BASE | 51127a | 51127b | 51127c |
| 4003 | 5.1.4 | (OTM) Tie Plates | Task | 1 | $ - 0 | $ - 0 | BASE | 51128a | 51128b | 51128c |
| 4003 | 5.1.4 | (OTM) Spikes | Task | 1 | $ - 0 | $ - 0 | BASE | 51129a | 51129b | 51129c |
| 4003 | 5.1.4 | (OTM) Hold down devices | Task | 1 | $ - 0 | $ - 0 | BASE | 51130a | 51130b | 51130c |
| 4003 | 5.1.4 | (OTM) Bolts, nuts, washers | Task | 1 | $ - 0 | $ - 0 | BASE | 51131a | 51131b | 51131c |
| 4003 | 5.1.4 | (OTM) Rail Anchors | Task | 1 | $ - 0 | $ - 0 | BASE | 51142a | 51142b | 51142c |
| 4003 | 5.1.4 | (OTM) Gage Rods | Task | 1 | $ - 0 | $ - 0 | BASE | 51132a | 51132b | 51132c |
| TOTAL MAINTENANCE REPAIR AND REPLACE COSTS | 1 | $0.00 |
| EMERGENCY CALL OUT FOR TRACK MAINTENANCE | Est Units | Unit Price | Total | ||||||
| 4004 | After hours emergency calls for track maintenance, repairs and replacement | Task | 1 | $ - 0 | $ - 0 | BASE | 51201a | 51201b | 51201c |
| TOTAL EMERGENCY CALL OUT FOR TRACK MAINTENANCE - COSTS | 1 | $0.00 |
| CONTRACT MANPOWER REPORTING | Est Units | Unit Price | Total | |||||||
| 4005 | 5.2 | Contract Manpower Reporting | Each | 1 | $ - 0 | $ - 0 | BASE | 51201a | 51201b | 51201c |
| TOTAL CONTRACT MANPOWER REPORTING - COSTS | 1 | $0.00 |
TOTAL COST OF THE CONTRACT $0.00