Attachment2_Bid_sheet.pdf
PDF 179 KB Posted
- Attached to
- Railroad Track Maintenance Ft. Wainwright
- Solicitation number
- W912D0-18-R-0025
About this file
Bid Sheet
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q&A3.pdf | ||
| Corrected_Attachment4_J14.xlsx | XLSX spreadsheet | |
| Corrected_Attachment4_J14.xlsx | XLSX spreadsheet | |
| Q&A2.pdf | ||
| Q&A.pdf | ||
| Attachment4_J14.XLSX | XLSX spreadsheet | |
| Attachment1_PWS.pdf | ||
| Attachment3_Wage_Det.pdf | ||
| CS_RR.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE YEAR
MAX
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE TOTAL CLIN COST
0001 12 Month
Inspect Railroad Track and Adjust and Lube All Switches
FFP
Inspect Railroad Track and Adjust and Lube All Switches in accordance with the PWS.
All specified tasks included within this Item Number (CLIN) are listed on the attachment J-14.
FOB: Destination
PSC CD: Z2LB
0002 1 Job
Snow and Vegetation Removal
Remove snow and vegetation from all tracks and switches on Fort Wainwright, AK.
All specified tasks included within this Item Number (CLIN) are listed on the Attachment J-14.
0003 1 Job
Maintenance Repair and Replace
Repair, replace Track maintenance provide all labor, tools, transportation and equipment.
All specified tasks included within this Item Number (CLIN) are listed on the Attachment J-14.
0004 1 Job
Emergency call out for track maintenance
Emergency call out for Track Maintenance with includes repairs to railway defects and provide all labor, tools, transportation and equipment. All specified task included with this Item Number (CLIN) are Listed on the Attachment J-14.
0005 1 EA
Contractor Manpower Reporting
Contractor Manpower Reporting
OPTION YEAR 1
1001 12 Month
Inspect Railroad Track and Adjust and Lube All Switches in accordance with the PWS.
All specified tasks included within this Item Number (CLIN) are listed on the Attachment J-14.
1002 1 Job
Remove snow and vegetation from all tracks and switches on Fort Wainwright, AK.
All specified tasks included within this Item Number (CLIN) are listed on the Attachment J-14.
1003 1 Job
Repair, replace Track maintenance provide all labor, tools, transportation and equipment.
All specified tasks included within this Item Number (CLIN) are listed on the Attachment J-14.
1004 1 Job
Emergency call out for Track Maintenance with includes repairs to railway defects and provide all labor, tools, transportation and equipment. All specified task included with this Item Number (CLIN) are listed on the Attachment J-14.
1005 1 EA
Contractor Manpower Reporting
OPTION YEAR 2
2001 12 Month
Inspect Railroad Track and Adjust and Lube All Switches in accordance with the PWS.
All specified tasks included within this Item Number (CLIN) are listed on the Attachment J-14.
2002 1 Job
Remove snow and vegetation from all tracks and switches on Fort Wainwright, AK.
All specified tasks included within this Item Number (CLIN) are listed on the Attachment J-14.
2003 1 Job
Repair, replace Track maintenance provide all labor, tools, transportation and equipment.
All specified tasks included within this Item Number (CLIN) are listed on the Attachment J-14.
2004 1 Job
Emergency call out for Track Maintenance with includes repairs to railway defects and provide all labor, tools, transportation and equipment. All specified task included with this Item Number (CLIN) are listed on the Attachment J-14.
2005 1 EA
Contractor Manpower Reporting
OPTION YEAR 3
3001 12 Month
Inspect Railroad Track and Adjust and Lube All Switches in accordance with the PWS.
All specified tasks included within this Item Number (CLIN) are listed on the Attachment J-14.
3002 1 Job
Remove snow and vegetation from all tracks and switches on Fort Wainwright, AK.
Attachment J-14.
3003 1 Job
Repair, replace Track maintenance provide all labor, tools, transportation and equipment.
All specified tasks included within this Item Number (CLIN) are listed on the Attachment J-14.
3004 1 Job
Emergency call out for Track Maintenance with includes repairs to railway defects and provide all labor, tools, transportation and equipment. All specified task included with this Item Number (CLIN) are listed on the Attachment J-14.
3005 1 EA
Contractor Manpower Reporting
OPTION YEAR 4
4001 12 Month
Inspect Railroad Track and Adjust and Lube All Switches in accordance with the PWS.
Attachment J-14.
4002 1 Job
Remove snow and vegetation from all tracks and switches on Fort Wainwright, AK.
All specified tasks included within this Item Number (CLIN) are listed on the Attachment J-14.
4003 1 Job
Repair, replace Track maintenance provide all labor, tools, transportation and equipment.
All specified tasks included within this Item Number (CLIN) are listed on the Attachment J-14.
4004 1 Job
Emergency call out for Track Maintenance with includes repairs to railway defects and provide all labor, tools, transportation and equipment. All specified task included with this Item Number (CLIN) are listed on the Attachment J-14.
4005 1 EA
Contractor Manpower Reporting
TOTAL CONTRACT
COST:
File details come from the government source that posted it.